Line 13: Line 13:
| Inspection procedure = IP 71111.19
| Inspection procedure = IP 71111.19
| Inspector = M Young, N Day, A Athar, J Kozal
| Inspector = M Young, N Day, A Athar, J Kozal
| CCA = H4a
| CCA =  
| INPO aspect = QA.4
| INPO aspect = QA.4
| description = The inspectors reviewed a self-revealed non-cited violation of Technical Specification 5.4.1.a, Procedures, for the licensees failure to have adequate procedural guidance while performing a standby service water surveillance procedure. Specifically, the licensees procedural guidance was not adequate to prevent the control room air conditioning subsystem B compressor from starting while condenser cooling water was isolated, which caused damage and rendered the subsystem inoperable and unavailable.
| description = The inspectors reviewed a self-revealed non-cited violation of Technical Specification 5.4.1.a, Procedures, for the licensees failure to have adequate procedural guidance while performing a standby service water surveillance procedure. Specifically, the licensees procedural guidance was not adequate to prevent the control room air conditioning subsystem B compressor from starting while condenser cooling water was isolated, which caused damage and rendered the subsystem inoperable and unavailable.
}}
}}

Latest revision as of 17:34, 10 September 2018

03
Site: Grand Gulf Entergy icon.png
Report IR 05000416/2018001 Section 1R19
Date counted Mar 31, 2018 (2018Q1)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.19
Inspectors (proximate) M Young
N Day
A Athar
J Kozal
Violation of: Technical Specification
INPO aspect QA.4
'