ML16190A264: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML16190A264
| number = ML16190A264
| issue date = 07/08/2016
| issue date = 07/08/2016
| title = Comanche Peak Nuclear Power Plant Units 1 and 2 - NRC Initial Operator Licensing Examination Approval 05000445/2016301; 05000446/2016301
| title = NRC Initial Operator Licensing Examination Approval 05000445/2016301; 05000446/2016301
| author name = Gaddy V
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB

Revision as of 03:39, 2 February 2019

NRC Initial Operator Licensing Examination Approval 05000445/2016301; 05000446/2016301
ML16190A264
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/08/2016
From: Vincent Gaddy
Operations Branch IV
To: Peters K
Luminant Generation Co
References
ES-201-4
Download: ML16190A264 (3)


See also: IR 05000445/2016301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV 1600 E LAMAR BLVD

ARLINGTON, TX 76011

-4511 July 8, 2016

Ken Peters, Senior Vice President

and Chief Nuclear Officer

Attention: Regulatory Affairs

Luminant Generation Company LLC

Comanche Peak Nuclear Power Plant

P.O. Box 1002

Glen Rose, TX 76043

SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL

05000445/201

6 301; 05000446/2016301 Dear Mr. Peters:

The purpose of this letter is to confirm the final arrangements for the upcoming operator

licensing examinations at

the Comanche Peak Nuclear Power Plant, Units 1 and 2.

The NRC has completed its review of the operator license applications submitted in connection

with this examination and separately provided a list of approved applicants to

R. Blankenship, Facility Representative. Note that any examination waivers and application denials

have been addressed in separate

correspondence.

The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations and you may administer the written examinations in accordance with Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," on

July 18, 2016. The NRC staff will

administer the operating tests during the week of July 11, 2016. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the

guidelines of

NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also

agree that it meets NUREG

-1021 guidelines, and is appropriate for

measuring the qualifications of licensed operator applicants at your facility. If you determine that

this examination is not appropriate for licensing operators at your facility, do not administer the

examination and contact me at (817) 200

-1159. Please contact your Chief Examiner, Brian Larson, at (817) 200

-1172, if you have any questions

or identify any errors or changes in the license level (RO

or SRO) or type of examination (partial

or complete written examination and/or operating test) specified for each applicant.

Sincerely,

/RA/ Vincent Gaddy, Chief Operations Branch

Division of Reactor Safety

Luminant Generation Company LP - 2 - Dockets: 50

-445; 50-446 Licenses: NPF-87; NPF-89 Enclosure:

ES-201-4

cc w/enclosure:

R. Blankenship

Luminant Generation Company LLC

Comanche Peak Nuclear Power Plant

P.O. Box 1002

Glen Rose, TX 76043

-1147 cc w/o enclosure:

Distribution via ListServ for

Comanche Peak

Luminant Generation Company LP - 3 - Electronic distribution by RIV: Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Jeffrey.Josey@nrc.gov) Resident Inspector (Rayomand.Kumana@nrc.gov)

Administrative Assistant (Rhonda.Smith@nrc.gov)

Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)

Project Engineer, DRP/A (Matthew.Kirk@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (Margaret.Watford@nrc.gov) Team Leader, DRS/TSS (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov) Branch Chief, DRS/OB (Vincent.Gaddy@nrc.gov)

X SUNSI Review

By: lah ADAMS X Yes No X Publicly Available

Non-Publicly Available

X Non-Sensitive Sensitive Keyword: NRR-079 OFFICE RIV:DRS:OB

SOE:OB C:OB NAME LAHurley BTLarson VGGaddy SIGNATURE /RA/ /RA/ /RA/ DATE 06/28/16 07/06/16 07/07/16 OFFICIAL RECORD COPY