Mr. Bryan Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
Mr. Bryan Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear  
 
4300 Winfield Road  
 
Warrenville, IL 60555


SUBJECT: BRAIDWOOD STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000456/2016201 AND 05000457/2016201
SUBJECT: BRAIDWOOD STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000456/2016201 AND 05000457/2016201


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
On July 1, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Braidwood Station, Units 1 and 2. On July 12, 2016, the NRC inspectors discussed the results of this inspection with Mr. Brian Finlay, Site Security Manager, and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report. NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Braidwood Station, Units 1 and 2. If you disagree with the cross-cutting aspect assigned in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, the Director, Office of Nuclear Security and Incident Response, and the NRC resident inspector at the Braidwood Station, Units 1 and 2. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21, "Protection of Safeguards Information; Performance Requirements," and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information -
On July 1, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Braidwood Station, Units 1 and 2. On July 12, 2016, the NRC inspectors discussed the results of this inspection with Mr. Brian Finlay, Site Security Manager, and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report. NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirem ents. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Braidwood Station, Units 1 and 2. If you disagree with the cross-cutting aspect assigned in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, the Director, Office of Nuclear Security and Incident Response, and the NRC resident inspector at the Braidwood Station, Units 1 and 2. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
The enclosure transmitted herewith contains Safeguards Information. When separated from the enclosure
, this transmittal document is decontrolled. The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21, "Protection of Safeguards Information; Performance Requirements," and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information -
Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response
.  


Sincerely,/RA/ Joseph H. Willis, Acting Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 50-456, and 50-457 License Nos. NPF-72, and NPF-77  
Sincerely,/RA/ Joseph H. Willis, Acting Chief  
 
Security Performance Evaluation Branch  
 
Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 50-456, and 50-457  
 
License Nos. NPF-72, and NPF-77  


Nonpublic  
Nonpublic  
Line 37: Line 52:


===w/Attachment:===
===w/Attachment:===
Supplemental Information cc w/ enclosure: Brian Finlay, Site Security Manager Marri Marchionda-Palmer, Site Vice President  
Supplemental Information  
 
cc w/ enclosure: Brian Finlay, Site Security Manager Marri Marchionda-Palmer, Site Vice President  


cc w/o enclosure: Brian C. Hanson, Chief Nuclear Officer  
cc w/o enclosure: Brian C. Hanson, Chief Nuclear Officer  

Revision as of 04:50, 30 June 2018

Braidwood Station Units 1 and 2 - NRC Security Inspection Report 05000456/2016201 and 05000457/2016201
ML16201A065
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/02/2016
From: Willis J H
NRC/NSIR/DSO/DDSO/SPEB
To: Bryan Hanson
Exelon Nuclear, Exelon Nuclear Generation Corp
References
IR 2016201
Download: ML16201A065 (3)


Text

August 2, 2016

Mr. Bryan Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: BRAIDWOOD STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000456/2016201 AND 05000457/2016201

Dear Mr. Hanson:

On July 1, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Braidwood Station, Units 1 and 2. On July 12, 2016, the NRC inspectors discussed the results of this inspection with Mr. Brian Finlay, Site Security Manager, and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report. NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirem ents. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Braidwood Station, Units 1 and 2. If you disagree with the cross-cutting aspect assigned in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, the Director, Office of Nuclear Security and Incident Response, and the NRC resident inspector at the Braidwood Station, Units 1 and 2. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding,"

of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The enclosure transmitted herewith contains Safeguards Information. When separated from the enclosure

, this transmittal document is decontrolled. The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21, "Protection of Safeguards Information; Performance Requirements," and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information -

Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response

.

Sincerely,/RA/ Joseph H. Willis, Acting Chief

Security Performance Evaluation Branch

Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 50-456, and 50-457

License Nos. NPF-72, and NPF-77

Nonpublic

Enclosure:

Inspection Report 05000456/2016201 and 05000457/2016201

w/Attachment:

Supplemental Information

cc w/ enclosure: Brian Finlay, Site Security Manager Marri Marchionda-Palmer, Site Vice President

cc w/o enclosure: Brian C. Hanson, Chief Nuclear Officer

ML16201A065 OFFICE NSIR/DSO/SPEBNSIR/DSO/SPEBNSIR/DSO/SPEBRIIINSIR/DSO/SPEBNAME D. Hostetter J. Clark D. Cardenas S. Orth (A. Anderson for via enmail J. Willis DATE 07/12 /2016 07/ 18 /2016 07/19/2016 07/18 /2016 08/ 2 /2016