ML17262B056: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:ROCHESTER | ||
GASANDELECTRICCORPORATION | |||
e89EASTAVENUE,'ROCHESTER | |||
N.Y.14649.0001 | |||
ROBERTCMECREOYVicePresident | |||
clnnaNuclearproduction | |||
September | |||
30,1992TELEPHONE | |||
nstEa,cooETis546-2700U.S.NuclearRegulatory | |||
Commission | |||
DocumentControlDeskAttn:AllenR.JohnsonPWRProjectDirectorate | |||
I-3Washington, | |||
D.C.20555Subject:StatusofActionsinResponsetoSWSOPXViolations, | |||
Deficiencies, | |||
andUnresolved | |||
ItemsXnspection | |||
Report50-244/91-201 | |||
R.E.GinnaNuclearPowerPlantDocketNo.50-244DearMr.Johnson,InReference | |||
(a)RG&Ecommitted, | |||
bytheendofthethirdquarter1992,toprovideanupdatedstatusofRG&Eactionstakenorplannedirnresponsetotheitemsidentified | |||
inAppendixAofReference | |||
(b).AppendixAofReference | |||
(b)identified | |||
atotalof15items;4wereidentified | |||
asDeficiencies, | |||
5wereidentified | |||
asUnresolved | |||
items,and6wereidentified | |||
asObservations. | |||
Three,of.theseresultedinViolations | |||
asdocumented | |||
inReference | |||
(c).Since.theissuanceofReference | |||
(b)andthesubsequent | |||
NoticeofViolations, | |||
Reference | |||
(c),RG&Ehasexpendedasignificant | |||
efforttowardresolution | |||
oftheopenissuesidentified | |||
duringtheSWSOPITeamXnspection. | |||
Asacknowledged | |||
bytheNRCinReference | |||
(c),allidentified | |||
items,weaknesses, | |||
andobservations | |||
relatedtotheSWSOPI're | |||
beingtrackedinourCommitment | |||
andActionTrackingSystemto.assureformalresolution | |||
ofthesematters.Sincethecompletion | |||
oftheteaminspection, | |||
RG&Ehasbeentrackingtheprogressof62COmrtlitmentS | |||
OiaCticnitesssSreSulting | |||
direCtjfrOmtaheSWSOPXOrrelatedtoit.Currently, | |||
35ofthesehavebeenclosedbyRG&Eand27remainopenin,variousstagesofcompletion. | |||
Inaddition, | |||
duringtheweekofAugust17,1992,NRCstaffperformed | |||
afollow-up | |||
inspection | |||
duringwhichRG&Eprovidedinformation | |||
andstatusofRG&Eactionsforthethreeviolations | |||
(91-201Ž01, | |||
91-201-11, | |||
and91-201-14) | |||
andtwooftheunresolved | |||
items(91-201-04 | |||
and91-201-15).SinceNRCdocumentation | |||
oftheresultsof.thatinspection | |||
(designated | |||
50-244/92-012) | |||
hasnotasyet,beenreceived, | |||
thisletterprovidesthestatusofallthe15deficiencies, | |||
unresolved | |||
items,andobservations | |||
identified | |||
inAppendixAofReference | |||
(a).('Tt210210045 | |||
921016PDRADOCK050002448,'PDR | |||
ATTACHMENT | |||
AInresponseRG&Ecommitted | |||
to1)evaluate/test, | |||
thedieselgenerator | |||
coolerperformance | |||
anddetermine | |||
theoptimumflow[R01958]; | |||
2)enhancetheanalytical | |||
modelingandcapability | |||
oftheexistinghydraulic | |||
modelsothatananalytical | |||
basisandtestspecification | |||
forthere-balance | |||
oftheSWSisavailable | |||
priortothe1993refueling | |||
outage[R01959]; | |||
and3)conducttestingasrequiredduringthe1993outagetoconfirmtheanalytical | |||
resultsoftheenhancedmodelandtosetoptimalflows"for | |||
eachSWcoolersothat.theSWSflowbalancewillbeoptimized | |||
whentheplantreturnstopowerfollowing | |||
"the1993outage.[R01960]Inalett~~,Reference,(d), | |||
RG&Eindicated | |||
thattheexistingservicewaters'st:emflowbalancetotheemergency | |||
dieselgenerator | |||
coolerswassatisfactory | |||
andthatnochangewaswarranted | |||
atthistime,however,theoverallSWSflowbalancecontinues;.to | |||
beplannedforthe1993outage.Inaddition, | |||
byReference | |||
(e)RG&Ecommitted | |||
toperformpilotthermalperformance | |||
testingofthedieselgenerator | |||
coolersduringthesummerof1992basedupontheexistingsysteminstrumentation | |||
[R02438], | |||
evaluatetheseresults[R02440], | |||
andcommenceperiodicthermalperformance | |||
testingduringthesummerof1993tocoincidewiththehighestlakewatertemperatures | |||
[R02439]. | |||
The'pilottestinghasbeencompleted | |||
andtheresultsarebeingreviewedbyengineering | |||
andplantstaff.Page-7 | |||
}} | }} | ||
Revision as of 12:05, 29 June 2018
| ML17262B056 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 09/30/1992 |
| From: | ROCHESTER GAS & ELECTRIC CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17262B055 | List: |
| References | |
| NUDOCS 9210210045 | |
| Download: ML17262B056 (2) | |
See also: IR 05000244/1991201
Text
ROCHESTER
GASANDELECTRICCORPORATION
e89EASTAVENUE,'ROCHESTER
N.Y.14649.0001
ROBERTCMECREOYVicePresident
clnnaNuclearproduction
September
30,1992TELEPHONE
nstEa,cooETis546-2700U.S.NuclearRegulatory
Commission
DocumentControlDeskAttn:AllenR.JohnsonPWRProjectDirectorate
I-3Washington,
D.C.20555Subject:StatusofActionsinResponsetoSWSOPXViolations,
Deficiencies,
andUnresolved
ItemsXnspection
Report50-244/91-201
R.E.GinnaNuclearPowerPlantDocketNo.50-244DearMr.Johnson,InReference
(a)RG&Ecommitted,
bytheendofthethirdquarter1992,toprovideanupdatedstatusofRG&Eactionstakenorplannedirnresponsetotheitemsidentified
inAppendixAofReference
(b).AppendixAofReference
(b)identified
atotalof15items;4wereidentified
asDeficiencies,
5wereidentified
asUnresolved
items,and6wereidentified
asObservations.
Three,of.theseresultedinViolations
asdocumented
inReference
(c).Since.theissuanceofReference
(b)andthesubsequent
NoticeofViolations,
Reference
(c),RG&Ehasexpendedasignificant
efforttowardresolution
oftheopenissuesidentified
duringtheSWSOPITeamXnspection.
Asacknowledged
bytheNRCinReference
(c),allidentified
items,weaknesses,
andobservations
relatedtotheSWSOPI're
beingtrackedinourCommitment
andActionTrackingSystemto.assureformalresolution
ofthesematters.Sincethecompletion
oftheteaminspection,
RG&Ehasbeentrackingtheprogressof62COmrtlitmentS
OiaCticnitesssSreSulting
direCtjfrOmtaheSWSOPXOrrelatedtoit.Currently,
35ofthesehavebeenclosedbyRG&Eand27remainopenin,variousstagesofcompletion.
Inaddition,
duringtheweekofAugust17,1992,NRCstaffperformed
afollow-up
inspection
duringwhichRG&Eprovidedinformation
andstatusofRG&Eactionsforthethreeviolations
(91-201Ž01,
91-201-11,
and91-201-14)
andtwooftheunresolved
items(91-201-04
and91-201-15).SinceNRCdocumentation
oftheresultsof.thatinspection
(designated
50-244/92-012)
hasnotasyet,beenreceived,
thisletterprovidesthestatusofallthe15deficiencies,
unresolved
items,andobservations
identified
inAppendixAofReference
(a).('Tt210210045
921016PDRADOCK050002448,'PDR
ATTACHMENT
AInresponseRG&Ecommitted
to1)evaluate/test,
thedieselgenerator
coolerperformance
anddetermine
theoptimumflow[R01958];
2)enhancetheanalytical
modelingandcapability
oftheexistinghydraulic
modelsothatananalytical
basisandtestspecification
forthere-balance
oftheSWSisavailable
priortothe1993refueling
outage[R01959];
and3)conducttestingasrequiredduringthe1993outagetoconfirmtheanalytical
resultsoftheenhancedmodelandtosetoptimalflows"for
eachSWcoolersothat.theSWSflowbalancewillbeoptimized
whentheplantreturnstopowerfollowing
"the1993outage.[R01960]Inalett~~,Reference,(d),
RG&Eindicated
thattheexistingservicewaters'st:emflowbalancetotheemergency
dieselgenerator
coolerswassatisfactory
andthatnochangewaswarranted
atthistime,however,theoverallSWSflowbalancecontinues;.to
beplannedforthe1993outage.Inaddition,
byReference
(e)RG&Ecommitted
toperformpilotthermalperformance
testingofthedieselgenerator
coolersduringthesummerof1992basedupontheexistingsysteminstrumentation
[R02438],
evaluatetheseresults[R02440],
andcommenceperiodicthermalperformance
testingduringthesummerof1993tocoincidewiththehighestlakewatertemperatures
[R02439].
The'pilottestinghasbeencompleted
andtheresultsarebeingreviewedbyengineering
andplantstaff.Page-7