| title = Dresden Unit 3 - RO Inquiry Report 05000249/1972013Q Regarding the Discovery of High Steam and High Condensate Flow Switches to Be Out of Calibration
| title = RO Inquiry Report 05000249/1972013Q Regarding the Discovery of High Steam and High Condensate Flow Switches to Be Out of Calibration
| author name = Dance H C
| author name = Dance H C
| author affiliation = US Atomic Energy Commission (AEC)
| author affiliation = US Atomic Energy Commission (AEC)

Revision as of 22:21, 27 January 2019

RO Inquiry Report 05000249/1972013Q Regarding the Discovery of High Steam and High Condensate Flow Switches to Be Out of Calibration
ML17252B022
Person / Time
Site: Dresden Constellation icon.png
Issue date: 09/25/1972
From: Dance H C
US Atomic Energy Commission (AEC)
To:
Commonwealth Edison Co
References
IR 1972013Q
Download: ML17252B022 (2)


Text

Qr-..._,. . .... . ;* i '* * * U. S. ATOMIC ENERGY COMMISSION DIRECTORATE OF REGULATORY OPERATIONS REGION III RO Inquiry Report No. 050-249/72-13Q Subject: Commonwealth Edison Company License No. DPR-25 Dresden Unit 3 Isolation Condenser High Flow Switch Out of Calibration Prepared By: H. C. Dance ' ( Nitv'"""L.....---

A. Date and Manner AEC was Informed:

B. RO:III was informed by T. Watts, Operating Engineer, via telephone on September 25, 1972. Description of Particular Event or Circumstance:

During ,quarterly surveillance testing the isolation condenser

  • IC) high and high condensate flow switches were found tci be out of calibration as shown below. Circuit As Left*Setting High steam flow 417 + 3 inches High condensate flow 30 + 1 inch As Found Setting Tech Spec 426 .5", 435 .O" <425 inches 33.3", 33.5" -32 inches These switches initiate closure of the IC isolation valves in of line failure. C. Action by Licensee:

The licensee reset the. switches to the as-left setting shown above when the condition was found. After data was reviewed, it was decided that future settings would be left at 400 +/- 5 inches for steam flow and 28.5 +/-one inch for condensate flow. The licensee intends to report this occurrence in accordance with license requirement ... REGUIATORY OPERATIONS REGION III RO Inquiry Report No. : 050-249/72-13Q Transmittal September 25, 1972 Distribution:

RO Chief, Reactor Test and Operations Branch RO:HQ (5) DR Central Files Regulatory Standards (3) Licensing (13) PDR Local PDR NSIC DTIE, OR .. . * *-.. REC"D &

9-27-72 Muller, H. Denton, Tedesco, Docket file ** 50-249 to the Vollmer, following Boyd (2) Hendrie; Operational Skovhoft (2) Safety Br.*