IR 05000275/2013502: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML14198A633 | | number = ML14198A633 | ||
| issue date = 07/17/2014 | | issue date = 07/17/2014 | ||
| title = | | title = NRC Emergency Preparedness Annual Inspection Report 05000275/2013502 and 05000323/2013502 | ||
| author name = Haire M S | | author name = Haire M S | ||
| author affiliation = NRC/RGN-IV/DRS | | author affiliation = NRC/RGN-IV/DRS | ||
Revision as of 17:14, 7 February 2019
| ML14198A633 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/17/2014 |
| From: | Haire M S Division of Reactor Safety IV |
| To: | Halpin E D Pacific Gas & Electric Co |
| References | |
| IR-13-502 | |
| Download: ML14198A633 (2) | |
Text
July 17, 2014
Mr. Edward Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company
Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2013502 AND
Dear Mr. Halpin:
On December 31, 2013, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Diablo Canyon Power Plant, Units 1 and 2. This inspection began on January 1, 2013. Issuance of this letter closes NRC Inspection Report 05000275/2013502 and 05000323/2013502. The inspection results associated with the 2013-502 reports are documented in integrated Resident Inspector Reports 2013-002, 2013-003, 2013-004, and 2013-005.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety
Dockets: 50-275; 50-323
Electronic Distribution Diablo Canyon Power Plant UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511
July 17, 2014
Mr. Edward Senior Vice President and
Chief Nuclear Officer Pacific Gas and Electric Company
Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2013502 AND
Dear Mr. Halpin:
On December 31, 2013, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Diablo Canyon Power Plant, Units 1 and 2. This inspection began on January 1, 2013. Issuance of this letter closes NRC Inspection Report 05000275/2013502 and 05000323/2013502. The inspection results associated with the 2013-502 reports are documented in integrated Resident Inspector Reports
2013-002, 2013-003, 2013-004, and 2013-005.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety
Dockets: 50-275; 50-323
Electronic Distribution Diablo Canyon Power Plant Distribution
- M. Haire P. Elkmann L. Williams DOCUMENT NAME: R:\_REACTORS\_DC\DC2013502-LTR-pje.docx ML14198A633 SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE C:PSB1 NAME MHaire/dch SIGNATURE /RA/ DATE 7/17/14 OFFICIAL RECORD COPY