{{#Wiki_filter:~4%'i,CATEGORY1REGULAjYINFORMATION DISTRIBUTION SYSTEM(RIDS)~''CCESSION NBR:9901200396 DOC.DATE:
{{#Wiki_filter:~4%'i, CATEGORY 1 REGULAj Y INFORMATION DISTRIBUTION SYSTEM (RIDS)~''CCESSION NBR:9901200396 DOC.DATE: 99/01/11 NOTARIZED:
99/01/11NOTARIZED:
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
NOFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester GAUTH.NAMEAUTHORAFFILIATION MECREDY,R.C.
Rochester Gas S Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.
Rochester GasSElectricCorp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.
DOCKET 05000244
DOCKET05000244


==SUBJECT:==
==SUBJECT:==
Requestsreliefper10CFR50.55a(a)(3)(ii)fromcertainrequirements ofSectionXXofASMEBPEVCodeforISIProgram.Reliefrequests37,38&39encl.DISTRXBUTION CODE:A047DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:ORSubmittal:
Requests relief per 10CFR50.55a (a)(3)(ii)from certain requirements of Section XX of ASME BPEV Code for ISI Program.Relief requests 37,38&39 encl.DISTRXBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:
Inservice/Testing/Relief fromASMECode-GL-89-04NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72)
Inservice/Testing/Relief from ASME Code-GL-89-04 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72)
.05000244E RECIPIENT IDCODE/NAME PD1-1LAVISSING,G.
.05000244E RECIPIENT ID CODE/NAME PD1-1 LA VISSING,G.
INTERNAL:
INTERNAL: AEOD/SPD/RAB NRR/DE/ECGB NUDOCS-ABSTRACT RES/DET/EIB EXTERNAL: LITCO ANDERSON NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT XD CODE/NAME PD1-1 PD ILE CENTER 0 NRR DE MEB OGC/HDS3 RES/DET/EMMEB NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 0 1 1 1 1 0 0, NOTE TO ALL"RIDS" RECIPIENTS:
AEOD/SPD/RAB NRR/DE/ECGB NUDOCS-ABSTRACT RES/DET/EIB EXTERNAL:
PLEASE HELP US TO REDUCE WASTETH TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 AND ROCHESTER GAS AND ElECTRIC CORPORATION
LITCOANDERSONNRCPDRCOPIESLTTRENCL1111111111111111RECIPIENT XDCODE/NAME PD1-1PDILECENTER0NRRDEMEBOGC/HDS3RES/DET/EMMEB NOACCOPIESLTTRENCL11111110111100,NOTETOALL"RIDS"RECIPIENTS:
~89 EAST AVENUE, ROCHESTER, N Y Idbf90001 AREA COOE716 54'6-2700 ROBERT C.MECREDY Vice President Nucteo r Operotioos Zanuary 11, 1999 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, D.C.20555  
PLEASEHELPUSTOREDUCEWASTETHTOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
LTTR14ENCL13 ANDROCHESTER GASANDElECTRICCORPORATION
~89EASTAVENUE,ROCHESTER, NYIdbf90001 AREACOOE71654'6-2700 ROBERTC.MECREDYVicePresident NucteorOperotioos Zanuary11,1999U.S.NuclearRegulatory Commission DocumentControlDeskAttn:GuyS.VissingProjectDirectorate I-1Washington, D.C.20555


==Subject:==
==Subject:==
Inservice Inspection ProgramASMESectionXIRequiredExaminations forFirst10-YearIntervalforContainment (IWEandIWL)RequestsforReliefNo.37,38,39R.E.GinnaNuclearPowerPlantDocketNo.50/244
Inservice Inspection Program ASME Section XI Required Examinations for First 10-Year Interval for Containment (IWE and IWL)Requests for Relief No.37, 38, 39 R.E.Ginna Nuclear Power Plant Docket No.50/244  


==References:==
==References:==


EPRI"Containment Inspection ProgramGuide"GC-110698, September 1998,andselectedReliefRequests:
EPRI"Containment Inspection Program Guide" GC-110698, September 1998, and selected Relief Requests: (1)Davis-Besse Relief Request E-1 (2)Davis-Besse Relief Request E-6 (3)Davis-Besse Relief Request E-7  
(1)Davis-Besse ReliefRequestE-1(2)Davis-Besse ReliefRequestE-6(3)Davis-Besse ReliefRequestE-7


==DearMr.Vissing:==
==Dear Mr.Vissing:==
IntheFederalRegister, datedAugust8,1996(61FR41303),theNRCamendeditsregulations toincorporate byreference the1992EditionandAddendaofSubsections IWEandIWLofSectionXIoftheASMECode.Subsections IWEandIWLgivetherequirements forinservice inspection (ISI)ofClassMC(metallic containment) andClassCC(concrete containment).
In the Federal Register, dated August 8, 1996 (61 FR 41303), the NRC amended its regulations to incorporate by reference the 1992 Edition and Addenda of Subsections IWE and IWL of Section XI of the ASME Code.Subsections IWE and IWL give the requirements for inservice inspection (ISI)of Class MC (metallic containment) and Class CC (concrete containment).
Theserequirements arenowapplicable forR.E.GinnaNuclearPowerPlant.Thepurposeofthisletteristorequestreliefpursuantto10CFR50.55a(a)(3)(ii) fromcertainrequirements ofSectionXIoftheAmericanSocietyofMechanical Engineers (ASME)BoilerandPressureVesselCode.Rochester GasandElectricisaparticipant intheElectricPowerResearchInstitute (EPRI)projectforthepreparation ofaGenericIWE/IWLProgramandIndustryGuide.Thisprogramwasdescribed totheNRCinameetingonOctober23,1997,betweentheNRC,EPRI,andNEI,andseveralutilities.
These requirements are now applicable for R.E.Ginna Nuclear Power Plant.The purpose of this letter is to request relief pursuant to 10 CFR 50.55a(a)(3)(ii) from certain requirements of Section XI of the American Society of Mechanical Engineers (ASME)Boiler and Pressure Vessel Code.Rochester Gas and Electric is a participant in the Electric Power Research Institute (EPRI)project for the preparation of a Generic IWE/IWL Program and Industry Guide.This program was described to the NRC in a meeting on October 23, 1997, between the NRC, EPRI, and NEI, and several utilities.
Asaresultfromthesemeetingsaswellasthepublication oftheEPRI"Containment Inspection ProgramGuide"GC-110698, datedSeptember 1998,Rochester GasandElectricissubmitting three(3)reliefrequests.
As a result from these meetings as well as the publication of the EPRI"Containment Inspection Program Guide" GC-110698, dated September 1998, Rochester Gas and Electric is submitting three (3)relief requests.Relief.,".3.'3b 9'ttoi200396 9'staiii POa ADOCK OSa002O4 8 PDR
Relief.,".3.'3b9'ttoi200396 9'staiiiPOaADOCKOSa002O48PDR
~~e~Requests Number 37 through 39 are based on the generic relief requests contained in the EPRI"Containment Inspection Program Guide".NRC approval of these relief requests is documented in the referenced submittal.
~~e~RequestsNumber37through39arebasedonthegenericreliefrequestscontained intheEPRI"Containment Inspection ProgramGuide".NRCapprovalofthesereliefrequestsisdocumented inthereferenced submittal.
More detailed comments are provided in Attachments 1, 2 and 3 to this letter.Relief Request Number 37 requests relief from Section XI of the ASME Code, 1992 Edition, 1992 Addenda, Code Items E5.10 and E5.20, which require a visual examination of metal containment seals and gaskets.Examination of most seals and gaskets require the joints to be disassembled.
MoredetailedcommentsareprovidedinAttachments 1,2and3tothisletter.ReliefRequestNumber37requestsrelieffromSectionXIoftheASMECode,1992Edition,1992Addenda,CodeItemsE5.10andE5.20,whichrequireavisualexamination ofmetalcontainment sealsandgaskets.Examination ofmostsealsandgasketsrequirethejointstobedisassembled.
Containment seal and gasket joints will be proven adequate through the performance of 10 CFR Appendix J testing.2.Relief Request Number 38 requests relief from Section XI of the ASME Code, 1992 Edition, 1992 Addenda, Subarticles IWE-2420(b)and IWE-2420(c), which require repaired areas be examined during the next inspection period.Repairs restore the component to an acceptable condition for continued service.Successive examinations should not be required for repaired areas.3~Relief Request Number 39 requests relief from Section XI of the ASME Code, 1992 Edition, 1992 Addenda, Code Item E8.20, which requires a bolt torque or tension test for bolted connections that have not been disassembled and reassembled during the inspection interval.The leak tightness of bolted connections will be verified through the performance of 10 CFR 50 Appendix J testing.Relief Requests, justification, and the proposed alternatives are included in the attachments to this letter.These relief requests will be included in the Inservice Inspection Program for R.E.Ginna Nuclear Power Plant for the Third Interval Program (which ends December 31, 1999)and the Fourth Interval Program (which begins January 1, 2000).NRC approval of these relief requests is desired before the end of June, 1999, to ensure these programs are in compliance with NRC requirements before the end of the Third Interval.Ver truly yours, Robert C.Me ed Attachments
Containment sealandgasketjointswillbeprovenadequatethroughtheperformance of10CFRAppendixJtesting.2.ReliefRequestNumber38requestsrelieffromSectionXIoftheASMECode,1992Edition,1992Addenda,Subarticles IWE-2420(b)andIWE-2420(c),
whichrequirerepairedareasbeexaminedduringthenextinspection period.Repairsrestorethecomponent toanacceptable condition forcontinued service.Successive examinations shouldnotberequiredforrepairedareas.3~ReliefRequestNumber39requestsrelieffromSectionXIoftheASMECode,1992Edition,1992Addenda,CodeItemE8.20,whichrequiresabolttorqueortensiontestforboltedconnections thathavenotbeendisassembled andreassembled duringtheinspection interval.
Theleaktightness ofboltedconnections willbeverifiedthroughtheperformance of10CFR50AppendixJtesting.ReliefRequests, justification, andtheproposedalternatives areincludedintheattachments tothisletter.ThesereliefrequestswillbeincludedintheInservice Inspection ProgramforR.E.GinnaNuclearPowerPlantfortheThirdIntervalProgram(whichendsDecember31,1999)andtheFourthIntervalProgram(whichbeginsJanuary1,2000).NRCapprovalofthesereliefrequestsisdesiredbeforetheendofJune,1999,toensuretheseprogramsareincompliance withNRCrequirements beforetheendoftheThirdInterval.
Vertrulyyours,RobertC.MeedAttachments
-3  
-3  
~~'c:Mr.GuyS.Vissing(MailStop14B2)ProjectDirectorate I-1DivisionofReactorProjects-I/IIOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555RegionalAdministrator, RegionIU.S.NuclearRegulatory Commission 475Allendale RoadKingofPrussia,PA19406U.S.NRCGinnaSeniorResidentInspector ATTACHMENT 1Rochester GasandElectricCorporation GinnaStationDocketNo.50/244First10-YearIntervalforContainment Inspection ProgramRequestforReliefNo.37Containment Inspection SealsandGasketsSystem/Component(s) forWhichReliefisRequested:
~~'c: Mr.Guy S.Vissing (Mail Stop 14B2)Project Directorate I-1 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 Regional Administrator, Region I U.S.Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector ATTACHMENT 1 Rochester Gas and Electric Corporation Ginna Station Docket No.50/244 First 10-Year Interval for Containment Inspection Program Request for Relief No.37 Containment Inspection Seals and Gaskets System/Component(s) for Which Relief is Requested:
SealsandgasketsofClassMCpressureretaining components andmetalliclinersofClassCCcomponents, Examination CategoryE-D,ItemNumbersE5.10andE5.20ofIWE-2500, TableIWE-2500-1, ASMESectionXI,1992Edition,1992Addenda.Severalhundredsealsandgasketsareaffectedbythisreliefrequest.II.CodeRequirement:
Seals and gaskets of Class MC pressure retaining components and metallic liners of Class CC components, Examination Category E-D, Item Numbers E5.10 and E5.20 of IWE-2500, Table IWE-2500-1, ASME Section XI, 1992 Edition, 1992 Addenda.Several hundred seals and gaskets are affected by this relief request.II.Code Requirement:
IWE-2500, TableIWE-2500-1 requiressealsandgasketsonairlocks, hatches,andotherdevicestobevisuallyexamined, VT-3,onceeachintervaltoassurecontainment leak-tight integrity.
IWE-2500, Table IWE-2500-1 requires seals and gaskets on airlocks, hatches, and other devices to be visually examined, VT-3, once each interval to assure containment leak-tight integrity.
III.CodeRequirement fromWhichReliefisRequested:
III.Code Requirement from Which Relief is Requested:
Reliefisrequested fromperforming theCode-required visualexamination, VT-3,ontheaboveidentified metalcontainment sealsandgaskets.IV.BasisforRelief:10CFR50.55awasamendedintheFederalRegister(61FR41303)torequiretheuse.ofthe1992Edition,1992Addenda,ofSectionXIwhenperforming containment examinations.
Relief is requested from performing the Code-required visual examination, VT-3, on the above identified metal containment seals and gaskets.IV.Basis for Relief: 10 CFR 50.55a was amended in the Federal Register (61 FR 41303)to require the use.of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations.
Thepenetrations discussed belowcontainsealsandgaskets.Electrical Penetrations Electrical penetrations useaheaderplateattachedtoacontainment penetration nozzleflangewithredundant 0-ringsbetweentheheaderplateandflangeface.RequestforReliefNo.37Attachments Page1of10 Modulesthroughwhichelectrical conductors passareinstalled intheheaderplate.Onetype,manufactured byAmphenol, usessealsandgasketstoassureleaktightintegrity.
The penetrations discussed below contain seals and gaskets.Electrical Penetrations Electrical penetrations use a header plate attached to a containment penetration nozzle flange with redundant 0-rings between the header plate and flange face.Request for Relief No.37 Attachments Page 1 of 10 Modules through which electrical conductors pass are installed in the header plate.One type, manufactured by Amphenol, uses seals and gaskets to assure leak tight integrity.
Asecondtype,manufactured byConax,usesasetofcompression fittings.
A second type, manufactured by Conax, uses a set of compression fittings.Replacement modules for the Amphenol penetrations use a combination of 0-rings and compression fittings.Each penetration is pressurized with dry nitrogen to maintain and monitor integrity and to prevent the intrusion of moisture into the penetration.
Replacement modulesfortheAmphenolpenetrations useacombination of0-ringsandcompression fittings.
These seals and gaskets cannot be inspected without disassembly of the penetration to gain access to the seals and gaskets.B.Containment Personnel and Equipment Hatches The Personnel and Equipment Hatches utilize an inner and outer door with gasket surfaces to ensure a leak tight integrity.
Eachpenetration ispressurized withdrynitrogentomaintainandmonitorintegrity andtopreventtheintrusion ofmoistureintothepenetration.
These hatches also contain other gaskets and seals such as the handwheel shaft seals, electrical penetrations, blank flanges, and equalizing pressure connections which require disassembly to gain access to the gaskets and seals.Seal and gasket joints receive a 10 CFR 50 Appendix J test.As noted in 10 CFR 50 Appendix J, the purpose of Type B tests is to measure leakage of containment or penetrations whose design incorporates resilient seals, gaskets, sealant compounds, and electrical penetrations fitted with flexible metal seal assemblies.
Thesesealsandgasketscannotbeinspected withoutdisassembly ofthepenetration togainaccesstothesealsandgaskets.B.Containment Personnel andEquipment HatchesThePersonnel andEquipment Hatchesutilizeaninnerandouterdoorwithgasketsurfacestoensurealeaktightintegrity.
Examination of seals and gaskets require the joints, which are proven adequate through Appendix J testing, be disassembled.
Thesehatchesalsocontainothergasketsandsealssuchasthehandwheel shaftseals,electrical penetrations, blankflanges,andequalizing pressureconnections whichrequiredisassembly togainaccesstothegasketsandseals.Sealandgasketjointsreceivea10CFR50AppendixJtest.Asnotedin10CFR50AppendixJ,thepurposeofTypeBtestsistomeasureleakageofcontainment orpenetrations whosedesignincorporates resilient seals,gaskets,sealantcompounds, andelectrical penetrations fittedwithflexiblemetalsealassemblies.
For electrical penetrations, this would involve a pre-maintenance Appendix J test, de-termination of cables at electrical penetrations if enough cable slack is not available, disassembly of the joint, removal and examination of the seals and gaskets, reassembly of the joint, re-termination of the cables if necessary, post maintenance testing of the cables, and a post maintenance Appendix J test of the penetration.
Examination ofsealsandgasketsrequirethejoints,whichareprovenadequatethroughAppendixJtesting,bedisassembled.
The work required for the Containment Hatches would be similar except for the de-termination, re-termination, and testing of cables.This imposes the risk that equipment could be damaged.The 1992 Edition, 1993 Addenda, of Section XI recognizes that disassembly of joints to perform these examinations is not warranted.
Forelectrical penetrations, thiswouldinvolveapre-maintenance AppendixJtest,de-termination ofcablesatelectrical penetrations ifenoughcableslackisnotavailable, disassembly ofthejoint,removalandexamination ofthesealsandgaskets,reassembly ofthejoint,re-termination ofthecablesifnecessary, postmaintenance testingofthecables,andapostmaintenance AppendixJtestofthepenetration.
Note 1 in Examination Category E-D was modified in the 1995, Edition of Section XI to state that seal or gasket connections need not be disassembled solely for performance of examinations.
TheworkrequiredfortheContainment Hatcheswouldbesimilarexceptforthede-termination, re-termination, andtestingofcables.Thisimposestheriskthatequipment couldbedamaged.The1992Edition,1993Addenda,ofSectionXIrecognizes thatdisassembly ofjointstoperformtheseexaminations isnotwarranted.
However, without disassembly, most of the surface of the seals and gaskets would be inaccessible.
Note1inExamination CategoryE-Dwasmodifiedinthe1995,EditionofSectionXItostatethatsealorgasketconnections neednotbedisassembled solelyforperformance ofexaminations.
Request for Relief No.37 Attachments Page 2 of 10 For those penetrations that are routinely disassembled, a Type B test is required upon final assembly and prior to start-up.Since the Type B test will assure the leak tight integrity of primary containment, the performance of the visual examination would not provide an increase in the level of safety or quality.Seals and gaskets are not part of the containment pressure boundary under current Code rules (NE-1220 (b)).The airlocks and hatches containing these materials are tested in accordance with 10 CFR 50, Appendix J.If increased leakage is identified during these Appendix J tests, the cause of leakage would be investigated.
However,withoutdisassembly, mostofthesurfaceofthesealsandgasketswouldbeinaccessible.
If increased leakage were due to degradation of the seal or gasket material, corrective measures would be applied and the component retested.Repair or replacement of seals and gaskets is not subject to Code (1992 Edition, 1992 Addenda)rules in accordance with Paragraph IWA-4111(b)(5) of ASME Section XI.The visual examination of seals and gaskets in accordance with IWE-2500, Table IWE-2500-1 is a burden without any compensating increase in the level of safety or quality.Relief is requested in accordance with 10 CFR 50.55a(a)(3)(ii).
RequestforReliefNo.37Attachments Page2of10 Forthosepenetrations thatareroutinely disassembled, aTypeBtestisrequireduponfinalassemblyandpriortostart-up.
Compliance with the original requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety., Testing the seal and gasket joints in accordance with 10 CFR 50, Appendix J will provide adequate assurance of the leak-'tight integrity of the seals and gaskets.V.Alternate Examinations:
SincetheTypeBtestwillassuretheleaktightintegrity ofprimarycontainment, theperformance ofthevisualexamination wouldnotprovideanincreaseinthelevelofsafetyorquality.Sealsandgasketsarenotpartofthecontainment pressureboundaryundercurrentCoderules(NE-1220(b)).Theairlocksandhatchescontaining thesematerials aretestedinaccordance with10CFR50,AppendixJ.Ifincreased leakageisidentified duringtheseAppendixJtests,thecauseofleakagewouldbeinvestigated.
The leak testing of seal and gasket joints will be in accordance with 10 CFR 50, Appendix J.No additional alternative examinations to the visual examination, VT-3, of the seals and gaskets will be performed.
Ifincreased leakagewereduetodegradation ofthesealorgasketmaterial, corrective measureswouldbeappliedandthecomponent retested.
VI.Justification for the Granting of Relief: This Relief Request is similar to Relief Request E-1 submitted by Davis-Besse as one of the EPRI"Containment Inspection Program Guide" Pilot Plant Relief Requests.This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.Request for Relief No.37 Attachments Page 3 of 10 VII.Implementation Schedule: Relief is requested for the first inspection interval for the IWE Containment Inspection Program (1996-2008).Note that this interval overlaps the Third and Fourth 10-Year Interval inspections of the Ginna Inservice Inspection Program.Request for Relief No.37 Attachments Page 4 of 10 ATTACHMENT 2 Rochester Gas and Electric Corporation Ginna Station Docket No.50/244 First 10-Year Interval for Containment Inspection Program Request for Relief No.38 Containment Inspection Successive Examinations after Repair System/Component(s) for Which Relief is Requested:
Repairorreplacement ofsealsandgasketsisnotsubjecttoCode(1992Edition,1992Addenda)rulesinaccordance withParagraph IWA-4111(b)(5) ofASMESectionXI.Thevisualexamination ofsealsandgasketsinaccordance withIWE-2500, TableIWE-2500-1 isaburdenwithoutanycompensating increaseinthelevelofsafetyorquality.Reliefisrequested inaccordance with10CFR50.55a(a)(3)(ii).
All Class MC, Paragraphs IWE-2420(b) and IWE-2420(c) successive examination requirements for components found acceptable for continued service.II.Code Requirement:
Compliance withtheoriginalrequirements ofthissectionwouldresultinhardshiporunusualdifficulty withoutacompensating increaseinthelevelofqualityandsafety.,Testingthesealandgasketjointsinaccordance with10CFR50,AppendixJwillprovideadequateassurance oftheleak-'tight integrity ofthesealsandgaskets.V.Alternate Examinations:
Paragraphs IWE-2420(b) and IWE-2420(c) of the 1992 Edition, 1992 Addenda of ASME Section XI requires that when component examination results require evaluation of flaws, evaluation of areas of degradation, or repairs in accordance with Article IWE-3000, and the component is found to be acceptable for continued service, the areas containing such flaws, degradation, or repairs shall be reexamined during the next inspection period listed in the schedule of the inspection program of Paragraph IWE-2411 or Paragraph IWE-2412, in accordance with Table IWE-2500-1, Examination Category E-C.III.Code Requirement from Which Relief is Requested:
Theleaktestingofsealandgasketjointswillbeinaccordance with10CFR50,AppendixJ.Noadditional alternative examinations tothevisualexamination, VT-3,ofthesealsandgasketswillbeperformed.
Relief is requested from the requirements of Paragraphs IWE-2420(b)and IWE-2420(c) to perform successive examination of repairs.IV.Basis for Relief: 10 CFR 50.55a was amended in the Federal Register (61 FR 41303)to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations.
VI.Justification fortheGrantingofRelief:ThisReliefRequestissimilartoReliefRequestE-1submitted byDavis-Besse asoneoftheEPRI"Containment Inspection ProgramGuide"PilotPlantReliefRequests.
The purpose of a repair is to restore the component to an acceptable condition for continued service in accordance with the acceptance standards of Article IWE-3000.Paragraph IWA-4150 requires the owner to conduct an evaluation of the suitability of the repair including consideration of the cause of failure.Request for Relief No.38 Attachments Page 5 of 10 If the repair has restored the component to an acceptable condition, it is overly conservative to require successive examinations.
ThisReliefRequestwillminimizeGinnaoperating andmaintenance costwithoutdecreasing thelevelofqualityandsafety.RequestforReliefNo.37Attachments Page3of10 VII.Implementation Schedule:
Other paragraphs of the ASME Code recognize this requirement as'overly conservative.
Reliefisrequested forthefirstinspection intervalfortheIWEContainment Inspection Program(1996-2008).NotethatthisintervaloverlapstheThirdandFourth10-YearIntervalinspections oftheGinnaInservice Inspection Program.RequestforReliefNo.37Attachments Page4of10 ATTACHMENT 2Rochester GasandElectricCorporation GinnaStationDocketNo.50/244First10-YearIntervalforContainment Inspection ProgramRequestforReliefNo.38Containment Inspection Successive Examinations afterRepairSystem/Component(s) forWhichReliefisRequested:
If the repair was not suitable, then the repair does not meet code requirements and the component is not acceptable for continued service.Neither Paragraph IWB-2420(b), Paragraph IWC-2420(b), nor Paragraph IWD-2420(b) requires a repair to be subject to successive examination requirements.
AllClassMC,Paragraphs IWE-2420(b) andIWE-2420(c) successive examination requirements forcomponents foundacceptable forcontinued service.II.CodeRequirement:
Furthermore, if the repair area is subject to accelerated degradation, it would still require augmented examination in accordance with Table IWE-2500-1, Examination Category E-C.The successive examination of repairs in accordance with Paragraphs IWE-2420(b) and IWE-2420(c) constitutes a burden without a compensating increase in quality or safety.In their resolution to public comment g3.3, the NRC stated: "The purpose of IWE-2420(b) is to manage components found to be acceptable for continued service (meaning no repair or replacement at this time)as an Examination Category E-C component...
Paragraphs IWE-2420(b) andIWE-2420(c) ofthe1992Edition,1992AddendaofASMESectionXIrequiresthatwhencomponent examination resultsrequireevaluation offlaws,evaluation ofareasofdegradation, orrepairsinaccordance withArticleIWE-3000, andthecomponent isfoundtobeacceptable forcontinued service,theareascontaining suchflaws,degradation, orrepairsshallbereexamined duringthenextinspection periodlistedinthescheduleoftheinspection programofParagraph IWE-2411orParagraph IWE-2412,inaccordance withTableIWE-2500-1, Examination CategoryE-C.III.CodeRequirement fromWhichReliefisRequested:
If the component had been repaired or replaced, then the more frequent examination would not be'needed." Relief is requested in accordance with 10 CFR 50.55a(a)(3)(ii).Compliance with the original requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.The requirement to perform successive examinations following repairs has been removed in the 1997 Addenda of ASME Section XI.This addenda has been approved by the ASME Main Committee and has been published.
Reliefisrequested fromtherequirements ofParagraphs IWE-2420(b)andIWE-2420(c) toperformsuccessive examination ofrepairs.IV.BasisforRelief:10CFR50.55awasamendedintheFederalRegister(61FR41303)torequiretheuseofthe1992Edition,1992Addenda,ofSectionXIwhenperforming containment examinations.
Thepurposeofarepairistorestorethecomponent toanacceptable condition forcontinued serviceinaccordance withtheacceptance standards ofArticleIWE-3000.
Paragraph IWA-4150requirestheownertoconductanevaluation ofthesuitability oftherepairincluding consideration ofthecauseoffailure.RequestforReliefNo.38Attachments Page5of10 Iftherepairhasrestoredthecomponent toanacceptable condition, itisoverlyconservative torequiresuccessive examinations.
Otherparagraphs oftheASMECoderecognize thisrequirement as'overly conservative.
Iftherepairwasnotsuitable, thentherepairdoesnotmeetcoderequirements andthecomponent isnotacceptable forcontinued service.NeitherParagraph IWB-2420(b),
Paragraph IWC-2420(b),
norParagraph IWD-2420(b) requiresarepairtobesubjecttosuccessive examination requirements.
Furthermore, iftherepairareaissubjecttoaccelerated degradation, itwouldstillrequireaugmented examination inaccordance withTableIWE-2500-1, Examination CategoryE-C.Thesuccessive examination ofrepairsinaccordance withParagraphs IWE-2420(b) andIWE-2420(c) constitutes aburdenwithoutacompensating increaseinqualityorsafety.Intheirresolution topubliccommentg3.3,theNRCstated:"ThepurposeofIWE-2420(b) istomanagecomponents foundtobeacceptable forcontinued service(meaningnorepairorreplacement atthistime)asanExamination CategoryE-Ccomponent...
Ifthecomponent hadbeenrepairedorreplaced, thenthemorefrequentexamination wouldnotbe'needed."
Reliefisrequested inaccordance with10CFR50.55a(a)(3)
(ii).Compliance withtheoriginalrequirements ofthissectionwouldresultinhardshiporunusualdifficulty withoutacompensating increaseinthelevelofqualityandsafety.Therequirement toperformsuccessive examinations following repairshasbeenremovedinthe1997AddendaofASMESectionXI.ThisaddendahasbeenapprovedbytheASMEMainCommittee andhasbeenpublished.
V.Alternate Examinations:
V.Alternate Examinations:
Successive examinations inaccordance withParagraphs IWE-2420(b)andIWE-2420(c) arenotrequiredfor'epairs madeinaccordance withArticleIWA-4000.
Successive examinations in accordance with Paragraphs IWE-2420(b)and IWE-2420(c) are not required for'epairs made in accordance with Article IWA-4000.VI.Justification for the Granting of Relief: This Relief Request is similar to Relief Request E-6 submitted by Davis-Besse as one of the EPRI"Containment Inspection Program Guide" Pilot Plant Relief Requests.This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.Request for Relief No.38 Attachments Page 6 of 10 VII.Implementation Schedule: Relief is requested for the first inspection interval for the IWE Containment Inspection Program (1996-2008).Note that this interval overlaps the Third and Fourth 10-Year Interval inspections of the Ginna Inservice Inspection Program.Request for Relief No.38 Attachments Page 7 of 10 ATTACHMENT 3 Rochester Gas and Electric Corporation Ginna Station Docket No.50/244 First.10-Year Interval for Containment Inspection Program Request for Relief No.39 Containment Inspection Bolt Torque or Tension Testing I.System/Component(s) for Which Relief is Requested:
VI.Justification fortheGrantingofRelief:ThisReliefRequestissimilartoReliefRequestE-6submitted byDavis-Besse asoneoftheEPRI"Containment Inspection ProgramGuide"PilotPlantReliefRequests.
Class MC pressure retaining bolting.II.Code Requirement:
ThisReliefRequestwillminimizeGinnaoperating andmaintenance costwithoutdecreasing thelevelofqualityandsafety.RequestforReliefNo.38Attachments Page6of10 VII.Implementation Schedule:
ASME Section XI, 1992 Edition with the 1992 Addenda, Table IWE-2500-1, Examination Category E-G, Pressure Retaining Bolting, Item E8.20.Bolt torque or tension testing is required on bolted connections that have not been disassembled and reassembled during the inspection interval.III.Code Requirement from Which Relief is Requested:
Reliefisrequested forthefirstinspection intervalfortheIWEContainment Inspection Program(1996-2008).NotethatthisintervaloverlapstheThirdandFourth10-YearIntervalinspections oftheGinnaInservice Inspection Program.RequestforReliefNo.38Attachments Page7of10 ATTACHMENT 3Rochester GasandElectricCorporation GinnaStationDocketNo.50/244First.10-YearIntervalforContainment Inspection ProgramRequestforReliefNo.39Containment Inspection BoltTorqueorTensionTestingI.System/Component(s) forWhichReliefisRequested:
Relief is requested from ASME Section XI 1992 Edition with the 1992 Addenda Table IWE-2500-1 Examination Category E-G, Pressure Retaining Bolting, Item E8.20.Bolt torque or tension testing is required on bolted connections that have not been disassembled and reassembled during the inspection interval.IV.Basis for Relief: 10CFR50.55a was amended in the Federal Register (61 FR 41303)to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations.
ClassMCpressureretaining bolting.II.CodeRequirement:
Bolt torque or tension testing is required on bolted connections that have not been disassembled and reassembled during the inspection interval.Determination of the torque or tension value would require that the bolting be un-torqued and then re-torqued or re-tensioned.
ASMESectionXI,1992Editionwiththe1992Addenda,TableIWE-2500-1, Examination CategoryE-G,PressureRetaining Bolting,ItemE8.20.Bolttorqueortensiontestingisrequiredonboltedconnections thathavenotbeendisassembled andreassembled duringtheinspection interval.
The performance of the Type B test itself proves that the bolt torque or tension remains adequate to provide a leak rate that is within acceptable limits.The torque or tension value of bolting only becomes an issue if the leak rate is excessive.
III.CodeRequirement fromWhichReliefisRequested:
Once a bolt is torqued or.tensioned, it is not subject to dynamic loading that could cause it to experience significant change.Request for Relief No.39 Attachments Page 8 of 10 Verification of torque or tension values on bolted joints that are proven adequate through Appendix J testing and visual inspection is adequate to demonstrate that design function is met.Torque or tension testing is not required on any other ASME Section XI, Class 1, 2, or 3 bolted connections or their supports as part of the inservice inspection program.Also, all penetrations at R.E.Ginna Nuclear Power Plant are seated with pressure (not unseated).
Reliefisrequested fromASMESectionXI1992Editionwiththe1992AddendaTableIWE-2500-1 Examination CategoryE-G,PressureRetaining Bolting,ItemE8.20.Bolttorqueortensiontestingisrequiredonboltedconnections thathavenotbeendisassembled andreassembled duringtheinspection interval.
Relief is requested in accordance with 10 CFR 50.55a(a)(3)(ii).Compliance with the original requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.V.Alternate Examinations:
IV.BasisforRelief:10CFR50.55a wasamendedintheFederalRegister(61FR41303)torequiretheuseofthe1992Edition,1992Addenda,ofSectionXIwhenperforming containment examinations.
The following examinations and tests required by Subsection IWE ensure the structural integrity and the leak-tightness of Class MC pressure retaining bolting, and, therefore, no additional alternative examinations are proposed: (1)Exposed surfaces of bolted connections shall be visually examined in accordance with requirements of Table IWE-2500-1, Examination Category E-G, Pressure Retaining Bolting, Item No.E8.10, and (2)Bolted connections shall meet the pressure test requirements of Table IWE-2500-1, Examination Category E-P, All Pressure Retaining Components, Item E9.40, and (3)A general visual examination of the entire containment once each inspection period shall be conducted in accordance with 10 CFR 50.55a(b)(2)(x)(E).
Bolttorqueortensiontestingisrequiredonboltedconnections thathavenotbeendisassembled andreassembled duringtheinspection interval.
VI.Justification for the Granting of Relief: This Relief Request is similar to Relief Request E-7 submitted by Davis-Besse as one of the EPRI"Containment Inspection Program Guide" Pilot Plant Relief Requests.This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.Request for Relief No.39 Attachments Page 9 of 10 VII.Implementation Schedule: Relief is requested for the first inspection interval for the IWE Containment Inspection Program (1996-2008).Note that this interval overlaps the Third and Fourth 10-Year Interval inspections of the Ginna Inservice Inspection Program.Request for Relief No.39 Attachments Page 10 of 10}}
Determination ofthetorqueortensionvaluewouldrequirethattheboltingbeun-torquedandthenre-torqued orre-tensioned.
Theperformance oftheTypeBtestitselfprovesthatthebolttorqueortensionremainsadequatetoprovidealeakratethatiswithinacceptable limits.Thetorqueortensionvalueofboltingonlybecomesanissueiftheleakrateisexcessive.
Onceaboltistorquedor.tensioned, itisnotsubjecttodynamicloadingthatcouldcauseittoexperience significant change.RequestforReliefNo.39Attachments Page8of10 Verification oftorqueortensionvaluesonboltedjointsthatareprovenadequatethroughAppendixJtestingandvisualinspection isadequatetodemonstrate thatdesignfunctionismet.TorqueortensiontestingisnotrequiredonanyotherASMESectionXI,Class1,2,or3boltedconnections ortheirsupportsaspartoftheinservice inspection program.Also,allpenetrations atR.E.GinnaNuclearPowerPlantareseatedwithpressure(notunseated).
Reliefisrequested inaccordance with10CFR50.55a(a)(3)
(ii).Compliance withtheoriginalrequirements ofthissectionwouldresultinhardshiporunusualdifficulty withoutacompensating increaseinthelevelofqualityandsafety.V.Alternate Examinations:
Thefollowing examinations andtestsrequiredbySubsection IWEensurethestructural integrity andtheleak-tightness ofClassMCpressureretaining bolting,and,therefore, noadditional alternative examinations areproposed:
(1)Exposedsurfacesofboltedconnections shallbevisuallyexaminedinaccordance withrequirements ofTableIWE-2500-1, Examination CategoryE-G,PressureRetaining Bolting,ItemNo.E8.10,and(2)Boltedconnections shallmeetthepressuretestrequirements ofTableIWE-2500-1, Examination CategoryE-P,AllPressureRetaining Components, ItemE9.40,and(3)Ageneralvisualexamination oftheentirecontainment onceeachinspection periodshallbeconducted inaccordance with10CFR50.55a(b)(2)(x)(E).
VI.Justification fortheGrantingofRelief:ThisReliefRequestissimilartoReliefRequestE-7submitted byDavis-Besse asoneoftheEPRI"Containment Inspection ProgramGuide"PilotPlantReliefRequests.
ThisReliefRequestwillminimizeGinnaoperating andmaintenance costwithoutdecreasing thelevelofqualityandsafety.RequestforReliefNo.39Attachments Page9of10 VII.Implementation Schedule:
Reliefisrequested forthefirstinspection intervalfortheIWEContainment Inspection Program(1996-2008).NotethatthisintervaloverlapstheThirdandFourth10-YearIntervalinspections oftheGinnaInservice Inspection Program.RequestforReliefNo.39Attachments Page10of10}}

Revision as of 12:35, 7 July 2018

Requests Relief Per 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section Xi of ASME Bp&V Code for ISI Program.Relief Requests 37,38 & 39 Encl
ML17265A511
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/11/1999
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: VISSING G S
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9901200396
Download: ML17265A511 (14)


Text

~4%'i, CATEGORY 1 REGULAj Y INFORMATION DISTRIBUTION SYSTEM (RIDS)~CCESSION NBR:9901200396 DOC.DATE: 99/01/11 NOTARIZED:

NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas S Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.

DOCKET 05000244

SUBJECT:

Requests relief per 10CFR50.55a (a)(3)(ii)from certain requirements of Section XX of ASME BPEV Code for ISI Program.Relief requests 37,38&39 encl.DISTRXBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:

Inservice/Testing/Relief from ASME Code-GL-89-04 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72)

.05000244E RECIPIENT ID CODE/NAME PD1-1 LA VISSING,G.

INTERNAL: AEOD/SPD/RAB NRR/DE/ECGB NUDOCS-ABSTRACT RES/DET/EIB EXTERNAL: LITCO ANDERSON NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT XD CODE/NAME PD1-1 PD ILE CENTER 0 NRR DE MEB OGC/HDS3 RES/DET/EMMEB NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 0 1 1 1 1 0 0, NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 AND ROCHESTER GAS AND ElECTRIC CORPORATION

~89 EAST AVENUE, ROCHESTER, N Y Idbf90001 AREA COOE716 54'6-2700 ROBERT C.MECREDY Vice President Nucteo r Operotioos Zanuary 11, 1999 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, D.C.20555

Subject:

Inservice Inspection Program ASME Section XI Required Examinations for First 10-Year Interval for Containment (IWE and IWL)Requests for Relief No.37, 38, 39 R.E.Ginna Nuclear Power Plant Docket No.50/244

References:

EPRI"Containment Inspection Program Guide" GC-110698, September 1998, and selected Relief Requests: (1)Davis-Besse Relief Request E-1 (2)Davis-Besse Relief Request E-6 (3)Davis-Besse Relief Request E-7

Dear Mr.Vissing:

In the Federal Register, dated August 8, 1996 (61 FR 41303), the NRC amended its regulations to incorporate by reference the 1992 Edition and Addenda of Subsections IWE and IWL of Section XI of the ASME Code.Subsections IWE and IWL give the requirements for inservice inspection (ISI)of Class MC (metallic containment) and Class CC (concrete containment).

These requirements are now applicable for R.E.Ginna Nuclear Power Plant.The purpose of this letter is to request relief pursuant to 10 CFR 50.55a(a)(3)(ii) from certain requirements of Section XI of the American Society of Mechanical Engineers (ASME)Boiler and Pressure Vessel Code.Rochester Gas and Electric is a participant in the Electric Power Research Institute (EPRI)project for the preparation of a Generic IWE/IWL Program and Industry Guide.This program was described to the NRC in a meeting on October 23, 1997, between the NRC, EPRI, and NEI, and several utilities.

As a result from these meetings as well as the publication of the EPRI"Containment Inspection Program Guide" GC-110698, dated September 1998, Rochester Gas and Electric is submitting three (3)relief requests.Relief.,".3.'3b 9'ttoi200396 9'staiii POa ADOCK OSa002O4 8 PDR

~~e~Requests Number 37 through 39 are based on the generic relief requests contained in the EPRI"Containment Inspection Program Guide".NRC approval of these relief requests is documented in the referenced submittal.

More detailed comments are provided in Attachments 1, 2 and 3 to this letter.Relief Request Number 37 requests relief from Section XI of the ASME Code, 1992 Edition, 1992 Addenda, Code Items E5.10 and E5.20, which require a visual examination of metal containment seals and gaskets.Examination of most seals and gaskets require the joints to be disassembled.

Containment seal and gasket joints will be proven adequate through the performance of 10 CFR Appendix J testing.2.Relief Request Number 38 requests relief from Section XI of the ASME Code, 1992 Edition, 1992 Addenda, Subarticles IWE-2420(b)and IWE-2420(c), which require repaired areas be examined during the next inspection period.Repairs restore the component to an acceptable condition for continued service.Successive examinations should not be required for repaired areas.3~Relief Request Number 39 requests relief from Section XI of the ASME Code, 1992 Edition, 1992 Addenda, Code Item E8.20, which requires a bolt torque or tension test for bolted connections that have not been disassembled and reassembled during the inspection interval.The leak tightness of bolted connections will be verified through the performance of 10 CFR 50 Appendix J testing.Relief Requests, justification, and the proposed alternatives are included in the attachments to this letter.These relief requests will be included in the Inservice Inspection Program for R.E.Ginna Nuclear Power Plant for the Third Interval Program (which ends December 31, 1999)and the Fourth Interval Program (which begins January 1, 2000).NRC approval of these relief requests is desired before the end of June, 1999, to ensure these programs are in compliance with NRC requirements before the end of the Third Interval.Ver truly yours, Robert C.Me ed Attachments

-3

~~'c: Mr.Guy S.Vissing (Mail Stop 14B2)Project Directorate I-1 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 Regional Administrator, Region I U.S.Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector ATTACHMENT 1 Rochester Gas and Electric Corporation Ginna Station Docket No.50/244 First 10-Year Interval for Containment Inspection Program Request for Relief No.37 Containment Inspection Seals and Gaskets System/Component(s) for Which Relief is Requested:

Seals and gaskets of Class MC pressure retaining components and metallic liners of Class CC components, Examination Category E-D, Item Numbers E5.10 and E5.20 of IWE-2500, Table IWE-2500-1, ASME Section XI, 1992 Edition, 1992 Addenda.Several hundred seals and gaskets are affected by this relief request.II.Code Requirement:

IWE-2500, Table IWE-2500-1 requires seals and gaskets on airlocks, hatches, and other devices to be visually examined, VT-3, once each interval to assure containment leak-tight integrity.

III.Code Requirement from Which Relief is Requested:

Relief is requested from performing the Code-required visual examination, VT-3, on the above identified metal containment seals and gaskets.IV.Basis for Relief: 10 CFR 50.55a was amended in the Federal Register (61 FR 41303)to require the use.of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations.

The penetrations discussed below contain seals and gaskets.Electrical Penetrations Electrical penetrations use a header plate attached to a containment penetration nozzle flange with redundant 0-rings between the header plate and flange face.Request for Relief No.37 Attachments Page 1 of 10 Modules through which electrical conductors pass are installed in the header plate.One type, manufactured by Amphenol, uses seals and gaskets to assure leak tight integrity.

A second type, manufactured by Conax, uses a set of compression fittings.Replacement modules for the Amphenol penetrations use a combination of 0-rings and compression fittings.Each penetration is pressurized with dry nitrogen to maintain and monitor integrity and to prevent the intrusion of moisture into the penetration.

These seals and gaskets cannot be inspected without disassembly of the penetration to gain access to the seals and gaskets.B.Containment Personnel and Equipment Hatches The Personnel and Equipment Hatches utilize an inner and outer door with gasket surfaces to ensure a leak tight integrity.

These hatches also contain other gaskets and seals such as the handwheel shaft seals, electrical penetrations, blank flanges, and equalizing pressure connections which require disassembly to gain access to the gaskets and seals.Seal and gasket joints receive a 10 CFR 50 Appendix J test.As noted in 10 CFR 50 Appendix J, the purpose of Type B tests is to measure leakage of containment or penetrations whose design incorporates resilient seals, gaskets, sealant compounds, and electrical penetrations fitted with flexible metal seal assemblies.

Examination of seals and gaskets require the joints, which are proven adequate through Appendix J testing, be disassembled.

For electrical penetrations, this would involve a pre-maintenance Appendix J test, de-termination of cables at electrical penetrations if enough cable slack is not available, disassembly of the joint, removal and examination of the seals and gaskets, reassembly of the joint, re-termination of the cables if necessary, post maintenance testing of the cables, and a post maintenance Appendix J test of the penetration.

The work required for the Containment Hatches would be similar except for the de-termination, re-termination, and testing of cables.This imposes the risk that equipment could be damaged.The 1992 Edition, 1993 Addenda, of Section XI recognizes that disassembly of joints to perform these examinations is not warranted.

Note 1 in Examination Category E-D was modified in the 1995, Edition of Section XI to state that seal or gasket connections need not be disassembled solely for performance of examinations.

However, without disassembly, most of the surface of the seals and gaskets would be inaccessible.

Request for Relief No.37 Attachments Page 2 of 10 For those penetrations that are routinely disassembled, a Type B test is required upon final assembly and prior to start-up.Since the Type B test will assure the leak tight integrity of primary containment, the performance of the visual examination would not provide an increase in the level of safety or quality.Seals and gaskets are not part of the containment pressure boundary under current Code rules (NE-1220 (b)).The airlocks and hatches containing these materials are tested in accordance with 10 CFR 50, Appendix J.If increased leakage is identified during these Appendix J tests, the cause of leakage would be investigated.

If increased leakage were due to degradation of the seal or gasket material, corrective measures would be applied and the component retested.Repair or replacement of seals and gaskets is not subject to Code (1992 Edition, 1992 Addenda)rules in accordance with Paragraph IWA-4111(b)(5) of ASME Section XI.The visual examination of seals and gaskets in accordance with IWE-2500, Table IWE-2500-1 is a burden without any compensating increase in the level of safety or quality.Relief is requested in accordance with 10 CFR 50.55a(a)(3)(ii).

Compliance with the original requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety., Testing the seal and gasket joints in accordance with 10 CFR 50, Appendix J will provide adequate assurance of the leak-'tight integrity of the seals and gaskets.V.Alternate Examinations:

The leak testing of seal and gasket joints will be in accordance with 10 CFR 50, Appendix J.No additional alternative examinations to the visual examination, VT-3, of the seals and gaskets will be performed.

VI.Justification for the Granting of Relief: This Relief Request is similar to Relief Request E-1 submitted by Davis-Besse as one of the EPRI"Containment Inspection Program Guide" Pilot Plant Relief Requests.This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.Request for Relief No.37 Attachments Page 3 of 10 VII.Implementation Schedule: Relief is requested for the first inspection interval for the IWE Containment Inspection Program (1996-2008).Note that this interval overlaps the Third and Fourth 10-Year Interval inspections of the Ginna Inservice Inspection Program.Request for Relief No.37 Attachments Page 4 of 10 ATTACHMENT 2 Rochester Gas and Electric Corporation Ginna Station Docket No.50/244 First 10-Year Interval for Containment Inspection Program Request for Relief No.38 Containment Inspection Successive Examinations after Repair System/Component(s) for Which Relief is Requested:

All Class MC, Paragraphs IWE-2420(b) and IWE-2420(c) successive examination requirements for components found acceptable for continued service.II.Code Requirement:

Paragraphs IWE-2420(b) and IWE-2420(c) of the 1992 Edition, 1992 Addenda of ASME Section XI requires that when component examination results require evaluation of flaws, evaluation of areas of degradation, or repairs in accordance with Article IWE-3000, and the component is found to be acceptable for continued service, the areas containing such flaws, degradation, or repairs shall be reexamined during the next inspection period listed in the schedule of the inspection program of Paragraph IWE-2411 or Paragraph IWE-2412, in accordance with Table IWE-2500-1, Examination Category E-C.III.Code Requirement from Which Relief is Requested:

Relief is requested from the requirements of Paragraphs IWE-2420(b)and IWE-2420(c) to perform successive examination of repairs.IV.Basis for Relief: 10 CFR 50.55a was amended in the Federal Register (61 FR 41303)to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations.

The purpose of a repair is to restore the component to an acceptable condition for continued service in accordance with the acceptance standards of Article IWE-3000.Paragraph IWA-4150 requires the owner to conduct an evaluation of the suitability of the repair including consideration of the cause of failure.Request for Relief No.38 Attachments Page 5 of 10 If the repair has restored the component to an acceptable condition, it is overly conservative to require successive examinations.

Other paragraphs of the ASME Code recognize this requirement as'overly conservative.

If the repair was not suitable, then the repair does not meet code requirements and the component is not acceptable for continued service.Neither Paragraph IWB-2420(b), Paragraph IWC-2420(b), nor Paragraph IWD-2420(b) requires a repair to be subject to successive examination requirements.

Furthermore, if the repair area is subject to accelerated degradation, it would still require augmented examination in accordance with Table IWE-2500-1, Examination Category E-C.The successive examination of repairs in accordance with Paragraphs IWE-2420(b) and IWE-2420(c) constitutes a burden without a compensating increase in quality or safety.In their resolution to public comment g3.3, the NRC stated: "The purpose of IWE-2420(b) is to manage components found to be acceptable for continued service (meaning no repair or replacement at this time)as an Examination Category E-C component...

If the component had been repaired or replaced, then the more frequent examination would not be'needed." Relief is requested in accordance with 10 CFR 50.55a(a)(3)(ii).Compliance with the original requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.The requirement to perform successive examinations following repairs has been removed in the 1997 Addenda of ASME Section XI.This addenda has been approved by the ASME Main Committee and has been published.

V.Alternate Examinations:

Successive examinations in accordance with Paragraphs IWE-2420(b)and IWE-2420(c) are not required for'epairs made in accordance with Article IWA-4000.VI.Justification for the Granting of Relief: This Relief Request is similar to Relief Request E-6 submitted by Davis-Besse as one of the EPRI"Containment Inspection Program Guide" Pilot Plant Relief Requests.This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.Request for Relief No.38 Attachments Page 6 of 10 VII.Implementation Schedule: Relief is requested for the first inspection interval for the IWE Containment Inspection Program (1996-2008).Note that this interval overlaps the Third and Fourth 10-Year Interval inspections of the Ginna Inservice Inspection Program.Request for Relief No.38 Attachments Page 7 of 10 ATTACHMENT 3 Rochester Gas and Electric Corporation Ginna Station Docket No.50/244 First.10-Year Interval for Containment Inspection Program Request for Relief No.39 Containment Inspection Bolt Torque or Tension Testing I.System/Component(s) for Which Relief is Requested:

Class MC pressure retaining bolting.II.Code Requirement:

ASME Section XI, 1992 Edition with the 1992 Addenda, Table IWE-2500-1, Examination Category E-G, Pressure Retaining Bolting, Item E8.20.Bolt torque or tension testing is required on bolted connections that have not been disassembled and reassembled during the inspection interval.III.Code Requirement from Which Relief is Requested:

Relief is requested from ASME Section XI 1992 Edition with the 1992 Addenda Table IWE-2500-1 Examination Category E-G, Pressure Retaining Bolting, Item E8.20.Bolt torque or tension testing is required on bolted connections that have not been disassembled and reassembled during the inspection interval.IV.Basis for Relief: 10CFR50.55a was amended in the Federal Register (61 FR 41303)to require the use of the 1992 Edition, 1992 Addenda, of Section XI when performing containment examinations.

Bolt torque or tension testing is required on bolted connections that have not been disassembled and reassembled during the inspection interval.Determination of the torque or tension value would require that the bolting be un-torqued and then re-torqued or re-tensioned.

The performance of the Type B test itself proves that the bolt torque or tension remains adequate to provide a leak rate that is within acceptable limits.The torque or tension value of bolting only becomes an issue if the leak rate is excessive.

Once a bolt is torqued or.tensioned, it is not subject to dynamic loading that could cause it to experience significant change.Request for Relief No.39 Attachments Page 8 of 10 Verification of torque or tension values on bolted joints that are proven adequate through Appendix J testing and visual inspection is adequate to demonstrate that design function is met.Torque or tension testing is not required on any other ASME Section XI, Class 1, 2, or 3 bolted connections or their supports as part of the inservice inspection program.Also, all penetrations at R.E.Ginna Nuclear Power Plant are seated with pressure (not unseated).

Relief is requested in accordance with 10 CFR 50.55a(a)(3)(ii).Compliance with the original requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.V.Alternate Examinations:

The following examinations and tests required by Subsection IWE ensure the structural integrity and the leak-tightness of Class MC pressure retaining bolting, and, therefore, no additional alternative examinations are proposed: (1)Exposed surfaces of bolted connections shall be visually examined in accordance with requirements of Table IWE-2500-1, Examination Category E-G, Pressure Retaining Bolting, Item No.E8.10, and (2)Bolted connections shall meet the pressure test requirements of Table IWE-2500-1, Examination Category E-P, All Pressure Retaining Components, Item E9.40, and (3)A general visual examination of the entire containment once each inspection period shall be conducted in accordance with 10 CFR 50.55a(b)(2)(x)(E).

VI.Justification for the Granting of Relief: This Relief Request is similar to Relief Request E-7 submitted by Davis-Besse as one of the EPRI"Containment Inspection Program Guide" Pilot Plant Relief Requests.This Relief Request will minimize Ginna operating and maintenance cost without decreasing the level of quality and safety.Request for Relief No.39 Attachments Page 9 of 10 VII.Implementation Schedule: Relief is requested for the first inspection interval for the IWE Containment Inspection Program (1996-2008).Note that this interval overlaps the Third and Fourth 10-Year Interval inspections of the Ginna Inservice Inspection Program.Request for Relief No.39 Attachments Page 10 of 10