4 th Qtr 2012  Heinrich/Snyder (Bryan) 2. Instrumentation RAI List (Knuettel)  
4 th Qtr 2012  Heinrich/Snyder (Bryan) 2. Instrumentation RAI List (Knuettel)
: 1. Submit I&C update letter
: 1. Submit I&C update letter
: 1. 1/19/12 a. 1/19/12 b. 1/19/12 c. 1/19/12  d. Cmplt e. TBD  2. 1/19/12 a. 1/15/12 b. 1/13/12 c. 1/13/12 d. 1/15/12  3. TBD a. TBD b. TBD  4. Cmplt 1. Next I&C submittal update  
: 1. 1/19/12 a. 1/19/12 b. 1/19/12 c. 1/19/12  d. Cmplt e. TBD  2. 1/19/12 a. 1/15/12 b. 1/13/12 c. 1/13/12 d. 1/15/12  3. TBD a. TBD b. TBD  4. Cmplt 1. Next I&C submittal update
: a. 04038903-1SP  
: a. 04038903-1SP
: b. 04038903-2SP  
: b. 04038903-2SP
: c. 04038903-4SP Requires Civil Calculation  
: c. 04038903-4SP Requires Civil Calculation
: d. Responses to 11/18/11 RAI for OI 80, 81  
: d. Responses to 11/18/11 RAI for OI 80, 81
: e. Revise Common Q Compliance Matrix  
: e. Revise Common Q Compliance Matrix
: 2) Jan. I&C submittal update  
: 2) Jan. I&C submittal update
: a. Revise IEEE-603 analysis  
: a. Revise IEEE-603 analysis
: b. TR-1136 NP & withholding affidavit  
: b. TR-1136 NP & withholding affidavit
: c. U2 BISI Calculation  
: c. U2 BISI Calculation
: d. Responses to 11/18/11 RAI for OI 94, 105, 108
: d. Responses to 11/18/11 RAI for OI 94, 105, 108
: 3) WINCISE qualification testing write-up  
: 3) WINCISE qualification testing write-up
: a. Composite summary  
: a. Composite summary
: b. Sketch of all cable segments  
: b. Sketch of all cable segments
: 4) Revise TVA response to SSER OI 127 Eng/Hilmes (Bryan)
: 4) Revise TVA response to SSER OI 127 Eng/Hilmes (Bryan)
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
Line 62: Line 62:
Pump Relocation 5/30/12  Bldg Plan Mar 2012  Inspection -
Pump Relocation 5/30/12  Bldg Plan Mar 2012  Inspection -
Oct 2012 Substantial building - preliminary planning in process, (Fukushima NTTF item 4.2)
Oct 2012 Substantial building - preliminary planning in process, (Fukushima NTTF item 4.2)
Provide document of mitigating equipment and location for unit 2. Hemmer  4. Fire Protection Report
Provide document of mitigating equipment and location for unit 2. Hemmer  4. Fire Protection Report
: 1. mid-Feb 2. TBD  1. Submit Revised FPR per 12-21 Meeting, include commitment update  
: 1. mid-Feb 2. TBD  1. Submit Revised FPR per 12-21 Meeting, include commitment update
: 2. Meet with Staff following submittal ENG/Hilmes (Arent) 5. Tech Spec Revisions from latest T/S markup and NRC Review comments  
: 2. Meet with Staff following submittal ENG/Hilmes (Arent) 5. Tech Spec Revisions from latest T/S markup and NRC Review comments
: 1. TBD 2. TBD 3. 1/27/12  
: 1. TBD 2. TBD 3. 1/27/12
: 4. TBD 1. CSST A & B
: 4. TBD 1. CSST A & B
: 2. I-131 DEI  
: 2. I-131 DEI
: 3. Diesel Generator Frequency  
: 3. Diesel Generator Frequency
: 4. AST FHA Licensing/Elton (Bryan) 6. ACRS 04/10/12
: 4. AST FHA Licensing/Elton (Bryan) 6. ACRS 04/10/12
* Cyber Security - Implementation
* Cyber Security - Implementation
Line 80: Line 80:
3/16/12  Chemistry/
3/16/12  Chemistry/
Woods (Bryan) 14. TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Woods (Bryan) 14. TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Licensing (Gordon) 15. EP Drill Open Items  
Licensing (Gordon) 15. EP Drill Open Items
: a. Duty Specialist  
: a. Duty Specialist
: b. Commercial Dose Assessment TBD Determine NPG Schedule for Changes - Update "AS-Built" E-Plan.
: b. Commercial Dose Assessment TBD Determine NPG Schedule for Changes - Update "AS-Built" E-Plan.
EP - Detchemendy  16. Extend Construction Permit 4/27/12  Lic (Arent)
EP - Detchemendy  16. Extend Construction Permit 4/27/12  Lic (Arent)

Revision as of 05:46, 30 April 2019

2012/01/03 Watts Bar 2 OL - NRC PM Open Items List 01-04-12.docx
ML12018A403
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 01/03/2012
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML12018A403 (5)


Text

1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]

Sent: Tuesday, January 03, 2012 9:56 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Rober t H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D

Subject:

NRC PM Open Items List 01-04-12.docx Attachments:

NRC PM Open Items List 01-04-12.docx For next phone call.

Thank You,

~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764 Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 618 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF26FACDB9)

Subject:

NRC PM Open Items List 01-04-12.docx Sent Date: 1/3/2012 9:55:38 AM Received Date: 1/3/2012 9:55:49 AM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients: "Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Smith, James D" <jdsmith@tva.gov>

Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com> Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>

Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov> Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> Tracking Status: None

Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 227 1/3/2012 9:55:49 AM NRC PM Open Items List 01-04-12.docx 35566

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#

1 l Page No. Description Status Additional Comments Resp Org/Person 1. Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Feb/Mar 2012

Inspection

4 th Qtr 2012 Heinrich/Snyder (Bryan) 2. Instrumentation RAI List (Knuettel)

1. Submit I&C update letter
1. 1/19/12 a. 1/19/12 b. 1/19/12 c. 1/19/12 d. Cmplt e. TBD 2. 1/19/12 a. 1/15/12 b. 1/13/12 c. 1/13/12 d. 1/15/12 3. TBD a. TBD b. TBD 4. Cmplt 1. Next I&C submittal update
a. 04038903-1SP
b. 04038903-2SP
c. 04038903-4SP Requires Civil Calculation
d. Responses to 11/18/11 RAI for OI 80, 81
e. Revise Common Q Compliance Matrix
2) Jan. I&C submittal update
a. Revise IEEE-603 analysis
b. TR-1136 NP & withholding affidavit
c. U2 BISI Calculation
d. Responses to 11/18/11 RAI for OI 94, 105, 108
3) WINCISE qualification testing write-up
a. Composite summary
b. Sketch of all cable segments
4) Revise TVA response to SSER OI 127 Eng/Hilmes (Bryan)

NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#

2 l Page No. Description Status Additional Comments Resp Org/Person 3. Complete Implementation (Hemmer)

Pump Relocation 5/30/12 Bldg Plan Mar 2012 Inspection -

Oct 2012 Substantial building - preliminary planning in process, (Fukushima NTTF item 4.2)

Provide document of mitigating equipment and location for unit 2. Hemmer 4. Fire Protection Report

1. mid-Feb 2. TBD 1. Submit Revised FPR per 12-21 Meeting, include commitment update
2. Meet with Staff following submittal ENG/Hilmes (Arent) 5. Tech Spec Revisions from latest T/S markup and NRC Review comments
1. TBD 2. TBD 3. 1/27/12
4. TBD 1. CSST A & B
2. I-131 DEI
3. Diesel Generator Frequency
4. AST FHA Licensing/Elton (Bryan) 6. ACRS 04/10/12
  • Attachment HH items (#59 - Sump, #61 -PAD, #63/93 - Eagle 21, #91 - GDC 5, #132 - Boron Dil) Arent/Hilmes/

Koontz 7. ACRS June 2012

  • Fire Protection
  • Attachment HH item - #133/134 - Hydrology Arent 8. SSER 22/23/24/25 Open Items Response As needed The expanded HH list and status is covered periodically. Licensing 9. Transient Analysis issues Boron dilution RAI response 1/13/12 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132. ENG/Koontz WEC/Morgan 10. FSAR A108 Feb. 2012 Lic/Stockton 11. Develop list of planned License Conditions, Exemptions and Relief Requests (Arent) 1. 1/20/12 2. TBD 3. TBD 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 2. NRR to review current exemptions 3. Verify required notifications made NRR/TVA (Bryan)

NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#

3 l Page No. Description Status Additional Comments Resp Org/Person 12. Submit TS version "G" (includes bases and TRM) 1/27/12 Include remaining changes resulting from U1 and Setpoint Reviews.

Lic/Bryan 13. Issue two Unit Offsite Dose Calculation Manual -

3/16/12 Chemistry/

Woods (Bryan) 14. TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.

Licensing (Gordon) 15. EP Drill Open Items

a. Duty Specialist
b. Commercial Dose Assessment TBD Determine NPG Schedule for Changes - Update "AS-Built" E-Plan.

EP - Detchemendy 16. Extend Construction Permit 4/27/12 Lic (Arent)

NRC Follow-up Items ASME N-801 & N-802 code cases TBD NRC response to relief request submitted 9/1/11. NRR Exemption to 10CFR50.49 for some Category II cables?

1/20/12 Determine if exemption required. NRC may need to establish a license condition.

Hilmes (Stockton)

Post ETC Updates Issue Unit 2 Completion Letter TBD Licensing/Arent Submit final as-constructed FSAR figures TBD Licensing/ Stockton Special Nuclear Materials License Licensing (Arent)

Letter to terminate Part 30/40 License after receipt of Part 50 License TBD Licensing (Arent) Combined U1/U2 FSAR (Stockton)

TBD Licensing ASME Section III N-3 report TBD Eng/Crouch Letter to notify NRC when Vital Area Boundary returned to original location TBD Security Plan Update - Boundary to be restored. Lic/Arent