IR 05000293/2006008: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams|number = ML062070396}}
{{Adams
| number = ML062070396
| issue date = 07/26/2006
| title = IR 05000293-06-008; 06/12/2006-06/16/2006; Pilgrim Nuclear Power Station; Physical Protection
| author name = Lorson R K
| author affiliation = NRC/RGN-I/DRS/PSB1
| addressee name = Balduzzi M A
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000293
| license number = DPR-035
| contact person =
| document report number = IR-06-008
| document type = Inspection Report, Letter
| page count = 4
}}


{{IR-Nav| site = 05000293 | year = 2006 | report number = 008 }}
{{IR-Nav| site = 05000293 | year = 2006 | report number = 008 }}
Line 7: Line 21:
[[Issue date::July 26, 2006]]
[[Issue date::July 26, 2006]]


Enclosure Contains Safeguards Information.When Separated from enclosure, this document is not Safeguards Information. Mr. Michael BalduzziSite Vice President Entergy Nuclear Operations, Inc.
Enclosure Contains Safeguards Information.When Separated from enclosure, this  


Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
document is not Safeguards Information.


SUBJECT: PILGRIM NUCLEAR POWER STATION - NRC PHYSICAL SECURITYBASELINE INSPECTION REPORT NO. 05000293/2006008
Mr. Michael Balduzzi Site Vice President
 
Entergy Nuclear Operations, Inc.
 
Pilgrim Nuclear Power Station
 
600 Rocky Hill Road
 
Plymouth, MA 02360-5508
 
SUBJECT: PILGRIM NUCLEAR POWER STATION - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NO. 05000293/2006008


==Dear Mr. Balduzzi:==
==Dear Mr. Balduzzi:==
On June 16, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at your Pilgrim Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on June 16, 2006, with Mr. Fred Marcussen, Security Manager, and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.
On June 16, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Pilgrim Nuclear Power Station. The inspection covered one or more
 
of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The
 
enclosed report documents the inspection results, which were discussed on June 16, 2006, with
 
Mr. Fred Marcussen, Security Manager, and other members of your staff.
 
The inspection examined activities conducted under y our license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
 
The inspectors reviewed selected procedures and records, observed activities, and interviewed


The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Warning: Violation of section 147 of the AtomicEnergy Act, "Safeguards Information" is subject to civil and criminal penalties DETERMINATION MADE BY:
personnel.Warning: Violation of section 147 of the AtomicEnergy Act, "Safeguards Information" is subject to civil and criminal penalties DETERMINATION MADE BY:
NAME/TITLE: Raymond K. Lorson, ChiefORGANIZATION: RI/DRS/PSB1BASIS: DG-SG-1:_(300) Physical Protection ProgramSIGNATURE____/RA/___________ DATE:_07/26/06_ M. Balduzzi2 No findings of significance were identified.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from thePublicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS isaccessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptableresponse, please provide the level of protection described in 10 CFR 73.21.
NAME/TITLE: Raymond K. Lorson, ChiefORGANIZATION: RI/DRS/PSB1BASIS: DG-SG-1:_(300) Physical Protection ProgramSIGNATURE____/RA/___________ DATE:_07/26/06
_ M. Balduzzi2 No findings of significance were identified.


Sincerely,/RA/Raymond K. Lorson, ChiefPlant Support Branch 1 Division of Reactor SafetyDocket Nos.50-293License Nos.DPR-35
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the
 
enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be
 
available for public inspection.
 
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's
 
document system, ADAMS. If Safeguards Inform ation is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
 
Sincerely,/RA/Raymond K. Lorson, Chief Plant Support Branch 1
 
Division of Reactor SafetyDocket Nos.50-293License Nos.DPR-35


===Enclosure:===
===Enclosure:===
NRC Inspection Report No. 05000293/2006008(CONTAINS (SGI)cc w/encl; w/SGIF. Marcussen, Manager - Nuclear SecurityC. McCombs, Director, Massachusetts Emergency Management Agencycc w/o encl w/o SGI:G. J. Taylor, Chief Executive Officer, Entergy Operations M. Kansler, President, Entergy Nuclear Operations, Inc.
NRC Inspection Report No. 05000293/2006008 (CONTAINS (SGI)
cc w/encl; w/SGI F. Marcussen, Manager - Nuclear Security C. McCombs, Director, Massachusetts Emergency Management Agency cc w/o encl w/o SGI
: G. J. Taylor, Chief Executive Officer, Entergy Operations
 
M. Kansler, President, Entergy Nuclear Operations, Inc.
 
J. T. Herron, Senior Vice President and Chief Operating Officer
 
C. Schwarz, Vice-President, Operations Support
 
S. J. Bethay, Director, Nuclear Safety Assurance
 
O. Limpias, Vice President, Engineering
 
J. F. McCann, Director, Licensing
 
C. D. Faison, Manager, Licensing


J. T. Herron, Senior Vice President and Chief Operating Officer C. Schwarz, Vice-President, Operations Support S. J. Bethay, Director, Nuclear Safety Assurance O. Limpias, Vice President, Engineering J. F. McCann, Director, Licensing C. D. Faison, Manager, Licensing M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.
M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.


B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, In
B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, In
}}
}}

Revision as of 21:01, 26 October 2018

IR 05000293-06-008; 06/12/2006-06/16/2006; Pilgrim Nuclear Power Station; Physical Protection
ML062070396
Person / Time
Site: Pilgrim
Issue date: 07/26/2006
From: Lorson R K
Plant Support Branch 1
To: Balduzzi M A
Entergy Nuclear Operations
References
IR-06-008
Download: ML062070396 (4)


Text

July 26, 2006

Enclosure Contains Safeguards Information.When Separated from enclosure, this

document is not Safeguards Information.

Mr. Michael Balduzzi Site Vice President

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station

600 Rocky Hill Road

Plymouth, MA 02360-5508

SUBJECT: PILGRIM NUCLEAR POWER STATION - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NO. 05000293/2006008

Dear Mr. Balduzzi:

On June 16, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Pilgrim Nuclear Power Station. The inspection covered one or more

of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The

enclosed report documents the inspection results, which were discussed on June 16, 2006, with

Mr. Fred Marcussen, Security Manager, and other members of your staff.

The inspection examined activities conducted under y our license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel.Warning: Violation of section 147 of the AtomicEnergy Act, "Safeguards Information" is subject to civil and criminal penalties DETERMINATION MADE BY:

NAME/TITLE: Raymond K. Lorson, ChiefORGANIZATION: RI/DRS/PSB1BASIS: DG-SG-1:_(300) Physical Protection ProgramSIGNATURE____/RA/___________ DATE:_07/26/06

_ M. Balduzzi2 No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the

enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be

available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's

document system, ADAMS. If Safeguards Inform ation is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Sincerely,/RA/Raymond K. Lorson, Chief Plant Support Branch 1

Division of Reactor SafetyDocket Nos.50-293License Nos.DPR-35

Enclosure:

NRC Inspection Report No. 05000293/2006008 (CONTAINS (SGI)

cc w/encl; w/SGI F. Marcussen, Manager - Nuclear Security C. McCombs, Director, Massachusetts Emergency Management Agency cc w/o encl w/o SGI

G. J. Taylor, Chief Executive Officer, Entergy Operations

M. Kansler, President, Entergy Nuclear Operations, Inc.

J. T. Herron, Senior Vice President and Chief Operating Officer

C. Schwarz, Vice-President, Operations Support

S. J. Bethay, Director, Nuclear Safety Assurance

O. Limpias, Vice President, Engineering

J. F. McCann, Director, Licensing

C. D. Faison, Manager, Licensing

M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.

B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, In