IR 05000331/2013405: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION
 
==REGION III==
2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
-4352 September 12, 2013 Mr. Richard Site Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324
-4352 September 12, 2013 Mr. Richard Site Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324
-9785
-9785
Line 42: Line 45:
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 Nonpublic  
Sincerely,
 
/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 Nonpublic Enclosure:
===Enclosure:===
Inspection Report 05000331/201 3 40 5 w/Attachment: Supplemental Information cc w/encl:
Inspection Report 05000331/201 3 40 5  
 
===w/Attachment:===
Supplemental Information cc w/encl:
S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV B. Kindred, Security Manager M. Rasmusson, State Liaison Officer, State of Iowa S. Catron, Licensing Manager M. Nazar, Executive Vice President, Nuclear Division and
S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV B. Kindred, Security Manager M. Rasmusson, State Liaison Officer, State of Iowa S. Catron, Licensing Manager M. Nazar, Executive Vice President, Nuclear Division and



Revision as of 18:11, 11 May 2019

IR 05000331-13-405; 07/29/2013 - 08/02/2013; Duane Arnold Energy Center; Routine Security Baseline Inspection (Cover Letter Only)
ML13256A114
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/12/2013
From: Skokowski R A
Plant Support Branch II
To: Anderson R L
NextEra Energy Duane Arnold
Jure Kutlesa
References
IR-13-405
Download: ML13256A114 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532

-4352 September 12, 2013 Mr. Richard Site Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324

-9785

SUBJECT: DUANE ARNOLD ENERGY CENTER NRC SECURITY BASELINE INSPECTION REPORT 05000331/201 3 40 5

Dear Mr. Anderson:

On August 2, 2013 , the U.S. Nuclear Regulatory Commission (NRC) completed a n inspection at your Duane Arnold Energy Center. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on August 2, 2013, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection

. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security

-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS.

Enclosure contains Sensitive Unclassified Non

-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. 1 Attachment If you choose to provide a response and Security

-Related Information is necessary to provide an acceptable response, please mark your entire response "Security

-Related Information

- Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49 Nonpublic Enclosure:

Inspection Report 05000331/201 3 40 5 w/Attachment: Supplemental Information cc w/encl:

S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR T. Dimitriadis, RI B. Desai, RII M. Haire, RIV B. Kindred, Security Manager M. Rasmusson, State Liaison Officer, State of Iowa S. Catron, Licensing Manager M. Nazar, Executive Vice President, Nuclear Division and

Chief Nuclear Officer

cc w/o encl: Distribution via ListServ TM