ML100820307: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/22/2010
| issue date = 03/22/2010
| title = Closure of Investigation (OI 4-2009-055)
| title = Closure of Investigation (OI 4-2009-055)
| author name = Jones W B
| author name = Jones W
| author affiliation = NRC/RGN-IV
| author affiliation = NRC/RGN-IV
| addressee name = Halpin E D
| addressee name = Halpin E
| addressee affiliation = South Texas Project Nuclear Operating Co
| addressee affiliation = South Texas Project Nuclear Operating Co
| docket = 05000498, 05000499
| docket = 05000498, 05000499

Revision as of 11:20, 11 July 2019

Closure of Investigation (OI 4-2009-055)
ML100820307
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/22/2010
From: William Jones
NRC Region 4
To: Halpin E
South Texas
References
4-2009-055
Download: ML100820307 (1)


Text

March 22, 2010

Mr. Edward D. Halpin President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric P.O. Box 289 Wadsworth, TX 77483

SUBJECT:

CLOSURE OF INVESTIGATION (OI 4-2009-055)

Dear Mr. Halpin:

This refers to an investigation conducted by the NRC's Office of Investigations regarding activities at South Texas Project. The Office of Investigations initiated the investigation to determine whether a performance technician at South Texas Project Electric Generating Station, Wadsworth, Texas, willfully tampered with a security lock on a delay gate located in the protected area.

Based on the evidence developed during the investigation, testimony, and document reviews, the allegation was not determined to be willful. The NRC plans no further action related to the willful aspect of this allegation and considers this investigation closed.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, /RA/

William B. Jones, Chief Allegations and Enforcement Branch Dockets: 50-498; 50-499 Licenses: NPF-76; NPF-80

UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125