| event date = 05/01/2011 12:00 EDT | | event date = 05/01/2011 12:00 EDT | ||
| last update date = 07/17/2011 | | last update date = 07/17/2011 | ||
| title = Previous Inoperability | | title = Previous Inoperability of Criticality Accident Alarm System Warning Circuit Not Identified | ||
| event text = As part of the corrective actions for the Criticality Accident Alarm System (CAAS) events reported on 7/13/11 (EN #47047) and 7/15/11 (EN #47061), GNF-A is performing an investigation into the cause of the delayed audible alarm actuation. The investigation has determined that this delay existed at the time of the May and June 2011 functional tests and was not adequately identified and thus not reported. The response time to activate the horns did not meet the design requirement for CAAS. These events are being reported pursuant to the requirements of 10CFR70.50 (b)(2). | | event text = As part of the corrective actions for the Criticality Accident Alarm System (CAAS) events reported on 7/13/11 (EN #47047) and 7/15/11 (EN #47061), GNF-A is performing an investigation into the cause of the delayed audible alarm actuation. The investigation has determined that this delay existed at the time of the May and June 2011 functional tests and was not adequately identified and thus not reported. The response time to activate the horns did not meet the design requirement for CAAS. These events are being reported pursuant to the requirements of 10CFR70.50 (b)(2). | ||
The licensee states that the delay in the alarm actuation existed during surveillance testing in May and June of 2011 but the delay was not recognized at the time. This condition rendered the system inoperable since May 2011. | The licensee states that the delay in the alarm actuation existed during surveillance testing in May and June of 2011 but the delay was not recognized at the time. This condition rendered the system inoperable since May 2011. | ||
Revision as of 21:06, 1 March 2018
| Where | |
|---|---|
| Global Nuclear Fuel Wilmington, North Carolina (NRC Region 2) | |
| License number: | Snm-1097 |
| Reporting | |
| 10 CFR 70.50(b)(2) | |
| Time - Person (Reporting Time:+1850.43 h77.101 days <br />11.014 weeks <br />2.535 months <br />) | |
| Opened: | Phillip Ollis 18:26 Jul 17, 2011 |
| NRC Officer: | Bill Huffman |
| Last Updated: | Jul 17, 2011 |
| 47066 - NRC Website
| |