{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL  60532-4352 June 20, 2014 EA-12-155 Mr. Anthony Vitale Vice President, Operations Entergy Nuclear Operations, Inc.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL  60532-4352 June 20, 2014  
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI  49043-9530
 
EA-12-155  
 
Mr. Anthony Vitale Vice President, Operations Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI  49043-9530  


==SUBJECT:==
==SUBJECT:==
Line 25: Line 29:


==Dear Mr. Vitale:==
==Dear Mr. Vitale:==
On July 17, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) EA-12-155 (Agencywide Documents Access & Management System [ADAMS] Accession Number ML12199A409) regarding leakage from the safety injection refueling water tank. On June 20, 2013, Entergy Nuclear Operations, Inc. (ENO) submitted a letter stating three of the five commitments in the CAL (ADAMS ML13171A219) were complete. On June 26, 2013, NRC staff revised EA-12-155 to reflect the closing of these commitments (ADAMS ML13177A280). The two commitments that remained were as follows:  
 
: 1) ENO will continue inspections of the concrete support structure above the control room, control room hallway, and the concrete support structure ceiling as prescribed in the approved Operations Standing Order. These inspections are to ensure that the temporary modifications installed to prevent impact to safety-related structures, systems and components are performing their intended functions. 2) ENO will correct the adverse condition related to cracking of the concrete support structure around the ceiling of the control room, which could lead to water intrusion, prior to restart from the next refueling outage.
On July 17, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) EA-12-155 (Agencywide Documents Access & Management System [ADAMS] Accession Number ML12199A409) regarding leakage from the safety injection refueling water tank. On June 20, 2013, Entergy Nuclear Operations, Inc. (ENO) submitted a letter stating three of the five commitments in the CAL (ADAMS ML13171A219) were complete. On June 26, 2013, NRC staff revised EA-12-155 to reflect the closing of these commitments (ADAMS ML13177A280). The two commitments that remained were as follows:  
: 1) ENO will continue inspections of the concrete support structure above the control room, control room hallway, and the concrete support structure ceiling as prescribed in the approved Operations Standing Order. These inspections are to ensure that the temporary modifications installed to prevent impact to safety-related structures, systems and components are performing their intended functions.
: 2) ENO will correct the adverse condition related to cracking of the concrete support structure around the ceiling of the control room, which could lead to water intrusion, prior to restart from the next refueling outage.  
 
On January 16, 2014, the NRC staff received your letter stating that the remaining two commitments noted above were complete (ADAMS ML14016A211). Based on the information in your letter and the inspections conducted during a biennial Problem Identification and Resolution inspection documented in NRC Inspection Report 05000255/2014007 (ADAMS ML14171A394), the NRC has concluded that the commitments in EA-12-155, Revision 1 are complete. No further response is required and the NRC considers CAL EA-12-155 closed.  
On January 16, 2014, the NRC staff received your letter stating that the remaining two commitments noted above were complete (ADAMS ML14016A211). Based on the information in your letter and the inspections conducted during a biennial Problem Identification and Resolution inspection documented in NRC Inspection Report 05000255/2014007 (ADAMS ML14171A394), the NRC has concluded that the commitments in EA-12-155, Revision 1 are complete. No further response is required and the NRC considers CAL EA-12-155 closed.  


A.Vitale In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
A.Vitale  
Sincerely,   
 
  /RA/  Cynthia D. Pederson Regional Administrator Docket No. 50-255 License No. DPR-20  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Pub lic Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
.
Sincerely,  
 
/RA/   Cynthia D. Pederson
 
Regional Administrator 
 
Docket No. 50-255 License No. DPR-20
 
cc:  Distribution via LISTSERV
 
A.Vitale
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, will be made available electronically for public inspection in the NRC Pub lic Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
.
Sincerely,
 
  /RA/  Cynthia D. Pederson  
 
Regional Administrator  
 
Docket No. 50-255 License No. DPR-20  
 
cc:  Distribution via LISTSERV DISTRIBUTION
: Joseph Nick RidsNrrPMPalisades Resource
 
RidsNrrDorlLpl3-1 Resource
 
RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth
 
Allan Barker
 
Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley


cc:  Distribution via LISTSERV A.Vitale In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Carmen Olteanu ROPassessment.Resource@nrc.gov
Sincerely, 
/RA/  Cynthia D. Pederson Regional Administrator Docket No. 50-255 License No. DPR-20


ccDistribution via LISTSERV  DISTRIBUTION: Joseph Nick RidsNrrPMPalisades Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu ROPassessment.Resource@nrc.gov 
DOCUMENT NAMEPalisades Closure of Confirmatory Action Letter  Publicly Available  Non-Publicly Available Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII  RIII  RIII  RIII  NRR  NRR  NAME JLennartz for CHunt:mt/rj


DOCUMENT NAME:  Palisades Closure of Confirmatory Action Letter  Publicly Available  Non-Publicly Available  Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy      OFFICE RIII  RIII  RIII  RIII  NRR  NRR  NAME JLennartz for CHunt:mt/rj EDuncan SOrth ABoland RLantz for MEvans ELeeds DATE 06/11/14 06/11/14 06/11/14 06/16/14 06/19/14 06/19/14  OFFICIAL RECORD COPY}}
EDuncan SOrth ABoland RLantz for MEvans ELeeds DATE 06/11/14 06/11/14 06/11/14 06/16/14 06/19/14 06/19/14  OFFICIAL RECORD COPY}}

Revision as of 13:23, 1 July 2018

Palisades Nuclear Plant - Closure of Confirmatory Action Letter, Revision 1
ML14171A628
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/20/2014
From: Pederson C D
Region 3 Administrator
To: Vitale A J
Entergy Nuclear Operations
References
EA-12-155
Download: ML14171A628 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 20, 2014

EA-12-155

Mr. Anthony Vitale Vice President, Operations Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530

SUBJECT:

PALISADES - CLOSURE OF CONFIRMATORY ACTION LETTER, REVISION 1

Dear Mr. Vitale:

On July 17, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) EA-12-155 (Agencywide Documents Access & Management System [ADAMS] Accession Number ML12199A409) regarding leakage from the safety injection refueling water tank. On June 20, 2013, Entergy Nuclear Operations, Inc. (ENO) submitted a letter stating three of the five commitments in the CAL (ADAMS ML13171A219) were complete. On June 26, 2013, NRC staff revised EA-12-155 to reflect the closing of these commitments (ADAMS ML13177A280). The two commitments that remained were as follows:

1) ENO will continue inspections of the concrete support structure above the control room, control room hallway, and the concrete support structure ceiling as prescribed in the approved Operations Standing Order. These inspections are to ensure that the temporary modifications installed to prevent impact to safety-related structures, systems and components are performing their intended functions.
2) ENO will correct the adverse condition related to cracking of the concrete support structure around the ceiling of the control room, which could lead to water intrusion, prior to restart from the next refueling outage.

On January 16, 2014, the NRC staff received your letter stating that the remaining two commitments noted above were complete (ADAMS ML14016A211). Based on the information in your letter and the inspections conducted during a biennial Problem Identification and Resolution inspection documented in NRC Inspection Report 05000255/2014007 (ADAMS ML14171A394), the NRC has concluded that the commitments in EA-12-155, Revision 1 are complete. No further response is required and the NRC considers CAL EA-12-155 closed.

A.Vitale

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Pub lic Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

.

Sincerely,

/RA/ Cynthia D. Pederson

Regional Administrator

Docket No. 50-255 License No. DPR-20

cc: Distribution via LISTSERV

A.Vitale

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, will be made available electronically for public inspection in the NRC Pub lic Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

.

Sincerely,

/RA/ Cynthia D. Pederson

Regional Administrator

Docket No. 50-255 License No. DPR-20

cc: Distribution via LISTSERV DISTRIBUTION

Joseph Nick RidsNrrPMPalisades Resource

RidsNrrDorlLpl3-1 Resource

RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth

Allan Barker

Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley

Carmen Olteanu ROPassessment.Resource@nrc.gov

DOCUMENT NAME: Palisades Closure of Confirmatory Action Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NRR NRR NAME JLennartz for CHunt:mt/rj

EDuncan SOrth ABoland RLantz for MEvans ELeeds DATE 06/11/14 06/11/14 06/11/14 06/16/14 06/19/14 06/19/14 OFFICIAL RECORD COPY