IR 05000348/2017404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 39: Line 39:
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


Sincerely,/RA/ James C. Shehee, Acting Chief Plant Support Branch 2  
Sincerely,
/RA/ James C. Shehee, Acting Chief Plant Support Branch 2  


Division of Reactor Safety  
Division of Reactor Safety  


Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8  
Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8 Enclosure: NRC IR 05000348/2017404 and 05000364/2017404 w/Attachment:


===Enclosure:===
NRC IR 05000348/2017404 and 05000364/2017404
===w/Attachment:===
Supplemental Info (OUO)  
Supplemental Info (OUO)  



Revision as of 03:52, 10 May 2019

Joseph M Farley Nuclear Plant - U.S. Nuclear Regulatory Commission Physical Security Inspection Report 05000348/2017404 and 05000364/2017404. OUO Removed
ML17227A150
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/15/2017
From: Shehee J C
Division of Reactor Safety II
To: McGavin S P
Southern Nuclear Operating Co
References
IR 2017404
Download: ML17227A150 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 15, 2017

Mr. Stephen Fleet Security Director Southern Nuclear Operating Co., Inc.

Joseph M. Farley Nuclear Plant 40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242

SUBJECT: JOSEPH M. FARLEY NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMMISSION PHYSICAL SECURITY INSPECTION REPORT 05000348/2017404 AND 05000364/2017404

Dear Mr. McGavin:

On July 27, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Farley Nuclear Plant, Units 1 and 2, and discussed the results of this inspection with Mr. J. Summy and members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at

https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/ James C. Shehee, Acting Chief Plant Support Branch 2

Division of Reactor Safety

Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8 Enclosure: NRC IR 05000348/2017404 and 05000364/2017404 w/Attachment:

Supplemental Info (OUO)

cc: (See page 3) cc: Steven M. Shipman

Fleet Security Project Manager Southern Nuclear Operating Co., Inc. 40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242

Michael P. Long Fleet Nuclear Security Operations Manager Southern Nuclear Operating Co, Inc. 40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII:DRS/PSB2 RII:DRP/BR2 RII:DRS/PSB2 SIGNATURE JDG4 JPT JCS3 SRS5 JCS3 NAME D. Golden J. Tornow J. Shehee S.Sandal J. Shehee DATE 8/ 9 /2017 8/ 15 /2017 8/ 11 /2017 8/ 11 /2017 8/ 15 /2017 E-MAIL COPY YES NO YES NO YES NO YES NO YES NO