Regulatory Guide 1.13: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:
COMMISSION
COMMISSION
REGULATORY  
REGULATORY  
GUIDEOFFICE OF STANDARDS  
GUIDE OFFICE OF STANDARDS  
DEVELOPMENT
DEVELOPMENT
Revision  
Revision 1 December 1975 REGULATORY
1December
GUIDE 1.13 SPENT FUEL STORAGE FACILITY DESIGN BASIS  
1975REGULATORY
GUIDE 1.13SPENT FUEL STORAGE FACILITY  
DESIGN BASIS


==A. INTRODUCTION==
==A. INTRODUCTION==
1. Loss of Water from Storage Pool*1.General Design LrtIerilon oi, rue, atoragt andi Unless protective measures are taken, loss of waterHandling Criteria for Nuclear Power Plants,"  
1. Loss of Water from Storage Pool*1.General Design LrtIerilon oi, rue, atoragt andi Unless protective measures are taken, loss of water Handling Criteria for Nuclear Power Plants," of Appen- from a fuel storage pool could cause ove~htating of the dix A, "General Dsign Critria for Nuclear Power spent luel and resultant damage to ftef-cladding integ-Plants," to 10 CFR Part 50, "Licensing of Production i l l ee .,*'c to..... ..... ." .. .... rity and could result in release of rapoactiv.piaterials to and Utilzation Facilities," requires that fuel storage and the environment, Natural events as .a q or handling systemls be designed to assure adequate safety s..... coue aamage "uia ue or.... ... .. m~~hgh winds, coul damamge arcyo under norm al and postulated accident conditions.
of Appen- from a fuel storage pool could cause ove~htating of thedix A, "General Dsign Critria for Nuclear Power spent luel and resultant damage to ftef-cladding integ-Plants,"  
to 10 CFR Part 50, "Licensing of Production i l l ee .,*'c to..... ..... ." .. .... rity and could result in release of rapoactiv.piaterials toand Utilzation Facilities,"  
requires that fuel storage and the environment, Natural events as .a q orhandling systemls be designed to assure adequate safety s..... coue aamage "uia ue or.... ... .. m~~hgh winds, coul damamge arcyounder norm al and postulated accident conditions.


It also bytthe g nera ion. o .._c-r directly or....... ... .. by the generation of t&igihnilS  
It also bytthe g nera ion. o .._c-r directly or....... ... .. by the generation of t&igihnilS  
or highl windsrequires that these systems be designed with appropriate hiuld winso cause ,,,d,-,,,  
or highl winds requires that these systems be designed with appropriate hiuld winso cause ,,,d,-,,, ,,, to fasn th, containment, confinement, and filtering systems and be could also c.un s he fa` ,eto. withsta..n to fall noct designed to prevent significant recduction in the L.oolant polcesiwith c f-caloJfwithsta t occur-inventory of the storage facility under accident condi- wen w......ithu.
,,, to fasn th,containment, confinement, and filtering systems and be could also c.un s he fa` ,eto. withsta..n to fall noctdesigned to prevent significant recduction in the L.oolant polcesiwith c f-caloJfwithsta t occur-inventory of the storage facility under accident condi- wen w......ithu.


of.w.tertig tgrty..... , .ulo u~cwz¢ tC9 Oceras.tions. This guide describes a method acceptable to the wud "he.. c cn.NRC staff for implementing this criterion.
of.w.tertig tgrty..... , .ulo u~cwz¢ tC9 Oceras.tions. This guide describes a method acceptable to the wud "he.. c cn.NRC staff for implementing this criterion.


Drftiling olheavy loads, such as a 100-ton fuel cask,DISCUSSIONW " w ro y
Drftiling olheavy loads, such as a 100-ton fuel cask, DISCUSSIONW " w ro y  


==B. DISCUSSION==
==B. DISCUSSION==
w o probability, cannot be ruled out in plant." t ents where such loads are positioned or movedIt is important that futel handling and storage iIt di to: lin-r over the fuel pool. Possible solutions to thisbe designed to"potential problem include (1) preventing, preferably bya. Prevent lotdesign rather than interlocks, heavy loads from beinga. P t lo lifted over the pool; (2) using a highly reliable handlingwould uncover fuel. sys:em designed to prevent dropping of heavy loads as aresult of any single failure;  
w o probability, cannot be ruled out in plant." t ents where such loads are positioned or moved It is important that futel handling and storage i It di to: lin-r over the fuel pool. Possible solutions to this be designed to"potential problem include (1) preventing, preferably by a. Prevent lotdesign rather than interlocks, heavy loads from being a. P t lo lifted over the pool; (2) using a highly reliable handling would uncover fuel. sys:em designed to prevent dropping of heavy loads as a result of any single failure; or (3) designing the pool to b. Protect the fuel from mechanical damage. withstand dropping of the load without significant S. .... leakage from the pool area in which fuel is stored.I c. Provide the capa y .limiting the potential offsite exposures in the ificant release of radioactivity fro .If spe el rage cilities are not located within the priý a , ontainment or provided with adequate ective features, radioactive materials could be released the environs as a result of either loss of water from the storage pool or mechanical damage to fuel within the pool.'*Lines indicate substantive changes from previous issue.Even if the measures described above to prevent loss of leak-tight integrity are followed, small leaks may still occur as a result of structural failure or other unfcresetn events. For example, equipment failures in systems connected to the pool could result in loss of water from the pool if such loss is not prevented by design. A permanent fuel-pool-coolant makeup system with a moderate capability, and with suitable redundancy or backup, could prevent the fuel from being uncovered if I I I USNRC REGULATORY  
or (3) designing the pool tob. Protect the fuel from mechanical damage. withstand dropping of the load without significant S. .... leakage from the pool area in which fuel is stored.Ic. Provide the capa y .limiting the potential offsite exposures in the ificant release ofradioactivity fro .If spe el rage cilities are not located withinthe priý a , ontainment or provided withadequate ective features, radioactive materials couldbe released the environs as a result of either loss ofwater from the storage pool or mechanical damage tofuel within the pool.'*Lines indicate substantive changes from previous issue.Even if the measures described above to prevent lossof leak-tight integrity are followed, small leaks may stilloccur as a result of structural failure or other unfcresetn events. For example, equipment failures in systemsconnected to the pool could result in loss of water fromthe pool if such loss is not prevented by design. Apermanent fuel-pool-coolant makeup system with amoderate capability, and with suitable redundancy orbackup, could prevent the fuel from being uncovered ifI I IUSNRC REGULATORY  
GUIDES Regutlatory Guides are issued to describ. and make Available to the Public malthods accopthble to the NRC %talf of implementing specific pensl OL the Commntision s regulations, to delineate techniques used by the stall in Ovltu eting speciitc problems or postulated accidents, or to provide guidance to appli.cnlto. Regulatory Guides ate not substitute*  
GUIDESRegutlatory Guides are issued to describ.
 
and make Available to the Publicmalthods accopthble to the NRC %talf of implementing specific pensl OL theCommntision s regulations, to delineate techniques used by the stall in Ovltueting speciitc problems or postulated accidents, or to provide guidance to appli.cnlto. Regulatory Guides ate not substitute*  
for regulations.
for regulations.


and compliance with them is not required Methods and solutions different from those set out inthe guides will be acceptable it they provide a basie for the findings requisite to, thd isluAnCe or continuance of a permit or license by the Commistion Demrents and suggestions fo, inmprovements  
and compliance with them is not required Methods and solutions different from those set out in the guides will be acceptable it they provide a basie for the findings requisite to , thd isluAnCe or continuance of a permit or license by the Commistion Demrents and suggestions fo, inmprovements ,n these guides are encouraged t alt times, and guides will be tevised. as AppOoprrate.
,n these guides are encouraged t alt times, and guides will be tevised.
 
as AppOoprrate.


to accommodate cornemals and to retlect new inoormation or emper.ence H*owever.
to accommodate corn emals and to retlect new inoormation or emper.ence H*owever.


cOmments onthis guide, of received within about two months Alter ilt issuance.
cOmments on this guide, of received within about two months Alter ilt issuance.


will be par,titcilarly usetul in evaluating the need lot .n early revisiont Comments should be sent to the Secretary of the Commission, U.S. NuclearRegulatory Commission, Washington.
will be par, titcilarly usetul in evaluating the need lot .n early revisiont Comments should be sent to the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington.


D.C. 205. Attentionm Doclsting andService Section.The guides ate issued in the following ton broad divisions
D.C. 205. Attentionm Doclsting and Service Section.The guides ate issued in the following ton broad divisions 1 Power Reactors 2. Research and Test Reactors J. Fuels end Materials Fi-cilities
1 Power Reactors2. Research and Test ReactorsJ. Fuels end Materials Fi-cilities
4. Eneronmental and Siting S Materials and Plant Protection
4. Eneronmental and SitingS Materials and Plant Protection
6 Product*
6 Product*


===7. Transportation===
===7. Transportation===
8, Occupational Health9 Antitrust Reviewto GeneralCopies of published guides may be obtained by wrraten request indicating thedivisions desitrd to the U S Nuclear Regulatory Commission.
8, Occupational Health 9 Antitrust Review to General Copies of published guides may be obtained by wrraten request indicating the divisions desitrd to the U S Nuclear Regulatory Commission.


Washington.
Washington.
Line 70: Line 56:
D C.2M,. Attention Oirector.
D C.2M,. Attention Oirector.


Oltice of Staedards Development such leaks should occur. Early detection of pool leakageand fuel damage could be provided by pool-water-level monitors and radiation monitors designed to alarm bothlocally and in a continuously manned location.
Oltice of Staedards Development such leaks should occur. Early detection of pool leakage and fuel damage could be provided by pool-water-level monitors and radiation monitors designed to alarm both locally and in a continuously manned location.
 
Timelyoperation of building filtration systems can be assuredby actuating these systems by a signal from localradiation monitors.
 
2. Mechanical Damage to FuelThe release of radioactive material from fuel mayoccur during the refueling process, and at other times, asa result of fuel-cladding failures or mechanical damagecaused by the dropping of fuel elements or the droppingof objects onto fuel elements.


Missiles generated by high winds can also be apotential cause of mechanical damage to fuel. Designing the fuel storage facility to prevent such missiles fromcontacting the fuel would eliminate this concern.A relatively small amount of mechanical damage tothe fuel might cause significant offiite doses if no dosereduction features are provided.
Timely operation of building filtration systems can be assured by actuating these systems by a signal from local radiation monitors.2. Mechanical Damage to Fuel The release of radioactive material from fuel may occur during the refueling process, and at other times, as a result of fuel-cladding failures or mechanical damage caused by the dropping of fuel elements or the dropping of objects onto fuel elements.Missiles generated by high winds can also be a potential cause of mechanical damage to fuel. Designing the fuel storage facility to prevent such missiles from contacting the fuel would eliminate this concern.A relatively small amount of mechanical damage to the fuel might cause significant offiite doses if no dose reduction features are provided.


Use of a controlled leakage building surrounding the fNel storage pool, withassociated capability to limit releases of radioactive material resulting from a refueling accident, appearsfeasible and would do much to eliminate this concern.C. REGULATORY  
Use of a controlled leakage building surrounding the fNel storage pool, with associated capability to limit releases of radioactive material resulting from a refueling accident, appears feasible and would do much to eliminate this concern.C. REGULATORY  
POSITIONI. The spent fuel storage facility (including itsstructures and equipment except as noted in paragraph  
POSITION I. The spent fuel storage facility (including its structures and equipment except as noted in paragraph  
6below) should be designed to Category I seismic require-ments.2. The facility should be designed (a) to keep tor-nadic winds and missiles generated by these winds fromcausing significant loss of watertight integrity of the fuelstorage pool and (b) to keep missiles generated byI tornadic winds from contacting fuel within the pool..3. Interlocks should be provided to prevent cranesfrom passing over stored fuel (or near stored fuel in amanner such that if a crane failed, the load could tipover on stored fuel) when fuel handling is not inprogress.
6 below) should be designed to Category I seismic require-ments.2. The facility should be designed (a) to keep tor-nadic winds and missiles generated by these winds from causing significant loss of watertight integrity of the fuel storage pool and (b) to keep missiles generated by I tornadic winds from contacting fuel within the pool..3. Interlocks should be provided to prevent cranes from passing over stored fuel (or near stored fuel in a manner such that if a crane failed, the load could tip over on stored fuel) when fuel handling is not in progress.


During fuel handling operations, the interlocks may be bypassed and administrative control used toprevent the crane from carrying loads that are notnecessary for fuel handling over the stored fuel or otherprohibited areas. The facility should be designed tominimize the need for bypassing such interlocks.
During fuel handling operations, the interlocks may be bypassed and administrative control used to prevent the crane from carrying loads that are not necessary for fuel handling over the stored fuel or other prohibited areas. The facility should be designed to minimize the need for bypassing such interlocks.


4. A controlled leakage building should enclose thefuel pool. The building should be equipped with anappropriate ventilation and filtration system to limit thepotential release of radioactive iodine and other radio-active materials.
4. A controlled leakage building should enclose the fuel pool. The building should be equipped with an appropriate ventilation and filtration system to limit the potential release of radioactive iodine and other radio-active materials.


The building need not be designed towithstand extremely high winds, but leakage should besuitably controlled during refueling operations.
The building need not be designed to withstand extremely high winds, but leakage should be suitably controlled during refueling operations.


Thedesign of the ventilation and filtration system should bebased on the assumption that the cladding of all of thefuel rods in one fuel bundle might be breached.
The design of the ventilation and filtration system should be based on the assumption that the cladding of all of the fuel rods in one fuel bundle might be breached.


Theinventory of radioactive materials available for leakagefrom the building should be based on the assumptions given in Regulatory Guide 1.25, "Assumptions Used forEvaluating the Potential Radiological Consequences of aFuel Handling Accident in the Fuel Handling andStorage Facility for Boiling and Pressurized WaterReactors"  
The inventory of radioactive materials available for leakage from the building should be based on the assumptions given in Regulatory Guide 1.25, "Assumptions Used for Evaluating the Potential Radiological Consequences of a Fuel Handling Accident in the Fuel Handling and Storage Facility for Boiling and Pressurized Water Reactors" (Safety Guide 25).5. The spent fuel storage facility should have at least one of the following provisions with respect to the handling of heavy loads, including the refueling cask: a. Cranes capable of carrying heavy loads should be prevented, preferably by design rather than by interlocks, from moving into the vicinity of the pool; or b. Cranes should be designed to provide sirgle-.failure-proof handling of heavy loads, so that a single failure will not result in loss of capability of the crane-handling system to perform its safety function;  
(Safety Guide 25).5. The spent fuel storage facility should have at leastone of the following provisions with respect to thehandling of heavy loads, including the refueling cask:a. Cranes capable of carrying heavy loads shouldbe prevented, preferably by design rather than byinterlocks, from moving into the vicinity of the pool; orb. Cranes should be designed to provide sirgle-.failure-proof handling of heavy loads, so that a singlefailure will not result in loss of capability of thecrane-handling system to perform its safety function;  
or-c. The fuel pool should be designed to withstand, without leakage that could uncover the fuel, the impact of the heaviest load to be carried by the crane from the maximum height to which it can be lifted. If this approach is used, design provisions should be made to prevent the crane, when carrying heavy loads, from moving in the vicinity of stored fuel.6. Drains, permanently connected mechanical or hydraulic systems, and other features that by malopera-tion or failure, could cause loss of coolant that woula uncover fuel should not be installed or included in the design. Systems for maintaining water quality and quantity should be designed so that any maloperation or failure of such systems (including failures resulting from the Safe Shutdown Earthquake)  
or-c. The fuel pool should be designed to withstand, without leakage that could uncover the fuel, the impactof the heaviest load to be carried by the crane from themaximum height to which it can be lifted. If thisapproach is used, design provisions should be made toprevent the crane, when carrying heavy loads, frommoving in the vicinity of stored fuel.6. Drains, permanently connected mechanical orhydraulic systems, and other features that by malopera- tion or failure, could cause loss of coolant that woulauncover fuel should not be installed or included in thedesign. Systems for maintaining water quality andquantity should be designed so that any maloperation orfailure of such systems (including failures resulting fromthe Safe Shutdown Earthquake)  
will not cause fuel to bej uncovered.
will not cause fuel to bejuncovered.


These systems need not otherwise meetCategory I seismic requirements.
These systems need not otherwise meet Category I seismic requirements.


7. Reliable and frequently tested monitoring equip-ment should be provided to alarm both locally and in acontinuously manned- location if the water level in thefuel storage pool falls below a predetermined level or ifhigh local-radiation levels are experienced.
7. Reliable and frequently tested monitoring equip-ment should be provided to alarm both locally and in a continuously manned- location if the water level in the fuel storage pool falls below a predetermined level or if high local-radiation levels are experienced.


The high-radiation-level instrumenttation should also actuate thefiltration system.8. A seismic Category I makeup system should beprovided to add coolant to the pool. Appropriate redundancy or a backup system for filling the pool froma reliable source, such as a lake, river, or onsite seismicCategory I water-storage facility, should be provided.
The high-radiation-level instrumenttation should also actuate the filtration system.8. A seismic Category I makeup system should be provided to add coolant to the pool. Appropriate redundancy or a backup system for filling the pool from a reliable source, such as a lake, river, or onsite seismic Category I water-storage facility, should be provided.


Ifa backup system is used, it need not be a permanently inst.lled system. The capacity of the makeup systemsshould be such that water can be supplied at a ratel011.13-2 determined by consideration of the leakage rate that  
If a backup system is used, it need not be a permanently inst.lled system. The capacity of the makeup systems should be such that water can be supplied at a ratel 01 1.13-2 determined by consideration of the leakage rate that  


==D. IMPLEMENTATION==
==D. IMPLEMENTATION==
would be expected as the result of damage to the fuelstorage pool from the dropping of loads, from earth- Any of the alternatives in Regulatory Position C.5 ofquakes, or from missiles originating in high winds.* Revision I may be applied at the option of applicants for construction perinits and operating licenses for all*The staff is considering the development of additional guidance plants, regardless of the date of application.
would be expected as the result of damage to the fuel storage pool from the dropping of loads, from earth- Any of the alternatives in Regulatory Position C.5 of quakes, or from missiles originating in high winds.* Revision I may be applied at the option of applicants for construction perinits and operating licenses for all*The staff is considering the development of additional guidance plants, regardless of the date of application.


concerning protection against missiles that might be generated by plant failures such as turbine failures.
concerning protection against missiles that might be generated by plant failures such as turbine failures.


For the present, theprotection of the fuel pool against such missiles will beevaluated on a case-by-case basis.1.13-3}}
For the present, the protection of the fuel pool against such missiles will be evaluated on a case-by-case basis.1.13-3}}


{{RG-Nav}}
{{RG-Nav}}

Revision as of 18:29, 13 July 2018

Spent Fuel Storage Facility Design Basis
ML13350A371
Person / Time
Issue date: 12/31/1975
From:
NRC/OSD
To:
References
RG-1.013, Rev. 1
Download: ML13350A371 (3)


U.S. NUCLEAR REGULATORY

COMMISSION

REGULATORY

GUIDE OFFICE OF STANDARDS

DEVELOPMENT

Revision 1 December 1975 REGULATORY

GUIDE 1.13 SPENT FUEL STORAGE FACILITY DESIGN BASIS

A. INTRODUCTION

1. Loss of Water from Storage Pool*1.General Design LrtIerilon oi, rue, atoragt andi Unless protective measures are taken, loss of water Handling Criteria for Nuclear Power Plants," of Appen- from a fuel storage pool could cause ove~htating of the dix A, "General Dsign Critria for Nuclear Power spent luel and resultant damage to ftef-cladding integ-Plants," to 10 CFR Part 50, "Licensing of Production i l l ee .,*'c to..... ..... ." .. .... rity and could result in release of rapoactiv.piaterials to and Utilzation Facilities," requires that fuel storage and the environment, Natural events as .a q or handling systemls be designed to assure adequate safety s..... coue aamage "uia ue or.... ... .. m~~hgh winds, coul damamge arcyo under norm al and postulated accident conditions.

It also bytthe g nera ion. o .._c-r directly or....... ... .. by the generation of t&igihnilS

or highl winds requires that these systems be designed with appropriate hiuld winso cause ,,,d,-,,, ,,, to fasn th, containment, confinement, and filtering systems and be could also c.un s he fa` ,eto. withsta..n to fall noct designed to prevent significant recduction in the L.oolant polcesiwith c f-caloJfwithsta t occur-inventory of the storage facility under accident condi- wen w......ithu.

of.w.tertig tgrty..... , .ulo u~cwz¢ tC9 Oceras.tions. This guide describes a method acceptable to the wud "he.. c cn.NRC staff for implementing this criterion.

Drftiling olheavy loads, such as a 100-ton fuel cask, DISCUSSIONW " w ro y

B. DISCUSSION

w o probability, cannot be ruled out in plant." t ents where such loads are positioned or moved It is important that futel handling and storage i It di to: lin-r over the fuel pool. Possible solutions to this be designed to"potential problem include (1) preventing, preferably by a. Prevent lotdesign rather than interlocks, heavy loads from being a. P t lo lifted over the pool; (2) using a highly reliable handling would uncover fuel. sys:em designed to prevent dropping of heavy loads as a result of any single failure; or (3) designing the pool to b. Protect the fuel from mechanical damage. withstand dropping of the load without significant S. .... leakage from the pool area in which fuel is stored.I c. Provide the capa y .limiting the potential offsite exposures in the ificant release of radioactivity fro .If spe el rage cilities are not located within the priý a , ontainment or provided with adequate ective features, radioactive materials could be released the environs as a result of either loss of water from the storage pool or mechanical damage to fuel within the pool.'*Lines indicate substantive changes from previous issue.Even if the measures described above to prevent loss of leak-tight integrity are followed, small leaks may still occur as a result of structural failure or other unfcresetn events. For example, equipment failures in systems connected to the pool could result in loss of water from the pool if such loss is not prevented by design. A permanent fuel-pool-coolant makeup system with a moderate capability, and with suitable redundancy or backup, could prevent the fuel from being uncovered if I I I USNRC REGULATORY

GUIDES Regutlatory Guides are issued to describ. and make Available to the Public malthods accopthble to the NRC %talf of implementing specific pensl OL the Commntision s regulations, to delineate techniques used by the stall in Ovltu eting speciitc problems or postulated accidents, or to provide guidance to appli.cnlto. Regulatory Guides ate not substitute*

for regulations.

and compliance with them is not required Methods and solutions different from those set out in the guides will be acceptable it they provide a basie for the findings requisite to , thd isluAnCe or continuance of a permit or license by the Commistion Demrents and suggestions fo, inmprovements ,n these guides are encouraged t alt times, and guides will be tevised. as AppOoprrate.

to accommodate corn emals and to retlect new inoormation or emper.ence H*owever.

cOmments on this guide, of received within about two months Alter ilt issuance.

will be par, titcilarly usetul in evaluating the need lot .n early revisiont Comments should be sent to the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington.

D.C. 205. Attentionm Doclsting and Service Section.The guides ate issued in the following ton broad divisions 1 Power Reactors 2. Research and Test Reactors J. Fuels end Materials Fi-cilities

4. Eneronmental and Siting S Materials and Plant Protection

6 Product*

7. Transportation

8, Occupational Health 9 Antitrust Review to General Copies of published guides may be obtained by wrraten request indicating the divisions desitrd to the U S Nuclear Regulatory Commission.

Washington.

D C.2M,. Attention Oirector.

Oltice of Staedards Development such leaks should occur. Early detection of pool leakage and fuel damage could be provided by pool-water-level monitors and radiation monitors designed to alarm both locally and in a continuously manned location.

Timely operation of building filtration systems can be assured by actuating these systems by a signal from local radiation monitors.2. Mechanical Damage to Fuel The release of radioactive material from fuel may occur during the refueling process, and at other times, as a result of fuel-cladding failures or mechanical damage caused by the dropping of fuel elements or the dropping of objects onto fuel elements.Missiles generated by high winds can also be a potential cause of mechanical damage to fuel. Designing the fuel storage facility to prevent such missiles from contacting the fuel would eliminate this concern.A relatively small amount of mechanical damage to the fuel might cause significant offiite doses if no dose reduction features are provided.

Use of a controlled leakage building surrounding the fNel storage pool, with associated capability to limit releases of radioactive material resulting from a refueling accident, appears feasible and would do much to eliminate this concern.C. REGULATORY

POSITION I. The spent fuel storage facility (including its structures and equipment except as noted in paragraph

6 below) should be designed to Category I seismic require-ments.2. The facility should be designed (a) to keep tor-nadic winds and missiles generated by these winds from causing significant loss of watertight integrity of the fuel storage pool and (b) to keep missiles generated by I tornadic winds from contacting fuel within the pool..3. Interlocks should be provided to prevent cranes from passing over stored fuel (or near stored fuel in a manner such that if a crane failed, the load could tip over on stored fuel) when fuel handling is not in progress.

During fuel handling operations, the interlocks may be bypassed and administrative control used to prevent the crane from carrying loads that are not necessary for fuel handling over the stored fuel or other prohibited areas. The facility should be designed to minimize the need for bypassing such interlocks.

4. A controlled leakage building should enclose the fuel pool. The building should be equipped with an appropriate ventilation and filtration system to limit the potential release of radioactive iodine and other radio-active materials.

The building need not be designed to withstand extremely high winds, but leakage should be suitably controlled during refueling operations.

The design of the ventilation and filtration system should be based on the assumption that the cladding of all of the fuel rods in one fuel bundle might be breached.

The inventory of radioactive materials available for leakage from the building should be based on the assumptions given in Regulatory Guide 1.25, "Assumptions Used for Evaluating the Potential Radiological Consequences of a Fuel Handling Accident in the Fuel Handling and Storage Facility for Boiling and Pressurized Water Reactors" (Safety Guide 25).5. The spent fuel storage facility should have at least one of the following provisions with respect to the handling of heavy loads, including the refueling cask: a. Cranes capable of carrying heavy loads should be prevented, preferably by design rather than by interlocks, from moving into the vicinity of the pool; or b. Cranes should be designed to provide sirgle-.failure-proof handling of heavy loads, so that a single failure will not result in loss of capability of the crane-handling system to perform its safety function;

or-c. The fuel pool should be designed to withstand, without leakage that could uncover the fuel, the impact of the heaviest load to be carried by the crane from the maximum height to which it can be lifted. If this approach is used, design provisions should be made to prevent the crane, when carrying heavy loads, from moving in the vicinity of stored fuel.6. Drains, permanently connected mechanical or hydraulic systems, and other features that by malopera-tion or failure, could cause loss of coolant that woula uncover fuel should not be installed or included in the design. Systems for maintaining water quality and quantity should be designed so that any maloperation or failure of such systems (including failures resulting from the Safe Shutdown Earthquake)

will not cause fuel to bej uncovered.

These systems need not otherwise meet Category I seismic requirements.

7. Reliable and frequently tested monitoring equip-ment should be provided to alarm both locally and in a continuously manned- location if the water level in the fuel storage pool falls below a predetermined level or if high local-radiation levels are experienced.

The high-radiation-level instrumenttation should also actuate the filtration system.8. A seismic Category I makeup system should be provided to add coolant to the pool. Appropriate redundancy or a backup system for filling the pool from a reliable source, such as a lake, river, or onsite seismic Category I water-storage facility, should be provided.

If a backup system is used, it need not be a permanently inst.lled system. The capacity of the makeup systems should be such that water can be supplied at a ratel 01 1.13-2 determined by consideration of the leakage rate that

D. IMPLEMENTATION

would be expected as the result of damage to the fuel storage pool from the dropping of loads, from earth- Any of the alternatives in Regulatory Position C.5 of quakes, or from missiles originating in high winds.* Revision I may be applied at the option of applicants for construction perinits and operating licenses for all*The staff is considering the development of additional guidance plants, regardless of the date of application.

concerning protection against missiles that might be generated by plant failures such as turbine failures.

For the present, the protection of the fuel pool against such missiles will be evaluated on a case-by-case basis.1.13-3