IR 05000528/2016402: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:" " March 1, 2017 Mr. Robert Executive Vice President Nuclear/ | {{#Wiki_filter:" " March 1, 2017 Mr. Robert Executive Vice President Nuclear/ | ||
Chief Nuclear Officer Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034 | |||
Chief Nuclear Officer | |||
Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034 | |||
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (NUCLEAR REGULATORY COMMISSION PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000528/2016402, 05000529/2016402, AND 05000530/2016402) | SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (NUCLEAR REGULATORY COMMISSION PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000528/2016402, 05000529/2016402, AND 05000530/2016402) | ||
==Dear Mr. Bement:== | ==Dear Mr. Bement:== | ||
On February 15, 2017, the NRC completed its end-of-cycle performance review of Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The results of that review have been transmitted to you separately in a publicly | On February 15, 2017, the NRC completed its end-of-cycle performance review of Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The results of that review have been transmitted to you separately in a publicly av ailable assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility. | ||
The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to | The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to dis cuss changes to the inspection plan should circumstances warrant any changes. | ||
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. | While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. | ||
| Line 33: | Line 36: | ||
Sincerely,/RA/ | Sincerely,/RA/ | ||
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51, and NPF-74 | Mark S. Haire, Chief | ||
Plant Support Branch 1 | |||
Division of Reactor Safety | |||
Docket Nos. 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51, and NPF-74 | |||
===Enclosure:=== | ===Enclosure:=== | ||
Inspection Plan | Inspection Plan | ||
ML17060A801 Letter w/encl: SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4 Non-Public A.3 Letter w/o encl: SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE C:PSB1/dch NAME MHaire SIGNATURE /RA/ DATE 3/1/17 | ML17060A801 Letter w/encl: SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4 Non-Public A.3 Letter w/o encl: | ||
SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE C:PSB1/dch NAME MHaire SIGNATURE /RA/ DATE 3/1/17 | |||
}} | }} | ||
Revision as of 21:37, 29 June 2018
| ML17060A801 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/01/2017 |
| From: | Haire M S Plant Support Branch-1 |
| To: | Bement R S Arizona Public Service Co |
| References | |
| IR 2016402 | |
| Download: ML17060A801 (3) | |
Text
" " March 1, 2017 Mr. Robert Executive Vice President Nuclear/
Chief Nuclear Officer
Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (NUCLEAR REGULATORY COMMISSION PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000528/2016402, 05000529/2016402, AND 05000530/2016402)
Dear Mr. Bement:
On February 15, 2017, the NRC completed its end-of-cycle performance review of Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The results of that review have been transmitted to you separately in a publicly av ailable assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility.
The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to dis cuss changes to the inspection plan should circumstances warrant any changes.
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.
Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking, and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS). Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Sincerely,/RA/
Mark S. Haire, Chief
Plant Support Branch 1
Division of Reactor Safety
Docket Nos. 50-528, 50-529, and 50-530 License Nos. NPF-41, NPF-51, and NPF-74
Enclosure:
Inspection Plan
ML17060A801 Letter w/encl: SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4 Non-Public A.3 Letter w/o encl:
SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE C:PSB1/dch NAME MHaire SIGNATURE /RA/ DATE 3/1/17