Regulatory Guide 1.129: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML13350A268
| number = ML003740104
| issue date = 04/30/1977
| issue date = 02/28/1978
| title = Maintenance Testing, and Replacement of Large Lead Storage Batteries for Nuclear Power Plants
| title = Maintenance, Testing and Replacement of Large Lead Storage Batteries for Nuclear Power Plants
| author name =  
| author name =  
| author affiliation = NRC/OSD
| author affiliation = NRC/RES
| addressee name =  
| addressee name =  
| addressee affiliation =  
| addressee affiliation =  
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = RG-1.129
| document report number = RG-1.129, Revision 1
| document type = Regulatory Guide
| document type = Regulatory Guide
| page count = 2
| page count = 2
}}
}}
{{#Wiki_filter:U.S. NUCLEAR REGULATORY.
{{#Wiki_filter:U.S. NUCLEAR REGULATORY  
 
COMMISSION
COMMISSION
April 1977 0 REGULATORY  
Revision 1 February 1978 REGULATORY  
GUIDE OFFICE OF STANDARDS  
GUIDE OFFICE OF STANDARDS  
DEVELOPMENT
DEVELOPMENT  
REGULATORY  
REGULATORY  
GUIDE 1.129 MAINTENANCE, TESTING, AND REPLACEMENT  
GUIDE 1.129 MAINTENANCE, TESTING, AND REPLACEMENT  
Line 26: Line 25:


==A. INTRODUCTION==
==A. INTRODUCTION==
27, 1975. It was subsequently approved and designated N41.15-1976 by the American National Criterion  
Criterion  
18, "Inspection and Testing of Electric Standards Institute on January 8, 1976.Power Systems," of Appendix A, "General Design Criteria for Nuclear Power Plants," to 10 CFR Part The. provisions of the standiard include 50, "Licensing of Production and Utilization maintenance, test schedules, testin r$.,'.edures, and Facilities," requires that electric power systems im- replacement criteria for large lead storagc batteries.
18, "Inspection and Testing of Electric Power Systems." of Appendix A, "General Design Criteria for Nuclear Power Plants." to 10 CFR Part 50, 'Licensing of Production and Utilization Facilities.' " requires that electric power systems im portant to safety be designed with a capability to test periodically the operability and functional perform ance of the components of the systems. such as on site power sources. Criterion X1, "Test Control," of Appendix B, "'Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," 10o 0 CFR Part 50 requires that a test program be estab lished tc ensure that all testing required to demon strate that structures, systems, and components will perform satisfactorily in service is identified and per formed in accordance with Aritten test procedures that incorporate the requirements and acceptance lim its contained in applicable design documents.


po~rtant to safety be designed with a capability to test The standard does not inclu i,,.survei0lajnce and periodically the operability and functional perfor- testing of the d.c. system. evaethb gh thehbattery is mance of the components of the systems, such as on- part of that system. This stadaitd.ontums require.site power sources. Criterion XI, "test Control," of ments indicated by th' verb "hall"'and recommen-Appendix B, "Quality Assurance Criteria for Nuclear dations indicated,,by'tki Verb "'should." Power Plants and Fuel Reprocessing Plants," to 10 CFR Part 50 requires that a test program be es- .. REB,46LATORY
Para graph 50.34(b)(6)
POSITION tablished to ensure that all testing required to demonstrate that structures, systems, and compo- Coiforrrancewth the requirements and recoi-nents will perform satisfactorily in service is iden- mende'ibns t'fithc maintenance.
of 10 CFR Part 50 requires that the final safety analysis report include, among other things, plans for conduct of normal operations.


testing. and replace-tified and performed in accordance with written test .rnt&YOrge ead storage batteries for nuclear power procedures that incorporate the requirements and ac- are specified by IEEE .Std 450.1975, ceptance limits contained in applicable design doju-' IEEE" Recommended Practice for Maintenance.
in cluding maintenance, surveillance, and periodic tpst ing of structures, systems, and components.


ment
This regulatory guide describes a method acceptable to the NRC staff for performing the maintenance, testing, and repiacement of large lead storage batteries for all types o: nuclear power plants. The Adisory Commit tee on Reactor Safeguards has been consulted con cerning this guide and has concurred in the regulatory position.


====s. Paragraph ====
==B. DISCUSSION==
50.34(b)(6)
IEEE Std 450-1975. "IEEE Recommended Prac tice for Maintenance.
of 10 CFR Part 50 re- and Replacement of Large Lead Storage Bat-quires that the final safety analysis report 1 for Generating Stations and Substations,'
among other things, plans for conductC of norrmiI1.


': provides an adequate basis for complying with the re-operations, including maintenance, sur;illance,,-and quirements of the Commission's regulations with periodic testing of structures, systems, respect to the maintenance, testing. and replacement nents. This regulatory guide describes a mret i'ld ac- of large lead storage batteries, subject to the follow-ceptable to the NRC staf. for performing the ing: maintenance, testing, auiid replacement of large lead storage batteries for all ty".e6f.iiclet'r power plants. I. The battery service test discussed in Subsection
Testing and Replacement of Large Lead Storage Batteries for Generating Stations and Substations," dated May 29, 1975, was prepared *Lines indicate substantive changes from previous issue.by the Working Group on Batteries, Station Design Subcommittee, of the Power Generation Committee and was approved by the Institute -of Electrical and Electronics Engineers Standards Board on February 27, 1975. It was subsequently approved and desig nated N41.15-1976 by the American National Stand ards Institute on January 8, 1976.  The provisions of the standard include mainte nance, test schedules, testing procedures, and re placement criteria for large lead storage batteries.
--4.3, "Service," and described in Subsection
5.6, "Ser-ý B. DISCU SION vice Test Description," should be performed with the.'. ' .intervals between tests in accordance with Regulatory450:'-j 7,"IEEE Recommended Prac- Guide 1.32, "Criteria for Safety-Related Electric tice for NWitenance, Testing and Replacement of Power Systems for Nuclear Power Plants." In addi-Large Lead"Siprage Batteries for Generating Stations tion, if the system design is changed so that the and Substati~ns," dated May 29, 1975, was prepared previous service test is no longer a valid test of the by the Working Group on Batteries, Station Design capability oj the battery to meet the changed design Subcommittee, of the Power Generation Committee  
'Copies ma)y be obtained from the Institute of IElectrical and and was approved by the Institute of Electrical and Electronics Engineers, United Engineering Center. 345 E.'ta 47th Electronics Engineers Standards Board on February Street, New York. New York 1001


===7. USNRC REGULATORY ===
The standard does not include surveillance and test ing of the d.c. system, even though the battery is part of that system. This standard contains requirements indicated by the verb "shall" and recommendations indicated by the verb "should." The recommenda tions as well as the requirements of the standard were evaluated with respect to importance to safety. All recommendations are considered to be of sufficient importance to safety to be endorsed along with the requirements given in the standard.
GUIDES Comment% osuld be sent to I h" o( I tv! C,,,vnini,,,n.U. Flt, n ,.Regulatory Guides ate issued to descrtia anti make avaiable to the public methods latury Comr.mion, i$.ishinqiuon.


D.C. ?0555h. Atrll,,,m, Ot~ckethJ
C. REGULATORY
mntl -V',.'acceptable to the NRC sltaf of imptlemnenting specific parts of the Conmism-on's Stanch.tegulations, to delineate techniquei used by the staff in evaluating specific problems The guides a imr uet in he followviilg ten Itytt.t dtiviirmt:
POSITION Conformance with the requirements and recom mendations for the maintenance, testing. and re placement of large lead storage batteries for nuclear power plants that are specified by IEEE Std 450 1975. "IEEE Recommended Practice for Mainte nance, Testing and Replacement of Large Lead Stor age Batteries for Generating Stations and Substa tions,'' provides an adequate basis for complying with the requirements of the Commission's regula tions with respect to the maintenance, testing. and replacement of large lead storage batteries, subject to the following:  
Or tostulateM
'Copies niMy be obtained from the Institute of Electrical and Electronics Engineers, United Engineering Center, 345 East 47th Street, New York, New York 1001
accidents.


of to Provde guidance to applicants.
===7. USNRC REGULATORY ===
GUIDES Comments should be sent to the Secretary of the Comnission US Nuclea, Ra,, Regu:atory Guides are issued to describe and rake avwlabic to the public method latory Commission Washington.


Regulatory Guides ate sot substltutes foe 'egulations.
0 C 20555. Attention Dockelng and acceotable to the NRC staff of implernnting spec i. Darts of the Commissio's Branch regiiations
*o delineate lechnilques usd bv the staff in eva:ualing spýeific protleecs The guidesare issued in the followsirng ten broaJ divisions or postulated accidents, or to provide guidance tc app..can-n Regulatory Guides are nOt subsitutes for regulatons.


and compnhence with them is not required.
and compliance w-it them is not rteuired 1. Power Reactors 6 Products Methods and solutions different from th.Sf se! O< i, Ihi guides will be accept 2 Research ard Test Reactors 7. Transportaior ah if they provide a basts to. the findings reourste to tic issiurici or continuance
3 Fuets and Materials Facilities
8. Occupationa, Hteatr, or a peri or license by the Cornmi-t-, 4. Enironmdental andSitrng
9. Antitrust 5 Materials and Plant Protection
10 General Comments and suggestions for in these guides are encouraged at at! Requests for single copies of issued guides twhief may be reproducedI
or lor la times ano gLi es will be revised. as appropriate, to accommodate comment,.
ano Reenst on an automaltc distiebuon list for single copies Of future Ouides or Iiaert to refie. ntc .-niormation or experience This guide wal -re.wseos s rea divisions sould be made in writing To US Nucpar Reoqlarou i Coi mss., ubsirlhv comn-er-t received from the publ an a 1,'ona staff reuiea. Washington CC 20555, Attention Director.


I. Power Reaclnts G. Prrntfuci Metholds and solutions diflerent from those set out in the guides will be accet-t 2. Research and Teft Reacturs 7.
Divisison r Docuriuni Cuirro, I. The battcry ser\ ice test discussed in Subsection
4.3, "Service.I
and described in Subsection
5.6, "Service Test Description," should be performed in addition to the battery performance discharge test.  The battery service test should be performed during refueling operations or at some other outage, with "intervals between tests not to exceed 18 months. In addition, if the system design is changed so that the previous service test is no longer a valid test of the capability of the battery to meet the changed design requirements of the system, the user should conduct the service test for the new system design.  2. Section 8. "Standards References," of IEEE Std 450-1975 lists additional standards.


able it they ptovide a basis for the finding rtequisite to the Itsuance at continuance
The specific applicability or acceptability of these referenced standards has been or will be covered separately in other regulatory guides, where appropriate.
3. Fuel% aond M.aterials Facifites


====a. OccspatonalI ====
==D. IMPLEMENTATION==
lt,JAl of a permit or license by the Commission.
The purpose of this section is to provide informa tion to applicants and licensees regarding the NRC. staff's plans for using this regulatory guide. This guide reflects current NRC staff practice.
 
4. Envitonmenlal anti String 9. Anltitust neview'y* i , n 5,es M b ensd.a uoOwle.fineanidt cmset sl o, Plane Prtcin 1.Gna Comments and suggestions for improvements In these gudes aft encouraged at of 5 Materials and Plant Protection t. Gental time, and gu.ides, will be revisedt, as aopDOtwilite.
 
to accommodatle commren-ts and Reqetslel for copies t)l issued ,quid"P Iwh~rh may tie" oelO(t r flatI O plic'-.to feallect new Info~rmaclot tie experience.
 
Havwe.vef.
 
commentt on this guideoif menn on' an automatic distribution hls for $inqllr tall estt III(ltlftti q~uides in specific: eecelved within about tw) tvmonths ,after, it issuance, will be' ereiatcular useful In divisionts should be malle in wtifinrl !a the US. Nu(dewfl Mlal I~ng the need lot aln early revision.
 
Washington, D.C. Attentionl:
Director, of Documnent Contfeti.
 
requirements of the system, the user should conduct the service test for the new system design.2. Section 8. 'Standards References." of IEEE Std 450-1975 lists additional standards.


The specific ap-plicability or acceptability of these referenced stan-dards has been or will be covered separately in other regulatory guides, where appropriate.
Therefore, except in those cases in which the appli cant or licensee proposes an acceptable alternative method for complying with specified portions of the Commission's regulations, the method described herein is being and will continue to be used in the evaluation of submittals in connection with construc tion permit applications until this guide is revised as a result of suggestions from the public or additional staff review.}}
 
==D. IMPLEMENTATION==
The purpose of this section is to provide informa-tion to applicants regarding the NRC staffs plans for using this regulatory guide.Except in those cases in which the applicant proposes an acceptable alternative method for com-plying with specified portions of the Commission's regulations, the method described herein will be used in the evaluation of submittals in connection with construction permit applications docketed after December I. 1977. unless this guide is revised as a result of suggestions from the public or additional staff review.If an applicant wishes to use this regulator)y guide in developing submittals for applications docketed on or before December I. 1977, the pertinent portions of the application will he evaluated on the basis of this guide.-o WC Z 2 a 0J ILn o 00.4 w j 0 LU 01 1.129-2}}


{{RG-Nav}}
{{RG-Nav}}

Revision as of 16:57, 31 August 2018

Maintenance, Testing and Replacement of Large Lead Storage Batteries for Nuclear Power Plants
ML003740104
Person / Time
Issue date: 02/28/1978
From:
Office of Nuclear Regulatory Research
To:
References
RG-1.129, Revision 1
Download: ML003740104 (2)


U.S. NUCLEAR REGULATORY

COMMISSION

Revision 1 February 1978 REGULATORY

GUIDE OFFICE OF STANDARDS

DEVELOPMENT

REGULATORY

GUIDE 1.129 MAINTENANCE, TESTING, AND REPLACEMENT

OF LARGE LEAD STORAGE BATTERIES

FOR NUCLEAR POWER PLANTS

A. INTRODUCTION

Criterion

18, "Inspection and Testing of Electric Power Systems." of Appendix A, "General Design Criteria for Nuclear Power Plants." to 10 CFR Part 50, 'Licensing of Production and Utilization Facilities.' " requires that electric power systems im portant to safety be designed with a capability to test periodically the operability and functional perform ance of the components of the systems. such as on site power sources. Criterion X1, "Test Control," of Appendix B, "'Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," 10o 0 CFR Part 50 requires that a test program be estab lished tc ensure that all testing required to demon strate that structures, systems, and components will perform satisfactorily in service is identified and per formed in accordance with Aritten test procedures that incorporate the requirements and acceptance lim its contained in applicable design documents.

Para graph 50.34(b)(6)

of 10 CFR Part 50 requires that the final safety analysis report include, among other things, plans for conduct of normal operations.

in cluding maintenance, surveillance, and periodic tpst ing of structures, systems, and components.

This regulatory guide describes a method acceptable to the NRC staff for performing the maintenance, testing, and repiacement of large lead storage batteries for all types o: nuclear power plants. The Adisory Commit tee on Reactor Safeguards has been consulted con cerning this guide and has concurred in the regulatory position.

B. DISCUSSION

IEEE Std 450-1975. "IEEE Recommended Prac tice for Maintenance.

Testing and Replacement of Large Lead Storage Batteries for Generating Stations and Substations," dated May 29, 1975, was prepared *Lines indicate substantive changes from previous issue.by the Working Group on Batteries, Station Design Subcommittee, of the Power Generation Committee and was approved by the Institute -of Electrical and Electronics Engineers Standards Board on February 27, 1975. It was subsequently approved and desig nated N41.15-1976 by the American National Stand ards Institute on January 8, 1976. The provisions of the standard include mainte nance, test schedules, testing procedures, and re placement criteria for large lead storage batteries.

The standard does not include surveillance and test ing of the d.c. system, even though the battery is part of that system. This standard contains requirements indicated by the verb "shall" and recommendations indicated by the verb "should." The recommenda tions as well as the requirements of the standard were evaluated with respect to importance to safety. All recommendations are considered to be of sufficient importance to safety to be endorsed along with the requirements given in the standard.

C. REGULATORY

POSITION Conformance with the requirements and recom mendations for the maintenance, testing. and re placement of large lead storage batteries for nuclear power plants that are specified by IEEE Std 450 1975. "IEEE Recommended Practice for Mainte nance, Testing and Replacement of Large Lead Stor age Batteries for Generating Stations and Substa tions, provides an adequate basis for complying with the requirements of the Commission's regula tions with respect to the maintenance, testing. and replacement of large lead storage batteries, subject to the following:

'Copies niMy be obtained from the Institute of Electrical and Electronics Engineers, United Engineering Center, 345 East 47th Street, New York, New York 1001

7. USNRC REGULATORY

GUIDES Comments should be sent to the Secretary of the Comnission US Nuclea, Ra,, Regu:atory Guides are issued to describe and rake avwlabic to the public method latory Commission Washington.

0 C 20555. Attention Dockelng and acceotable to the NRC staff of implernnting spec i. Darts of the Commissio's Branch regiiations

  • o delineate lechnilques usd bv the staff in eva:ualing spýeific protleecs The guidesare issued in the followsirng ten broaJ divisions or postulated accidents, or to provide guidance tc app..can-n Regulatory Guides are nOt subsitutes for regulatons.

and compliance w-it them is not rteuired 1. Power Reactors 6 Products Methods and solutions different from th.Sf se! O< i, Ihi guides will be accept 2 Research ard Test Reactors 7. Transportaior ah if they provide a basts to. the findings reourste to tic issiurici or continuance

3 Fuets and Materials Facilities

8. Occupationa, Hteatr, or a peri or license by the Cornmi-t-, 4. Enironmdental andSitrng

9. Antitrust 5 Materials and Plant Protection

10 General Comments and suggestions for in these guides are encouraged at at! Requests for single copies of issued guides twhief may be reproducedI

or lor la times ano gLi es will be revised. as appropriate, to accommodate comment,.

ano Reenst on an automaltc distiebuon list for single copies Of future Ouides or Iiaert to refie. ntc .-niormation or experience This guide wal -re.wseos s rea divisions sould be made in writing To US Nucpar Reoqlarou i Coi mss., ubsirlhv comn-er-t received from the publ an a 1,'ona staff reuiea. Washington CC 20555, Attention Director.

Divisison r Docuriuni Cuirro, I. The battcry ser\ ice test discussed in Subsection

4.3, "Service.I

and described in Subsection

5.6, "Service Test Description," should be performed in addition to the battery performance discharge test. The battery service test should be performed during refueling operations or at some other outage, with "intervals between tests not to exceed 18 months. In addition, if the system design is changed so that the previous service test is no longer a valid test of the capability of the battery to meet the changed design requirements of the system, the user should conduct the service test for the new system design. 2. Section 8. "Standards References," of IEEE Std 450-1975 lists additional standards.

The specific applicability or acceptability of these referenced standards has been or will be covered separately in other regulatory guides, where appropriate.

D. IMPLEMENTATION

The purpose of this section is to provide informa tion to applicants and licensees regarding the NRC. staff's plans for using this regulatory guide. This guide reflects current NRC staff practice.

Therefore, except in those cases in which the appli cant or licensee proposes an acceptable alternative method for complying with specified portions of the Commission's regulations, the method described herein is being and will continue to be used in the evaluation of submittals in connection with construc tion permit applications until this guide is revised as a result of suggestions from the public or additional staff review.