IR 05000020/2018201: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML18116A521
| number = ML18324A858
| issue date = 05/02/2018
| issue date = 12/07/2018
| title = Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Route Inspection Report No. 5000020/2018-201
| title = Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000020/2018201
| author name = Mendiola A J
| author name = Mendiola A J
| author affiliation = NRC/NRR/DLP/PROB
| author affiliation = NRC/NRR/DLP/PROB
Line 9: Line 9:
| docket = 05000020
| docket = 05000020
| license number = R-037
| license number = R-037
| contact person = Eads J H
| contact person = Takacs M, NRR/DLP 415-2042
| document report number = IR 218201
| document report number = IR 2018201
| document type = Inspection Report, Letter
| document type = Inspection Report, Letter
| page count = 17
| page count = 16
}}
}}


Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:Code of Federal Regulations
[[Issue date::May 2, 2018]]
/RA/


Mr. Alberto Queirolo , Director of Reactor Operations Nuclear Reactor Laboratory Massachusetts Institute of Technology 138 Albany Street, MS NW12-116A Cambridge, MA 02139
*
*********
**
*****
*
Code of Federal Regulations ***


SUBJECT: MASSACHUSETTS INSTITUTE OF TECHNOLOGY
**
- U.S. NUCLEAR REGULATORY COMMISSION ROUTINE INSPECTION REPORT NO. 50-020/201 8-201
*
**


==Dear Mr. Queirolo:==
***
From March 5
-8, 2018, the U.S. Nuclear Regulatory Commission (NRC) conducted an inspection at your Massachusetts Institute of Technology Research Reactor. The enclosed report presents the results of that inspection, which were discussed on March 8, 2018, with members of your staff.


The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selective procedures and records, observed various activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified. No response to this letter is required.
*****


In accordance with Title 10 of the Code of Federal Regulations Section 2.390, "Public inspections, exemptions, requests for withholding," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (Agencywide Documents Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
Code of Federal Regulations
-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this inspection, please contact Mr. Johnny Eads at (301) 415-0136 or by electronic mail at Johnny.Eads@nrc.gov
.
 
Sincerely,/RA/ Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No.
 
50-020 License No. R
-37
 
===Enclosure:===
As stated cc: See next page
}}
}}

Revision as of 19:36, 22 January 2019

Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000020/2018201
ML18324A858
Person / Time
Site: MIT Nuclear Research Reactor
Issue date: 12/07/2018
From: Mendiola A J
Research and Test Reactors Oversight Projects Branch
To: Queirolo A
Massachusetts Institute of Technology (MIT)
Takacs M, NRR/DLP 415-2042
References
IR 2018201
Download: ML18324A858 (16)


Text

Code of Federal Regulations

/RA/

Code of Federal Regulations ***

Code of Federal Regulations