HNP-13-071, 90-Day Inservice Inspection Summary Report Corrections: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
(No difference)
|
Revision as of 12:18, 29 January 2019
| ML13177A279 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/26/2013 |
| From: | Corlett D H Duke Energy Corp, Carolina Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| HNP-13-071 | |
| Download: ML13177A279 (6) | |
Text
ENERGY June 26 , 2013 Serial: HNP-13-071 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington , DC 20555 Shearon Harris Nuclear Power Plant , Unit 1 Docket No. 50-400
Subject:
90-Day lnservice Inspection Summary Report Corrections Ladies and Gentlemen: David H. Corlett Manager , Regu l atory Affairs Harris Nuclear Plant 5413 Shearon Harris Road New Hill NC 27562-9300 919.362.3137 10 CFR 50.55a By letter HNP-12-091 dated September 5, 2012 , Carolina Power & Light Company submitted an lnservice Inspection Summary Report for the Harris Nuclear Plant. The report was prepared in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code , 2001 Edition with addenda through 2003 as amended by ASME Code Case N-532-4,Section XI , Division 1. The report was for Harris Nuclear Plant's Cycle 17 Operat i ons and Refueling Outage 17 of the third 1 0-year lnserv i ce Inspection interval.
Harris staff identified errors that warranted correction in the submitted report. Enclosed is a revised inservice inspection summary report with changes marked by revision bars in the margin. This document contains no new regulatory commitments. Please refer any questions regarding this submittal to Mr. John Caves at (919) 362-2406.
Sincerely , David H. Corlett
Enclosure:
Revised 90-Day lnservice Inspection Summary Report cc: Mr. J. D. Austin , NRC Sr. Resident Inspector , HNP Ms. A. T. Billoch Colon , NRC Project Manager , HNP Mr. V. M. McCree , NRC Regional Administrator , Region II 1 Summary The Shearon Harris Nuclear Power Plant, Unit 1, Third Ten Year Inservice Inspection (ISI) Plan complies with 10CFR50.55a (g), which implements, by reference, the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 2001 Edition with 2003 Addenda.
This summary report is being submitted pursuant to the reporting requirements of ASME Sec tion XI as amended by ASME Code Case N-532-4 Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission Section XI, Division 1. Contained within this summary report are the form OAR
-1 (Owner's Activity Report) and Tables 1 and 2 of Code Case N-532-4 for Harris Nuclear Plant during cycle 17 and Refueling Outage 17 (RFO-17). RFO-17 is the second outage of the second period in the third inspection interval and includes the Repair/Replacement activities from February 4, 2011 through August 28, 2012. During inspection of the Reactor Pressure Vessel Head (RPVH) Control Rod Drive Mechanism (CRDM) nozzle penetrations, flaws were discovered in four nozzles and were subsequently repaired. Refer to Table 2 of this report for an abstract of repair/replacement activities required for continued service.
CASES OF ASME BOILER AND PRESSURE VESSEL CODE FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: __
___ Piant: _ ___.!.H.!!a!.!.r.!.!ri:..s
!-r . .LHl.!!a.!.!rr..!iisuR!!.!o,!!a!..!,d!....
- cJ.N!.!e'-!w!....!..!H!.!.ii!L.
I.
Unit No.: _I_ Commercial Service Date: --'M-'-'-""ay
..... 2,....'-'1""9""8" Refueling Outage __,RcuF...,0"-'--=1"-7
_________
_ Current Inspection Interval:
__
_____ Current Inspection Period: __
____ _ Edition and Addenda of Section XI Applicable to the Inspection Plans: __
_____ _ Date and Revision of Inspect i on Pia ns: ___
Edition and Addenda of Section XI Applicable to Repair/Replacement Activities, if Different than the Inspection Plans: __!:1/.A_
Code Cases Used: N-460, N-532-4. N-685. N-722-1. N-729-1. N-770-1. N-638-1 Certificate of Conformance lSI Inspections 1 certify that (a) the statements made in this report are correct; and (b) the examinations and tests meet the Inspection Plan as
- required by he ASME Code,Section XI; and the completion of RF0-17 conform to the requirements of Section XI.
Angela Staller, lSI Program Manager Date J/q/20/3 u Certificate of Conformance lSI Repair/Replacement 1 certify that (a) the statements made in this report are correct; and (b) the repa i r/replacement activ i ties and evaluat i ons supporting the completion of RF0-17 conform to the requirements of Section XI. Wayne Holley, Repair/Replacement PM Certificate of lnservice Inspection Date 1/q fzo!3 # I 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pres ure Vessel Inspectors and the State or Prov i nce of North Carolina and employed by HSBCT of Hartford, CT have inspected the i tems described in this Owner's Activity Report, and state that , to the best of my knowledge and belief, the Owner has performed all act i vities represented by this report in accordance with the requirements of Section XI. By sign i ng this certificate ne i the r the Inspector nor his employer makes any warranty, expressed or implied, con c ern i ng the repa i r/replacement activities and evaluation described in this report. Furthermore, neithe r the Inspector nor hi s employer shall be liable in any manner for any personal i njury or property damage or a loss of any ki nd arising fr om or connected with this inspection. _____ Commissions
,./.tz.W-z. ln s pec t 01gnature National Board , State , Province , and Endorsements 2
3 Table 1 Items with Flaws or Relevant Conditions That Required Evaluation For Continued Service Examination Category and Item Number Item Description Evaluation Description None None None
4 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service Code Class Item Description/Component ID Description of Work Date Completed Repair/Replacement Plan Number Class 2 1CS-748 Replace valve due to leakby 4/19/2011 WO 1461983
-03 Class 2 1CS-207 Replace valve disc due to leakby 4/19/2011 WO 1834256
-01 Class 1 1RC-E001 Reactor Vessel Head, CRDM Housing, Partial Penetration Weld in accordance with Code Case N
-729-1, Nozzle 5 CRDM Inside Diameter Temper Bead Weld Repair of Nozzle 5 (Ref. RR I 3R-09) 5/25/12 WO 1091074
-11 Class 1 1RC-E001 Reactor Vessel Head, CRDM Housing, Partial Penetration Weld in accordance with Code Case N
-729-1, Nozzle 17 CRDM Inside Diameter Temper Bead Weld Repair of Nozzle 17 (Ref. RR I 3R-09) 5/25/12 WO 1091074
-11 Class 1 1RC-E001 Reactor Vessel Head, CRDM Housing, Partial Penetration Weld in accordance with Code Case N
-729-1, Nozzle 38 CRDM Inside Diameter Temper Bead Weld Repair of Nozzle 38 (Ref. RR I 3R-09) 5/25/12 WO 1091074
-11 Class 1 1RC-E001 Reactor Vessel Head, CRDM Housing, Partial Penetration Weld in accordance with Code Case N
-729-1, Nozzle 63 CRDM Inside Diameter Temper Bead Weld Repair of Nozzle 63 (Ref. RR I 3R-09) 5/25/12 WO 1091074
-11 Class 2 1CS-750 Replace disk to repair seat leak 5/28/2012 WO 1841770-01 Class 2 1MS-51 Replace leaking relief valve and inlet nuts 7/17/2012 WO 01893435
-01 Class 2 1CS-227 Replace valve plug due to poor seating 7/17/2012 WO 02007787
-01 Class 2 1MS-82 Replace bonnet studs and nuts 7/23/2012 WO 2074702
-09 Class 2 1MS-80 Replace bonnet studs and nuts 7/23/2012 WO 02077265
-06 Class 2 1MS-84 Replace bonnet nuts and studs 7/23/2012 WO 01832703
-11 Class 1 1RC-E001 Repair threads on reactor vessel stud 7/24/2012 WO 2077023
-01 Class 2 1CT-68 Replace valve due to leakby 7/30/2012 WO 0676149
-13 5 Code Class Item Description/Component ID Description of Work Date Completed Repair/Replacement Plan Number Class 2 1FP-349 Replace valve due to LLRT leakage; replace pipe from valve to penetration due to corrosion 7/30/2012 WO 1857906-01 Class 2 1CS-748 Replace valve due to seat damage 7/30/2012 WO 01986798
-05 Class 2 1MS-230 Replace valve due to seat leakage 7/30/2012 WO 01852124
-08 Class 2 1MS-229 Replace valve due to seat leakage 7/30/2012 WO 01852124
-07 Class 2 1CT-81 Replace valve due to leakage 7/30/2012 WO 676150-11 Class 2 1CV-E004 Replace leaking AH
-3 cooling coil 7/31/2012 WO 01888117
-01 Class 2 1CS-344 Replace check valve due to LLRT failure 7/31/2012 WO 1876405
-01 Class 2 1RH-HXA Replace Main Flange Bolting 7/31/2012 WO 02040559
-01 Class 2 1MS-60 Replace disc/stem assembly 8/1/2012 WO 858184-01