{{Adams|number = ML061660217}}
{{Adams
| number = ML061660217
| issue date = 06/14/2006
| title = IR 05000277-06-008, 05000278-06-008; 05/01/2006 - 05/05/2006; Peach Bottom Atomic Power Station, Units 2 and 3, Physical Protection
| author name = Lorson R K
| author affiliation = NRC/RGN-I/DRP
| addressee name = Crane C M
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000277, 05000278
| license number = DPR-044, DPR-056
| contact person =
| document report number = IR-06-008
| document type = Letter
| page count = 4
}}


{{IR-Nav| site = 05000277 | year = 2006 | report number = 008 }}
{{IR-Nav| site = 05000277 | year = 2006 | report number = 008 }}
Line 7: Line 21:
[[Issue date::June 14, 2006]]
[[Issue date::June 14, 2006]]


Enclosure Contains Safeguards Information.When Separated from enclosure, this document is not Safeguards Information. Mr. Christopher President and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348
Enclosure Contains Safeguards Information.When Separated from enclosure, this  


SUBJECT: PEACH BOTTOM ATOMIC POWER STATION - NRC SECURITY INSPECTIONREPORT NOS. 05000277/2006008 AND 05000278/2006008
document is not Safeguards Information.
 
Mr. Christopher President and CNO
 
Exelon Nuclear
 
Exelon Generation Company, LLC
 
200 Exelon Way
 
Kennett Square, PA 19348
 
SUBJECT: PEACH BOTTOM ATOMIC POWER STATION - NRC SECURITY INSPECTION REPORT NOS. 05000277/2006008 AND 05000278/2006008


==Dear Mr. Crane:==
==Dear Mr. Crane:==
On May 5, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baselineinspection at your Peach Bottom Atomic Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on May 5, 2006, with Mr. Joe Grimes, Plant Manager, and other members of your staff.The inspection examined activities conducted under your licenses as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Warning: Violation of section 147 of the AtomicEnergy Act, "Safeguards Information" is subject to civil and criminal penalties DETERMINATION MADE BY:
On May 5, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Peach Bottom Atomic Power Station. The inspection covered one or more of
NAME/TITLE: Raymond K. Lorson, ChiefORGANIZATION: RI/DRS/PSB1BASIS: DG-SG-1:_(300) Physical Protection ProgramSIGNATURE__/RA/_____________ DATE:_06/13/06_No findings of significance were identified. Mr. C. Crane2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from thePublicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS isaccessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptableresponse, please provide the level of protection described in 10 CFR 73.21.
 
the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The
 
enclosed report documents the inspection results, which were discussed on May 5, 2006, with
 
Mr. Joe Grimes, Plant Manager, and other members of your staff.
 
The inspection examined activities conducted under y our licenses as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your


Sincerely,/RA/Raymond K. Lorson, ChiefPlant Support Branch 1 Division of Reactor SafetyDocket Nos.50-277, 50-278License Nos.DPR-44, DPR-56
licenses. The inspectors reviewed selected procedures and records, observed activities, and
 
interviewed personnel.Warning: Violation of section 147 of the AtomicEnergy Act, "Safeguards Information" is subject to civil and criminal penalties DETERMINATION MADE BY:
NAME/TITLE: Raymond K. Lorson, ChiefORGANIZATION: RI/DRS/PSB1BASIS: DG-SG-1:_(300) Physical Protection ProgramSIGNATURE__/RA/_____________ DATE:_06/13/06
_No findings of significance were identified. Mr. C. Crane2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the
 
enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be
 
available for public inspection.
 
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's
 
document system, ADAMS. If Safeguards Inform ation is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
 
Sincerely,/RA/Raymond K. Lorson, Chief Plant Support Branch 1
 
Division of Reactor SafetyDocket Nos.50-277, 50-278License Nos.DPR-44, DPR-56


===Enclosure:===
===Enclosure:===
NRC Inspection Report Nos. 05000277/2006008 and 05000278/2006008  
NRC Inspection Report Nos. 05000277/2006008 and 05000278/2006008


===w/Attachment:===
===w/Attachment:===
Supplemental Information (CONTAINS (SGI)cc w/encl; w/SGIW. Trump, Manager - Nuclear SecurityD. Allard, Director, Bureau of Radiation Protection State of PA G. Aburn, Maryland Department of the Environment M
Supplemental Information (CONTAINS (SGI)
cc w/encl; w/SGI W. Trump, Manager - Nuclear Security D. Allard, Director, Bureau of Radiation Protection State of PA
 
G. Aburn, Maryland Department of the Environment M
}}
}}

Revision as of 08:05, 27 October 2018

IR 05000277-06-008, 05000278-06-008; 05/01/2006 - 05/05/2006; Peach Bottom Atomic Power Station, Units 2 and 3, Physical Protection
ML061660217
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/14/2006
From: Lorson R K
Division Reactor Projects I
To: Crane C M
Exelon Generation Co, Exelon Nuclear
References
IR-06-008
Download: ML061660217 (4)


Text

June 14, 2006

Enclosure Contains Safeguards Information.When Separated from enclosure, this

document is not Safeguards Information.

Mr. Christopher President and CNO

Exelon Nuclear

Exelon Generation Company, LLC

200 Exelon Way

Kennett Square, PA 19348

SUBJECT: PEACH BOTTOM ATOMIC POWER STATION - NRC SECURITY INSPECTION REPORT NOS. 05000277/2006008 AND 05000278/2006008

Dear Mr. Crane:

On May 5, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Peach Bottom Atomic Power Station. The inspection covered one or more of

the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The

enclosed report documents the inspection results, which were discussed on May 5, 2006, with

Mr. Joe Grimes, Plant Manager, and other members of your staff.

The inspection examined activities conducted under y our licenses as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your

licenses. The inspectors reviewed selected procedures and records, observed activities, and

interviewed personnel.Warning: Violation of section 147 of the AtomicEnergy Act, "Safeguards Information" is subject to civil and criminal penalties DETERMINATION MADE BY:

NAME/TITLE: Raymond K. Lorson, ChiefORGANIZATION: RI/DRS/PSB1BASIS: DG-SG-1:_(300) Physical Protection ProgramSIGNATURE__/RA/_____________ DATE:_06/13/06

_No findings of significance were identified. Mr. C. Crane2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the

enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be

available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's

document system, ADAMS. If Safeguards Inform ation is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Sincerely,/RA/Raymond K. Lorson, Chief Plant Support Branch 1

Division of Reactor SafetyDocket Nos.50-277, 50-278License Nos.DPR-44, DPR-56

Enclosure:

NRC Inspection Report Nos. 05000277/2006008 and 05000278/2006008

w/Attachment:

Supplemental Information (CONTAINS (SGI)

cc w/encl; w/SGI W. Trump, Manager - Nuclear Security D. Allard, Director, Bureau of Radiation Protection State of PA

G. Aburn, Maryland Department of the Environment M