IR 05000454/2008007: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 5: | Line 5: | ||
| author name = Peterson H | | author name = Peterson H | ||
| author affiliation = NRC/RGN-III/DRS/OB | | author affiliation = NRC/RGN-III/DRS/OB | ||
| addressee name = Pardee C | | addressee name = Pardee C | ||
| addressee affiliation = Exelon Generation Co, LLC | | addressee affiliation = Exelon Generation Co, LLC | ||
| docket = 05000454, 05000455 | | docket = 05000454, 05000455 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:ber 10, 2008 | ||
==SUBJECT:== | |||
BYRON STATION, UNITS 1 AND 2 TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000454/2008007(DRS); 5000455/2008007(DRS) | |||
SUBJECT: BYRON STATION, UNITS 1 AND 2 TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000454/2008007(DRS); 5000455/2008007(DRS) | |||
==Dear Mr. Pardee:== | ==Dear Mr. Pardee:== | ||
| Line 43: | Line 39: | ||
Enclosure transmitted herewith contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. | Enclosure transmitted herewith contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. | ||
Sincerely,/RA/ Hironori Peterson, Chief | Sincerely, | ||
/RA/ Hironori Peterson, Chief | |||
Operations Branch | Operations Branch | ||
| Line 49: | Line 46: | ||
Division of Reactor Safety Docket Nos. 50-454; 50-455 | Division of Reactor Safety Docket Nos. 50-454; 50-455 | ||
License Nos. NPF-37; NPF-66 Nonpublic | License Nos. NPF-37; NPF-66 Nonpublic Enclosure: Inspection Report 05000454/2008007(DRS); | ||
05000455/2008007(DRS) w/Attachment: Supplemental Information cc w/encl: D. Nelson, NRR/DPR/PSPB E. Bowman, NRR/DPR/PSPB J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl: Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron, and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station | |||
Inspection Report 05000454/2008007(DRS); | |||
05000455/2008007(DRS) | |||
Supplemental Information cc w/encl: D. Nelson, NRR/DPR/PSPB E. Bowman, NRR/DPR/PSPB J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl: Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron, and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station | |||
}} | }} | ||
Revision as of 05:50, 12 July 2019
| ML082900885 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 10/10/2008 |
| From: | Hironori Peterson Operations Branch III |
| To: | Pardee C Exelon Generation Co |
| References | |
| IR-08-007 | |
| Download: ML082900885 (4) | |
Text
ber 10, 2008
SUBJECT:
BYRON STATION, UNITS 1 AND 2 TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000454/2008007(DRS); 5000455/2008007(DRS)
Dear Mr. Pardee:
On August 29, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection at your Byron Station, Units 1 and 2. The enclosed report documents the results of the inspection, which were discussed on August 29, 2008, with Mr. Brad Adams and other members of your staff.
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission
=s rules and regulations, and with the conditions of your operating licenses. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.
Based on the results of this inspection, no findings of significance were identified.
However, two licensee identified violations are listed in Section 4OA7 of this report.
If you contest any finding or the subject or severity of any Non-Cited Violation in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for
your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Regional Administrator, U. S. Nuclear Regulatory Commission - Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532-4352; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector Office at the Byron Station.
Enclosure transmitted herewith contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Sincerely,
/RA/ Hironori Peterson, Chief
Operations Branch
Division of Reactor Safety Docket Nos. 50-454; 50-455
License Nos. NPF-37; NPF-66 Nonpublic Enclosure: Inspection Report 05000454/2008007(DRS);
05000455/2008007(DRS) w/Attachment: Supplemental Information cc w/encl: D. Nelson, NRR/DPR/PSPB E. Bowman, NRR/DPR/PSPB J. Klinger, State Liaison Officer, Illinois Emergency Management Agency cc w/o encl: Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron, and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station