ML14024A476: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 32: | Line 32: | ||
Bridgman, MI 49106 | Bridgman, MI 49106 | ||
SUBJECT: D. C. COOK NUCLEAR POWER PLANT, UNIT 1 | SUBJECT: D. C. COOK NUCLEAR POWER PLANT, UNIT 1 | ||
- INFORMATION REQUEST FOR A NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL | - INFORMATION REQUEST FOR A NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL 05000 315/20 14007 Dear Mr. Weber: On April 28, 201 4 , the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval Site Inspection for License Renewal | ||
at D. C. Cook Nuclear Power Plant | at D. C. Cook Nuclear Power Plant. This inspection will be performed in accordance with NRC Inspection Procedure (IP) | ||
. This inspection will be performed in accordance with NRC Inspection Procedure (IP) | |||
71003. This inspection will focus on verifying that license conditions added as part of your renewed license and a sample of license renewal commitments have been implement | 71003. This inspection will focus on verifying that license conditions added as part of your renewed license and a sample of license renewal commitments have been implement | ||
ed. In order to minimize the inspection impact on the site and to ensure a productive inspection for | ed. In order to minimize the inspection impact on the site and to ensure a productive inspection for | ||
| Line 44: | Line 43: | ||
-office preparation activities, the team will identify as much as possible the information and activities to be reviewed during the inspection. | -office preparation activities, the team will identify as much as possible the information and activities to be reviewed during the inspection. | ||
This information should be provided to the lead inspector by | This information should be provided to the lead inspector by | ||
April 11, 2014 | April 11, 2014. The second group includes the additional information required for the team to review selected activities. This information should be available to the team onsite April 28, 201 4. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated. | ||
. The second group includes the additional information required for the team to review selected activities. This information should be available to the team onsite April 28, | |||
The lead inspector for this inspection is | The lead inspector for this inspection is | ||
Ms. Caroline Tilton. We understand that our licensing contact for this inspection is Richard Wynegar | Ms. Caroline Tilton. We understand that our licensing contact for this inspection is Richard Wynegar | ||
of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the | of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the | ||
l ead inspector at (630) 829 | |||
-9718 or via e-mail at Caroline.Tilton@nrc.gov | -9718 or via e-mail at Caroline.Tilton@nrc.gov. | ||
. | |||
L. Weber -2- This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). | L. Weber -2- This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). | ||
Existing information collection requirements were approved by the Office of Management and Budget | Existing information collection requirements were approved by the Office of Management and Budget | ||
| Line 60: | Line 56: | ||
-rm/adams.html | -rm/adams.html | ||
(the Public Electronic Reading Room). | (the Public Electronic Reading Room). | ||
Sincerely, | Sincerely, /RA/ | ||
Stuart Sheldon | Stuart Sheldon | ||
, Acting | , Acting Chie f Engineering Branch 2 | ||
Division of Reactor Safety | Division of Reactor Safety | ||
Docket Nos. | Docket Nos. | ||
50- | 50-3 15 License Nos. DPR-58 Enclosure: | ||
Post-Approval Site Inspection | Post-Approval Site Inspection | ||
License Renewal Request for Information | License Renewal Request for Information | ||
| Line 74: | Line 69: | ||
POST-APPROVAL SITE INSPECTION LICENSE RENEWAL | POST-APPROVAL SITE INSPECTION LICENSE RENEWAL | ||
REQUEST INFORMATION | REQUEST INFORMATION | ||
1 Enclosure | 1 Enclosure Inspection Report | ||
: 05000 315/20 14007 Inspection Dates | |||
: | |||
: April 28, 2014 | : April 28, 2014 | ||
- May 16, 2014 | - May 16, 2014 | ||
| Line 82: | Line 76: | ||
: Inspection Procedure 71003 "Post-Approval Site Inspection for License Renewal | : Inspection Procedure 71003 "Post-Approval Site Inspection for License Renewal | ||
" Lead Inspector | " Lead Inspector | ||
: Caroline Tilton | : Caroline Tilton , Lead Inspector | ||
, Lead Inspector | (630) 829-9718 Caroline.Tilton@nrc.gov | ||
(630) 829 | |||
-9718 Caroline.Tilton@nrc.gov | |||
I. Information Requested Prior to the On | I. Information Requested Prior to the On | ||
-site Inspection Week | -site Inspection Week | ||
on April 11, 2014 | on April 11, 2014 | ||
The following | The following information is requested by April 11, 2014, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the team leader as soon as possible. (Please provide the information electronically in "pdf" files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CDROM, DVD, flash drive, etc.). The portable electronic media | ||
should be identified by unit, contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood by someone who has knowledge of light water reactor technology). | should be identified by unit, contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood by someone who has knowledge of light water reactor technology). | ||
1. Provide a list of your license renewal commitments with an approximate | 1. Provide a list of your license renewal commitments with an approximate | ||
| Line 105: | Line 95: | ||
. | . | ||
2 II. Information Requested | 2 II. Information Requested | ||
t o be Available When the Inspectors Arrive On | |||
-Site on April 28, 2014 | -Site on April 28, 2014 | ||
1. Documentation demonstrating completion of license renewal commitments | 1. Documentation demonstrating completion of license renewal commitments complete d as of the inspection date. For example, this may be in the form of a binder for each commitment which includes the implementing documentation and | ||
references. | references. | ||
III. Information Requested to be Provided Throughout the Inspection | III. Information Requested to be Provided Throughout the Inspection | ||
| Line 123: | Line 113: | ||
-rm/adams.html | -rm/adams.html | ||
(the Public Electronic Reading Room). | (the Public Electronic Reading Room). | ||
Sincerely, | Sincerely, /RA/ | ||
Stuart Sheldon, Acting Chief | Stuart Sheldon, Acting Chief | ||
Engineering Branch 2 | Engineering Branch 2 | ||
| Line 149: | Line 138: | ||
DOCUMENT NAME | DOCUMENT NAME | ||
: G:\DRSIII\DRS\Work in Progress | : G:\DRSIII\DRS\Work in Progress | ||
\Ltr | \Ltr 01 2314 DCCOOK LR RFI CET.docx | ||
-Publicly Available | -Publicly Available | ||
-Sensitive | -Sensitive To receive a copy of this document, indicate in | ||
the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy | the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy | ||
OFFICE RIII RIII NAME CTilton:ls | OFFICE RIII RIII NAME CTilton:ls | ||
SSheldon DATE 01/23/14 via email | SSheldon DATE 01/23/14 via email 01/23/14 OFFICIAL RECORD COPY | ||
}} | }} | ||
Revision as of 16:48, 13 July 2018
| ML14024A476 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/23/2014 |
| From: | Sheldon S N NRC/RGN-III/DRS/EB2 |
| To: | Weber L Indiana Michigan Power Co |
| Caroline Tilton | |
| References | |
| IR-14-007 | |
| Download: ML14024A476 (5) | |
See also: IR 05000315/2014007
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532
-4352 January 23, 2014
Mr. Larry Weber
Senior Vice President and
Chief Nuclear Officer
Indiana Michigan Power Company
Nuclear Generation Group
One Cook Place
Bridgman, MI 49106
SUBJECT: D. C. COOK NUCLEAR POWER PLANT, UNIT 1
- INFORMATION REQUEST FOR A NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL 05000 315/20 14007 Dear Mr. Weber: On April 28, 201 4 , the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval Site Inspection for License Renewal
at D. C. Cook Nuclear Power Plant. This inspection will be performed in accordance with NRC Inspection Procedure (IP)
71003. This inspection will focus on verifying that license conditions added as part of your renewed license and a sample of license renewal commitments have been implement
ed. In order to minimize the inspection impact on the site and to ensure a productive inspection for
both parties, we have enclosed a request for information needed for the inspection.
It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on
-site portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into two groups:
The first group lists information necessary for our initial inspection scoping and
in-office preparation activities. During the in
-office preparation activities, the team will identify as much as possible the information and activities to be reviewed during the inspection.
This information should be provided to the lead inspector by
April 11, 2014. The second group includes the additional information required for the team to review selected activities. This information should be available to the team onsite April 28, 201 4. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated.
The lead inspector for this inspection is
Ms. Caroline Tilton. We understand that our licensing contact for this inspection is Richard Wynegar
of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the
l ead inspector at (630) 829
-9718 or via e-mail at Caroline.Tilton@nrc.gov.
L. Weber -2- This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
Existing information collection requirements were approved by the Office of Management and Budget
Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number
. In accordance with Title 10, Code of Federal Regulations
(CFR), Section 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA/
, Acting Chie f Engineering Branch 2
Division of Reactor Safety
Docket Nos.
50-3 15 License Nos. DPR-58 Enclosure:
Post-Approval Site Inspection
License Renewal Request for Information
cc w/encl:
Distribution via ListServŽ
POST-APPROVAL SITE INSPECTION LICENSE RENEWAL
REQUEST INFORMATION
1 Enclosure Inspection Report
- 05000 315/20 14007 Inspection Dates
- April 28, 2014
- May 16, 2014
Inspection Procedure
- Inspection Procedure 71003 "Post-Approval Site Inspection for License Renewal
" Lead Inspector
- Caroline Tilton , Lead Inspector
(630) 829-9718 Caroline.Tilton@nrc.gov
I. Information Requested Prior to the On
-site Inspection Week
on April 11, 2014
The following information is requested by April 11, 2014, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the team leader as soon as possible. (Please provide the information electronically in "pdf" files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CDROM, DVD, flash drive, etc.). The portable electronic media
should be identified by unit, contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood by someone who has knowledge of light water reactor technology).
1. Provide a list of your license renewal commitments with an approximate
completion status of each.
2. Provide a list of your Aging Management Programs (AMPs), copies of the program basis documents for each, and a listing of the action tracking items for each. 3. For AMPs that are one
-time inspection programs, provide a list of completed work order numbers for inspections that have been completed. This may be incorporated with the previous item and should include identification of the inspected component.
4. Provide current management and license renewal
organizational chart
s. 5. Provide electronic copies of Updated Final Safety Analysis Report, Technical
Specifications, Technical Specifications Bases, and Technical Requirements Manual. 6. Provide copies
of any internal/external self
-assessments and associated corrective action documents generated in preparation for the inspection
.
2 II. Information Requested
t o be Available When the Inspectors Arrive On
-Site on April 28, 2014
1. Documentation demonstrating completion of license renewal commitments complete d as of the inspection date. For example, this may be in the form of a binder for each commitment which includes the implementing documentation and
references.
III. Information Requested to be Provided Throughout the Inspection
1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection
. 2. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection to each team member)
. If you have questions regarding the information requested, please contact the lead inspector.
L. Weber -2- This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget Control Number 3150
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
In accordance
with Title 10, Code of Federal Regulations
(CFR), Section 2.390 of the NRC's "Rules of Practice," a copy of this letter
and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available
Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA/
Stuart Sheldon, Acting Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos.
50-315 License Nos. DPR-58 Enclosure:
Post-Approval Site Inspection
License Renewal Request for Information
cc w/encl:
Distribution via ListServŽ
DISTRIBUTION
RidsNrrDorlLpl3
-1 Resource
RidsNrrPMDCCook Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII DRSIII Patricia Buckley
DOCUMENT NAME
- G:\DRSIII\DRS\Work in Progress
\Ltr 01 2314 DCCOOK LR RFI CET.docx
-Publicly Available
-Sensitive To receive a copy of this document, indicate in
the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII RIII NAME CTilton:ls
SSheldon DATE 01/23/14 via email 01/23/14 OFFICIAL RECORD COPY