ML092600643: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:Kewaunee Power StationNRC Agenda Setting MeetingALDENSolving flow problems since 1894ALDENNRC Agenda Setting Meeting9/15/2009 | ||
*No concentrated spray and drainage sources are located in the immediate vicinity of the strainer*The closest source is modeled in the transport calculation and the flume wall calculation*The influence of the source can be seen in the calculated approach velocity profile*The drainage source influence was represented in the large flume testRAI E9j: RAI E9j: Concentrated sources of drainageConcentrated sources of drainageALDENSolving flow problems since 1894ALDEN Kewaunee Power StationNRC Agenda Setting MeetingALDENSolving flow problems since 1894ALDENNRC Agenda Setting Meeting9/15/2009 | |||
*No concentrated spray and drainage sources are located in the immediate vicinity of the strainer*The closest source is modeled in the transport calculation and the flume wall calculation*The influence of the source can be seen in the calculated approach velocity profile*The drainage source influence was represented in the large flume testRAI E9j: RAI E9j: Concentrated sources of drainageConcentrated sources of drainageALDENSolving flow problems since 1894ALDEN}} | |||
Revision as of 20:21, 19 September 2018
| ML092600643 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 09/15/2009 |
| From: | Dominion Energy Kewaunee |
| To: | Office of Nuclear Reactor Regulation |
| Tam P S | |
| Shared Package | |
| ML092600030 | List: |
| References | |
| TAC MC4691 | |
| Download: ML092600643 (7) | |
Text
Kewaunee Power StationNRC Agenda Setting MeetingALDENSolving flow problems since 1894ALDENNRC Agenda Setting Meeting9/15/2009
- No concentrated spray and drainage sources are located in the immediate vicinity of the strainer*The closest source is modeled in the transport calculation and the flume wall calculation*The influence of the source can be seen in the calculated approach velocity profile*The drainage source influence was represented in the large flume testRAI E9j: RAI E9j: Concentrated sources of drainageConcentrated sources of drainageALDENSolving flow problems since 1894ALDEN Kewaunee Power StationNRC Agenda Setting MeetingALDENSolving flow problems since 1894ALDENNRC Agenda Setting Meeting9/15/2009
- No concentrated spray and drainage sources are located in the immediate vicinity of the strainer*The closest source is modeled in the transport calculation and the flume wall calculation*The influence of the source can be seen in the calculated approach velocity profile*The drainage source influence was represented in the large flume testRAI E9j: RAI E9j: Concentrated sources of drainageConcentrated sources of drainageALDENSolving flow problems since 1894ALDEN