Regulatory Guide 1.147: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML19128A244
| number = ML16321A336
| issue date = 10/31/2019
| issue date = 03/31/2017
| title = Rev. 19, Inservice Inspection Code Case Acceptability, ASME Section XI, Div 1
| title = 8, Inservice Inspection Code Case Acceptability ASME Section XI, Division 1
| author name = Lin B
| author name = Facco G
| author affiliation = NRC/RES/DE
| author affiliation = NRC/RES
| addressee name =  
| addressee name =  
| addressee affiliation =  
| addressee affiliation =  
| docket =  
| docket =  
| license number =  
| license number =  
| contact person = Lin B
| contact person = Giovanni Facco, 301-415-6337
| document report number = RG-1.147, Rev 19
| case reference number = NRC-2012-0059, RIN 3150-AJ13
| package number = ML19156A147
| document report number = RG-1.147, Rev 18
| document type = Regulatory Guide
| document type = Regulatory Guide
| page count = 47
| page count = 44
}}
}}
{{#Wiki_filter:U.S. NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:U.S. NUCLEAR REGULATORY COMMISSION  
REGULATORY GUIDE 1.147, REVISION 19
March 2017 OFFICE OF NUCLEAR REGULATORY RESEARCH
Revision 18 REGULATORY GUIDE  


Issue Date: October 2019 Technical Lead: Bruce Lin
Technical Lead Giovanni Facco


Written suggestions regarding this guide or development of new guides may be submitted through the NRCs public Web site in the NRC Library at https://nrcweb.nrc.gov/reading-rm/doc-collections/reg-guides/, under Document Collections, in Regulatory Guides, at https://nrcweb.nrc.gov/reading-rm/doc-collections/reg-guides/contactus.htm
Written suggestions regarding this guide or development of new guides may be submitted through the NRCs public Web site under the Regulatory Guides document collection of the NRC Library at http://www.nrc.gov/reading-rm/doc-collections/reg-guides/contactus.html.


====l.     ====
Electronic copies of this regulatory guide, previous versions of this guide, and other recently issued guides are available through the NRCs public Web site under the Regulatory Guides document collection of the NRC Library at http://www.nrc.gov/reading-rm/doc-collections/. 
The regulatory guide is also available through the NRCs Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html, under ADAMS Accession No. ML16321A336. The regulatory basis for this guide is the regulatory analysis prepared for the amendment to 10 CFR 50.55a (ADAMS Accession No. ML16285A013. The staff responses to the public comments on DG-1297 may be found under ADAMS Accession No. ML16285A012.


Electronic copies of this RG, previous versions of RGs, and other recently issued guides are also available through the NRCs public Web site in the NRC Library at https://nrcweb.nrc.gov/reading-rm/doc-collections/reg-guides/, under Document Collections, in Regulatory Guides. This RG is also available through the NRCs Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html, under ADAMS Accession Number (No.) ML19128A244. The regulatory analysis for this guide is the regulatory analysis prepared for the amendment to 10 CFR 50.55a and may be found in ADAMS
REGULATORY GUIDE 1.147 (Draft was issued as DG-1296, dated March 2016)  
under Accession No. ML19156A178. The associated draft guide DG-1342 may be found in ADAMS under Accession No.
 
ML18114A225, and the staff responses to the public comments on DG-1342 may be found in the Federal Register Notice for the Final Rule under ADAMS Accession No. ML19156A174.


INSERVICE INSPECTION CODE CASE ACCEPTABILITY,  
INSERVICE INSPECTION CODE CASE ACCEPTABILITY,  
ASME SECTION XI, DIVISION 1  
ASME SECTION XI, DIVISION 1  


==A. INTRODUCTION==
Purpose  
Purpose  


This regulatory guide (RG) lists the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code, Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, (Ref. 1) Code Cases that the U.S. Nuclear Regulatory Commission (NRC) has approved for use as voluntary alternatives to the mandatory ASME BPV Code provisions that are incorporated by reference into Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Domestic Licensing of Production and Utilization Facilities (Ref. 2).  
This regulatory guide (RG) lists the American Society of Mechanical Engineers (ASME)  
Section XI Code Cases that the U.S. Nuclear Regulatory Commission (NRC) has approved for use as voluntary alternatives to the mandatory ASME Boiler and Pressure Vessel (BPV) Code provisions that are incorporated by reference into Title 10, Part 50, of the Code of Federal Regulations (10 CFR Part 50),  
Domestic Licensing of Production and Utilization Facilities (Ref. 1).  


Applicability
Applicability  


This RG applies to reactor licensees subject to 10 CFR Part 50, Section 50.55a, Codes and standards.
This RG applies to reactor licensees subject to 10 CFR Part 50, Section 50.55a, Codes and Standards.


Applicable Rules and Regulations  
Applicable Rules and Regulations  
Line 46: Line 46:
General Design Criterion (GDC) 1, Quality Standards and Records, of Appendix A, General Design Criteria for Nuclear Power Plants, to 10 CFR Part 50 requires, in part, that structures, systems, and components important to safety be designed, fabricated, erected, and tested to quality standards commensurate with the importance of the safety function to be performed.
General Design Criterion (GDC) 1, Quality Standards and Records, of Appendix A, General Design Criteria for Nuclear Power Plants, to 10 CFR Part 50 requires, in part, that structures, systems, and components important to safety be designed, fabricated, erected, and tested to quality standards commensurate with the importance of the safety function to be performed.


Where generally recognized codes and standards are used, GDC 1 requires that they be identified and evaluated to determine their applicability, adequacy, and sufficiency and be supplemented or modified as necessary to ensure a quality product in keeping with the required safety function.
Where generally recognized codes and standards are used, Criterion 1 requires that they be identified and evaluated to determine their applicability, adequacy, and sufficiency and be supplemented or modified as necessary to ensure a quality product in keeping with the required safety function.
 
RG 1.147, Rev. 19, Page 2
*
10 CFR Part 50, Appendix A, GDC 30, Quality of Reactor Coolant Pressure Boundary, requires, in part, that components that are part of the reactor coolant pressure boundary be designed, fabricated, erected, and tested to the highest practical quality standards.


*  
*  
10 CFR Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Processing Plants, requires, in part, a program for the inspection of activities that affect quality to verify its conformance with documented instructions and procedures.
Criterion 30, Quality of Reactor Coolant Pressure Boundary, of Appendix A to 10 CFR Part 50  
requires, in part, that components that are part of the reactor coolant pressure boundary be designed, fabricated, erected, and tested to the highest practical quality standards.


*  
*  
10 CFR 50.55a(g) requires, in part, that Class 1, 2, 3, metal containment (MC), and concrete containment (CC) components and their supports meet the requirements of ASME BPV Code, Section XI, or equivalent quality standards.
Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Processing Plants, to 10 CFR Part 50 requires, in part, a program for inspection of activities affecting quality to verify conformance with documented instructions and procedures.


RG 1.147, Page 2
*  
*  
10 CFR 52.79(a)(11) (Ref. 3) requires the final safety analysis report to include a description of the program(s), and their implementation, necessary to ensure that the systems and components meet the requirements of the ASME Boiler and Pressure Vessel Code and the ASME Code for Operation and Maintenance of Nuclear Power Plants in accordance with 50.55a of this chapter.
10 CFR 50.55a(g), Inservice Inspection Requirements, requires, in part, that Classes 1, 2, 3, MC, and CC components and their supports meet the requirements of Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, of the ASME BPV Code (Ref. 2) or equivalent quality standards.


Related Guidance  
Related Guidance  


*  
*  
RG 1.84, Design, Fabrication, and Materials Code Case Acceptability, ASME Section III  
Regulatory Guide 1.84, Design, Fabrication, and Materials Code Case Acceptability, ASME  
(Ref. 4), lists the ASME BPV Code Section III Rules for Construction of Nuclear Power Plant Components Code Cases that the NRC has approved for use as voluntary alternatives to the mandatory ASME BPV Code provisions that are incorporated into 10 CFR 50.55a.
Section III (Ref. 3), lists the ASME Section III Code Cases that the NRC has approved for use as voluntary alternatives to the mandatory ASME BPV Code provisions that are incorporated into  
10 CFR 50.55a.


*  
*  
RG 1.192, Operation and Maintenance Code Case Acceptability, ASME OM Code (Ref. 5),  
Regulatory Guide 1.192, Operation and Maintenance Code Case Acceptability, ASME OM  
lists the ASME Operation and Maintenance Code (OM Code) Code Cases that the NRC has approved for use as voluntary alternatives to the mandatory ASME OM Code provisions that are incorporated into 10 CFR 50.55a.
Code (Ref. 4), lists the ASME Operation and Maintenance Code (OM Code) Code Cases that the NRC has approved for use as voluntary alternatives to the mandatory ASME OM Code provisions that are incorporated into 10 CFR 50.55a.


*  
*  
RG 1.193, ASME Code Cases Not Approved for Use (Ref. 6), lists the ASME BPV Code, Sections III and XI Code Cases, and the ASME OM Code, Code Cases, that the NRC has not approved for generic use.
Regulatory Guide 1.193, ASME Code Cases Not Approved for Use (Ref. 5), lists the ASME  
Section III and Section XI, and ASME OM Code, Code Cases that the NRC has not approved for generic use.


Purpose of This Regulatory Guide  
Purpose of This Regulatory Guide  


The NRC incorporated this RG into 10 CFR 50.55a by reference. The RG contains new Code Cases and revisions to existing Code Cases that the NRC staff has approved for use, as listed in Tables 1 and 2 of this guide. The RG also states the requirements governing the use of Code Cases. Licensees may voluntarily use Code Cases approved by the NRC as an alternative to compliance with the ASME Code provisions that have been incorporated by reference into 10 CFR 50.55a. Because the status of Code Cases continually changes, the staff plans to periodically update 10 CFR 50.55a and this guide to accommodate new Code Cases and any revisions of existing Code Cases.
The NRC will amend 10 CFR 50.55a to incorporate by reference the new Code Cases and revisions to existing Code Cases listed as approved in Tables 1 and 2 of this guide, and to state the requirements governing the use of Code Cases. Code Cases approved by the NRC may be used voluntarily by licensees as an alternative to compliance with ASME Code provisions that have been incorporated by reference into 10 CFR 50.55a. Because of continuing change in the status of Code Cases, the staff plans periodic updates to 10 CFR 50.55a and this guide to accommodate new Code Cases and any revisions of existing Code Cases.
 
Paperwork Reduction Act 


This RG provides voluntary guidance for implementing the mandatory information collections in
Paperwork Reduction Act  
10 CFR Parts 50 and 52 that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et.


seq.). These information collections were approved by the Office of Management and Budget (OMB),  
This RG contains and references information collections covered by 10 CFR Part 50  that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), control number 3150-0011.
approval numbers 3150-0011 and 3150-0151. Send comments regarding this information collection to the Information Services Branch (T6-A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-


RG 1.147, Rev. 19, Page 3
Public Protection Notification
0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the OMB reviewer at:  OMB Office of Information and Regulatory Affairs (3150-0011 and 3150-0151), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street, NW Washington, DC20503; e- mail: 
oira_submission@omb.eop.gov.


Public Protection Notification 
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.


The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB
DG-1296, Page 3
control number.
 
RG 1.147, Rev. 19, Page 4


==B. DISCUSSION==
==B. DISCUSSION==
Reason for Revision  
Reason for Revision  


RG 1.147, Revision 19, includes information reviewed by the NRC on the Section XI Code Cases listed in Supplement 11 to the 2010 Edition and Supplements 0 through 7 to the 2013 Edition of the ASME BPV Code. In addition, there are six Code Cases selected from supplements to the 2015 Edition and two Code Cases selected from supplements to the 2017 Edition of the ASME BPV Code. This revision updates and supersedes RG 1.147, Revision 18, which included information from Supplement 11 to the 2007 Edition and Supplements 0 through 10 to the 2010 Edition.
This revision (Revision 18) of RG 1.147 includes new information reviewed by the NRC that is provided in Section XI Code Cases listed in Supplement 11 to the 2007 Edition and Supplements 0  
through 10 to the 2010 Edition of the ASME BPV Code. This is an update to RG 1.147, Revision 17, which included information from Supplements 1 through 10 to the 2007 Edition.


Background  
Background  


Provisions of the ASME BPV Code have been used since 1971 as one part of the framework to establish the necessary design, fabrication, construction, testing, and performance requirements for structures, systems, and components important to safety in nuclear power plants. Among other things, ASME standards committees develop improved methods for the construction and inservice inspection (ISI) of ASME Class 1, 2, 3, MC, and CC nuclear power plant components. A broad spectrum of stakeholders participates in the ASME process to help ensure consideration of the various interests.
Provisions of the ASME BPV Code have been used since 1971 as one part of the framework to establish the necessary design, fabrication, construction, testing, and performance requirements for structures, systems, and components important to safety in nuclear power plants. Among other things, ASME standards committees develop improved methods for the construction and inservice inspection (ISI) of ASME Class 1, 2, 3, MC (metal containment), and CC (concrete containment) nuclear power plant components. A broad spectrum of stakeholders participates in the ASME process, which helps to ensure that the various interests are considered.


ASME publishes a new edition of the BPV Code, which includes Section XI, every 2 years. In
The ASME publishes a new edition of the BPV Code, which includes Section XI, every 2 years.
10 CFR 50.55a(a)(1)(ii), the NRC references the latest edition of Section XI, that the agency has approved for use. ASME also publishes Code Cases quarterly. Code Cases provide alternatives developed and approved by ASME. This RG identifies the Code Cases that the NRC has determined to be acceptable alternatives to applicable parts of Section XI. Under 10 CFR 50.55a(z), a licensee or applicant may use Section XI Code Cases that the NRC has not yet endorsed. In 10 CFR 50.55a(z), the NRC permits the use of alternatives to the Code requirements referenced in 10 CFR 50.55a provided that the proposed alternatives result in an acceptable level of quality and safety and their use is authorized by the Director of the Office of Nuclear Reactor Regulation.


The NRC incorporated the ASME BPV Code by reference into 10 CFR 50.55a. NRC-approved Code Cases provide an acceptable voluntary alternative to the mandatory ASME Code provisions. The regulation at 10 CFR 50.55a(b)(5) provides requirements related to the implementation of ASME Section XI Code Cases. When a licensee initially applies a Code Case listed in Tables 1 or 2 of this guide, it must implement the most recent version of that Code Case incorporated by reference in 10 CFR 50.55a.
The latest edition of Section XI that the NRC has approved for use is referenced in 10 CFR  
50.55a(a)(1)(ii).  The ASME also publishes Code Cases quarterly. Code Cases provide alternatives developed and approved by ASME.  This regulatory guide identifies the Code Cases that have been determined by the NRC to be acceptable alternatives to applicable parts of Section XI.  Section XI Code Cases not yet endorsed by the NRC may be used by a licensee or applicant through 10 CFR 50.55a(z)
That section permits the use of alternatives to the Code requirements referenced in 10 CFR 50.55a provided that the proposed alternatives result in an acceptable level of quality and safety, and that their use is authorized by the Director of the Office of Nuclear Reactor Regulation.


ASME may annul a Code Case because its provisions have been incorporated into the Code, the application for which it was specifically developed no longer exists, or experience has shown that an examination or testing method is no longer adequate. After ASME annuls a Code Case and after the NRC  
The ASME Code is incorporated by reference into 10 CFR 50.55a.  Code Cases approved by the NRC provide an acceptable voluntary alternative to the mandatory ASME Code provisions.
 
Requirements related to Code Case implementation are provided in 10 CFR 50.55a(b).  When a licensee initially applies a Code Case listed in Tables 1 or 2, the licensee must implement the most recent version of that Code Case incorporated by reference in 10 CFR 50.55a.
 
Code Cases may be annulled because the provisions have been incorporated into the Code, the application for which it was specifically developed no longer exists, or experience has shown that an examination or testing method is no longer adequate. After the ASME annuls a Code Case and the NRC  
amends 10 CFR 50.55a and this guide, licensees may not implement that Code Case for the first time.
amends 10 CFR 50.55a and this guide, licensees may not implement that Code Case for the first time.


However, a licensee that implemented the Code Case before its annulment may continue to use that Code Case through the end of the present ISI interval. An annulled Code Case cannot be used in the subsequent ISI interval unless it is implemented as an approved alternative under 10 CFR 50.55a(z). If the NRC
However, a licensee who implemented the Code Case prior to annulment may continue to use that Code Case through the end of the present ISI interval. An annulled Code Case cannot be used in the subsequent ISI interval unless implemented as an approved alternative under 10 CFR 50.55a(z). If a Code Case is incorporated by reference into 10 CFR 50.55a and later annulled by the ASME because experience has shown that an examination or testing method is inadequate, the NRC will amend 10 CFR 50.55a and this guide to remove the approval of the annulled Code Case. Licensees should not begin to implement such annulled Code Cases in advance of the rulemaking. Notwithstanding these requirements, the Commission may impose new or revised Code requirements, including implementation schedules, which it determines are consistent with the Backfit Rule (10 CFR 50.109).  
incorporated a Code Case by reference into 10 CFR 50.55a and ASME later annulled it because experience has shown that an examination or testing method is inadequate, the NRC will amend 10 CFR  
50.55a and this guide to remove its approval of the annulled Code Case. Licensees should not begin to implement such annulled Code Cases in advance of the rulemaking. Notwithstanding these requirements, the Commission may impose new or revised Code requirements, including implementation schedules, that it determines are consistent with 10 CFR 50.109, Backfitting.


RG 1.147, Rev. 19, Page 5 ASME may revise a Code Case, for example, to incorporate user experience. The licensee or applicant cannot apply the older or superseded version of the Code Case for the first time. If an applicant or a licensee applied a Code Case before it was listed as superseded, it may continue to use the Code Case until it updates its Construction Code of Record (an applicant would update its application) or until the licensees 120-month ISI/inservice testing (IST) update interval expires, after which the NRC prohibits the continued use of the Code Case unless the agency approves its use under 10 CFR 50.55a(z). If the NRC incorporates a Code Case by reference into 10 CFR 50.55a and if ASME later issues a revised version of the Code Case because experience has shown that the design analysis, construction method, examination method, or testing method is inadequate, the NRC will amend 10 CFR 50.55a and the relevant RG to remove its approval of the superseded Code Case. Applicants and licensees should not begin to implement such superseded Code Cases in advance of the rulemaking.
A Code Case may be revised, for example, to incorporate user experience. The older or superseded version of the Code Case cannot be applied by the licensee or applicant for the first tim


With regard to the use of any Code Case, the user is responsible for ensuring that the provisions of the Code Case do not conflict with licensee commitments or regulatory requirements.
====e.   If ====


RG 1.147, Rev. 19, Page 6
DG-1296, Page 4 an applicant or a licensee applied a Code Case before it was listed as superseded, the applicant or the licensee may continue to use the Code Case until the applicant or the licensee updates its construction Code of Record (in the case of an applicant, updates its application) or until the licensees 120-month ISI/IST update interval expires, after which the continued use of the Code Case is prohibited unless NRC
approval is granted under 10 CFR Part 50.55a(z).  If a Code Case is incorporated by reference into 10
CFR Part 50.55a and later a revised version is issued by the ASME because experience has shown that the design analysis, construction method, examination method, or testing method is inadequate; the NRC will amend 10 CFR Part 50.55a and the relevant RG to remove the approval of the superseded Code Case.


==C. REGULATORY POSITION==
Applicants and licensees should not begin to implement such superseded Code Cases in advance of the rulemaking.
For RG 1.147, Revision 19, the NRC reviewed the Section XI Code Cases listed in Supplement 11 to the 2010 Edition and Supplements 0 through 7 to the 2013 Edition of the ASME BPV
Code. Additionally, there are six Code Cases selected from supplements to the 2015 Edition and two Code Cases selected from supplements to the 2017 Edition of the ASME Code. RG 1.147, Revision 19 supersedes the information in Revision 18. Appendix A to this guide lists the supplements reviewed by the NRC, the editions, the supplement numbers, and the dates on which the supplements were approved by the ASME Board on Nuclear Codes and Standards. Appendix B to this guide lists the Section XI Code Cases in the nine supplements and eight selected Code Cases from the 2015 and 2017 Editions of the ASME Code. Finally, Appendix C to this guide lists all current Section XI Code Cases. The following five tables list the Code Cases addressed by this RG:


a. Table 1, Acceptable Section XI Code Cases, lists the Code Cases that are acceptable to the NRC for implementation in the ISI of light-water-cooled nuclear power plants.
With regard to the use of any Code Case, it is the responsibility of the user to make certain that the provisions of the Code Case do not conflict with licensee commitments or regulatory requirements.


b. Table 2, Conditionally Acceptable Section XI Code Cases, lists the Code Cases that are acceptable as long as they are used with the identified conditions (i.e., the Code Case is generally acceptable;
RG 1.147, Page 5 C. STAFF REGULATORY GUIDANCE
however, the NRC has determined that the requirements in the Code Case, which are alternative requirements to the BPV Code, must be supplemented to provide an acceptable level of quality and safety).
c. Table 3, Annulled Unconditionally Approved Section XI Code Cases, lists ASME-annulled Code Cases that the NRC previously determined to be fully acceptable.


d. Table 4, Annulled Conditionally Acceptable Section XI Code Cases, lists Code Cases that the NRC
For Revision 18 of Regulatory Guide 1.147, the NRC reviewed the Section XI Code Cases listed in Supplement 11 to the 2007 Edition and Supplement 0 through Supplement 10 to the 2010 Edition of the ASME BPV Code.  Appendix A to this guide lists the supplements reviewed, the edition, the supplement number, and the date on which the supplement was approved by the ASME Board on Nuclear Codes and Standards.  Appendix B is a list of the Section XI Code Cases published by the ASME in the eleven supplements.  Finally, Appendix C is a current list of all Section XI Code Cases. The Code Cases addressed by this regulatory guide are listed in five tables:
found to be acceptable as long as the licensee used them with the identified conditions; however, they were subsequently annulled by ASME.


e. Table 5, Section XI Code Cases That Have Been Superseded by Revised Code Cases, lists Code Cases that have been superseded through revision.
(1)
Table 1, Acceptable Section XI Code Cases, lists the Code Cases that are acceptable to the NRC for implementation in the ISI of light-water-cooled nuclear power plants.


RG 1.147, Rev. 19, Page 7
(2)
1. Acceptable Section XI Code Cases  
Table 2, Conditionally Acceptable Section XI Code Cases, lists the Code Cases that are acceptable, provided that they are used with the identified conditions (i.e., the Code Case is generally acceptable but the NRC has determined that the requirements in the Code Case, which are an alternative to requirements in the BPV Code, must be supplemented in order to provide an acceptable level of quality and safety).  
(3)
Table 3, Annulled Unconditionally Approved Section XI Code Cases, lists Code Cases annulled by the ASME that the NRC previously determined to be fully acceptable.


The NRC determined that the Code Cases listed in Table 1 are acceptable for application in licensee Section XI ISI programs. ASME published the 2010 Edition of the ASME BPV Code on July 1, 2010. ASME issued an addendum in 2011 but did not issue an addendum in 201
(4)
Table 4, Annulled Conditionally Acceptable Section XI Code Cases, lists Code Cases that the NRC determined to be acceptable, provided that they were used with the identified conditions, but were subsequently annulled by the ASME.


===2. Beginning in ===
(5)
2013, ASME issues new editions of the BPV Code every 2 years. ASME will continue to publish Code Cases quarterly in supplements to each edition. To assist users, new and revised Code Cases are shaded to distinguish them from those approved in previous versions of this guide. For Code Cases previously listed in this guide, the third column of Table 1 lists the dates of ASME approvals. For new or revised Code Cases, the third column of Table 1 lists the supplement and edition in which each Code Case was published (e.g., 5/13E means Supplement 5 to the 2013 Edition of the ASME BPV Code).  
Table 5, Section XI Code Cases That Have Been Superseded by Revised Code Cases, lists Code Cases that have been superseded through revision.


RG 1.193 lists the ASME Code Cases that the NRC determined to be unacceptable.
1.


Table 1.  Acceptable Section XI Code Cases  
Acceptable Section XI Code Cases  


CODE CASE
The Code Cases listed in Table 1 are acceptable to the NRC for application in licensees Section XI inservice inspection programs.  The 2010 Edition of the ASME BPV Code was published on July 1, 2010.  An addenda was issued in 2011; no addenda was issued in 2012.  Beginning with 2013, new editions of the BPV Code will be issued every two years.  Code Cases will continue to be published quarterly in supplements to each edition.  For Code Cases previously listed in this guide, the third column of Table 1 lists the date of ASME approval.  For new or revised Code Cases, the third column of Table 1 lists the supplement and edition in which each Code Case was published (e.g., 5/10E means Code Case Supplement 5 to the 2010 Edition).
NUMBER
TABLE 1 ACCEPTABLE SECTION XI CODE CASES


DATE OR
Code Cases that the NRC determined to be unacceptable are listed in Regulatory Guide 1.193, ASME Code Cases Not Approved for Use.
SUPPLEMENT/  
 
EDITION
RG 1.147, Page 6 Table 1.  Acceptable Section XI Code Cases
N-432-1 Repair Welding Using Automatic or Machine Gas Tungsten-Arc Welding (GTAW) Temper Bead Technique, Section XI, Division 1   
 
Code Case Number Table 1 Acceptable Section XI Code Cases
 
Date or Supplement/  
Edition N-432-1 Repair Welding Using Automatic or Machine Gas Tungsten-Arc Welding (GTAW) Temper Bead Technique, Section XI, Division 1   
3/28/01 N-460  
3/28/01 N-460  
Alternative Examination Coverage for Class 1 and Class 2 Welds, Section XI, Division 1  
Alternative Examination Coverage for Class 1 and Class 2 Welds, Section XI, Division 1  
2/14/03 N-491-2 Rules for Examination of Class 1, 2, 3, and MC Component Supports of Light-Water Cooled Power Plants, Section XI, Division 1  
2/14/03 N-491-2 Rules for Examination of Class 1, 2, 3, and MC Component Supports of Light- Water Cooled Power Plants, Section XI, Division 1  
2/14/03 N-494-4 Pipe Specific Evaluation Procedures and Acceptance Criteria for Flaws in Class 1 Ferritic Piping that Exceed the Acceptance Standards of IWB-3514.2 and in Class 1 Austenitic Piping that Exceed the Acceptance Standards of IWB-3514.3, Section XI, Division   
2/14/03 N-494-4 Pipe Specific Evaluation Procedures and Acceptance Criteria for Flaws in Class 1 Ferritic Piping that Exceed the Acceptance Standards of IWB-3514.2 and in Class 1 Austenitic Piping that Exceed the Acceptance Standards of IWB-3514.3, Section XI, Division   
1/12/05 N-496-2 Helical-Coil Threaded Inserts, Section XI, Division 1  
1/12/05 N-496-2 Helical-Coil Threaded Inserts, Section XI, Division 1  
8/4/04 N-513-4 Evaluation of Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping, Section XI, Division 1
8/04/04 N-517-1 Quality Assurance Program Requirements for Owners, Section XI, Division 1  
6/13E
 
N-517-1 Quality Assurance Program Requirements for Owners, Section XI, Division 1  
3/28/01 N-526 Alternative Requirements for Successive Inspections of Class 1 and 2 Vessels, Section XI, Division 1  
3/28/01 N-526 Alternative Requirements for Successive Inspections of Class 1 and 2 Vessels, Section XI, Division 1  
8/20/02 N-528-1 Purchase, Exchange, or Transfer of Material Between Nuclear Plant Sites, Section XI, Division 1
8/20/02 N-532-5 Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000, Section XI, Division 1
4/19/02 N-532-5 Repair/Replacement Activity Documentation Requirements and Inservice Inspection Summary Report Preparation and Submission, Section XI,  
1/04/11 N-534 Alternative Requirements for Pneumatic Pressure Testing, Section XI,  
Division 1  
Division 1  
1/4/11 N-537 Location of Ultrasonic Depth-Sizing Flaws, Section XI, Division 1  
5/09/03 N-537 Location of Ultrasonic Depth-Sizing Flaws, Section XI, Division 1
3/28/01 N-553-1 Inservice Eddy Current Surface Examination of Pressure Retaining Pipe Welds and Nozzle-to-Safe End Welds, Section XI, Division 1  
3/28/01 N-554-3 Alternative Requirements for Reconciliation of Replacement Items and Addition of New Systems, Section XI, Division 1  
3/28/01 N-554-3 Alternative Requirements for Reconciliation of Replacement Items and Addition of New Systems, Section XI, Division 1  
2/14/03 N-566-2 Corrective Action for Leakage Identified at Bolted Connections, Section XI,  
2/14/03 N-566-2 Corrective Action for Leakage Identified at Bolted Connections, Section XI,  
Division 1  
Division 1  
3/28/01 N-567-1 Alternative Requirements for Class 1, 2, and 3 Replacement Components, Section XI, Division 1  
3/28/01 N-567-1 Alternative Requirements for Class 1, 2, and 3 Replacement Components, Section XI, Division 1  
4/19/02  
4/19/02 N-573 Transfer of Procedure Qualification Records Between Owners, Section XI,  
 
RG 1.147, Rev. 19, Page 8 CODE CASE
NUMBER
TABLE 1 ACCEPTABLE SECTION XI CODE CASES
 
DATE OR
SUPPLEMENT/
EDITION
N-573 Transfer of Procedure Qualification Records Between Owners, Section XI,  
Division 1  
Division 1  
2/14/03 N-586-1 Alternative Additional Examination Requirements for Classes 1, 2, and 3 Piping, Components, and Supports, Section XI, Division 1  
2/14/03 N-586-1 Alternative Additional Examination Requirements for Classes 1, 2, and 3 Piping, Components, and Supports, Section XI, Division 1  
5/4/04 N-600  
5/04/04 N-600  
Transfer of Welder, Welding Operator, Brazer, and Brazing Operator Qualifications Between Owners, Section XI, Division 1  
Transfer of Welder, Welding Operator, Brazer, and Brazing Operator Qualifications Between Owners, Section XI, Division 1  
9/18/01 N-609-1 Alternative Requirements to Stress-Based Selection Criteria for Category B-J  
9/18/01  
 
RG 1.147, Page 7 Code Case Number Table 1 Acceptable Section XI Code Cases
 
Date or Supplement/
Edition N-609-1 Alternative Requirements to Stress-Based Selection Criteria for Category B-J  
Welds, Section XI, Division 1  
Welds, Section XI, Division 1  
9/17/10
3/10E
N-613-2 Ultrasonic Examination of Full Penetration Nozzles in Vessels, Examination Category B-D, Reactor Nozzle-To-Vessel Welds, and Nozzle Inside Radius Section Figs. IWB-2500-7(a), (b), (c), and (d), Section XI, Division 1  
N-613-2 Ultrasonic Examination of Full Penetration Nozzles in Vessels, Examination Category B-D, Reactor Nozzle-To-Vessel Welds, and Nozzle Inside Radius Section Figs. IWB-2500-7(a), (b), (c), and (d), Section XI, Division 1  
12/10/10
4/10E
N-624 Successive Inspections, Section XI, Division 1  
N-624 Successive Inspections, Section XI, Division 1  
4/19/02 N-629 Use of Fracture Toughness Test Data to Establish Reference Temperature for Pressure Retaining Materials, Section XI, Division 1  
4/19/02 N-629 Use of Fracture Toughness Test Data to Establish Reference Temperature for Pressure Retaining Materials, Section XI, Division 1  
8/20/02 N-641 Alternative Pressure-Temperature Relationship and Low Temperature Overpressure Protection System Requirements, Section XI, Division 1  
8/20/02 N-641 Alternative Pressure-Temperature Relationship and Low Temperature Overpressure Protection System Requirements, Section XI, Division 1  
2/3/03 N-643-2 Fatigue Crack Growth Rate Curves for Ferritic Steels in PWR Water Environment, Section XI, Division 1  
2/03/03 N-643-2 Fatigue Crack Growth Rate Curves for Ferritic Steels in PWR Water Environment, Section XI, Division 1  
5/4/04 N-649 Alternative Requirements for IWE-5240 Visual Examination, Section XI,  
5/04/04 N-649 Alternative Requirements for IWE-5240 Visual Examination, Section XI,  
Division 1  
Division 1  
3/28/01 N-651 Ferritic and Dissimilar Metal Welding Using SMAW Temper Bead Technique Without Removing the Weld Bead Crown for the First Layer, Section XI,  
3/28/01 N-651 Ferritic and Dissimilar Metal Welding Using SMAW Temper Bead Technique Without Removing the Weld Bead Crown for the First Layer, Section XI,  
Division 1  
Division 1  
8/14/01 N-652-2 Alternative Requirements to Categorize B-G-1, B-G-2, and C-D Bolting Examination Methods and Selection Criteria, Section XI, Division 1  
8/14/01 N-652-2 Alternative Requirements to Categorize B-G-1, B-G-2, and C-D Bolting Examination Methods and Selection Criteria, Section XI, Division 1  
9/3/10
9/10E
N-653-1 Qualification Requirements for Full Structural Overlaid Wrought Austenitic Piping Welds, Section XI, Division 1  
N-653-1 Qualification Requirements for Full Structural Overlaid Wrought Austenitic Piping Welds, Section XI, Division 1  
4/4/12 N-658 Qualification Requirements for Ultrasonic Examination of Wrought Austenitic Piping Welds, Section XI, Division 1  
9/10E
4/4/02 N-661-3 Alternative Requirements for Wall Thickness Restoration of Class 2 and 3 Carbon Steel Piping for Raw Water Service Section XI, Division 1
N-658 Qualification Requirements for Ultrasonic Examination of Wrought Austenitic Piping Welds, Section XI, Division 1  
6/15E
4/4/02 N-663 Alternative Requirements for Classes 1 and 2 Surface Examinations, Section XI, Division 1  
N-663 Alternative Requirements for Classes 1 and 2 Surface Examinations, Section XI, Division 1  
9/17/02 N-664 Performance Demonstration Requirements for Examination of Unclad Reactor Pressure Vessel Welds, Excluding Flange Welds, Section XI, Division 1  
9/17/02 N-664 Performance Demonstration Requirements for Examination of Unclad Reactor Pressure Vessel Welds, Excluding Flange Welds, Section XI,  
Division 1  
8/20/02 N-665 Alternative Requirements for Beam Angle Measurements Using Refracted Longitudinal Wave Search Units, Section XI, Division 1  
8/20/02 N-665 Alternative Requirements for Beam Angle Measurements Using Refracted Longitudinal Wave Search Units, Section XI, Division 1  
2/28/03 N-683 Method for Determining Maximum Allowable False Calls When Performing Single-Sided Access Performance Demonstration in Accordance with Appendix VIII, Supplements 4 and 6, Section XI, Division 1  
2/28/03 N-683 Method for Determining Maximum Allowable False Calls When Performing Single-Sided Access Performance Demonstration in Accordance with Appendix VIII, Supplements 4 and 6, Section XI, Division 1  
2/28/03 N-685 Lighting Requirements for Surface Examination, Section XI, Division 1  
2/28/03 N-685 Lighting Requirements for Surface Examination, Section XI, Division 1  
2/28/03  
2/28/03 N-686-1 Alternative Requirements for Visual Examinations, VT-1, VT-2, and VT-3, Section XI, Division 
1/10/07


RG 1.147, Rev. 19, Page 9 CODE CASE
RG 1.147, Page 8 Code Case Number Table 1 Acceptable Section XI Code Cases
NUMBER
TABLE 1 ACCEPTABLE SECTION XI CODE CASES


DATE OR
Date or Supplement/  
SUPPLEMENT/  
Edition N-694-2 Evaluation Procedure and Acceptance Criteria for PWR Reactor Vessel Head Penetration Nozzles, Section XI, Division 1  
EDITION
1/13E
N-686-1 Alternative Requirements for Visual Examinations, VT-1, VT-2, and VT-3, Section XI, Division 
N-695 Qualification Requirements for Dissimilar Metal Piping Welds, Section XI
1/10/07 N-694-2 Evaluation Procedure and Acceptance Criteria for PWR Reactor Vessel Head Penetration Nozzles, Section XI, Division 1  
Division 1
1/16/13 N-697 Pressurized Water Reactor (PWR) Examination and Alternative Examination Requirements for Pressure Retaining Welds in Control Rod Drive and Instrument Nozzle Housings, Section XI, Division 1  
5/21/03 N-696 Qualification Requirements for Appendix VIII Piping Examinations Conducted from the Inside Surface, Section XI, Division 1
5/21/03 N-697 Pressurized Water Reactor (PWR) Examination and Alternative Examination Requirements for Pressure Retaining Welds in Control Rod Drive and Instrument Nozzle Housings, Section XI, Division 1  
11/18/03 N-700  
11/18/03 N-700  
Alternative Rules for Selection of Classes 1, 2, and 3 Vessel Welded Attachments for Examination, Section XI, Division 1  
Alternative Rules for Selection of Classes 1, 2, and 3 Vessel Welded Attachments for Examination, Section XI, Division 1  
11/18/03 N-706-1 Alternative Examination Requirements of Table IWB-2500-1 and Table IWC-2500-1 for PWR Stainless Steel Residual and Regenerative Heat Exchangers, Section XI, Division 1  
11/18/03 N-705 Evaluation Criteria for Temporary Acceptance of Degradation in Moderate Energy Class 2 or 3 Vessels and Tanks, Section XI, Division 1
10/12/06 N-706-1 Alternative Examination Requirements of Table IWB-2500-1 and Table IWC-2500-1 for PWR Stainless Steel Residual and Regenerative Heat Exchangers, Section XI, Division 1 (Note: Code Case N-706 was unconditionally approved in Revision 15 to Regulatory Guide 1.147)
1/10/07 N-712 Class 1 Socket Weld Examinations, Section XI, Division 1  
1/10/07 N-712 Class 1 Socket Weld Examinations, Section XI, Division 1  
5/12/04 N-716-1 Alternative Piping Classification and Examination Requirements, Section XI,  
5/12/04 N-716-1 Alternative Piping Classification and Examination Requirements, Section XI,  
Division 1  
Division 1  
1/27/13 N-730-1 Roll Expansion of Class 1 Control Rod Drive Bottom Head Penetrations in BWRs, Section XI, Division 1  
1/27/13 N-730-1 Roll Expansion of Class 1 Control Rod Drive Bottom Head Penetrations in BWRs, Section XI, Division 1  
7/16/12 N-731 Alternative Class 1 System Leakage Test Pressure Requirements, Section XI,  
10/10E
N-731 Alternative Class 1 System Leakage Test Pressure Requirements, Section XI,  
Division 1  
Division 1  
2/22/05 N-733 Mitigation of Flaws in NPS 2 (DN 50) and Smaller Nozzles and Nozzle Partial Penetration Welds in Vessels and Piping by Use of a Mechanical Connection Modification, Section XI, Division 1  
2/22/05 N-733 Mitigation of Flaws in NPS 2 (DN 50) and Smaller Nozzles and Nozzle Partial Penetration Welds in Vessels and Piping by Use of a Mechanical Connection Modification, Section XI, Division 1  
7/1/05 N-735 Successive Inspection of Class 1 and 2 Piping Welds, Section XI, Division 1  
7/01/05 N-735 Successive Inspection of Class 1 and 2 Piping Welds, Section XI, Division 1  
10/12/06 N-739-1 Alternative Qualification Requirements for Personnel Performing Class CC  
10/12/06 N-739-1 Alternative Qualification Requirements for Personnel Performing Class CC  
Concrete and Post-Tensioning System Visual Examinations, Section XI,  
Concrete and Post-Tensioning System Visual Examinations, Section XI,  
Line 243: Line 237:
1/21/07 N-747 Reactor Vessel Head-to-Flange Weld Examinations, Section XI, Division 1  
1/21/07 N-747 Reactor Vessel Head-to-Flange Weld Examinations, Section XI, Division 1  
1/13/06 N-753 Vision Tests, Section XI, Division 1  
1/13/06 N-753 Vision Tests, Section XI, Division 1  
7/14/06 N-762-1 Temper Bead Procedure Qualification Requirements for Repair/Replacement Activities Without Postweld Heat Treatment, Section XI, Division 1  
7/14/06  
3/13E
 
N-765 Alternative to Inspection Interval Scheduling Requirements of IWA-2430,  
RG 1.147, Page 9 Code Case Number Table 1 Acceptable Section XI Code Cases
 
Date or Supplement/
Edition N-762 Temper Bead Procedure Qualification Requirements for Repair/Replacement Activities Without Post Weld Heat Treatment, Section XI, Division 1  
1/27/07 N-765 Alternative to Inspection Interval Scheduling Requirements of IWA-2430,  
Section XI, Division 1  
Section XI, Division 1  
1/26/09 N-769-2 Roll Expansion of Class 1 In-Core Housing Bottom Head Penetrations in BWRs, Section XI, Division 1  
1/26/09 N-769-2 Roll Expansion of Class 1 In-Core Housing Bottom Head Penetrations in BWRs, Section XI, Division 1  
7/16/12 N-771 Alternative Requirements for Additional Examinations of Class 2 or 3 Items, Section XI, Division 1  
10/10E
9/8/11 N-773 Alternative Qualification Criteria for Eddy Current Examinations of Piping Inside Surfaces, Section XI, Division 1  
N-771 Alternative Requirements for Additional Examinations of Class 2 or 3 Items, Section XI, Division 1  
7/10E
N-773 Alternative Qualification Criteria for Eddy Current Examinations of Piping Inside Surfaces, Section XI, Division 1  
1/26/09 N-775 Alternative Requirements for Bolting Affected by Borated Water Leakage, Section XI, Division 1  
1/26/09 N-775 Alternative Requirements for Bolting Affected by Borated Water Leakage, Section XI, Division 1  
6/24/10
2/10E
 
N-776 Alternative to IWA-5244 Requirements for Buried Piping, Section XI,      
RG 1.147, Rev. 19, Page 10
CODE CASE
NUMBER
TABLE 1 ACCEPTABLE SECTION XI CODE CASES
 
DATE OR
SUPPLEMENT/
EDITION
N-776 Alternative to IWA-5244 Requirements for Buried Piping, Section XI,  
Division 1  
Division 1  
4/9/10
1/10E
N-786-1 Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1
N-786-1 Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate- Energy Carbon Steel Piping, Section XI, Division 1  
4/24/11 N-789-2 Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section XI, Division 1  
5/10E
5/15E
N-798 Alternative Pressure Testing Requirements for Class 1 Piping Between the First and Second Vent, Drain, and Test Isolation Devices, Section XI,      
N-798 Alternative Pressure Testing Requirements for Class 1 Piping Between the First and Second Vent, Drain, and Test Isolation Devices, Section XI,  
Division 1  
Division 1  
12/20/10
4/10E
N-800  
N-800  
Alternative Pressure Testing Requirements for Class 1 Piping Between the First and Second Injection Valves, Section XI, Division 1  
Alternative Pressure Testing Requirements for Class 1 Piping Between the First and Second Injection Valves, Section XI, Division 1  
12/20/10
4/10E
N-803 Similar and Dissimilar Metal Welding Using Ambient Temperature Automatic or Machine Dry Underwater Laser Beam Welding (ULBW)  
N-803 Similar and Dissimilar Metal Welding Using Ambient Temperature Automatic or Machine Dry Underwater Laser Beam Welding (ULBW) Temper Bead Technique, Section XI, Division 1  
Temper Bead Technique, Section XI, Division 1  
5/10E
2/25/11 N-805 Alternative to Class 1 Extended Boundary End of Interval or Class 2 System Leakage Testing of the Reactor Vessel Head Flange O-Ring Leak-Detection System, Section XI, Division 1  
N-805 Alternative to Class 1 Extended Boundary End of Interval or Class 2 System Leakage Testing of the Reactor Vessel Head Flange O-Ring Leak-Detection System, Section XI, Division 1  
2/25/11 N-823-1 Visual Examination, Section XI, Division 1  
6/10E
4/13E
N-823 Visual Examination, Section XI, Division 1  
9/10E
N-825 Alternative Requirements for Examination of Control Rod Drive Housing Welds, Section XI, Division 1  
N-825 Alternative Requirements for Examination of Control Rod Drive Housing Welds, Section XI, Division 1  
10/2/13 N-839 Similar and Dissimilar Metal Welding Using Ambient Temperature SMAW
3/13E  
Temper Bead Technique, Section XI, Division 1
7/13E
N-842 Alternative Inspection Program for Longer Fuel Cycles, Section XI,
Division 1
4/13E  
N-845 Qualification Requirements for Bolts and Studs, Section XI, Division 1  
N-845 Qualification Requirements for Bolts and Studs, Section XI, Division 1  
5/7/14 N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking, Section XI, Division 1
6/13E
6/15E
N-854 Alternative Pressure Testing Requirements for Class 2 and 3 Components Connected to the Class 1 Boundary, Section XI, Division 1
1/15E


RG 1.147, Rev. 19, Page 11
RG 1.147, Page 10
2. Conditionally Acceptable Section XI Code Cases
2.


The NRC determined that the Code Cases listed in Table 2 are acceptable for application in licensee Section XI ISI programs within the limitations imposed by the NRC staff. Unless otherwise stated, limitations imposed by the NRC are in addition to the conditions specified in the Code Case.
Conditionally Acceptable Section XI Code Cases


ASME published the 2010 Edition of the ASME BPV Code on July 1, 2010. ASME issued an addendum in 2011 but did not issue an addendum in 2012. Beginning in 2013, ASME will issue new editions of the BPV Code every 2 years. ASME will continue to publish Code Cases quarterly in supplements to each edition. To assist users, new and revised Code Cases are shaded to distinguish them from those approved in previous versions of this guide. For Code Cases previously listed in this guide, the third column of Table 1 lists the dates of ASME approvals. For new or revised Code Cases, the third column of Table 1 lists the supplement and edition in which each Code Case was published (e.g., 5/13E means Supplement 5 to the 2013 Edition of the ASME BPV Code).  
The Code Cases listed in Table 2 are acceptable to the NRC for application in licensees Section XI inservice inspection programs within the limitations imposed by the NRC staff.  Unless otherwise stated, limitations imposed by the NRC are in addition to the conditions specified in the Code Case.  The 2010 Edition of the ASME BPV Code was published on July 1, 2010. An addenda was issued in 2011; no addenda was issued in 2012. Beginning with 2013, new editions of the BPV Code will be issued every two years. Code Cases will continue to be published quarterly in supplements to each edition. For Code Cases previously listed in this guide, the third column of Table 1 lists the date of ASME approval. For new or revised Code Cases, the third column of Table 1 lists the supplement and edition in which each Code Case was published (e.g., 5/10E means Code Case Supplement 5 to the  
2010 Edition).  


Table 2.  Conditionally Acceptable Section XI Code Cases  
Table 2.  Conditionally Acceptable Section XI Code Cases  


CODE CASE
Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/  
NUMBER
Edition Condition N-416-4 Alternative Pressure Test Requirement for Welded or Brazed Repairs, Fabrication Welds or Brazed Joints for Replacement Parts and Piping Subassemblies, or Installation of Replacement Items by Welding or Brazing, Classes 1, 2, and 3, Section XI, Division 1  
TABLE 2 CONDITIONALLY ACCEPTABLE SECTION XI CODE CASES
1/12/05 Nondestructive examination shall be performed on welded or brazed repairs and fabrication and installation joints in accordance with the methods and acceptance criteria of the applicable subsection of the 1992 Edition of Section III.
CONDITION
DATE OR
SUPPLEMENT/  
EDITION
N-416-4 Alternative Pressure Test Requirement for Welded or Brazed Repairs, Fabrication Welds or Brazed Joints for Replacement Parts and Piping Subassemblies, or Installation of Replacement Items by Welding or Brazing, Classes 1, 2, and 3, Section XI, Division 1 Nondestructive examination (NDE) shall be performed on welded or brazed repairs and fabrication and installation joints in accordance with the methods and acceptance criteria of the applicable subsection of the 1992 Edition of Section III.


1/12/05 N-498-4 Alternative Requirements for 10-Year System Hydrostatic Testing for Class 1,  
N-498-4 Alternative Requirements for 10-Year System Hydrostatic Testing for Class 1, 2, and 3 Systems, Section XI, Division 1  
2, and 3 Systems, Section XI, Division 1 Prior to conducting the VT-2 examination of Class 2 and Class 3 components not required to operate during normal plant operation, a 10 minute holding time is required after attaining test pressure.  Prior to conducting the VT-2 examination of Class 2 and Class 3 components required to operate during normal plant operation, no holding time is required, provided the system has been in operation for at least 4 hours for insulated components or 10 minutes for non-insulated components..
4/08/02 Prior to conducting the VT-2 examination of Class 2 and Class 3 components not required to operate during normal plant operation, a 10-minute holding time is required after attaining test pressure.  Prior to conducting the VT-2 examination of Class 2 and Class 3 components required to operate during normal plant operation, no holding time is required, provided the system has been in operation for at least 4 hours for insulated components or 10 minutes for non-insulated components.
4/8/02 N-504-4 Alternative Rules for Repair of Class 1, 2, and 3 Austenitic Stainless Steel Piping, Section XI, Division 1 The provisions of Section XI, Nonmandatory Appendix Q, Weld Overlay Repair of Class 1, 2, and 3 Austenitic Stainless Steel Piping Weldments, must also be met. In addition, the following conditions shall be met: (1) the sum of laminar flaw length in any direction shall be less than 10 percent of the overlay with a total reduction in area equal to or less than that in Table IWB-3514-3, (2) the finished overlay surface shall be 250 micro-in
(6.3 micrometers) root mean square or smoother, (3) the surface flatness shall be adequate for ultrasonic examination, and (4) radiography shall not be used to detect planar flaws under, or masked by, laminar flaws.


7/14/06  
RG 1.147, Page 11 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/
Edition Condition N-504-4 Alternative Rules for Repair of Class 1, 2, and 3 Austenitic Stainless Steel Piping, Section XI, Division 1
7/14/06 The provisions of Section XI, Nonmandatory Appendix Q, Weld Overlay Repair of Class 1, 2, and 3 Austenitic Stainless Steel Piping Weldments, must also be met.  In addition, the following conditions shall be met: (a) the sum of laminar flaw length in any direction shall be less than 10% of the overlay with a total reduction in area equal to or less than Table IWB-3514-3; (b) the finished overlay surface shall be 250 micro-in (6.3 micrometers) root mean square or smoother; (c)
the surface flatness shall be adequate for ultrasonic examination; and (d)
radiography shall not be used to detect planar flaws under or masked by laminar flaws.


RG 1.147, Rev. 19, Page 12 CODE CASE
NUMBER
TABLE 2 CONDITIONALLY ACCEPTABLE SECTION XI CODE CASES
CONDITION
DATE OR
SUPPLEMENT/
EDITION
N-508-4  
N-508-4  


Rotation of Serviced Snubbers and Pressure Retaining Items for the Purpose of Testing, Section XI, Division 1 When Section XI requirements are used to govern the examination and testing of snubbers and the ISI Code of Record is earlier than the Section XI,  
Rotation of Serviced Snubbers and Pressure Retaining Items for the Purpose of Testing, Section XI, Division 1  
2006 Addenda, Footnote 1 shall not be applied.
1/26/09 When Section XI requirements are used to govern the examination and testing of snubbers and the ISI Code of Record is earlier than Section XI, 2006 Addenda, Footnote 1 shall not be applied.
 
N-513-3 Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping, Section XI, Division 1
1/26/09 The repair or replacement activity temporarily deferred under the provisions of this Code Case shall be performed during the next scheduled outage.


1/26/09 N-516-4 Underwater Welding, Section XI, Division 1  
N-516-3 Underwater Welding, Section XI, Division 1  
(1) Licensees must obtain NRC approval in accordance with  
4/08/02 Licensees must obtain NRC approval in accordance with 10 CFR 50.55a(z)  
10 CFR 50.55a(z) regarding the welding technique to be used prior to performing welding on ferritic material exposed to fast neutron fluence greater than 1x1017 n/cm2 (E > 1 MeV). 
regarding the technique to be used in the weld repair or replacement of irradiated material underwater.
(2) Licensees must obtain NRC approval in accordance with
10 CFR 50.55a(z) regarding the welding technique to be used prior to performing welding on austenitic material other than P-No. 8 material exposed to thermal neutron fluence greater than 1x1017 n/cm2 (E < 0.5 eV).
(3) Licensees must obtain NRC approval in accordance with
10 CFR 50.55a(z) regarding the welding technique to be used prior to performing welding on P-No. 8 austenitic material exposed to thermal neutron fluence greater than 1x1017 n/cm2 (E < 0.5 eV) and measured or calculated helium concentration of the material greater than 0.1 atomic parts per million.


7/13E
N-528-1 Purchase, Exchange, or Transfer of Material Between Nuclear Plant Sites, Section XI, Division 1  
N-533-1 Alternative Requirements for VT-2 Visual Examination of Class 1, 2, and 3 Insulated Pressure-Retaining Bolted Connections, Section XI, Division 1 Prior to conducting the VT-2 examination of Class 2 and Class 3 components not required to operate during normal plant operation, a 10 minute holding time is required after attaining test pressure.  Prior to conducting the VT-2 examination of Class 2 and Class 3 components required to operate during normal plant operation, no holding time is required, provided the system has been in operation for at least 4 hours for insulated components or 10 minutes for non-insulated components.
4/19/02 The requirements of 10 CFR Part 21, Reporting of Defects and Noncompliance (Ref. 6), are to be applied to the nuclear plant site supplying the material as well as to the nuclear plant site receiving the material that has been purchased, exchanged, or transferred between sites.


4/8/02 N-552-1 Alternative MethodsQualification for Nozzle Inside Radius Section from the Outside Surface, Section XI, Division 1 To achieve consistency with the 10 CFR 50.55a rule change published September 22, 1999 (64 FR 51370), incorporating Appendix VIII,  
N-533-1 Alternative Requirements for VT-2 Visual Examination of Class 1, 2, and 3 Insulated Pressure-Retaining Bolted Connections, Section XI, Division 1
Performance Demonstration for Ultrasonic Examination Systems, to Section XI, add the following to the specimen requirements:  
4/08/02 Prior to conducting the VT-2 examination of Class 2 and Class 3 components not required to operate during normal plant operation, a 10 minute holding time is required after attaining test pressure.  Prior to conducting the VT-2 examination of Class 2 and Class 3 components required to operate during normal plant operation, no holding time is required, provided the system has been in operation for at least 4 hours for insulated components or 10 minutes for non-insulated components.
 
RG 1.147, Page 12 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/
Edition Condition N-552-1 Alternative Methods - Qualification for Nozzle Inside Radius Section from the Outside Surface, Section XI, Division 1  
10/10E
To achieve consistency with the 10 CFR 50.55a rule change published September 22, 1999 (64 FR 51370), incorporating Appendix VIII, Performance Demonstration for Ultrasonic Examination Systems, to Section XI, add the following to the specimen requirements:  
At least 50 percent of the flaws in the demonstration test set must be cracks and the maximum misorientation must be demonstrated with cracks.  Flaws in nozzles with bore diameters equal to or less than 4 inches may be notches.
At least 50 percent of the flaws in the demonstration test set must be cracks and the maximum misorientation must be demonstrated with cracks.  Flaws in nozzles with bore diameters equal to or less than 4 inches may be notches.


Add to detection criteria, The number of false calls must not exceed three.
Add to detection criteria, The number of false calls must not exceed three.


(Note: The above conditions are identical to those imposed on Code Case N-
Note: The above conditions are identical to those imposed on Code Case N-552, Rev. 16, RG 1.147.
552, in RG 1.147, Revision 16.)
6/22/12


RG 1.147, Rev. 19, Page 13 CODE CASE
NUMBER
TABLE 2 CONDITIONALLY ACCEPTABLE SECTION XI CODE CASES
CONDITION
DATE OR
SUPPLEMENT/
EDITION
N-557-1 In-Place Dry Annealing of a PWR Nuclear Reactor Vessel, Section XI,  
N-557-1 In-Place Dry Annealing of a PWR Nuclear Reactor Vessel, Section XI,  
Division 1 The secondary stress allowable of 3Sm, shown in Figure 1 of the Code Case, must be applied to the entire primary plus secondary stress range during the anneal.
Division 1  
8/20/02 The secondary stress allowable of 3Sm, shown in Figure 1 of the Code Case, must be applied to the entire primary plus secondary stress range during the anneal.


8/20/02 N-561-2 Alternative Requirements for Wall Thickness Restoration of Class 2 and High Energy Class 3 Carbon Steel Piping, Section XI, Division 1
N-561-2 Alternative Requirements for Wall Thickness Restoration of Class 2 and High Energy Class 3 Carbon Steel Piping, Section XI, Division 1  
(1) In Paragraph 5(b), for repairs performed on a wet surface, the overlay is only acceptable until the next refueling outage.
1/22/07
(1) Paragraph 5(b): for repairs performed on a wet surface, the overlay is only acceptable until the next refueling outage.


(2) In Paragraph 7(c), if the cause of the degradation has not been determined, the repair is only acceptable until the next refueling outage.
(2) Paragraph 7(c): if the cause of the degradation has not been determined, the repair is only acceptable until the next refueling outage.


(3) The area where the weld overlay is to be applied must be examined using ultrasonic methods to demonstrate that no crack-like defects exist.
(3) The area where the weld overlay is to be applied must be examined using ultrasonic methods to demonstrate that no crack-like defects exist.


(4) Piping with a wall thickness less than the diameter of the electrode shall be depressurized before welding.
(4) Piping with wall thickness less than the diameter of the electrode shall be depressurized before welding.


1/22/07 N-562-2 Alternative Requirements for Wall Thickness Restoration of Class 3 Moderate Energy Carbon Steel Piping, Section XI, Division 1
N-562-2 Alternative Requirements for Wall Thickness Restoration of Class 3 Moderate Energy Carbon Steel Piping, Section XI, Division 1  
(1) In Paragraph 5(b), for repairs performed on a wet surface, the overlay is only acceptable until the next refueling outage.
1/22/07
(1) Paragraph 5(b): for repairs performed on a wet surface, the overlay is only acceptable until the next refueling outage.


(2) In Paragraph 7(c), if the cause of the degradation has not been determined, the repair is only acceptable until the next refueling outage.
(2) Paragraph 7(c): if the cause of the degradation has not been determined, the repair is only acceptable until the next refueling outage.


(3) The area where the weld overlay is to be applied must be examined using ultrasonic methods to demonstrate that no crack-like defects exist.
(3) The area where the weld overlay is to be applied must be examined using ultrasonic methods to demonstrate that no crack-like defects exist.


(4) Piping with a wall thickness less than the diameter of the electrode shall be depressurized before welding.
(4) Piping with wall thickness less than the diameter of the electrode shall be depressurized before welding.


1/22/07 N-569-1 Alternative Rules for Repair by Electrochemical Deposition of Class 1 and 2 Steam Generator Tubing, Section XI, Division 1 Note: Steam generator tube repair methods require prior NRC approval through technical specifications. This Code Case does not address certain aspects of this repair (e.g., the qualification of the inspection and plugging criteria necessary for staff approval of the repair method). In addition, if the user plans to reconcile, as described in Footnote 2, the user must perform the reconciliation in accordance with the 1995 Edition and 1996 Addenda of the ASME Code, Section XI, IWA-4200.
RG 1.147, Page 13 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/  
Edition Condition N-569-1 Alternative Rules for Repair by Electrochemical Deposition of Class 1 and 2 Steam Generator Tubing, Section XI, Division 1  
4/19/02 NOTES: Steam generator tube repair methods require prior NRC approval through the Technical Specifications. This Code Case does not address certain aspects of this repair, e.g., the qualification of the inspection and plugging criteria necessary for staff approval of the repair method. In addition, if the user plans to reconcile, as described in Footnote 2, the reconciliation is to be performed in accordance with IWA-4200 in the 1995 Edition, 1996 Addenda of ASME  
Section XI.


4/19/02 N-576-2 Repair of Class 1 and 2 SB-163, UNS N06600 Steam Generator Tubing, Section XI, Division 1 Note: Steam generator tube repair methods require prior NRC approval through technical specifications. This Code Case does not address certain aspects of this repair (e.g., the qualification of the inspection and plugging criteria necessary for staff approval of the repair method).  
N-576-2 Repair of Class 1 and 2 SB-163, UNS N06600 Steam Generator Tubing, Section XI, Division 1  
3/16/12
9/10E
NOTES: Steam generator tube repair methods require prior NRC approval through the Technical Specifications. This Code Case does not address certain aspects of this repair, e.g., the qualification of the inspection and plugging criteria necessary for staff approval of the repair method.


RG 1.147, Rev. 19, Page 14 CODE CASE
NUMBER
TABLE 2 CONDITIONALLY ACCEPTABLE SECTION XI CODE CASES
CONDITION
DATE OR
SUPPLEMENT/
EDITION
N-583 Annual Training Alternative, Section XI, Division 1  
N-583 Annual Training Alternative, Section XI, Division 1  
(1)  Supplemental practice shall be performed on material or welds that contain cracks or by analyzing prerecorded data from material or welds that contain cracks.
2/14/03
(1)  Supplemental practice shall be performed on material or welds that contain cracks, or by analyzing prerecorded data from material or welds that contain cracks.


(2)  The training must be completed no earlier than 6 months prior to performing ultrasonic examinations at a licensees facility.
(2)  The training must be completed no earlier than 6 months prior to performing ultrasonic examinations at a licensees facility.


2/14/03 N-593-2 Alternative Examination Requirements for Steam Generator Nozzle to Vessel Welds, Section XI, Division 1
N-593-2 Alternative Examination Requirements for Steam Generator Nozzle to Vessel Welds, Section XI, Division 1  
(1) Essentially 100 percent (not less than 90 percent) of the examination volume A-B-C-D-E-F-G-H must be inspected. (Note: This condition is identical to the condition on the use of Code Case N-593 in RG 1.147, Revision 16.)
8/10E
(2) The examination volume specified in Section XI, Table IWB-2500-1, Examination Category B-D, must be used for the examination of steam generator nozzle-to-vessel welds at least once before using the reduced examination volume allowed by Code Case N-593-2.
(1) Essentially 100 percent (not less than 90 percent) of the examination volume A-B-C-D-E-F-G-H must be inspected.


11/8/11 N-597-3 Requirements for Analytical Evaluation of Pipe Wall Thinning, Section XI
(Note: the above condition is identical to condition on the use of Code Case N-593, RG 1.147, Rev. 17)  
(1) The use of Code Case N-597-3 for any degradation mechanisms other than flow-accelerated corrosion is not authorized unless an alternative is proposed and approved in accordance with 10 CFR 50.55a(z)
(2) The examination volume specified in Section XI, Table IWB-2500-1, Examination Category B-D, must be used for the examination of steam generator nozzle-to-vessel welds at least once prior to using the reduced examination volume allowed by Code Case N-593-2.
(2) Use of Code Case N-597-3 to mitigate flow-accelerated corrosion is authorized subject to the following conditions:
a.


The Code Case must be supplemented by the provisions of the EPRI/Nuclear Safety Analysis Center Report (NSAC) report EPRI/NSAC-202L-2,Recommendations for an Effective Flow Accelerated Corrosion Program, issued April 1999 (Ref. 7), for developing the inspection requirements, the method of predicting the rate of wall-thickness loss, and the value of the predicted remaining wall thickness. As used in EPRI/NSAC-202L-R2, the term should is to be applied as shall (i.e., a requirement).  
RG 1.147, Page 14 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/
b. Components affected by flow-accelerated corrosion to which this Code Case is applied must be repaired or replaced in accordance with the Construction Code of Record and the owners requirements or a later NRC-approved edition of Section III before the value of tp reaches the allowable minimum wall thickness, tmin, as specified in Figure-3622.1(a)(1) of this Code Case. Alternatively, use of the Code Case is subject to NRC review and approval in accordance with 10 CFR 50.55a(z).  
Edition Condition N-597-2 Requirements for Analytical Evaluation of Pipe Wall Thinning, Section XI,
(3) For those components that do not require immediate repair or replacement, the rate of wall-thickness loss is to be used to determine a suitable inspection frequency so that repair or replacement occurs prior to reaching allowable minimum wall thickness, tmin.
Division 1
11/18/03
(1) Code Case must be supplemented by the provisions of EPRI Nuclear Safety Analysis Center Report 202L-R2,Recommendations for an Effective Flow Accelerated Corrosion Program (Ref. 7), April 1999, for developing the inspection requirements, the method of predicting the rate of wall thickness loss, and the value of the predicted remaining wall thickness. As used in NSAC-202L-R2, the term should is to be applied as shall (i.e., a requirement).  
(2) Components affected by flow-accelerated corrosion to which this Code Case are applied must be repaired or replaced in accordance with the construction code of record and Owners requirements or a later NRC approved edition of Section III, Rules for Construction of Nuclear Power Plant Components, of the ASME Code (Ref. 8) prior to the value of tp reaching the allowable minimum wall thickness, tmin, as specified in -3622.1(a)(1) of this Code Case. Alternatively, use of the Code Case is subject to NRC review and approval per 10 CFR 50.55a(z).  
(3) For Class 1 piping not meeting the criteria of -3221, the use of evaluation methods and criteria is subject to NRC review and approval per 10 CFR
50.55a(z).
(4) For those components that do not require immediate repair or replacement, the rate of wall thickness loss is to be used to determine a suitable inspection frequency so that repair or replacement occurs prior to reaching allowable minimum wall thickness, tmin.


(4) The evaluation criteria in Code Case N-513-4 may be applied to Code Case N-597-3 for the temporary acceptance of wall thinning (until the next refueling outage) for moderate-energy Class 2 and 3 piping.
(5) For corrosion phenomenon other than flow accelerated corrosion, use of the Code Case is subject to NRC review and approval.  Inspection plans and wall thinning rates may be difficult to justify for certain degradation mechanisms such as MIC and pitting.


(5) Code Case N-597-3 shall not be used to evaluate through-wall leakage conditions.
(6) The evaluation criteria in Code Case N-513-2 may be applied to Code Case N-597-2 for temporary acceptance of wall thinning (until the next refueling outage) for moderate-energy Class 2 and 3 piping.  Moderate-energy piping is defined as Class 2 and 3 piping whose maximum operating temperature does not exceed 200 &deg;F (93 &deg;C) and whose maximum operating  pressure does not exceed 275 psig (1.9MPa).  Code Case N-597-2 shall not be used to evaluate through-wall leakage conditions.


5/13E
RG 1.147, Page 15 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/  
Edition Condition N-606-1 Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique for BWR CRD Housing/Stub Tube Repairs, Section XI, Division 1
8/20/02 Prior to welding, an examination or verification must be performed to ensure proper preparation of the base metal, and that the surface is properly contoured so that an acceptable weld can be produced.  This verification is to be required in the welding procedures.


RG 1.147, Rev. 19, Page 15 CODE CASE
NUMBER
TABLE 2 CONDITIONALLY ACCEPTABLE SECTION XI CODE CASES
CONDITION
DATE OR
SUPPLEMENT/
EDITION
N-606-2 Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique for BWR CRD Housing/Stub Tube Repairs, Section XI, Division 1 Prior to welding, an examination or verification must be performed to ensure proper preparation of the base metal, and that the surface is properly contoured so that an acceptable weld can be produced. This verification is to be required in the welding procedure.
2/13E
N-616 Alternative Requirements for VT-2 Visual Examination of Classes 1, 2, 3 Insulated Pressure Retaining Bolted Connections, Section XI, Division 1  
N-616 Alternative Requirements for VT-2 Visual Examination of Classes 1, 2, 3 Insulated Pressure Retaining Bolted Connections, Section XI, Division 1  
4/08/02
(1) Insulation must be removed for VT-2 examination during the system pressure test for any 17-4 PH stainless steel of 410 stainless steel stud or bolt aged at a temperature below 1100 &deg;F or with hardness above Rc 30.
(1) Insulation must be removed for VT-2 examination during the system pressure test for any 17-4 PH stainless steel of 410 stainless steel stud or bolt aged at a temperature below 1100 &deg;F or with hardness above Rc 30.


(2) For A-286 stainless steel studs or bolts, the preload must be verified to be below 100 Ksi, or the thermal insulation must be removed and the joint visually examined.
(2) For A-286 stainless steel studs or bolts, the preload must be verified to be below 100 Ksi or the thermal insulation must be removed and the joint visually examined.


(3) Prior to conducting the VT-2 examination of Class 2 and Class 3 components not required to operate during normal plant operation, a 10  
(3) Prior to conducting the VT-2 examination of Class 2 and Class 3 components not required to operate during normal plant operation, a 10-
minute holding time is required after attaining test pressure.  Prior to conducting the VT-2 examination of Class 2 and Class 3 components required to operate during normal plant operation, no holding time is required, provided the system has been in operation for at least 4 hours for insulated components or 10 minutes for non-insulated components.
minute holding time is required after attaining test pressure.  Prior to conducting the VT-2 examination of Class 2 and Class 3 components required to operate during normal plant operation, no holding time is required, provided the system has been in operation for at least 4 hours for insulated components or 10 minutes for non-insulated components.


4/8/02 N-619 Alternative Requirements for Nozzle Inner Radius Inspections for Class 1 Pressurizer and Steam Generator Nozzles, Section XI, Division 1 In lieu of an ultrasonic examination, licensees may perform a VT-1 examination in accordance with the Code of Record for the ISI program using the allowable flaw length criteria of Section XI, Table IWB-3512-1, with limiting assumptions on the flaw aspect ratio.
N-619 Alternative Requirements for Nozzle Inner Radius Inspections for Class 1 Pressurizer and Steam Generator Nozzles, Section XI, Division 1  
4/08/02 In lieu of a UT examination, licensees may perform a VT-1 examination in accordance with the code of record for the Inservice Inspection Program utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio.


4/8/02 N-638-7 Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique, Section XI, Division 1 Demonstration of ultrasonic examination of the repaired volume is required using representative samples that contain construction-type flaws.
RG 1.147, Page 16 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/  
Edition Condition N-638-6 Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique, Section XI, Division 1  
6/10E
Demonstration for ultrasonic examination of the repaired volume is required using representative samples which contain construction type flaws.


2/13E
(Note: the above condition is identical to the condition on the use of Code Case N 638-4, RG 1.147, Rev. 17)
N-639  
N-639  


Alternative Calibration Block Material, Section XI, Division 1 Chemical ranges of the calibration block may vary from the materials specification if (1) it is within the chemical range of the component specification to be inspected and (2) the phase and grain shape are maintained in the same ranges produced by the thermal process required by the material specification.
Alternative Calibration Block Material, Section XI, Division 1  
8/20/02 Chemical ranges of the calibration block may vary from the materials specification if (1) it is within the chemical range of the component specification to be inspected, and (2) the phase and grain shape are maintained in the same ranges produced by the thermal process required by the material specification.


8/20/02 N-647 Alternative to Augmented Examination Requirements of IWE-2500,  
N-647 Alternative to Augmented Examination Requirements of IWE-2500, Section XI,  
Section XI, Division 1 A VT-1 examination is to be used in lieu of the detailed visual examination.
Division 1  
 
11/18/03 A VT-1 examination is to be used in lieu of the detailed visual examination.
(Note: RG 1.164, Dedication of Commercial-Grade Items for Use in Nuclear Power Plants (Ref. 8), which endorses, in part, EPRI Technical Report 3002002982, provides acceptable guidelines for sampling criteria.)
11/18/03


RG 1.147, Rev. 19, Page 16 CODE CASE
[Note:  Draft Regulatory Guide DG-1070, Sampling Plans Used for Dedicating Simple Metallic Commercial Grade Items for Use in Nuclear Power Plants (Ref. 9), is being developed to provide acceptable guidelines for sampling criteria.]
NUMBER
N-648-1 Alternative Requirements for Inner Radius Examination of Class 1 Reactor Vessel Nozzles, Section XI Division 1  
TABLE 2 CONDITIONALLY ACCEPTABLE SECTION XI CODE CASES
9/18/01 In lieu of a UT examination, licensees may perform a VT-1 examination in accordance with the code of record for the Inservice Inspection Program utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio.
CONDITION
DATE OR
SUPPLEMENT/
EDITION
N-648-2 Alternative Requirements for Inner Radius Examination of Class 1 Reactor Vessel Nozzles, Section XI, Division 1 This Code Case shall not be used to eliminate the preservice or inservice volumetric examination of plants with a combined operating license under
10 CFR Part 52, or a plant that receives its operating license after October 22,
2015.


7/13E
N-660  
N-660  
Risk-Informed Safety Classification for Use in Risk-Informed Repair/Replacement Activities, Section XI, Division 1 This Code Case must be applied only to ASME Code Classes 2 and 3 and non-Code Class pressure-retaining components and their associated supports.
Risk-Informed Safety Classification for Use in Risk-Informed Repair/Replacement Activities, Section XI, Division 1  
7/23/02 The Code Case must be applied only to ASME Code Classes 2 and 3, and non- Code Class pressure retaining components and their associated supports.


7/23/02 N-662-1 Alternative Repair/Replacement Requirements for Items Classified in Accordance with Risk-Informed Processes, Section XI, Division 1 This Code Case must be applied only to ASME Code Classes 2 and 3 and non-Code Class pressure-retaining components and their associated supports.
RG 1.147, Page 17 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/  
Edition Condition N-661-2 Alternative Requirements for Wall Thickness Restoration of Classes 2 and 3 Carbon Steel Piping for Raw Water Service, Section XI, Division 1  
3/22/07
(1) Paragraph 4(b): for repairs performed on a wet surface, the overlay is only acceptable until the next refueling outage.


(Note: This condition is identical to condition on the use of Code Case N-662 in RG 1.147, Revision 16).
(2) Paragraph 7(c): if the cause of the degradation has not been determined, the repair is only acceptable until the next refueling outage.
7/15/11 N-666-1 Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI,
Division 1 A surface examination (magnetic particle or liquid penetrant) must be performed after installation of the weld overlay on Class 1 and 2 piping socket welds. Fabrication defects, if detected, must be dispositioned using the surface examination acceptance criteria of the construction code identified in the repair/replacement plan. (Note: The NRC unconditionally approved Code Case N-666 in RG 1.147, Revision 17, issued August 2014.)
3/13/12 N-695-1 Qualification Requirements for Dissimilar Metal Piping Welds Section XI,
Division 1 Examiners qualified using the 0.25 RMS error for measuring the depths of flaws using Code Case N-695-1 are not qualified to depth-size inner-diameter (ID) surface-breaking flaws greater than 50-percent through-wall in dissimilar metal welds 2.1 inches or greater in thickness. If an examiner qualified using Code Case N-695-1 measures a flaw as greater than 50-percent through-wall in a dissimilar metal weld from the ID, the flaw shall be considered to have an indeterminate depth.


0/15E
(3) The area where the weld overlay is to be applied must be examined using ultrasonic methods to demonstrate that no crack-like defects exist.
N-696-1 Qualification Requirements for Mandatory Appendix VIII Piping Examinations Conducted from the Inside Surface Section XI, Division 1 Examiners qualified using the 0.25 RMS error for measuring the depths of flaws using Code Case N-696-1 in dissimilar metal or austenitic welds are not qualified to depth-size ID surface-breaking flaws greater than
50-percent through-wall in dissimilar metal or austenitic welds 2.1 inches or greater in thickness. If an examiner qualified using Code Case N-696-1 measures a flaw as greater than 50-percent through-wall in a dissimilar metal or austenitic weld from the ID, the flaw shall be considered to have an indeterminate depth.


6/13E
(4) Piping with wall thickness less than the diameter of the electrode shall be depressurized before welding.


RG 1.147, Rev. 19, Page 17 CODE CASE
N-662-1 Alternative Repair/Replacement Requirements for Items Classified in Accordance with Risk-Informed Processes, Section XI, Division 1  
NUMBER
6/10E 
TABLE 2 CONDITIONALLY ACCEPTABLE SECTION XI CODE CASES
The Code Case must be applied only to ASME Code Classes 2 and 3, and non- Code Class pressure retaining components and their associated supports.
CONDITION
DATE OR
SUPPLEMENT/
EDITION
N-702 Alternative Requirements for Boiling Water Reactor (BWR) Nozzle Inner Radius and Nozzle-to-Shell Welds, Section XI, Division 1 The applicability of Code Case N-702 for the first 40 years of operation must be demonstrated by satisfying the criteria in Section 5.0 of NRC
Safety Evaluation regarding BWRVIP-108 dated December 18, 2007 (ML073600374) or Section 5.0 of NRC Safety Evaluation regarding BWRVIP-241 dated April 19, 2013 (ML13071A240). 
The use of Code Case N-702 in the period of extended operation is not approved.


If VT-1 is used, it shall utilize Code Case N-648-2, Alternative Requirements for Inner Radius Examination of Class 1 Reactor Vessel Nozzles, Section XI Division 1, with associated required conditions specified in RG 1.147.
(Note: this condition is identical to condition on the use of Code Case N-662, RG 1.147, Rev. 17). 
N-666-1 Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI,
Division 1  
9/10E
A surface examination (magnetic particle or liquid penetrant) must be performed after installation of the weld overlay on Class 1 and 2 piping socket welds.


(Note: The NRC previously approved this Code Case with conditions; the staff revised these conditions for this guide.)
Fabrication defects, if detected, must be dispositioned using the surface examination acceptance criteria of the Construction Code identified in the Repair/Replacement Plan.
2/20/04 N-705 Evaluation Criteria for Temporary Acceptance of Degradation in Moderate Energy Class 2 or 3 Vessels and Tanks Section XI, Division 1 The ASME Code repair or replacement activity temporarily deferred under the provisions of this Code Case shall be performed during the next scheduled refueling outage for through-wall flaws.


(Note: The NRC previously approved this Code Case without conditions;
(Note: Code Case N-666 was unconditionally approved in Rev. 17, RG 1.147.)
this is a new condition for this guide.) 
11/10E
N-711-1 Alternative Examination Coverage Requirements for Examination Category B-F, B-J, C-F-1, C-F-2, and R-A Piping Welds Section XI, Division 1 Code Case N-711-1 shall not be used to redefine the required examination volume for preservice examinations or when the postulated degradation mechanism for piping welds is primary water stress-corrosion cracking or crevice-corrosion degradation mechanisms.


0/17E
RG 1.147, Page 18 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/
N-749 Alternative Acceptance Criteria for Flaws in Ferritic Steel Components Operating in the Upper Shelf Temperature Range, Section XI, Division 1 In lieu of the upper shelf transition temperature, Tc, as defined in the Code Case, the following shall be used:
Edition Condition N-702 Alternative Requirements for Boiling Water Reactor (BWR) Nozzle Inner Radius and Nozzle-to-Shell Welds, Section XI, Division 1  
Tc = 154.8 &deg;F + 0.82 x RTNDT (in U.S customary units).
2/20/04 The technical basis supporting the implementation of this Code Case is addressed by BWRVIP-108: BWR Vessel and Internals Project, Technical Basis for the Reduction of Inspection Requirements for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Blend Radii, EPRI
Tc = 82.8 &deg;C + 0.82 x RTNDT (in the International System of Units).
Technical Report 1003557, October 2002 (ML023330203) and BWRVIP-241:
Tc is the temperature above which the elastic plastic fracture mechanics (EPFM) method must be applied. Additionally, the NRC defines temperature Tc1 below which the linear elastic fracture mechanics (LEFM)  
BWR Vessels and Internals Project, Probabilistic Fracture Mechanics Evaluation for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Blend Radii, EPRI Technical Report 1021005, October 2010
method must be applied:
(ML11119A041).  The applicability of Code Case N-702 must be shown by demonstrating that the criteria in Section 5.0 of NRC Safety Evaluation regarding BWRVIP-108 dated December 18, 2007 (ML073600374) or Section
Tc1 = 95.36 &deg;F + 0.703 x RTNDT (in U.S customary units).  
5.0 of NRC Safety Evaluation regarding BWRVIP-241 dated April 19, 2013 (ML13071A240) are met. The evaluation demonstrating the applicability of the Code Case shall be reviewed and approved by the NRC prior to the application of the Code Case.
Tc1 = 47.7 &deg;C + 0.703 x RTNDT (in international system of units).
Between Tc1 and Tc, although the fracture mode is in transition from LEFM
to EPFM, users should consider whether it is appropriate to apply the EPFM method. Alternatively, the licensee may use a different Tc value if it can be justified by plant-specific Charpy curves.


3/16/12
N-749 Alternative Acceptance Criteria for Flaws in Ferritic Steel Components Operating in the Upper Shelf Temperature Range, Section XI, Division 1
9/10E
In lieu of the upper shelf transition temperature, Tc, as defined in the Code Case, the following shall be used:
Tc = 154.8 &deg;F + 0.82 x RTNDT (in U.S Customary Units), and Tc = 82.8 &deg;C + 0.82 x RTNDT (in SI Units).
Tc is the temperature above which the elastic plastic fracture mechanics (EPFM)
method must be applied.  Additionally, the NRC defines temperature Tc1 below which the linear elastic fracture mechanics (LEFM) method must be applied:
Tc1 = 95.36 &deg;F + 0.703 x RTNDT (in U.S Customary Units), and Tc1 = 47.7 &deg;C + 0.703 x RTNDT (in SI Units).
Between Tc1 and Tc, while the fracture mode is in transition from LEFM to EPFM, users should consider whether or not it is appropriate to apply the EPFM
method.  Alternatively, the licensee may use a different Tc value if it can be justified by plant specific Charpy curves.


RG 1.147, Rev. 19, Page 18 CODE CASE
N-751 Pressure Testing of Containment Penetration Piping, Section XI, Division 1  
NUMBER
8/03/06 When a 10 CFR 50, Appendix J, Type C test is performed as an alternative to the requirements of IWA-4540 (IWA-4700 in the 1989 edition through the 1995 edition) during repair and replacement activities, nondestructive examination must be performed in accordance with IWA-4540(a)(2) of the 2002 Addenda of Section XI.
TABLE 2 CONDITIONALLY ACCEPTABLE SECTION XI CODE CASES
CONDITION
DATE OR
SUPPLEMENT/
EDITION
N-751 Pressure Testing of Containment Penetration Piping, Section XI, Division 1 When a 10 CFR 50, Appendix J, Type C test is performed as an alternative to the requirements of IWA-4540 (IWA-4700 in the 1989 edition through the 1995 edition) during repair and replacement activities, nondestructive examination must be performed in accordance with IWA-4540(a)(2) of the  
2002 Addenda of Section XI.


8/3/06 N-754-1 Optimized Structural Dissimilar Metal Weld Overlay for Mitigation of PWR  
RG 1.147, Page 19 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/
Class 1 Items, Section XI, Division 1
Edition Condition N-754 Optimized Structural Dissimilar Metal Weld Overlay for Mitigation of PWR  
(1) The conditions imposed on the optimized weld overlay design in the NRCs safety evaluation for the topical report, Materials Reliability Program (MRP): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in PWRs (MRP-169), Revision 1-A, Electric Power Research Institute (ADAMS Accession Nos. ML101620010 and ML101660468), must be satisfied.
Class 1 Items, Section XI, Division 1  
6/10E
1) The conditions imposed on the optimized weld overlay design in the NRC
safety evaluation for MRP-169, Revision 1-A (Agencywide Document Access and Management System Nos. ML101620010 and ML101660468)  
must be satisfied.


(2) In lieu of the preservice and inservice examinations, as specified in Section 3(c) of the Code Case, the optimized weld overlay must be examined in accordance with 10 CFR 50.55a(g)(6)(ii)(F).  
2) The preservice and inservice inspections of the overlaid weld must satisfy
1/13E
10 CFR 50.55a(g)(6)(ii)(F).  
N-766-1 Nickel Alloy Reactor Coolant Inlay and Onlay for Mitigation of PWR Full Penetration Circumferential Nickel Alloy Dissimilar Metal Welds in Class 1 Items, Section XI, Division 1
3) The first layer of weld metal deposited shall not be credited toward the required optimized weld overlay thickness unless the chromium content of the first layer is at least 24 percent.  The presence of the first layer shall be considered in the design analysis requirements of paragraph 2(b) of Code Case N-754 regardless of the chromium content.
(1) Credit cannot be taken to reduce preservice and ISI requirements specified by this Code Case on an inlay or onlay if an inlay or onlay is applied to an Alloy 82/182 dissimilar metal weld that contains an axial indication that has a depth of more than 25 percent of the pipe wall thickness and a length of more than one-half of the axial width of the dissimilar metal weld or a circumferential indication that has a depth of more than 25 percent of the pipe wall thickness and a length of more than 20 percent of the circumference of the pipe.


(2) In lieu of Paragraph 2(e) of the Code Case, pipes with any thickness of inlay or onlay must be evaluated for weld shrinkage, pipe system flexibility, and additional weight of the inlay or onlay.
N-778 Alternative Requirements for Preparation and Submittal of Inservice Inspection Plans, Schedules, and Preservice and Inservice Inspection Summary Reports, Section XI, Division 1 
0/10E
Licensees must submit the following reports to the regulatory authority:
1) The preservice inspection summary report must be submitted prior to the date of placement of the unit into commercial service.


(3) If an inlay or onlay is applied to an Alloy 82/182 dissimilar metal weld that contains an indication that exceeds the acceptance standards of Section XI, IWB-3514, and that is accepted for continued service in accordance with Section XI, IWB-3132.3 or IWB-3142.4, the subject weld must be inspected in three successive examinations after inlay or onlay installation.
2) The inservice inspection summary report must be submitted within 90
calendar days of the completion of each refueling outage.


(4) Any detectable subsurface indication discovered by eddy current testing in the inlay or onlay during acceptance examinations is prohibited to remain in service.
N-789 Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate- Energy Carbon Steel Piping, Section XI, Division 1
6/10E
Areas containing pressure pads shall be visually observed at least once per month to monitor for evidence of leakage.  If the areas containing pressure pads are not accessible for direct observation, then monitoring will be accomplished by visual assessment of surrounding areas or ground surface areas above pressure pads on buried piping, or monitoring of leakage collection systems, if available.


(5) The flaw analysis of Paragraph 2(d) of the Code Case shall also consider primary water stress corrosion-cracking growth in the circumferential and axial directions in accordance with Section XI, IWB-3640.
RG 1.147, Page 20
Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/
Edition Condition N-795 Alternative Requirements for BWR Class 1 System Leakage Test Pressure Following Repair/Replacement Activities, Section XI, Division 1
3/10E
1) The use of nuclear heat to conduct the BWR Class 1 system leakage test is prohibited (i.e., the reactor must be in a non-critical state), except during refueling outages in which the ASME Section XI Category B-P pressure test has already been performed, or at the end of mid-cycle maintenance outages fourteen (14) days or less in duration.


1/13E
2) The test condition holding time, after pressurization to test conditions, and before the visual examinations commence, shall be 1 hour for non-insulated components.
 
RG 1.147, Rev. 19, Page 19 CODE CASE
NUMBER
TABLE 2 CONDITIONALLY ACCEPTABLE SECTION XI CODE CASES
CONDITION
DATE OR
SUPPLEMENT/
EDITION
N-778 Alternative Requirements for Preparation and Submittal of Inservice Inspection Plans, Schedules, and Preservice and Inservice Inspection Summary Reports, Section XI, Division 1 Licensees must submit the following reports to the regulatory authority:
(1) The preservice inspection summary report must be submitted prior to the date of placement of the unit into commercial service
(2) The inservice inspection summary report must be submitted within 90
calendar days of the completion of each refueling outage.
 
12/29/05 N-795 Alternative Requirements for BWR Class 1 System Leakage Test Pressure Following Repair/Replacement Activities, Section XI, Division 1
(1) The use of nuclear heat to conduct the BWR Class 1 system leakage test is prohibited (i.e., the reactor must be in a noncritical state), except during refueling outages in which the ASME Section XI Category B-P
pressure test has already been performed or at the end of midcycle maintenance outages 14 days or less in duration.
 
(2) The test condition holding time, after pressurization to test conditions and before the visual examinations commence, shall be 1 hour for noninsulated components.


9/17/10
N-799 Dissimilar Metal Welds Joining Vessel Nozzles to Components, Section XI,  
N-799 Dissimilar Metal Welds Joining Vessel Nozzles to Components, Section XI,  
Division 1  
Division 1  
(1) Ultrasonic examination procedures, equipment, and personnel shall be qualified by performance demonstration in accordance with Section XI,
4/10E
Appendix VIII, Supplement 10. When applying the examination requirements of Figure IWB-2500-8, the examination volume shall be extended to include 100 percent of the weld.
1) The gap between the ultrasonic probe and component surface shall not exceed 1/32 in. If the gap exceeds 1/32 in., the weld shall be considered to be unexamined unless the examination technique is successfully demonstrated on representative mockups.


(2) Examination requirements of Section XI, Mandatory Appendix I,  
2) The following requirements must be implemented when applying this Code Case to ensure that welds are adequately inspected:
Paragraph I-3200(c), must be applied.
a. Examination requirements of Section XI, Mandatory Appendix I,  
paragraph I-3200(c) must be applied.


(3) Ultrasonic depth and sizing qualifications for cast austenitic stainless steel components must follow Appendix VIII, Supplement 10, using representative cast austenitic stainless steel mockups containing representative cracks and be independent of other Supplement 10  
b. Ultrasonic depth and sizing qualifications for cast austenitic stainless steel components must follow Appendix VIII, Supplement 10, using representative cast austenitic stainless steel mockups containing representative cracks and be independent of other Supplement 10  
qualifications.
qualifications.


(4) Cracks detected and not depth sized to Appendix VIII type performance-based procedures, equipment, and personnel qualifications shall be repaired or removed.
c. Cracks detected and not depth sized to Appendix VIII type performance-based procedures, equipment, and personnel qualifications shall be repaired or removed.


12/20/10
RG 1.147, Page 21
N-824 Ultrasonic Examination of Cast Austenitic Piping Welds From the Outside Surface, Section XI, Division 1  
3.
(1) Instead of Paragraph 1(c)(1)(-c)(-2), licensees shall use a search unit with a center frequency of 500 kHz with a tolerance of plus or minus
20 percent for piping greater than 1.6 in (41 mm) thick.


(2) Instead of Paragraph 1(c)(1)(-d), the search unit must produce angles, including those at, but not limited to, 30 to 55 degrees with a maximum increment of 5 degrees.
Annulled Unconditionally Approved Section XI Code Cases


11/10E
The Code Cases listed in Table 3 were previously unconditionally approved by the NRC and have been annulled by the ASME.
 
RG 1.147, Rev. 19, Page 20
CODE CASE
NUMBER
TABLE 2 CONDITIONALLY ACCEPTABLE SECTION XI CODE CASES
CONDITION
DATE OR
SUPPLEMENT/
EDITION
N-829 Austenitic Stainless Steel Cladding and Nickel Base Cladding Using Ambient Temperature Machine GTAW Temper Bead Technique Section XI,
Division 1 The provisions of Paragraph 3(e)(2) or 3(e)(3) may only be used when it is impractical to use the interpass temperature measurement methods described in Paragraph 3(e)(1), such as in situations where the weldment area is inaccessible (e.g., internal bore welding) or when there are extenuating radiological conditions.
 
0/13E
N-830
Direct Use of Master Fracture Toughness Curve for Pressure Retaining Materials of Class 1 Vessels, Section XI
Use of Code Case N-830, Paragraph (f), which provides an alternative to limiting the lower shelf of the 95-percent lower tolerance bound Master Curve toughness, KJC-lower 95%, to a value consistent with the current KIC
curve, is prohibited.
 
7/13E
N-831 Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic Pipe, Section XI, Division 1 Code Case N-831 is prohibited for use in new reactor construction.
 
0/17E
N-838 Flaw Tolerance Evaluation of Cast Austenitic Stainless Steel Piping Section XI, Division 1 Code Case N-838 shall not be used to evaluate flaws in cast austenitic stainless steel piping where the delta ferrite content exceeds 25 percent.
 
2/15E
N-843 Alternative Pressure Testing Requirements Following Repairs or Replacements for Class 1 Piping between the First and Second Inspection Isolation Valves, Section XI, Division 1 If the portions of the system that requires pressure testing are associated with more than one safety function, the pressure test and visual examination VT-2 shall be performed during a test conducted at the higher of the operating pressures for the respective system safety functions.
 
4/13E
N-849 In-situ VT-3 Examination of Removable Core Support Structures Without Removal, Section XI
(1) The use of Code Case N-849 is limited to plants that are designed with accessible core support structures to allow for in situ inspection.
 
(2) Before the initial plant startup, a VT-3 examination shall be performed with the core support structure removed, as required by ASME
Section XI, IWB-2500-1, and shall include all surfaces that are accessible when the core support structure is removed, including all load bearing and contact surfaces.
 
7/13E
 
RG 1.147, Rev. 19, Page 21
3. Annulled Unconditionally Approved Section XI Code Cases
 
The NRC had previously approved the Code Cases listed in Table 3 unconditionally; however, they have been annulled by ASME.


Table 3.  Annulled Unconditionally Approved Section XI Code Cases  
Table 3.  Annulled Unconditionally Approved Section XI Code Cases  


CODE CASE
Code Case Number Table 3 Annulled Unconditionally Approved Section XI Code Cases Annulment Date N-34  
NUMBER
TABLE 3 ANNULLED UNCONDITIONALLY APPROVED SECTION XI  
CODE CASES
ANNULMENT
DATE
N-34  
(1551)  
(1551)  
Inservice Inspection of Welds of Nuclear Components, Section XI  
Inservice Inspection of Welds of Nuclear Components, Section XI  
Line 638: Line 536:
1/1/81 N-98  
1/1/81 N-98  
(1705-1)  
(1705-1)  
Ultrasonic ExaminationCalibration Block Tolerances, Section XI, Division 1  
Ultrasonic Examination - Calibration Block Tolerances, Section XI,  
Division 1  
8/9/96 N-112  
8/9/96 N-112  
(1730)  
(1730)  
Acceptance Standards for Class 2 and 3 Components, Section XI, Division 1  
Acceptance Standards for Class 2 and 3 Components, Section XI,  
7/1/79 N-113-1 Basic Calibration Block for Ultrasonic Examination of Weld 10 in. to 14 in.
Division 1  
 
7/1/79 N-113-1 Basic Calibration Block for Ultrasonic Examination of Weld 10 in. to  
Thick, Section XI, Division 1  
14 in. Thick, Section XI, Division 1  
8/9/96 N-167  
8/9/96 N-167  
(1804)  
(1804)  
Minimum Section Thickness Requirements for Repair of Nozzles, Section XI,  
Minimum Section Thickness Requirements for Repair of Nozzles, Section XI, Division 1  
Division 1  
1/14/80  
1/14/80  
N-198-1 Exemption from Examination for ASME Class 1 and 2 Piping Located at Containment Penetrations, Section XI, Division 1  
N-198-1 Exemption from Examination for ASME Class 1 and 2 Piping Located at Containment Penetrations, Section XI, Division 1  
3/28/01 N-211 Recalibration of Ultrasonic Equipment Upon Change of Personnel, Section XI,  
3/28/01 N-211 Recalibration of Ultrasonic Equipment Upon Change of Personnel, Section XI, Division 1 (The Code Case was annulled on 3/20/81 and reinstated on 7/13/81.
Division 1 (Note: ASME annulled the Code Case on March 20, 1981, and reinstated it on July 13, 1981. There was no change in the Code Case, and the NRC considers that the Code Case was in effect during the March 20-July 13, 1981, time period.)  
 
4/30/93 N-216 Alternative Rules for Reactor Vessel Closure Stud Examination, Section XI,  
There was no change in the Code Case, and the NRC considers that the Code Case was in effect during the period 3/20/81 through 7/13/81)  
Division 1  
4/30/93 N-216 Alternative Rules for Reactor Vessel Closure Stud Examination, Section XI, Division 1  
5/7/90  
5/7/90  
N-234 Time Between Ultrasonic Calibration Checks, Section XI, Division 1  
N-234 Time Between Ultrasonic Calibration Checks, Section XI, Division 1  
Line 665: Line 563:
5/25/83 N-306 Calibration Block Material Selection, Appendix 1, 1-3121, Section XI, Division 1  
5/25/83 N-306 Calibration Block Material Selection, Appendix 1, 1-3121, Section XI, Division 1  
5/7/90  
5/7/90  
N-307-3 Revised Ultrasonic Examination Volume for Class 1 Bolting, Table IWB-2500-1, Examination Category B-G-1, When the Examinations Are Conducted from the End of the Bolt or Stud or from the Center-Drilled Hole, Section XI, Division 1
1/21/07


RG 1.147, Rev. 19, Page 22 CODE CASE
RG 1.147, Page 22 Code Case Number Table 3 Annulled Unconditionally Approved Section XI Code Cases Annulment Date N-307-3 Revised Ultrasonic Examination Volume for Class 1 Bolting, Table IWB-2500-1, Examination Category B-G-1, When the Examinations Are Conducted from the End of the Bolt or Stud or from the Center-Drilled Hole, Section XI, Division 1
NUMBER
1/21/07 N-308 Documentation of Repairs and Replacements of Components in Nuclear Power Plants, Section XI, Division 1  
TABLE 3 ANNULLED UNCONDITIONALLY APPROVED SECTION XI  
CODE CASES
ANNULMENT
DATE
N-308 Documentation of Repairs and Replacements of Components in Nuclear Power Plants, Section XI, Division 1  
9/30/90  
9/30/90  
N-311 Alternative Examination of Outlet Nozzle on Secondary Side of Steam Generators, Section XI, Division 1  
N-311 Alternative Examination of Outlet Nozzle on Secondary Side of Steam Generators, Section XI, Division 1  
11/18/03 N-322 Examination Requirements for Integrally Welded or Forged Attachments to Class 1 Piping at Containment Penetrations, Section XI, Division 1  
11/18/03 N-322 Examination Requirements for Integrally Welded or Forged Attachments to Class 1 Piping at Containment Penetrations, Section XI, Division 1  
2/14/03 N-323-1 Alternative Examination for Welded Attachments to Pressure Vessels, Section XI, Division 1  
2/14/03 N-323-1 Alternative Examination for Welded Attachments to Pressure Vessels, Section XI, Division 1  
1/21/07 N-334 Examination Requirements for Integrally Welded or Forged Attachments to Class 2 Piping at Containment Penetrations, Section XI, Division 1  
1/21/07 N-334 Examination Requirements for Integrally Welded or Forged Attachments to Class 2 Piping at Containment Penetrations, Section XI,  
Division 1  
7/14/06 N-335-1 Rules for Ultrasonic Examination of Similar and Dissimilar Metal Piping Welds, Section XI, Division 1  
7/14/06 N-335-1 Rules for Ultrasonic Examination of Similar and Dissimilar Metal Piping Welds, Section XI, Division 1  
5/11/97 N-343 Alternative Scope of Examination of Attachment Welds for Examination Categories B-H, B-K-1, and C-C, Section XI, Division 1  
5/11/97 N-343 Alternative Scope of Examination of Attachment Welds for Examination Categories B-H, B-K-1, and C-C, Section XI,  
Division 1  
12/3/90  
12/3/90  
N-355 Calibration Block for Angle Beam Ultrasonic Examination of Large Fittings in Accordance with Appendix III-3410, Section XI, Division 1  
N-355 Calibration Block for Angle Beam Ultrasonic Examination of Large Fittings in Accordance with Appendix III-3410, Section XI,  
8/9/96 N-356 Certification Period for Level III NDE Personnel, Section XI, Division 1 (Note: The NRC found the provisions of the Code Case to be acceptable on July 1, 1988.)  
Division 1  
8/5/97 N-375-2 Rules for Ultrasonic Examination of Bolds and Studs, Section XI, Division 1  
8/9/96 N-356 Certification Period for Level III NDE Personnel, Section XI,  
Division 1 (Note: July 1, 1988, is the date that the provisions of the Code Case were acceptable to the NRC.)  
8/5/97 N-375-2 Rules for Ultrasonic Examination of Bolds and Studs, Section XI,  
Division 1  
5/7/90  
5/7/90  
N-389-1 Alternative Rules for Repairs, Replacements, or Modifications, Section XI, Division 1   
N-389-1 Alternative Rules for Repairs, Replacements, or Modifications, Section XI, Division 1   
Line 692: Line 588:
5/11/97 N-406 Alternative Rules for Replacement, Section XI, Division 1  
5/11/97 N-406 Alternative Rules for Replacement, Section XI, Division 1  
5/7/90  
5/7/90  
N-408-3 Alternative Rules for Examination of Class 2 Piping, Section XI, Division 1   
N-408-3 Alternative Rules for Examination of Class 2 Piping, Section XI,  
4/19/02 N-409-3 Procedure and Personnel Qualification Requirements for Ultrasonic Detection and Sizing of Flaws in Piping Welds, Section XI, Division 1  
Division 1   
4/19/02  
 
RG 1.147, Page 23 Code Case Number Table 3 Annulled Unconditionally Approved Section XI Code Cases Annulment Date N-409-3 Procedure and Personnel Qualification Requirements for Ultrasonic Detection and Sizing of Flaws in Piping Welds, Section XI,  
Division 1  
4/30/96 N-415 Alternative Rules for Testing Pressure Relief, Section XI, Division 1  
4/30/96 N-415 Alternative Rules for Testing Pressure Relief, Section XI, Division 1  
8/14/94 N-419 Extent of VT-1 Examinations, Category B-G-1 of Table IWB-2500-1, Section XI, Division 1  
8/14/94 N-419 Extent of VT-1 Examinations, Category B-G-1 of Table IWB-2500-1, Section XI, Division 1  
5/13/94 N-424 Qualification of Visual Examination Personnel, Section XI, Division 1  
5/13/94 N-424 Qualification of Visual Examination Personnel, Section XI,  
Division 1  
7/18/88 N-426 Extent of VT-1 Examinations, Category B-G-2 of Table IWB-2500-1, Section XI, Division 1  
7/18/88 N-426 Extent of VT-1 Examinations, Category B-G-2 of Table IWB-2500-1, Section XI, Division 1  
5/13/94 N-427 Code Cases in Inspection Plans, Section XI, Division 1  
5/13/94 N-427 Code Cases in Inspection Plans, Section XI, Division 1  
12/16/94 N-429-2 Alternative Rules for Ultrasonic Instrument Calibration, Section XI, Division 1
12/16/94 N-429-2 Alternative Rules for Ultrasonic Instrument Calibration, Section XI,  
7/27/95 N-435-1 Alternative Examination Requirements for Vessels With Wall Thickness 2 in.
 
or Less, Section XI, Division 1
5/4/04 N-436-1 Alternative Methods for Evaluation of Flaws in Austenitic Piping, Section XI,  
Division 1  
Division 1  
7/27/95 N-435-1 Alternative Examination Requirements for Vessels With Wall Thickness
2 in. or Less, Section XI, Division 1
5/4/04 N-436-1 Alternative Methods for Evaluation of Flaws in Austenitic Piping, Section XI, Division 1
12/3/90  
12/3/90  
N-437 Use of Digital Readout and Digital Measurement Devices for Performing Pressure Tests, Section XI, Division 1  
N-437 Use of Digital Readout and Digital Measurement Devices for Performing Pressure Tests, Section XI, Division 1  
7/27/95  
7/27/95 N-444 Preparation of Inspection Plans, Section XI, Division 1 (Valve stroke times may be documented outside of the IST program.
 
RG 1.147, Rev. 19, Page 23 CODE CASE
NUMBER
TABLE 3 ANNULLED UNCONDITIONALLY APPROVED SECTION XI   
CODE CASES
ANNULMENT
DATE
N-444 Preparation of Inspection Plans, Section XI, Division 1 (Note: Valve stroke times may be documented outside of the IST program.


However, if the IST program includes these valve stroke times and if it becomes necessary to revise the maximum stroke time required by Section XI,
However, if included within the IST program and it becomes necessary to revise the maximum stroke time required by Supplement 4 Content of IWV Valve Test Tables, it is not necessary to submit a revised IST program to the NRC solely to document a revision in valve stroke time.)  
Supplement 4, Content of IWV Valve Test Tables, the licensee does not need to submit a revised IST program to the NRC solely to document a revision in the valve stroke time.)  
12/30/90  
12/30/90  
N-445 Use of Later Editions of SNT-TC-1A for Qualification of Nondestructive Examination Personnel, Section XI, Division 1, 2, and 3  
N-445 Use of Later Editions of SNT-TC-1A for Qualification of Nondestructive Examination Personnel, Section XI, Division 1, 2 and 3  
5/7/90  
5/7/90  
N-446 Recertification of Visual Examination Personnel, Section XI, Division 1  
N-446 Recertification of Visual Examination Personnel, Section XI,  
Division 1  
5/7/90  
5/7/90  
N-448 Qualification of VT-2 and VT-3 Visual Examination Personnel, Section XI,  
N-448 Qualification of VT-2 and VT-3 Visual Examination Personnel, Section XI, Division 1
4/30/96 N-449 Qualification of VT-4 Visual Examination Personnel, Section XI,  
Division 1  
Division 1  
4/30/96 N-449 Qualification of VT-4 Visual Examination Personnel, Section XI, Division 1
4/30/96 N-457 Qualification Specimen Notch Location for Ultrasonic Examination of Bolts and Studs, Section XI, Division 1  
4/30/96 N-457 Qualification Specimen Notch Location for Ultrasonic Examination of Bolts and Studs, Section XI, Division 1  
4/19/02 N-458-1 Magnetic Particle Examination of Coated Materials, Section XI, Division 1
4/19/02 N-458-1 Magnetic Particle Examination of Coated Materials, Section XI,  
3/38/01 N-461-1 Alternative Rules for Piping Calibration Block Thickness, Section XI,  
Division 1  
Division 1  
3/38/01
RG 1.147, Page 24 Code Case Number Table 3 Annulled Unconditionally Approved Section XI Code Cases Annulment Date N-461-1 Alternative Rules for Piping Calibration Block Thickness, Section XI, Division 1
3/28/01 N-463-1 Evaluation Procedures and Acceptance Criteria for Flaws in Class 1 Ferritic Piping That Exceed the Acceptance Standards of IWB-3514.2, Section XI, Division 1  
3/28/01 N-463-1 Evaluation Procedures and Acceptance Criteria for Flaws in Class 1 Ferritic Piping That Exceed the Acceptance Standards of IWB-3514.2, Section XI, Division 1  
3/28/01 N-471 Acoustic Emission for Successive Inspections, Section XI, Division 1  
3/28/01 N-471 Acoustic Emission for Successive Inspections, Section XI, Division 1  
4/19/02 N-472 Use of Digital Readout and Digital Measurement Devices for Performing Pump Vibration Testing, Section XI, Division 1  
4/19/02 N-472 Use of Digital Readout and Digital Measurement Devices for Performing Pump Vibration Testing, Section XI, Division 1  
8/14/97 N-478 Inservice Inspection for Class CC Concrete Components of Light-Water Cooled Power Plants, Section XI, Division 1  
8/14/97 N-478 Inservice Inspection for Class CC Concrete Components Of Light-Water Cooled Power Plants, Section XI, Division 1  
3/2/98 N-479-1 Boiling Water Reactor (BWR) Main Steam Hydrostatic Test, Section XI, Division 1  
3/2/98 N-479-1 Boiling Water Reactor (BWR) Main Steam Hydrostatic Test, Section XI, Division 1  
4/19/02 N-481 Alternative Examination Requirements for Cast Austenitic Pump Casings, Section XI, Division 1  
4/19/02 N-481 Alternative Examination Requirements for Cast Austenitic Pump Casings, Section XI, Division 1  
3/28/04 N-485-1 Eddy Current Examination of Coated Ferritic Surfaces as an Alternative to Surface Examination, Section XI, Division 1  
3/28/04 N-485-1 Eddy Current Examination of Coated Ferritic Surfaces as an Alternative to Surface Examination, Section XI, Division 1  
2/14/03 N-489 Alternative Rules for Level III NDE Qualification Examinations, Section XI,  
2/14/03 N-489 Alternative Rules for Level III NDE Qualification Examinations, Section XI, Divisions 1, 2, and 3  
Divisions 1, 2, and 3  
4/19/02 N-490-1 Alternative Vision Test Requirements for Nondestructive Examiners, Section XI, Divisions 1, 2, and 3  
4/19/02 N-490-1 Alternative Vision Test Requirements for Nondestructive Examiners, Section XI, Divisions 1, 2, and 3  
2/14/03 N-495 Hydrostatic Testing of Relief Valves, Section XI, Division 1  
2/14/03 N-495 Hydrostatic Testing of Relief Valves, Section XI, Division 1  
4/19/02 N-496-1 Helical-Coil Threaded Inserts, Section XI, Division 1  
4/19/02 N-496-1 Helical-Coil Threaded Inserts, Section XI, Division 1  
5/11/97 N-503 Limited Certification of Nondestructive Examination Personnel, Section XI,  
5/11/97 N-503 Limited Certification of Nondestructive Examination Personnel, Section XI, Division 1 (Note: Because of the statistical screening criteria used for Appendix VIII to Section XI qualifications, this Code Case is not applicable to Appendix VIII, Performance Demonstration for Ultrasonic Examination Systems.)  
Division 1 (Note: Because of the statistical screening criteria used for the qualifications in Section XI, Appendix VIII, this Code Case does not apply to Section XI,
2/14/03 N-514 Low Temperature Overpressure Protection, Section XI, Division 1  
Appendix VIII.)  
2/14/03  
 
RG 1.147, Rev. 19, Page 24 CODE CASE
NUMBER
TABLE 3 ANNULLED UNCONDITIONALLY APPROVED SECTION XI   
CODE CASES
ANNULMENT
DATE
N-514 Low Temperature Overpressure Protection, Section XI, Division 1  
4/19/02 N-515 Class 1 Mechanical Joint Pressure Tests, Section XI, Division 1  
4/19/02 N-515 Class 1 Mechanical Joint Pressure Tests, Section XI, Division 1  
4/19/02 N-521 Alternative Rules for Deferral of Inspections of Nozzle-to-Vessel Welds, Inside Radius Sections, and Nozzle-to-Safe End Welds of a Pressurized Water Reactor (PWR) Vessel, Section XI, Division 1  
4/19/02 N-521 Alternative Rules for Deferral of Inspections of Nozzle-to-Vessel Welds, Inside Radius Sections, and Nozzle-to-Safe End Welds of a Pressurized Water Reactor (PWR) Vessel, Section XI, Division 1  
4/19/02 N-522 Pressure Testing of Containment Penetration Piping, Section XI, Division 1
4/19/02 N-522 Pressure Testing of Containment Penetration Piping, Section XI,  
4/8/02 N-523-2 Mechanical Clamping Devices for Class 2 and 3 Piping, Section XI, Division 1
3/28/04 N-524 Alternative Examination Requirements for Longitudinal Welds in Class 1 and
2 Piping, Section XI, Division 1
4/19/02 N-534 Alternative Requirements for Pneumatic Pressure Testing, Section XI,  
Division 1  
Division 1  
5/9/03 N-535 Alternative Requirements for Inservice Inspection Intervals, Section XI, Division 1  
4/8/02 N-523-2 Mechanical Clamping Devices for Class 2 and 3 Piping, Section XI,
Division 1
3/28/04
 
RG 1.147, Page 25 Code Case Number Table 3 Annulled Unconditionally Approved Section XI Code Cases Annulment Date N-524 Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping, Section XI, Division 1
4/19/02 N-535 Alternative Requirements for Inservice Inspection Intervals, Section XI, Division 1  
3/28/01 N-538 Alternative Requirements for Length Sizing Performance Demonstration in Accordance with Appendix VIII, Supplements 2, 3, 10, 11, and 12, Section XI, Division 1  
3/28/01 N-538 Alternative Requirements for Length Sizing Performance Demonstration in Accordance with Appendix VIII, Supplements 2, 3, 10, 11, and 12, Section XI, Division 1  
4/19/02 N-541 Alternative Requirements for Performance Demonstration in Accordance with Appendix VIII, Supplements 4 and 6, Section XI, Division 1  
4/19/02 N-541 Alternative Requirements for Performance Demonstration in Accordance with Appendix VIII, Supplements 4 and 6, Section XI,
3/28/01 N-543 Alternative to Performing Periodic Calibration Checks, Section XI, Division 1  
Division 1  
3/28/01 N-543 Alternative to Performing Periodic Calibration Checks, Section XI,  
Division 1  
9/18/01 N-544 Repair/Replacement of Small Items, Section XI, Division 1  
9/18/01 N-544 Repair/Replacement of Small Items, Section XI, Division 1  
3/28/01 N-545 Alternative Requirements for Conduct of Performance Demonstration Detection Test of Reactor Vessel, Section XI, Division 1  
3/28/01 N-545 Alternative Requirements for Conduct of Performance Demonstration Detection Test of Reactor Vessel, Section XI, Division 1  
5/20/98 N-553-1 Inservice Eddy Current Surface Examination of Pressure Retaining Pipe Welds and Nozzle-to-Safe End Welds, Section XI, Division 1
5/20/98 N-555 Use of Section II, V, and IX Code Cases, Section XI, Division 1  
3/28/01 N-555 Use of Section II, V, and IX Code Cases, Section XI, Division 1  
4/8/02 N-556 Alternative Requirements for Verification of Acceptability Of Replacements, Section XI, Division 1  
4/8/02 N-556 Alternative Requirements for Verification of Acceptability of Replacements, Section XI, Division 1  
4/19/02 N-563 Grading of Examinations, IWA-2320, Section XI, Division 1  
4/19/02 N-563 Grading of Examinations, IWA-2320, Section XI, Division 1  
4/19/02 N-588 Attenuation to Reference Flaw Orientation of Appendix G for Circumferential Welds in Reactor Vessels, Section XI, Division 1  
4/19/02 N-588 Attenuation to Reference Flaw Orientation of Appendix G
for Circumferential Welds in Reactor Vessels, Section XI, Division 1  
3/28/04 N-592 ASNT Central Certification Program, Section XI, Division 1  
3/28/04 N-592 ASNT Central Certification Program, Section XI, Division 1  
3/28/04 N-598 Alternative Requirements to Required Percentages of Examinations, Section XI, Division 1  
3/28/04 N-598 Alternative Requirements to Required Percentages of Examinations, Section XI, Division 1  
Line 779: Line 665:
3/28/04 N-603 Alternative to the Requirements of IWL-2421, Sites with Two Plants, Section XI, Division 1  
3/28/04 N-603 Alternative to the Requirements of IWL-2421, Sites with Two Plants, Section XI, Division 1  
3/28/04 N-604 Alternative to Bolt Torque or Tension Test Requirements of Table IWE-2500-1, Category E-G, Item E8.20, Section XI, Division 1  
3/28/04 N-604 Alternative to Bolt Torque or Tension Test Requirements of Table IWE-2500-1, Category E-G, Item E8.20, Section XI, Division 1  
9/18/04 N-605 Alternative to the Requirements of IWE-2500(c) [sic, should state IWE-2500(b)] for Augmented Examination of Surface Areas, Section XI,  
9/18/04 N-605 Alternative to the Requirements of IWE-2500(c)
Division 1  
[sic, should state IWE-2500(b)] for Augmented Examination of Surface Areas, Section XI, Division 1  
3/28/04  
[Note:  Draft Regulatory Guide DG-1070 is being developed to provide acceptable guidelines for sampling criteria.]
3/28/04 N-617 Alternative Examination Distribution Requirements for Table IWC-2500-1, Examination Category C-G, Pressure Retaining Welds in Pumps and Valves, Section XI, Division 1
4/19/02


RG 1.147, Rev. 19, Page 25 CODE CASE
RG 1.147, Page 26 Code Case Number Table 3 Annulled Unconditionally Approved Section XI Code Cases Annulment Date N-623 Deferral of Inspections of Shell-to-Flange and Head-to-Flange Welds of a Reactor Vessel, Section XI, Division 1  
NUMBER
4/19/02 N-627 VT-1 Visual Examination in Lieu of Surface Examination for RPV  
TABLE 3 ANNULLED UNCONDITIONALLY APPROVED SECTION XI   
Closure Nuts, Section XI, Division 1  
CODE CASES
ANNULMENT
DATE
N-617 Alternative Examination Distribution Requirements for Table IWC-2500-1, Examination Category C-G, Pressure Retaining Welds in Pumps and Valves, Section XI, Division 1
4/19/02 N-623 Deferral of Inspections of Shell-to-Flange and Head-to-Flange Welds of a Reactor Vessel, Section XI, Division 1  
4/19/02 N-627 VT-1 Visual Examination in Lieu of Surface Examination for RPV Closure Nuts, Section XI, Division 1  
5/7/02 N-640  
5/7/02 N-640  
Alternative Reference Fracture Toughness for Development of P-T Limit Curves, Section XI, Division 1  
Alternative Reference Fracture Toughness for Development of P-T  
Limit Curves, Section XI, Division 1  
4/19/02  
4/19/02  


RG 1.147, Rev. 19, Page 26
RG 1.147, Page 27
4. Annulled Conditionally Acceptable Section XI Code Cases  
4.
 
Annulled Conditionally Acceptable Section XI Code Cases  


The NRC conditionally approved the Code Cases listed in Table 4; however, they were subsequently annulled by ASME.
The Code Cases listed in Table 4 were conditionally approved by the NRC but were subsequently annulled by the ASME.


Table 4.  Annulled Conditionally Acceptable Section XI Code Cases  
Table 4.  Annulled Conditionally Acceptable Section XI Code Cases  


CODE CASE
Code Case Number Table 4 Annulled Conditionally Acceptable Section XI Code Cases Annulment Date N-118  
NUMBER
TABLE 4 ANNULLED CONDITIONALLY ACCEPTABLE SECTION XI,   
CODE CASES
ANNULMENT
DATE
N-118  
(1738)  
(1738)  
ExaminationAcceptance Standards for Surface Indications in Cladding, Section XI  
ExaminationAcceptance Standards for Surface Indications in Cladding, Section XI  
The last sentence of the Reply is to be replaced with the following: The provisions of this Code Case may not be applied for the examination of clad surfaces of nozzles, including the inner surface of the nozzle-to-vessel insert welds.
12/3/90


12/3/90
The last sentence of the Reply is to be replaced with the following: 
The provisions of this Code Case may not be applied for the examination of clad surfaces of nozzles, including the inner surface of the nozzle-to-vessel insert welds.


N-210  
N-210  
Exemption to Hydrostatic Tests After Repairs, Section XI, Division 1 Paragraph (3) of the Reply is to be replaced with the following: Repairs to piping, pumps, and valves where the depth of the repaired cavity does not exceed 25 percent of the wall thickness.
Exemption to Hydrostatic Tests After Repairs, Section XI, Division 1  
3/20/81 Paragraph (3) of the Reply is to be replaced with the following:
Repairs to piping, pumps, and valves where the depth of the repaired cavity does not exceed 25 percent of the wall thickness.


3/20/81 N-252 Low Energy Capacitive Discharge Welding Method for Temporary or Permanent Attachments to Components and Supports, Section III,  
N-252 Low Energy Capacitive Discharge Welding Method for Temporary or Permanent Attachments to Components and Supports, Section III,  
Division 1, and Section XI  
Division 1, and Section XI  
The applicant should indicate in the safety analysis report the application, the material, and the thickness of the material to which the strain gage or thermocouple will be attached by CD welding.
7/16/82 The applicant should indicate in the safety analysis report the application, the material, and the thickness of the material to which the strain gage or thermocouple will be attached by CD welding.


7/16/82 N-278 Alternative Ultrasonic Calibration Block Configuration I-3131 and T-434.3, Section XI, Division 1 (Note: Code Case N-278 was inadvertently allowed to expire because of an ASME administrative error on 3/17/83.  The Code Case was reinstated without technical change on May 25, 1993.  Thus, the NRC considered the Code Case to be in effect during the period from March 17, 1983, through May 25, 1993.)  
N-278 Alternative Ultrasonic Calibration Block Configuration I-3131 and T-434.3, Section XI, Division 1 (Code Case N-278 was inadvertently allowed to expire because of an ASME administrative error on 3/17/83.  The Code Case was reinstated without technical change on May 25, 1993.  Thus, the NRC considered the Code Case to be in effect during the period from March 17, 1983, through May 25, 1993.)  
When a universal calibration block is used and some or all of the reference holes are larger than the reflector holes at comparable depths recommended by the 1980 Edition of the ASME Code, Section V, Article IV, a correction factor should be used to adjust the DAC level to compensate for the larger reflector holes. In addition, if the reactor pressure vessel was previously examined using a conventional block, a ratio between the DAC curves obtained from the two blocks should be noted (for reference) with the significant indication data.
2/19/92 When a universal calibration block is used and some or all of the reference holes are larger than the reflector holes at comparable depths recommended by Article IV, Section V, 1980 Edition of the ASME  
Code, a correction factor should be used to adjust the DAC level to compensate for the larger reflector holes. Also, if the reactor pressure vessel was previously examined using a conventional block, a ratio between the DAC curves obtained from the two blocks should be noted (for reference) with the significant indication data.


2/19/92 N-509 Alternative Rules for the Selection and Examination of Class 1, 2, and 3 Integrally Welded Attachments, Section XI, Division 1 A minimum 10-percent sample of integrally welded attachments for each item in each Code Class per interval should be examined.
RG 1.147, Page 28 Code Case Number Table 4 Annulled Conditionally Acceptable Section XI Code Cases Annulment Date N-509 Alternative Rules for the Selection and Examination of Class 1, 2, and 3 Integrally Welded Attachments, Section XI, Division 1
5/20/01 A minimum 10% sample of integrally welded attachments for each item in each Code class per interval should be examined.


5/20/01 N-512-1 Assessment of Reactor Vessels with Low Upper Shelf Charpy Impact Energy Levels, Section XI, Division 1 The material properties and transient selection must follow the guidance in RG 1.161, Evaluation of Reactor Pressure Vessels with Charpy Upper-Shelf Energy Less Than 50 ft-lb (Ref. 9), or an equivalent NRC-approved method.
N-512-1 Assessment of Reactor Vessels With Low Upper Shelf Charpy Impact Energy Levels, Section XI, Division 1
5/20/01 The material properties and transient selection must follow the guidance in Regulatory Guide 1.161, Evaluation of Reactor Pressure Vessels with Charpy Upper-Shelf Energy Less Than 50 ft-lb (Ref. 10),  
or an equivalent method approved by the NRC staff.


5/20/01
N-546 Alternative Requirements for Qualification of VT-2 Examination Personnel, Section XI, Division 1
9/18/04 This Code Case is applicable only to the performance of VT-2 examinations and may not be applied to other VT-2 functions such as verifying the adequacy of procedures and training VT-2 personnel.


RG 1.147, Rev. 19, Page 27 CODE CASE
N-568 Alternative Examination Requirements for Welded Attachments, Section XI, Division 1  
NUMBER
2/14/03 This Code Case may only be used for examination of the accessible portions of lugs on piping where riser clamps (i.e., clamps on vertical runs of pipe) obstruct access to welded surfaces.
TABLE 4 ANNULLED CONDITIONALLY ACCEPTABLE SECTION XI,   
CODE CASES
ANNULMENT
DATE
N-546 Alternative Requirements for Qualification of VT-2 Examination Personnel, Section XI, Division 1 This Code Case only applies to the performance of VT-2 examinations and may not be applied to other VT-2 functions such as verifying the adequacy of procedures and training VT-2 personnel.


9/18/04 N-568 Alternative Examination Requirements for Welded Attachments, Section XI,  
N-599 Alternatives to Qualification of Nondestructive Examination Personnel for Inservice Inspection of Metal (Class MC) and Concrete (Class CC)
Division 1 This Code Case may only be used for examination of the accessible portions of lugs on piping where riser clamps (i.e., clamps on the vertical runs of pipes)
Containments, Section XI, Division 1  
obstruct access to welded surfaces.
9/18/04 This Code Case may not be used when a licensee updates to the 1992 or later Edition of Section XI that requires the use of ANSI/ASNT CP-
189, Standard for Qualification and Certification of Nondestructive Testing Personnel (Ref. 11).  
N-630
Alternatives to VT-1C and VT-3C Visual Examination for Inservice Inspection of Concrete and VT-1 Visual Examination for Inservice Inspection of Anchorage Hardware and Surrounding Concrete for Concrete Containments, Section XI, Division 1
4/8/02 The Responsible Engineers written practice must define qualification requirements for concrete and tendon hardware examination personnel in accordance with IWA-2300 in lieu of the Owner defined qualification requirements specified in Paragraph (c) of the Code Case.


2/14/03 N-599 Alternatives to Qualification of Nondestructive Examination Personnel for Inservice Inspection of Metal (Class MC) and Concrete (Class CC)
However, limited certification in accordance with IWA-2350 is permitted.
Containments, Section XI, Division 1 This Code Case may not be used when a licensee updates to the 1992 or later edition of Section XI, which requires the use of ANSI/ASNT-CP-189, Standard for Qualification and Certification of Nondestructive Testing Personnel (Ref. 10).
9/18/04 N-630
Alternatives to VT-1C and VT-3C Visual Examination for Inservice Inspection of Concrete and VT-1 Visual Examination for Inservice Inspection of Anchorage Hardware and Surrounding Concrete for Concrete Containments, Section XI, Division 1 The responsible engineers written practice must define qualification requirements for concrete and tendon hardware examination personnel in accordance with Section XI, IWA-2300, in lieu of the owner-defined qualification requirements specified in Paragraph (c) of the Code Case.


However, limited certification in accordance with Section XI, IWA-2350, is permitted.
RG 1.147, Page 29
 
5.
4/8/02
 
RG 1.147, Rev. 19, Page 28
5. Section XI Code Cases That Have Been Superseded


Table 5 lists Code Cases that have been superseded by revision. The third column of the table indicates the date on which each Code Case was superseded. The versions of the Code Cases listed in Table 5 cannot be applied by the licensee or applicant for the first time after the effective date of this RG.
Code Cases That Have Been Superseded


(Note: The NRC did not approve some of these Code Cases in previous versions of this guide.)
Table 5 lists Code Cases that have been superseded by revision.  The third column of the table indicates the date on which each Code Case was superseded.  The older or superseded version of the Code Case, if listed in Table 5, cannot be applied by the licensee or applicant for the first time.  Note: Some of these Code Cases were not approved for use by the NRC in previous versions of this guide.


Table 5.  Section XI Code Cases That Have Been Superseded  
Table 5.  Section XI Code Cases That Have Been Superseded  


CODE CASE
Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-113  
NUMBER
TABLE 5 SECTION XI CODE CASES THAT HAVE BEEN SUPERSEDED
DATE
N-113  
(1731)  
(1731)  
Basic Calibration Block for Ultrasonic Examination of Weld 10 in. To 14 in.
Basic Calibration Block for Ultrasonic Examination of Weld 10 in.


Thick, Section XI, Division 1 N-113-1 Published on  
To 14 in. Thick, Section XI, Division 1 N-113-1 Published on  
12/31/82 N-236  
12/31/82 N-236  


Repair and Replacement of Class MC Vessels, Section XI, Division 1 N-236-1 Published on  
Repair and Replacement of Class MC Vessels, Section XI,  
9/5/85  
Division 1 N-236-1 Published on  
(1) In the second sentence of Paragraph 1.0(a), the phrase, while the plant is not in service, refers to a refueling outage.
9/5/85 (a) In paragraph 1.0(a), second sentence, the phrase, while the plant is not in service, refers to a refueling outage.


(2) In the third sentence of Paragraph 1.0(a), the phrase, the next scheduled plant outage, refers to the next scheduled refueling outage.
(b) In paragraph 1.0(a), third sentence, the phrase, the next scheduled plant outage, refers to the next scheduled refueling outage.


For clarification, the phrase, repair and replacement of Class MC vessels, means repair and replacement of Class MC vessels and components (systems). Acceptance of this Code Case in no way provides/constitutes NRC  
For clarification, Repair and Replacement of Class MC Vessels means Repair and Replacement of Class MC Vessels and Components (systems). Acceptance of this Code Case in no way provides/constitutes NRC approval to violate the technical specification or any NRC requirements with regard to breach of containment during repair and replacement procedures while the plant is in operation.
approval to violate the technical specification or any NRC requirements with regard to breach of containment during repair and replacement procedures while the plant is in operation.


Where a numbered Code paragraph is not identified by a particular edition of the Code, the Code in effect at the time of the ASME meeting (November 3, 1978) that approved the Code Case should govern.
Where a numbered Code paragraph is not identified by a particular edition of the Code, the Code in effect at the time of the ASME  
meeting (November 3, 1978) that approved the Code Case should be governing.


N-307 N-307-1 N-307-2 Revised Ultrasonic Examination Volume for Class 1 Bolting, Table IWB-2500-1, Examination Category B-G-1, When the Examinations Are Conducted from the Center-Drilled Hole, Section XI, Division 1 N-307-1 Published on  
N-307 N-307-1 N-307-2 Revised Ultrasonic Examination Volume for Class 1 Bolting, Table IWB-2500-1, Examination Category B-G-1, When the Examinations Are Conducted from the Center-Drilled Hole, Section XI, Division 1 N-307-1 Published on  
Line 893: Line 768:
4/5/84  
4/5/84  


RG 1.147, Rev. 19, Page 29 CODE CASE
RG 1.147, Page 30
NUMBER
Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-389 Alternative Rules for Repairs, Replacements, or Modifications, Section XI, Division 1 N-389-1 Published on
TABLE 5 SECTION XI CODE CASES THAT HAVE BEEN SUPERSEDED
12/9/93 The applicant should submit for approval the appropriate edition and addenda of the Code that is to be used for the repair, replacement, or modification before the start of the work.
DATE
N-389 Alternative Rules for Repairs, Replacements, or Modifications, Section XI,  
Division 1 The applicant should submit for approval the appropriate edition and addenda of the Code that is to be used for the repair, replacement, or modification before the start of the work.


N-389-1 Published on
N-401 Eddy Current Examination, Section XI, Division 1 N-401-1 Published on  
12/9/93 N-401 Eddy Current Examination, Section XI, Division 1 N-401-1 Published on  
5/4/88 N-402 Eddy Current Calibration Standards, Section XI, Division 1 N-402-1 Published on  
5/4/88 N-402 Eddy Current Calibration Standards, Section XI, Division 1 N-402-1 Published on  
3/14/91 N-408 Alternative Rules for Examination of Class 2 Piping, Section XI, Division 1 N-408-1 Published on  
3/14/91 N-408 Alternative Rules for Examination of Class 2 Piping, Section XI,  
3/8/89 N-408-1 N-408-2 Alternative Rules for Examination of Class 2 Piping, Section XI, Division 1 The applicant for an operating license should define the Class 2 piping subject to volumetric and surface examination in the Preservice Inspection for determination of acceptability by the NRC staff.
Division 1 N-408-1 Published on  
3/8/89 N-408-1 N-408-2 Alternative Rules for Examination of Class 2 Piping, Section XI, Division 1 N-408-2 Published on
7/24/89 N-408-3 Published on
8/9/93 The applicant for an operating license should define the Class 2 piping subject to volumetric and surface examination in the Preservice Inspection for determination of acceptability by the NRC  
staff.


N-408-2 Published on
N-409 Procedure and Personnel Qualification Requirements for Ultrasonic Detection and Sizing of Flaws in Piping Welds, Section XI, Division 1 N-409-1 Published on  
7/24/89 N-408-3 Published on
12/7/87 N-409-1 N-409-2 Procedure and Personnel Qualification Requirements for Ultrasonic Detection and Sizing of Flaws in Piping Welds, Section XI, Division 1 N-409-2 Published on
8/9/93 N-409 Procedure and Personnel Qualification Requirements for Ultrasonic Detection and Sizing of Flaws in Piping Welds, Section XI, Division 1 N-409-1 Published on  
7/27/88;
12/7/87 N-409-1 N-409-2 Procedure and Personnel Qualification Requirements for Ultrasonic Detection and Sizing of Flaws in Piping Welds, Section XI, Division 1 The applicant should give prior notification to the NRC of its intention to use the Code Case.
N-409-3 Published on
4/30/93 The applicant should give prior notification to the NRC of the intention to use the Code Case.


N-409-2 Published on
N-416 N-416-1 N-416-2 N-416-3 Alternative Pressure Test Requirements for Welded Repairs or Installation of Replacement Items by Welding, Class 1, 2, and 3, Section XI, Division 1 N-416-1 Published on  
7/27/88 N-409-3 Published on
4/30/93 N-416 N-416-1 N-416-2 N-416-3 Alternative Pressure Test Requirements for Welded Repairs or Installation of Replacement Items by Welding, Class 1, 2, and 3, Section XI, Division 1 N-416-1 Published on  
2/15/94 N-416-2 Published on  
2/15/94 N-416-2 Published on  
5/5/00  
5/5/00  
N-416-3 Published on  
N-416-3 Published on  
9/7/01 N-416-4 Published on  
7/7/01 N-416-3 Published on
1/12/05 N-429 N-429-1 Alternative Rules for Ultrasonic Instrument Calibration, Section XI,  
1/12/05 N-416-4 Published on  
Division 1 N-429-1 Published on  
1/12/05 N-429 N-429-1 Alternative Rules for Ultrasonic Instrument Calibration, Section XI, Division 1 N-429-1 Published on  
2/23/87 N-429-2 Published on  
2/23/87;
7/27/92  
N-429-2 Published on  
 
7/27/92 N-432 Repair Welding Using Automatic or Machine Gas Tungsten-Arc Welding (GTAW) Temper Bead Technique, Section XI, Division 1 N-432-1 Published on  
RG 1.147, Rev. 19, Page 30
3/28/01  
CODE CASE
NUMBER
TABLE 5 SECTION XI CODE CASES THAT HAVE BEEN SUPERSEDED
DATE
N-432 Repair Welding Using Automatic or Machine Gas Tungsten-Arc Welding (GTAW) Temper Bead Technique, Section XI, Division 1 N-432-1 Published on  
3/28/01 N-435 Alternative Examination Requirements for Vessels with Wall Thickness 2 in.


or Less, Section XI, Division 1 N-435-1 Published on  
RG 1.147, Page 31 Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-435 Alternative Examination Requirements for Vessels With Wall Thickness 2 in. Or Less, Section XI, Division 1 N-435-1 Published on  
7/30/86 N-436 Alternative Methods for Evaluation of Flaws in Austenitic Piping, Section XI,  
7/30/86 N-436 Alternative Methods for Evaluation of Flaws in Austenitic Piping, Section XI, Division 1 N-436-1 Published on  
Division 1 N-436-1 Published on  
12/7/87 N-458 Magnetic Particle Examination of Coated Materials, Section XI, Division 1 N-458-1 Published on  
12/7/87 N-458 Magnetic Particle Examination of Coated Materials, Section XI, Division 1 N-458-1 Published on  
3/14/95 N-461 Alternative Rules for Piping Calibration Block Thickness, Section XI,  
3/14/95 N-461 Alternative Rules for Piping Calibration Block Thickness, Section XI, Division 1 N-461-1 Published on  
Division 1 N-461-1 Published on  
3/14/95 N-463 Evaluation Procedures and Acceptance Criteria for Flaws in Class 1 Ferritic Piping That Exceed the Acceptance Standards of IWB-3514.2, Section XI, Division 1 N-463-1 Published on  
3/14/95 N-463 Evaluation Procedures and Acceptance Criteria for Flaws in Class 1 Ferritic Piping That Exceed the Acceptance Standards of IWB-3514.2, Section XI, Division 1 N-463-1 Published on  
3/5/90  
3/5/90  
N-479 Boiling Water Reactor (BWR) Main Steam Hydrostatic Test, Section XI,  
N-479 Boiling Water Reactor (BWR) Main Steam Hydrostatic Test, Section XI, Division 1 N-479-1 Published on  
Division 1 N-479-1 Published on  
12/3/90  
12/3/90  
N-485 Eddy Current Examination of Coated Ferritic Surfaces as an Alternative to Surface Examination, Section XI, Division 1 N-485 Published on  
N-485 Eddy Current Examination of Coated Ferritic Surfaces as an Alternative to Surface Examination, Section XI, Division 1 N-485 Published on  
8/14/91 N-490  
8/14/91 N-490  
Alternative Vision Test Requirements for Nondestructive Examiners, Section XI, Divisions 1, 2, and 3 N-490-1 Published on  
Alternative Vision Test Requirements for Nondestructive Examiners, Section XI, Divisions 1, 2, and 3 N-490-1 Published on  
5/13/91 N-491 N-491-1 Alternative Rules for Examination of Class 1, 2, 3, and MC Component Supports of Light-Water Cooled Power Plants, Section XI, Division 1 N-491-1 Published on  
5/13/91 N-491 N-491-1 Alternative Rules for Examination of Class 1, 2, 3, and MC  
4/30/93 N-491-2 Published on  
Component Supports of Light-Water Cooled Power Plants, Section XI, Division 1 N-491-1 Published on  
4/30/93;
N-491-2 Published on  
3/12/97 N-494 N-494-1 N-494-2 N-494-3 Pipe Specific Evaluation Procedures and Acceptance Criteria for Flaws in Class 1 Ferritic Piping that Exceed the Acceptance Standards of IWB-3514.2, Section XI, Division 1 N-494-1 Published on  
3/12/97 N-494 N-494-1 N-494-2 N-494-3 Pipe Specific Evaluation Procedures and Acceptance Criteria for Flaws in Class 1 Ferritic Piping that Exceed the Acceptance Standards of IWB-3514.2, Section XI, Division 1 N-494-1 Published on  
7/27/92 N-494-2 Published on  
7/27/92;
N-494-2 Published on  
12/9/93 N-494-3 Published on  
12/9/93 N-494-3 Published on  
8/9/96 N-494-4 Published on  
8/9/96 N-494-4 Published on  
10/11/05  
10/11/05 N-496 N-496-1 Helical-Coil Threaded Inserts, Section XI, Division 1 N-496-1 Published on  
 
RG 1.147, Rev. 19, Page 31 CODE CASE
NUMBER
TABLE 5 SECTION XI CODE CASES THAT HAVE BEEN SUPERSEDED
DATE
N-496 N-496-1 Helical-Coil Threaded Inserts, Section XI, Division 1 N-496-1 Published on  
5/11/94;  
5/11/94;  
N-496-1 Annulled on  
N-496-1 Annulled on  
5/11/97 N-496-2 Published on  
5/11/97 N-496-2 Published on  
9/18/01 N-498 N-498-1 N-498-2 N-498-3 Alternative Rules for 10-Year System Hydrostatic Testing for Class 1, 2, and 3 Systems, Section XI, Division 1 N-498-1 Published on  
9/18/01  
 
RG 1.147, Page 32 Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-498 N-498-1 N-498-2 N-498-3 Alternative Rules for 10-Year System Hydrostatic Testing for Class 1, 2, and 3 Systems, Section XI, Division 1 N-498-1 Published on  
5/11/94 N-498-2 Published on  
5/11/94 N-498-2 Published on  
6/9/95 N-498-3 Published on  
6/9/95 N-498-3 Published on  
Line 973: Line 837:
3/28/01 N-508-3 Published on  
3/28/01 N-508-3 Published on  
11/18/03 N-508-4 Published on  
11/18/03 N-508-4 Published on  
1/26/09 N-512 Assessment of Reactor Vessels with Low Upper Shelf Charpy Impact Energy Levels, Section XI, Division 1 N-512-1 Published on  
1/26/09 N-512 Assessment of Reactor Vessels With Low Upper Shelf Charpy Impact Energy Levels, Section XI, Division 1 N-512-1 Published on  
8/24/95  
8/24/95 N-513 Evaluation Criteria for Temporary Acceptance of Flaws in Class 3 Piping, Section XI, Division 1 N-513-1 Published on
3/28/01 N-513-1


RG 1.147, Rev. 19, Page 32 CODE CASE
N-513-2 Evaluation Criteria for Temporary Acceptance of Flaws in Class 3 Piping, Section XI, Division 1 N-513-2 Published on  
NUMBER
2/20/04 N-513-3 Published on
TABLE 5 SECTION XI CODE CASES THAT HAVE BEEN SUPERSEDED
1/26/09
DATE
N-513 Evaluation Criteria for Temporary Acceptance of Flaws in Class 3 Piping, Section XI, Division 1 N-513-1 Published on  
3/28/01 N-513-1 N-513-2 Evaluation Criteria for Temporary Acceptance of Flaws in Class 3 Piping, Section XI, Division 1  
(1)  
(1)  
Specific safety factors in Paragraph 4.0 must be satisfied.
Specific safety factors in paragraph 4.0 must be satisfied.


(2)  
(2)  
Code Case N-513 may not be applied to the following:  
Code Case N-513 may not be applied to:  
(a)  
(a) Components other than pipe and tube.
components other than pipes and tubes (b)
leakage through a gasket (c)
threaded connections that use nonstructural seal welds for leakage prevention (through seal weld leakage is not a structural flaw;
thread integrity must be maintained)
(d)
degraded socket welds N-513-2 Published on
2/20/04 N-513-3 Published on
1/26/09 N-513-3 Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping, Section XI, Division 1 The repair or replacement activity temporarily deferred under the provisions of this Code Case shall be performed during the next scheduled outage.


N-513-4 Published on
(b) Leakage through a gasket.
5/7/2014 N-516 N-516-1 Underwater Welding, Section XI, Division 1 When welding is to be performed on high neutron fluence Class 1 material, then a mockup, using material with similar fluence levels, should be welded to verify that adequate crack prevention measures were used.


N-516-1 Published on  
(c) Threaded connections employing nonstructural seal welds for leakage prevention (through seal weld leakage is nota structural flaw; thread integrity must be maintained).
12/31/96 N-516-2 Published on  
(d) Degraded socket welds N-516 N-516-1 Underwater Welding, Section XI, Division 1 N-516-1 Published on  
12/31/96;
N-516-2 Published on  
1/17/00  
1/17/00  
N-516-2 N-516-3 Underwater Welding, Section XI, Division 1 Licensees must obtain NRC approval in accordance with 10 CFR 50.55a(z)
When welding is to be performed on high neutron fluence Class 1 material, then a mockup, using material with similar fluence levels, should be welded to verify that adequate crack prevention measures were used.
regarding the method to be used in the weld repair or replacement of irradiated material underwater.


N-516-3 Published on  
RG 1.147, Page 33 Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-516-2 Underwater Welding, Section XI, Division 1 N-516-3 Published on  
4/8/02 N-516-4 Published on
4/8/02 Licensees must obtain NRC approval in accordance with 10 CFR
5/7/13 N-517 Quality Assurance Program Requirements for Owners, Section XI, Division 1 N-517-1 Published on  
50.55a(z) regarding the method to be used in the weld repair or replacement of irradiated material underwater.
7/30/98 N-523 N-523-1 Mechanical Clamping Devices for Class 2 and 3 Piping, Section XI,  
 
Division 1 N-523-1 Published on  
N-517 Quality Assurance Program Requirements for Owners, Section XI,  
Division 1 N-517-1 Published on  
7/30/98 N-523 N-523-1 Mechanical Clamping Devices for Class 2 and 3 Piping, Section XI, Division 1 N-523-1 Published on  
8/24/95 N-523-2 Published on  
8/24/95 N-523-2 Published on  
10/2/00  
10/2/00  
N-528 Purchase, Exchange, or Transfer of Material Between Nuclear Plant Sites, Section XI, Division 1 N-528-1 Published on  
N-528 Purchase, Exchange, or Transfer of Material Between Nuclear Plant Sites, Section XI, Division 1 N-528-1 Published on  
5/7/99  
5/7/99 N-532 N-532-1 N-532-2 N-532-3 N-532-4 Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000, Section XI, Division 1 N-532-1 Published on  
 
RG 1.147, Rev. 19, Page 33 CODE CASE
NUMBER
TABLE 5 SECTION XI CODE CASES THAT HAVE BEEN SUPERSEDED
DATE
N-532 N-532-1 N-532-2 N-532-3 N-532-4 Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000, Section XI, Division 1 N-532-1 Published on  
3/28/01 N-532-2 Published on  
3/28/01 N-532-2 Published on  
7/23/02 N-532-3 Published on  
7/23/02 N-532-3 Published on  
2/20/04 N-532-4 Published on  
2/20/04 N-532-4 Published on  
4/19/06 N-532-5 Published on  
4/19/06 N-532-5 Published on  
1/4/11 N-533 Alternative Requirements for VT-2 Visual Examination of Class 1 Insulated Pressure-Retaining Bolted Connections, Section XI, Division 1 N-533-1 Published  
1/04/11 N-533 Alternative Requirements for VT-2 Visual Examination of Class 1 Insulated Pressure-Retaining Bolted Connections, Section XI,  
Division 1 N-533-1 Published  
2/26/99 N-552 Alternative Methods - Qualification for Nozzle Inside Radius Section from the Outside Surface, Section XI, Division 1 N-552-1 Published on  
2/26/99 N-552 Alternative Methods - Qualification for Nozzle Inside Radius Section from the Outside Surface, Section XI, Division 1 N-552-1 Published on  
6/22/12 To achieve consistency with the 10 CFR 50.55a rule change published September 22, 1999 (64 FR 51370), incorporating Appendix VIII,  
6/22/12 To achieve consistency with the 10 CFR 50.55a rule change published September 22, 1999 (64 FR 51370), incorporating Appendix VIII, Performance Demonstration for Ultrasonic Examination Systems, to Section XI, add the following to the specimen requirements:  
Performance Demonstration for Ultrasonic Examination Systems, to Section XI, add the following to the specimen requirements:  
At least 50 percent of the flaws in the demonstration test set must be cracks and the maximum misorientation must be demonstrated with cracks.  Flaws in nozzles with bore diameters equal to or less than 4 inches may be notches.
At least 50 percent of the flaws in the demonstration test set must be cracks and the maximum misorientation must be demonstrated with cracks.  Flaws in nozzles with bore diameters equal to or less than 4 inches may be notches.


Add to detection criteria, The number of false calls must not exceed three.
Add to detection criteria, The number of false calls must not exceed three.


N-553 Inservice Eddy Current Surface Examination of Pressure Retaining Pipe Welds and Nozzle-to-Safe End Welds, Section XI, Division 1 N-553-1 Published on  
RG 1.147, Page 34 Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-553 Inservice Eddy Current Surface Examination of Pressure Retaining Pipe Welds and Nozzle-to-Safe End Welds, Section XI, Division 1 N-553-1 Published on  
3/28/01 N-554 N-554-1 N-554-2 Alternative Requirements for Reconciliation of Replacement Items, Section XI,  
3/28/01 N-554 N-554-1 N-554-2 Alternative Requirements for Reconciliation of Replacement Items, Section XI, Division 1 N-554-1 Published on  
Division 1 N-554-1 Published on  
7/98E;
7/98E  
N-554-2 Published on  
N-554-2 Published on  
2/25/00  
2/25/00  
N-554-3 Published on  
N-554-3 Published on  
2/14/03 N-557 In-Place Dry Annealing of a PWR Nuclear Reactor Vessel, Section XI,  
2/14/03 N-557 In-Place Dry Annealing of a PWR Nuclear Reactor Vessel, Section XI, Division 1 N-557-1 Published on  
Division 1 N-557-1 Published on  
12/31/96 N-560  
12/31/96 N-560  
N-560-1 Alternative Examination Requirements for Class 1, Category B-J Piping Welds, Section XI, Division 1 N-560-1 Published on  
N-560-1 Alternative Examination Requirements for Class 1, Category B-J  
8/9/96 N-560-2 Published on  
Piping Welds, Section XI, Division 1 N-560-1 Published on  
8/9/96;
N-560-2 Published on  
3/28/00  
3/28/00  
N-561


RG 1.147, Rev. 19, Page 34 CODE CASE
N-561-1 Alternative Requirements for Wall Thickness Restoration of Class 2 and High Energy Class 3 Carbon Steel Piping, Section XI, Division 1 N-561-1 Published on  
NUMBER
TABLE 5 SECTION XI CODE CASES THAT HAVE BEEN SUPERSEDED
DATE
N-561 N-561-1 Alternative Requirements for Wall Thickness Restoration of Class 2 and High Energy Class 3 Carbon Steel Piping, Section XI, Division 1 N-561-1 Published on  
7/30/98 N-561-2 Published on  
7/30/98 N-561-2 Published on  
3/22/07 N-562 N-562-1 Alternative Requirements for Wall Thickness Restoration of Class 3 Moderate Energy Carbon Steel Piping, Section XI, Division 1 N-562-1 Published on  
3/22/07 N-562  
 
N-562-1 Alternative Requirements for Wall Thickness Restoration of Class 3 Moderate Energy Carbon Steel Piping, Section XI,  
Division 1 N-562-1 Published on  
7/30/98 N-562-2 Published on  
7/30/98 N-562-2 Published on  
3/22/07 N-566 N-566-1 Corrective Action for Leakage Identified at Bolted Connections, Section XI,  
3/22/07 N-566 N-566-1 Corrective Action for Leakage Identified at Bolted Connections, Section XI, Division 1 N-566-1 Published on  
Division 1 N-566-1 Published on  
2/15/99 N-566-2 Published on  
2/15/99 N-566-2 Published on  
3/28/01 N-567 Alternative Requirements for Class 1, 2, and 3 Replacement Components, Section XI, Division 1 N-567-1 Published on  
3/28/01 N-567 Alternative Requirements for Class 1, 2, and 3 Replacement Components, Section XI, Division 1 N-567-1 Published on  
Line 1,062: Line 911:
5/7/99 N-576 N-576-1 Repair of Class 1 and 2 SB-163, UNS N06600 Steam Generator Tubing, Section XI, Division 1 N-576-1 Published on  
5/7/99 N-576 N-576-1 Repair of Class 1 and 2 SB-163, UNS N06600 Steam Generator Tubing, Section XI, Division 1 N-576-1 Published on  
5/7/99 N-576-2 Published on  
5/7/99 N-576-2 Published on  
3/16/12 N-577 Risk-Informed Requirements for Class 1, 2, and 3 Piping, Method A,  
3/16/12 N-577 Risk-Informed Requirements for Class 1, 2, and 3 Piping, Method A, Section XI, Division 1 N-577-1 Published on  
Section XI, Division 1 N-577-1 Published on  
3/28/00  
3/28/00  
N-578 Risk-Informed Requirements for Class 1, 2, and 3 Piping, Method B,  
N-578 Risk-Informed Requirements for Class 1, 2, and 3 Piping, Method B, Section XI, Division 1 N-578-1 Published on  
Section XI, Division 1 N-578-1 Published on  
3/28/00  
3/28/00  
N-586 Alternative Additional Examination Requirements for Class 1, 2, and 3 Piping, Components, and Supports, Section XI, Division 1 The engineering evaluations addressed under item (a) and the additional examinations addressed under item (b) shall be performed during this outage.


If the additional examinations performed under item (b) reveal indications that exceed the applicable acceptance criteria of Section XI, the engineering evaluations and the examinations shall be further extended to include additional evaluations and examinations at this outage.
RG 1.147, Page 35 Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-586 Alternative Additional Examination Requirements for Class 1, 2, and
3 Piping, Components, and Supports, Section XI, Division 1 N-586-1 Published on
5/4/04 The engineering evaluations addressed under Item (a) and the additional examinations addressed under Item (b) shall be performed during this outage.  If the additional examinations performed under Item (b) reveal indications exceeding the applicable acceptance criteria of Section XI, the engineering evaluations and the examinations shall be further extended to include additional evaluations and examinations at this outage.


N-586-1 Published on
N-589 Class 3 Nonmetallic Cured-in-Place Piping, Section XI,  
5/4/04 N-589 Class 3 Nonmetallic Cured-in-Place Piping, Section XI, Division 1 N-589-1 Published on  
Division 1 N-589-1 Published on  
7/23/02  
7/23/02 N-593 N-593-1 Alternative Examination Requirements for Steam Generator Nozzle to Vessel Welds, Section XI, Division 1 N-593-1 Published on  
 
RG 1.147, Rev. 19, Page 35 CODE CASE
NUMBER
TABLE 5 SECTION XI CODE CASES THAT HAVE BEEN SUPERSEDED
DATE
N-593 N-593-1 Alternative Examination Requirements for Steam Generator Nozzle to Vessel Welds, Section XI, Division 1 N-593-1 Published on  
10/8/04 N-593-2 Published on  
10/8/04 N-593-2 Published on  
11/8/11 N-597 N-597-1 Requirements for Analytical Evaluation of Pipe Wall Thinning, Section XI,  
11/8/11 N-597 N-597-1 Requirements for Analytical Evaluation of Pipe Wall Thinning, Section XI, Division 1 N-597-1 Published on  
Division 1 N-597-1 Published on  
7/7/01 N-597-2 Published on  
7/7/01 N-597-2 Published on  
11/18/03 N-597-2 Requirements for Analytical Evaluation of Pipe Wall Thinning, Section XI,
11/18/03 N-606 Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique, Section XI, Division 1 N-606-1 Published on  
Division 1 N-597-3 Published on
9/24/99 N-609 Alternative Requirements to Stress-Based Selection Criteria for Category B-J Welds, Section XI, Division 1 N-609-1 Published on  
5/7/2014
(1) The Code Case must be supplemented by the provisions of EPRI Nuclear Safety Analysis Center Report 202L-R2,Recommendations for an Effective Flow Accelerated Corrosion Program, April 1999, for developing the inspection requirements, the method of predicting the rate of wall thickness loss, and the value of the predicted remaining wall thickness.  As used in NSAC-202L-R2, the term should is to be applied as shall (i.e., a requirement).
(2) Components affected by flow-accelerated corrosion to which this Code Case is applied must be repaired or replaced in accordance with the Construction Code of Record and the owners requirements or a later NRC-approved edition of Section III (Ref. 11), before the value of tp reaches the allowable minimum wall thickness, tmin, as specified in Figure-3622.1(a)(1) of this Code Case. Alternatively, use of the Code Case is subject to NRC review and approval under 10 CFR 50.55a(z).
(3) For Class 1 piping that does not meet the criteria of Figure-3221, the use of evaluation methods and criteria is subject to NRC review and approval under 10 CFR 50.55a(z).
(4) For those components that do not require immediate repair or replacement, the rate of wall-thickness loss is to be used to determine a suitable inspection frequency so that repair or replacement occurs prior to reaching the allowable minimum wall thickness, tmin.
 
(5) For corrosion phenomena other than flow-accelerated corrosion, use of the Code Case is subject to NRC review and approval. Inspection plans and wall-thinning rates may be difficult to justify for certain degradation mechanisms such as MIC and pitting.
 
(6) The evaluation criteria in Code Case N-513-2 may be applied to Code Case N-597-2 for temporary acceptance of wall thinning (until the next refueling outage) for moderate-energy Class 2 and 3 piping.
 
Moderate-energy piping is defined as Class 2 and 3 piping whose maximum operating temperature does not exceed 200 &deg;F (93 &deg;C) and whose maximum operating pressure does not exceed 275 psig (1.9MPa).
Code Case N-597-2 shall not be used to evaluate through-wall leakage conditions.
 
RG 1.147, Rev. 19, Page 36 CODE CASE
NUMBER
TABLE 5 SECTION XI CODE CASES THAT HAVE BEEN SUPERSEDED
DATE
N-606 Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique, Section XI, Division 1 N-606-1 Published on  
9/24/99 N-606-1 Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique for BWR CRD Housing/Stub Tube Repairs, Section XI, Division 1 Prior to welding, an examination or verification must be performed to ensure proper preparation of the base metal, and that the surface is properly contoured so that an acceptable weld can be produced. This verification is to be required in the welding procedures.
 
N-606-2 Published on
8/13/13 N-609 Alternative Requirements to Stress-Based Selection Criteria for Category B-J  
Welds, Section XI, Division 1 N-609-1 Published on  
9/17/10  
9/17/10  
N-613 N-613-1 Ultrasonic Examination of Penetration Nozzles in Vessels, Examination Category B-D, Item Nos. B3.10 and B3.90, Reactor Nozzle-to-Vessel Welds, Figs. IWB-2500-7(a), (b), and (c), Section XI, Division 1 N-613-1 Published on  
N-613 N-613-1 Ultrasonic Examination of Penetration Nozzles in Vessels, Examination Category B-D, Item Nos. B3.10 and B3.90, Reactor Nozzle-to-Vessel Welds, Figs. IWB-2500-7(a), (b), and (c),          
Section XI, Division 1 N-613-1 Published on  
8/20/02 N-613-2 Published on  
8/20/02 N-613-2 Published on  
12/10/10  
12/10/10  
N-638 N-638-1 N-638-2 N-638-3  
N-638 N-638-1 N-638-2 N-638-3  


Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique, Section XI, Division 1 The Construction Code of Record acceptance criteria must be used for volumetric examinations.
Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique, Section XI, Division 1 N-638-1 Published on  
 
N-638-1 Published on  
5/9/03 N-638-2 Published on  
5/9/03 N-638-2 Published on  
7/1/05 N-638-3 Published on  
7/1/05 N-638-3 Published on  
Line 1,124: Line 941:
10/12/06  
10/12/06  


N-638-4 N-638-5 Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique, Section XI, Division 1
The Construction Code of Record acceptance criteria must be used for volumetric examinations.
(1) Demonstration for ultrasonic examination of the repaired volume is required using representative samples that contain construction type flaws.


(2) The provisions of Paragraph 3(e)(2) or 3(e)(3) may only be used when it is impractical to use the interpass temperature measurement methods described in Paragraph 3(e)(1) such as in situations where the weldment area is inaccessible (e.g., internal bore welding) or when there are extenuating radiological conditions.
RG 1.147, Page 36 Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-638-4 N-638-5 Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique, Section XI, Division 1 N-638-5 Published on  
 
N-638-5 Published on  
4/27/09 N-638-6 Published on  
4/27/09 N-638-6 Published on  
6/25/11 N-638-6 Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique, Section XI, Division 1 Demonstration for ultrasonic examination of the repaired volume is required using representative samples that contain construction type flaws.
6/25/11  
(1) Demonstration for ultrasonic examination of the repaired volume is required using representative samples which contain construction type flaws.


(Note: The above condition is identical to the condition on the use of Code Case N-638-4 in RG 1.147, Revision 17.)
(2) The provisions of 3(e)(2) or 3(e)(3) may only be used when it is impractical to use the interpass temperature measurement methods described in 3(e)(1), such as in situations where the weldment area is inaccessible (e.g., internal bore welding) or when there are extenuating radiological conditions.
N-638-7 Published on
5/17/13


RG 1.147, Rev. 19, Page 37 CODE CASE
NUMBER
TABLE 5 SECTION XI CODE CASES THAT HAVE BEEN SUPERSEDED
DATE
N-643 N-643-1 Fatigue Crack Growth Rate Curves for Ferritic Steels in PWR Water Environment, Section XI, Division 1 N-643-1 Published on  
N-643 N-643-1 Fatigue Crack Growth Rate Curves for Ferritic Steels in PWR Water Environment, Section XI, Division 1 N-643-1 Published on  
2/3/03 N-643-2 Published on  
2/3/03 N-643-2 Published on  
5/4/04 N-648 Alternative Requirements for Inner Radius Examination of Class 1 Reactor Vessel Nozzles, Section XI, Division 1 N-648-1 Published on  
5/4/04 N-648 Alternative Requirements for Inner Radius Examination of Class 1 Reactor Vessel Nozzles, Section XI, Division 1 N-648-1 Published on  
7/7/01 N-648-1 Alternative Requirements for Inner Radius Examination of Class 1 Reactor Vessel Nozzles, Section XI, Division 1 In lieu of an ultrasonic examination, licensees may perform a VT-1 examination in accordance with the Code of Record for the ISI program using the allowable flaw-length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio.
7/7/01 N-652 N-652-1 Alternative Requirements to Categorize B-G-1, B-G-2, and C-D Bolting Examination Methods and Selection Criteria, Section XI, Division 1 N-652-1 Published on  
 
N-648-2 Published on
9/4/14 N-652 N-652-1 Alternative Requirements to Categorize B-G-1, B-G-2, and C-D Bolting Examination Methods and Selection Criteria, Section XI, Division 1 N-652-1 Published on  
2/20/04 N-652-2 Published on  
2/20/04 N-652-2 Published on  
9/3/10  
9/3/10  
N-653 Qualification Requirements for Full Structural Overlaid Wrought Austenitic Piping Welds, Section XI, Division 1 N-653-1 Published on  
N-653 Qualification Requirements for Full Structural Overlaid Wrought Austenitic Piping Welds, Section XI, Division 1 N-653-1 Published on  
4/4/12 N-661 Alternative Requirements for Wall Thickness Restoration of Classes 2 and 3 Carbon Steel Piping for Raw Water Service, Section XI, Division 1  
4/4/12 N-661 Alternative Requirements for Wall Thickness Restoration of Classes  
(1) If the root cause of the degradation has not been determined, the repair is only acceptable for one cycle.
2 and 3 Carbon Steel Piping for Raw Water Service, Section XI,  
Division 1 N-661-1 Published on
10/11/05 (a) If the root cause of the degradation has not been determined, the repair is only acceptable for one cycle.


(2) The weld overlay repair of an area can only be performed once in the same location.
(b) Weld overlay repair of an area can only be performed once in the same location.


(3) When through-wall repairs are made by welding on surfaces that are wet or exposed to water, the weld overlay repair is only acceptable until the next refueling outage.
(c) When through-wall repairs are made by welding on surfaces that are wet or exposed to water, the weld overlay repair is only acceptable until the next refueling outage.


N-661-1 Published on
N-661-1 Alternative Requirements for Wall Thickness Restoration of Class 2 and 3 Carbon Steel Piping for Raw Water Service, Section XI,  
10/11/05 N-661-1 Alternative Requirements for Wall Thickness Restoration of Class 2 and 3 Carbon Steel Piping for Raw Water Service, Section XI, Division 1 N-661-2 Published on  
Division 1 N-661-2 Published on  
3/22/07  
3/22/07 N-662 Alternative Repair/Replacement Requirements for Items Classified in Accordance with Risk-Informed Processes, Section XI, Division 1 N-662-1 Published on
6/25/11


RG 1.147, Rev. 19, Page 38 CODE CASE
RG 1.147, Page 37 Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-666 Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 N-666-1 Published on  
NUMBER
TABLE 5 SECTION XI CODE CASES THAT HAVE BEEN SUPERSEDED
DATE
N-661-2 Alternative Requirements for Wall Thickness Restoration of Classes 2 and 3 Carbon Steel Piping for Raw Water Service, Section XI, Division 1
(1) In Paragraph 4(b), for repairs performed on a wet surface, the overlay is only acceptable until the next refueling outage.
 
(2) In Paragraph 7(c), if the cause of the degradation has not been determined, the repair is only acceptable until the next refueling outage.
 
(3) The area where the weld overlay is to be applied must be examined using ultrasonic methods to demonstrate that no crack-like defects exist.
 
(4) Piping with a wall thickness that is less than the diameter of the electrode shall be depressurized before welding.
 
N-661-3 Published on
4/25/16 N-662 Alternative Repair/Replacement Requirements for Items Classified in Accordance with Risk-Informed Processes, Section XI, Division 1 N-662-1 Published on
6/25/11 N-666 Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI,  
Division 1 A surface (magnetic particle or liquid penetrant) examination must be performed after the seal weld and weld overlay are installed on Class 1 and 2 piping socket welds. The fabrication defects, if detected, must be dispositioned using the surface examination acceptance criteria of the construction code identified in the repair/replacement plan.
 
N-666-1 Published on  
3/12/12 N-686 Alternative Requirements for Visual Examinations, VT-1, VT-2, and VT-3, Section XI, Division 1 N-686-1 Published on  
3/12/12 N-686 Alternative Requirements for Visual Examinations, VT-1, VT-2, and VT-3, Section XI, Division 1 N-686-1 Published on  
1/10/07 N-694 N-694-1 Evaluation Procedure and Acceptance Criteria for PWR Reactor Vessel Upper Head Penetration, Section XI, Division 1  
1/10/07 N-694-2 Evaluation Procedure and Acceptance Criteria for PWR Reactor Vessel Upper Head Penetration, Section XI, Division 1 N-694-2 Published on
(1) The maximum instantaneous through-thickness stress distribution along the crack front and in the crack-length path must be used to calculate the crack-driving force.
1/16/13 (a) The maximum instantaneous through-thickness stress distribution along the crack front and in the crack-length path must be used to calculate the crack driving force.


(2) The stress intensity factor expression Raju and Newman (Ref. 12), is only applicable to cylindrical products having a ratio of wall thickness to inside radius between 0.1 and 0.25.
(b) The stress intensity factor expression Raju and Newman (Ref.


N-694-1 Published on
12) is only applicable to cylindrical products having a ratio of wall thickness to inside radius between 0.1 and 0.25.
2/20/04 N-694-2 Published on
1/16/13 N-695 Qualification Requirements for Dissimilar Metal Piping Welds Section XI,
Division 1 N-695-1 Published on
12/31/14 N-696 Qualification Requirements for Appendix VIII Piping Examinations Conducted from the Inside Surface, Section XI, Division 1 N-696-1 Published on
5/7/14 N-706 Alternative Examination Requirements of Table IWB-2500-1 and Table IWC-2500-1 for PWR Stainless Steel Residual and Regenerative Heat Exchangers, Section XI, Division 1 N-706-1 Published on
1/10/07 N-711 Alternative Examination Coverage Requirements for Examination Category B-F, B-J, C-F-1, C-F-2, and R-A Piping Welds N-711-1 Published on
11/7/2016


RG 1.147, Rev. 19, Page 39 CODE CASE
N-706 Alternative Examination Requirements of Table IWB-2500-1 and Table IWC-2500-1 for PWR Stainless Steel Residual and Regenerative Heat Exchangers, Section XI, Division 1 N-706-1 Published on
NUMBER
1/10/07 N-716 Alternative Piping Classification and Examination Requirements, Section XI, Division 1 N-716-1 Published on  
TABLE 5 SECTION XI CODE CASES THAT HAVE BEEN SUPERSEDED
DATE
N-716 Alternative Piping Classification and Examination Requirements, Section XI,  
Division 1 N-716-1 Published on  
1/27/13 N-730  
1/27/13 N-730  
Roll Expansion of Class 1 Control Rod Drive Bottom Head Penetrations in BWRs, Section XI, Division 1 N-730-1 Published on  
Roll Expansion of Class 1 Control Rod Drive Bottom Head Penetrations in BWRs, Section XI, Division 1 N-730-1 Published on  
7/16/12 N-739 Alternative Qualification Requirements for Personnel Performing Class CC  
7/16/12 N-739 Alternative Qualification Requirements for Personnel Performing Class CC Concrete and Post-Tensioning System Visual Examinations, Section XI, Division 1 N-739-1 Published on  
Concrete and Post-Tensioning System Visual Examinations, Section XI,  
1/21/07 N-769 N-769-1 Roll Expansion of Class 1 In-Core Housing Bottom Head Penetrations in BWRs, Section XI, Division 1 N-769-1 Published on  
Division 1 N-739-1 Published on  
1/21/07 N-754 Optimized Structural Dissimilar Metal Weld Overlay for Mitigation of PWR
Class 1 Items, Section XI, Division 1 N-754-1 Published on
2/28/13 N-762 Temper Bead Procedure Qualification Requirements for Repair/Replacement Activities without Postweld Heat Treatment, Section XI, Division 1 N-762-1 Published on
10/21/13 N-766 Nickel Alloy Reactor Coolant Inlay and Onlay for Mitigation of PWR Full Penetration Circumferential Nickel Alloy Dissimilar Metal Welds in Class 1 Items, Section XI, Division 1 N-766-1 Published on
4/7/13 N-769 N-769-1 Roll Expansion of Class 1 In-Core Housing Bottom Head Penetrations in BWRs, Section XI, Division 1 N-769-1 Published on  
9/17/10  
9/17/10  
N-769-2 Published on  
N-769-2 Published on  
7/16/12 N-786 Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1 N-786-1 Published on
7/16/12  
4/24/11 N-789 Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1 Areas that contain pressure pads shall be visually observed at least once per month to monitor for evidence of leakage. If the areas that contain pressure pads are not accessible for direct observation, monitoring will be accomplished by the visual assessment of the surrounding areas or the ground surface areas above pressure pads on buried piping or by the monitoring of leakage collection systems, if available.


N-789-1 Published on
RG 1.147, Page 38
11/13/13


N-789-1 Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service N-789-2 Published on
==D. IMPLEMENTATION==
6/23/15
The purpose of this section is to provide information to applicants and licensees regarding the NRC staffs plans for using this regulatory guide.  The requirements addressing implementation of Section XI Code Cases are contained in 10 CFR 50.55a(b)(5).  No backfitting is intended or approved in connection with the issuance of this guide.


N-823 Visual Examination, Section XI, Division 1 N-823-1 Published on
REGULATORY ANALYSIS
1/23/14


RG 1.147, Rev. 19, Page 40
A separate regulatory analysis was not prepared for this regulatory guide. The regulatory analysis for this guide is the regulatory analysis prepared for the amendment to 10 CFR 50.55a, Codes and Standards.  The amendment to 10 CFR 50.55a incorporates this regulatory guide by reference.


==D. IMPLEMENTATION==
RG 1.147, Page 39 REFERENCES1
The purpose of this section is to provide information to applicants and licensees regarding the NRC staffs plans for using this regulatory guide.  The requirements addressing implementation of Section XI, Code Cases are contained in 10 CFR 50.55a(b)(5).  No backfitting is intended or approved in connection with the issuance of this guide.


RG 1.147, Rev. 19, Page 41 REFERENCES1
1.


1.
Code of Federal Regulations, Title 10, Energy, Part 50, Domestic Licensing of Production and Utilization Facilities (10 CFR Part 50), U.S. Nuclear Regulatory Commission, Washington, DC.


American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, New York, NY.2 
2.
2.


Code of Federal Regulations (CFR), Domestic Licensing of Production and Utilization Facilities, Part 50, Chapter 1, Title 10, Energy.
ASME Boiler and Pressure Vessel Code, Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, American Society of Mechanical Engineers, New York, NY.2
 
3.
3.


CFR, Licenses, Certifications, and Approvals for Nuclear Power Plants, Part 52, Chapter 1, Title 10, Energy.
Regulatory Guide 1.84, Design, Fabrication, and Materials Code Case Acceptability, ASME
Section III, U.S. Nuclear Regulatory Commission, Washington, DC.


4.
4.


U.S. Nuclear Regulatory Commission (NRC) Regulatory Guide (RG) 1.84, Design, Fabrication, and Materials Code Case Acceptability, ASME Section III, Washington, DC.
Regulatory Guide 1.192, Operation and Maintenance Code Case Acceptability, ASME OM
Code, U.S. Nuclear Regulatory Commission, Washington, DC.


5.
5.


NRC, RG 1.192, Operation and Maintenance Code Case Acceptability, ASME OM Code, Washington, DC.
Regulatory Guide 1.193, ASME Code Cases Not Approved for Use, U.S. Nuclear Regulatory Commission, Washington, DC.


6.
6.


NRC, RG 1.193, ASME Code Cases Not Approved for Use, Washington, DC.
Code of Federal Regulations, Title 10, Energy, Part 21, Reporting of Defects and Noncompliance (10 CFR Part 21), U.S. Nuclear Regulatory Commission, Washington, DC.


7.
7.


Electric Power Research Institute (EPRI)/Nuclear Safety Analysis Center (NSAC),
Recommendations for an Effective Flow-Accelerated Corrosion Program, EPRI, Palo Alto, CA: 1999. NSAC-202L-R2.3  
EPRI/NSAC-202L-R2, Recommendations for an Effective Flow Accelerated Corrosion Program, Palo Alto, CA, April 1999.3  
8.
8.


NRC, RG 1.64, Dedication of Commercial-Grade Items for Use in Nuclear Power Plants, Washington, DC.
ASME Boiler and Pressure Vessel Code, Section III, Rules for Construction of Nuclear Power Plant Components, American Society of Mechanical Engineers, New York, NY.2
 
9.
9.


NRC, RG 1.161, Evaluation of Reactor Pressure Vessels with Charpy Upper-Shelf Energy Less Than 50 ft-lb, Washington, DC.
Draft Regulatory Guide DG-1070, Sampling Plans Used for Dedicating Simple Metallic Commercial Grade Items for Use in Nuclear Power Plants, U.S. Nuclear Regulatory Commission, Washington, DC. [DG-1070 was issued in October 1997.]
 
10.
10.


American National Standards Institute (ANSI)/American Society of Nondestructive Testing (ASNT), ANSI/ASNT-CP-189, Standard for Qualification and Certification of Nondestructive Testing Personnel, Columbus, OH.4
Regulatory Guide 1.161, Evaluation of Reactor Pressure Vessels with Charpy Upper-Shelf Energy Less Than 50 ft-lb, U.S. Nuclear Regulatory Commission, Washington, DC.


1 Publicly available NRC published documents are available electronically through the NRC Library on the NRCs public Web site at http://www.nrc.gov/reading-rm/doc-collections/ and through the NRCs Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html. The documents can also be viewed online or printed for a fee in the NRCs Public Document Room (PDR) at 11555 Rockville Pike, Rockville, MD. For problems with ADAMS, contact the PDR staff at (301) 415-4737 or (800) 397-4209; fax (301) 415-3548; or e-mail pdr.resource@nrc.gov.
11.


2 Copies may of American Society of Mechanical Engineers (ASME) standards may be purchased from ASME at American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-5990; telephone (800) 843-2763. Purchase information is available through the ASME Web site at http://www.asme.org/Codes/Publications/.  
ANSI/ASNT CP-189, Standard for Qualification and Certification of Nondestructive Testing Personnel, American Society for Nondestructive Testing, Columbus, OH.4
3 Copies of Electric Power Research Institute (EPRI) documents may be obtained by contacting EPRI at Electric Power Research Institute, 3420 Hillview Avenue, Palo Alto, CA 94304, telephone: 650-855-2000, or online at http://my.epri.com/portal/server.pt.
12.


4 Copies of American Society for Nondestructive Testing (ASNT) documents may be obtained from ASNT at American Society for Nondestructive Testing, 1711 Arlingate Lane, Columbus, OH, 43228-0518; telephone (800) 222-2768 or
Raju, I. S. and J. C, Newman. Jr., Stress Intensity Factor Influence Coefficients for Internal and External Surface Cracks in Cylindrical Vessels, ASME PVP 58, Aspects of Fracture Mechanics in Pressure Vessel and Piping, pp, 35-41, 1982


RG 1.147, Rev. 19, Page 42
1 Publicly available NRC published documents are available electronically through the NRC Library on the NRCs public Web site at: http://www.nrc.gov/reading-rm/doc-collections/.  The documents can also be viewed on-line or printed for a fee in the NRCs Public Document Room (PDR) at 11555 Rockville Pike, Rockville, MD; the mailing address is USNRC PDR,  
11.
Washington, DC 20555; telephone 301-415-4737 or (800) 397-4209; fax (301) 415-3548; and e-mail pdr.resource@nrc.gov.


ASME Boiler and Pressure Vessel Code, Section III, Rules for Construction of Nuclear Power Plant Components, New York, NY.
2 Copies may be purchased from the American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-
5990; phone (212) 591-8500; fax (212) 591-8501; www.asme.org.


12.
3 Copies of the listed EPRI standards and reports may be purchased from the Electric Power Research Institute (EPRI), 3420
Hillview Ave., Palo Alto, California 94304; telephone (800) 313-3774; fax (925) 609-1310.


Raju, I.S., and J.C., Newman. Jr., Stress Intensity Factor Influence Coefficients for Internal and External Surface Cracks in Cylindrical Vessels, in Proceedings of the ASME Pressure Vessel and Piping Conference 58, Aspects of Fracture Mechanics in Pressure Vessel and Piping, pp. 35-41, 1982.
4 Copies may be obtained from the American Society for Nondestructive Testing, 1711 Arlingate Lane, Columbus, OH,  
43228-0518; telephone (800) 222-2768 or (614) 274-6003; fax (614) 274-6899. Purchase information is available through the ASNT Web-based store at http://www.asnt.org/publications/standards/cp-189/index.htm


(614) 274-6003; fax (614) 274-6899. Purchase information is available through the ASNT Web site at http://www.asnt.org/publications/standards/cp-189/index.htm.
Appendix A to RG 1.147, Page A-1 APPENDIX A


RG 1.147, Rev. 19, Appendix A, Page A-1 APPENDIX A
SUPPLEMENTS ADDRESSED IN PROPOSED REVISION 18 OF REGULATORY GUIDE 1.147  


SUPPLEMENTS ADDRESSED IN REVISION 19 OF REGULATORY GUIDE 1.147
Edition Supplement Number BNCS1 Approval Date of Code Cases in Supplement2
 
2007
EDITION
11 November 10, 2009
SUPPLEMENT NUMBER
BNCS1 APPROVAL DATE OF CODE CASES 
IN SUPPLEMENT2
2010  
2010  
11 December 17, 2012
2013
0  
0  
July 1, 2013
December 25, 2009
2013
2010
1 April 7, 2013
1 April 9, 2010
2013
2010
2 August 13, 2013
2 June 24, 2010
2013
2010
3 October 22, 2013
3 September 20, 2010
2013
2010
4 January 28, 2014
4 December 23, 2010
2013
2010
5 May 7, 2014
5 March 24, 2011
2013
2010
6 May 7, 2014
6 July 15, 2011
2013
2010
7 October 28, 2014
7 October 14, 2011
1 BNCS is the American Society of Mechanical Engineers (ASME) Board on Nuclear Codes and Standards.
2010
 
8 December 29, 2011
2 ASME published the supplements approximately 6 months after BNCS approval.
2010
 
9 April 4, 2012
RG 1.147, Rev. 19, Appendix B, Page B-1
2010
10
July 16, 2012
1 BNCS = ASME Board on Nuclear Codes and Standards  
2 Publication of supplements approximately 6 months after BNCS approval.


APPENDIX B  
Appendix B to RG 1.147, Page B-1 APPENDIX B  


NUMERICAL LISTING OF SECTION XI CODE CASES IN  
NUMERICAL LISTING OF SECTION XI CODE CASES IN  
SUPPLEMENT 11 TO THE 2010 EDITION AND SUPPLEMENT 0  
SUPPLEMENT 11 TO THE 2007 EDITION AND SUPPLEMENT 0  
THROUGH SUPPLEMENT 7 TO THE 2013 EDITION AND SELECTED
THROUGH SUPPLEMENT 10 TO THE 2010 EDITION  
CODE CASES FROM THE 2015 AND 2017 EDITIONS


N-513-4 N-516-4 N-528-11 N-597-3 N-606-2 N-638-7 N-648-2 N-661-32 N-695-13 N-696-1 N-7024 N-7055 N-711-16 N-729-4 N-754-1 N-762-1 N-766-1 N-770-4 N-789-27 N-823-1 N-824 N-829 N-830
Legend
N-8316 N-8388 N-839 N-840
1 Code Case N-532-5 was approved in Revision 17 to Regulatory Guide 1.147
N-842 N-843 N-849 N-8532 N-8549
2 Code Case in unacceptable for use.  See Revision 5 of Regulatory Guide 1.193.


1 American Society of Mechanical Engineers (ASME) Code Case N-528-1 was approved with conditions in Regulatory Guide (RG) 1.147, Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1, Revision 18. RG
3 Code Case is directly addressed in 10 CFR 50.55a.
1.147, Revision 19, removes these conditions from ASME Code Case N-528-1.


2 ASME Published ASME Code Cases N-661-3 and N-853 in Supplement 6 to the 2015 Edition of the ASME Code.
4 Code Case published in Supplement 1 to the 2013 Edition; included at request of ASME  
5 Code Case published in Supplement 3 to the 2013 Edition; included at request of ASME  
6 Code Case published in Supplement 6 to the 2013 Edition; included at request of ASME  


These ASME Code Cases were included at the request of ASME.
N-532-51 N-7802 N-552-1 N-7842 N-576-2 N-786-1 N-593-2 N-789 N-609-1 N-795 N-613-2 N-798 N-638-6 N-799 N-652-2 N-800
N-653-1 N-803 N-662-1 N-805 N-666-1 N-8062 N-694-24 N-8132 N-722-23 N-823 N-729-23 N-8255 N-729-33 N-8262 N-730-1 N-8456 N-749


3 ASME published ASME Code Case N-695-1 in Supplement 0 to the 2015 Edition of the ASME Cod
N-754


====e. This ASME ====
N-7662
Code Case was included at the request of ASME.


4 ASME Code Case N-702 was approved with conditions in RG 1.147, Revision 18. RG 1.147, Revision 19, revises the conditions for ASME Code Case N-702.
N-769-1  


5 ASME Code Case N-705 was approved without conditions in RG 1.147, Revision 18. RG 1.147, Revision 19, adds a condition to ASME Code Case N-705.
N-769-2


6 ASME published ASME Code Cases N-711-1 and N-831 in Supplement 0 to the 2017 Edition of the ASME Code.
N-770-13


These ASME Code Cases were included at the request of ASME.
N-770-23


7 ASME published ASME Code Case N-789-2 in Supplement 5 to the 2015 Edition of the ASME Cod
N-771


====e. This ASME ====
N-775
Code Case was included at the request of ASME.


8 ASME published ASME Code Case N-838 in Supplement 2 to the 2015 Edition of the ASME Code. This ASME Code Case was included at the request of ASME.
N-776


N-778


ASME Published ASME Code Case N-854 in Supplement 1 to the 2015 Edition of the ASME Code. This ASME Code Case was included at the request of ASME.
Appendix C to RG 1.147, Page C-1  


RG 1.147, Rev. 19, Appendix C, Page C-1
APPENDIX C  


APPENDIX C
NUMERICAL LISTING OF SECTION XI CODE CASES  
NUMERICAL LISTING OF SECTION XI CODE CASES  
AND TABLE WHERE EACH CODE CASE IS LISTED  
AND TABLE WHERE EACH CODE CASE IS LISTED  


N-34 [T3]  
Legend
1 Code Case in unacceptable for use.  See Draft Regulatory Guide DG-1298, proposed Revision 5 of Regulatory Guide 1.193.
 
2 Code Case is directly addressed in 10 CFR 50.55a.
 
N-34 [T3]  
N-72 [T3]  
N-72 [T3]  
N-73 [T3]  
N-73 [T3]  
Line 1,481: Line 1,253:
N-496-2 [T1]  
N-496-2 [T1]  
N-498 [T5]  
N-498 [T5]  
N-498-1 [T5]  
N-498-11 [T5]  
N-498-2 [T5]  
 
N-498-3 [T5]  
Appendix C to DG-1296, Page C-2 N-498-21 [T5]  
N-498-31 [T5]  
N-498-4 [T2]  
N-498-4 [T2]  
N-503 [T3]  
N-503 [T3]  
Line 1,502: Line 1,275:
N-513-1 [T5]  
N-513-1 [T5]  
N-513-2 [T5]  
N-513-2 [T5]  
N-513-3 [T5]
N-513-32 N-514 [T3]  
N-513-4[T1]
N-514 [T3]  
N-515 [T3]  
N-515 [T3]  
N-516 [T5]  
N-516 [T5]  
N-516-1 [T5]  
N-516-1 [T5]  
N-516-2 [T5]  
N-516-2 [T5]  
N-516-3 [T5]
N-516-3 [T2]  
N-516-4 [T2]  
N-517 [T5]  
N-517 [T5]  
N-517-1 [T1]  
N-517-1 [T1]  
Line 1,521: Line 1,291:
N-526 [T1]  
N-526 [T1]  
N-528 [T5]  
N-528 [T5]  
N-528-1 [T1]  
N-528-1 [T2]  
N-532 [T5]  
N-532 [T5]  
N-532-1 [T5]  
N-532-1 [T5]  
Line 1,530: Line 1,300:
N-533 [T5]  
N-533 [T5]  
N-533-1 [T2]  
N-533-1 [T2]  
N-534 [T3]  
N-534 [T1]  
N-535 [T3]  
N-535 [T3]  
N-537 [T1]  
N-537 [T1]  
N-538 [T3]  
N-538 [T3]  
 
N-541 [T3]  
1 This Code Case is not acceptable for use (see RG 1.193, ASME Code Cases Not Approved for Use, Revision 6). 
 
RG 1.147, Rev. 19, Appendix C, Page C-2 N-541 [T3]  
N-5421 N-543 [T3]  
N-5421 N-543 [T3]  
N-544 [T3]  
N-544 [T3]  
Line 1,545: Line 1,312:
N-552-1 [T2]  
N-552-1 [T2]  
N-553 [T5]  
N-553 [T5]  
N-553-1 [T3]  
N-553-1 [T1]  
N-554 [T5]  
N-554 [T5]  
N-554-1 [T5]  
N-554-1 [T5]  
Line 1,554: Line 1,321:
N-557 [T5]  
N-557 [T5]  
N-557-1 [T2]  
N-557-1 [T2]  
N-560 [T5]  
N-5601 [T5]  
N-560-1 [T5]
N-560-11 [T5]  
N-560-21 N-561 [T5]  
N-560-21 N-5611 [T5]  
N-561-1 [T5]  
N-561-11 [T5]  
N-561-2 [T2]  
N-561-2 [T2]  
N-562 [T5]  
N-5621 [T5]  
N-562-[T5]
N-562-11 N-562-2 [T2]  
N-562-2 [T2]  
N-563 [T3]  
N-563 [T3]  
N-566 [T5]  
N-566 [T5]  
Line 1,575: Line 1,341:
N-576-1 [T5]  
N-576-1 [T5]  
N-576-2 [T2]  
N-576-2 [T2]  
N-577 [T5]  
N-5771 [T5]  
N-577-11 N-578 [T5]  
N-577-11 N-5781 [T5]  
N-578-11 N-583 [T2]  
N-578-11 N-583 [T2]  
N-586 [T5]  
N-586 [T5]  
Line 1,587: Line 1,353:
N-597 [T5]  
N-597 [T5]  
N-597-1 [T5]  
N-597-1 [T5]  
N-597-2 [T5]
N-597-2 [T2]  
N-597-3 [T2]  
N-598 [T3]  
N-598 [T3]  
N-599 [T4]  
N-599 [T4]  
Line 1,597: Line 1,362:
N-605 [T3]  
N-605 [T3]  
N-606 [T5]  
N-606 [T5]  
N-606-1 [T5]
N-606-1 [T2]  
N-606-2 [T2]  
N-609 [T5]  
N-609 [T5]  
N-609-1 [T1]  
N-609-1 [T1]  
Line 1,613: Line 1,377:
N-638 [T5]  
N-638 [T5]  
N-638-1 [T5]  
N-638-1 [T5]  
N-638-2 [T5]
N-638-3 [T5]  
N-638-3 [T5]  
N-638-4 [T5]  
N-638-4 [T5]  
N-638-5 [T5]  
N-638-5 [T5]  
N-638-6 [T5]
N-638-6 [T2]  
N-638-7 [T2]  
N-639 [T2]  
N-639 [T2]  
N-640 [T3]  
N-640 [T3]  
Line 1,627: Line 1,389:
N-647 [T2]  
N-647 [T2]  
N-648 [T5]  
N-648 [T5]  
N-648-1 [T5]
N-648-1 [T2]  
N-648-2 [T2]  
N-649 [T1]  
N-649 [T1]  
N-651 [T1]  
N-651 [T5]  
N-652 [T5]  
N-652 [T5]  
N-652-1 [T5]  
N-652-1 [T5]  
Line 1,639: Line 1,400:
N-661 [T5]  
N-661 [T5]  
N-661-1 [T5]  
N-661-1 [T5]  
N-661-2 [T5]
N-661-2 [T2]  
N-661-3 [T1]  
N-662 [T5]  
N-662 [T5]  
N-662-1 [T2]  
N-662-1 [T2]  
Line 1,650: Line 1,410:
N-683 [T1]  
N-683 [T1]  
N-685 [T1]  
N-685 [T1]  
N-686 [T5]  
 
Appendix C to DG-1296, Page C-3 N-686 [T5]  
N-686-1 [T1]  
N-686-1 [T1]  
N-6911 N-694 [T5]
N-6911 N-694-1 [T5]  
N-694-1 [T5]  
N-694-2 [T1]  
N-694-2 [T1]  
N-695 [T5]
N-695 [T1]  
N-695-1[T2]  
N-696 [T1]  
N-696 [T5]
N-696-1 [T2]  
N-697 [T1]  
N-697 [T1]  
N-700 [T1]  
N-700 [T1]  
N-702 [T2]  
N-702 [T2]  
N-705 [T2]  
N-705 [T1]  
N-706 [T5]  
N-706 [T5]  
N-706-1 [T1]  
N-706-1 [T1]  
N-711[T5]
N-7111 N-712 [T1]  
N-711-1[T2]
N-712 [T1]  
N-7131 N-7161 N-716-1 [T1]  
N-7131 N-7161 N-716-1 [T1]  
N-7222 N-722-12 N-722-21 N-7291 N-729-12 N-729-22 N-729-32 N-729-42 N-730 [T5]  
N-7222 N-722-12 N-722-21 N-7291 N-729-12 N-729-22 N-729-32 N-729-42 N-730 [T5]  
Line 1,677: Line 1,433:
N-739-1 [T1]  
N-739-1 [T1]  
N-7401 N-740-11 N-740-21 N-747 [T1]  
N-7401 N-740-11 N-740-21 N-747 [T1]  
N-749 [T2]
N-749 N-751 [T2]  
N-751 [T2]  
N-753 [T1]  
N-753 [T1]  
N-754 [T5]
N-754 [T2]  
N-754-1 [T2]  
N-7551 N-762 [T1]  
N-7551 N-762 [T5]
N-762-1[T1]  
N-765 [T1]  
N-765 [T1]  
N-766 [T5]
N-7661 N-769 [T5]  
N-766-1 [T2]
N-769 [T5]  
N-769-1 [T5]  
N-769-1 [T5]  
N-769-2 [T1]  
N-769-2 [T1]  
N-7702 N-770-12 N-770-22 N-771 [T1]  
N-7702 N-770-12 N-770-22 N-771 [T1]  
N-773 [T1]  
N-773 [T1]  
 
N-775 [T1]  
2 Title 10 of the Code of Federal Regulations (10 CFR) 50.55a, Codes and standards, directly addresses this ASME
Code Case.
 
RG 1.147, Rev. 19, Appendix C, Page C-3 N-775 [T1]  
N-776 [T1]  
N-776 [T1]  
N-778 [T2]  
N-778 [T2]  
N-7801 N-7841 N-786 [T5]
N-7801 N-7841 N-786-1 [T1]  
N-786-1 [T1]  
N-789 [T2]  
N-789 [T5]
N-789-1 [T5]
N-789-2 [T1]  
N-795 [T2]  
N-795 [T2]  
N-799 [T2]  
N-799 [T2]  
Line 1,710: Line 1,454:
N-803 [T1]  
N-803 [T1]  
N-805 [T1]  
N-805 [T1]  
N-8061 N-8131 N-823 [T5]
N-8061 N-8131 N-823 [T1]  
N-823-1 [T1]  
N-8242 N-825 [T1]  
N-824 [T2]
N-8261 N-845 [T1]  
N-825 [T1]  
N-8522}}
N-8261 N-829 [T2]
N-830 [T2]
N-831[T2]
N-838[T2]
N-839 [T1]
N-8401 N-842 [T1]
N-843 [T2]
N-845 [T1]  
N-849 [T2]
N-853 [T1]
N-854 [T1]}}


{{RG-Nav}}
{{RG-Nav}}

Revision as of 19:04, 9 January 2025

8, Inservice Inspection Code Case Acceptability ASME Section XI, Division 1
ML16321A336
Person / Time
Issue date: 03/31/2017
From: Giovanni Facco
Office of Nuclear Regulatory Research
To:
Giovanni Facco, 301-415-6337
References
NRC-2012-0059, RIN 3150-AJ13 RG-1.147, Rev 18
Download: ML16321A336 (44)


U.S. NUCLEAR REGULATORY COMMISSION

March 2017 OFFICE OF NUCLEAR REGULATORY RESEARCH

Revision 18 REGULATORY GUIDE

Technical Lead Giovanni Facco

Written suggestions regarding this guide or development of new guides may be submitted through the NRCs public Web site under the Regulatory Guides document collection of the NRC Library at http://www.nrc.gov/reading-rm/doc-collections/reg-guides/contactus.html.

Electronic copies of this regulatory guide, previous versions of this guide, and other recently issued guides are available through the NRCs public Web site under the Regulatory Guides document collection of the NRC Library at http://www.nrc.gov/reading-rm/doc-collections/.

The regulatory guide is also available through the NRCs Agencywide Documents Access and Management System (ADAMS) at http://www.nrc.gov/reading-rm/adams.html, under ADAMS Accession No. ML16321A336. The regulatory basis for this guide is the regulatory analysis prepared for the amendment to 10 CFR 50.55a (ADAMS Accession No. ML16285A013. The staff responses to the public comments on DG-1297 may be found under ADAMS Accession No. ML16285A012.

REGULATORY GUIDE 1.147 (Draft was issued as DG-1296, dated March 2016)

INSERVICE INSPECTION CODE CASE ACCEPTABILITY,

ASME SECTION XI, DIVISION 1

Purpose

This regulatory guide (RG) lists the American Society of Mechanical Engineers (ASME)

Section XI Code Cases that the U.S. Nuclear Regulatory Commission (NRC) has approved for use as voluntary alternatives to the mandatory ASME Boiler and Pressure Vessel (BPV) Code provisions that are incorporated by reference into Title 10, Part 50, of the Code of Federal Regulations (10 CFR Part 50),

Domestic Licensing of Production and Utilization Facilities (Ref. 1).

Applicability

This RG applies to reactor licensees subject to 10 CFR Part 50, Section 50.55a, Codes and Standards.

Applicable Rules and Regulations

General Design Criterion (GDC) 1, Quality Standards and Records, of Appendix A, General Design Criteria for Nuclear Power Plants, to 10 CFR Part 50 requires, in part, that structures, systems, and components important to safety be designed, fabricated, erected, and tested to quality standards commensurate with the importance of the safety function to be performed.

Where generally recognized codes and standards are used, Criterion 1 requires that they be identified and evaluated to determine their applicability, adequacy, and sufficiency and be supplemented or modified as necessary to ensure a quality product in keeping with the required safety function.

Criterion 30, Quality of Reactor Coolant Pressure Boundary, of Appendix A to 10 CFR Part 50

requires, in part, that components that are part of the reactor coolant pressure boundary be designed, fabricated, erected, and tested to the highest practical quality standards.

Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Processing Plants, to 10 CFR Part 50 requires, in part, a program for inspection of activities affecting quality to verify conformance with documented instructions and procedures.

RG 1.147, Page 2

10 CFR 50.55a(g), Inservice Inspection Requirements, requires, in part, that Classes 1, 2, 3, MC, and CC components and their supports meet the requirements of Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, of the ASME BPV Code (Ref. 2) or equivalent quality standards.

Related Guidance

Regulatory Guide 1.84, Design, Fabrication, and Materials Code Case Acceptability, ASME

Section III (Ref. 3), lists the ASME Section III Code Cases that the NRC has approved for use as voluntary alternatives to the mandatory ASME BPV Code provisions that are incorporated into

10 CFR 50.55a.

Regulatory Guide 1.192, Operation and Maintenance Code Case Acceptability, ASME OM

Code (Ref. 4), lists the ASME Operation and Maintenance Code (OM Code) Code Cases that the NRC has approved for use as voluntary alternatives to the mandatory ASME OM Code provisions that are incorporated into 10 CFR 50.55a.

Regulatory Guide 1.193, ASME Code Cases Not Approved for Use (Ref. 5), lists the ASME

Section III and Section XI, and ASME OM Code, Code Cases that the NRC has not approved for generic use.

Purpose of This Regulatory Guide

The NRC will amend 10 CFR 50.55a to incorporate by reference the new Code Cases and revisions to existing Code Cases listed as approved in Tables 1 and 2 of this guide, and to state the requirements governing the use of Code Cases. Code Cases approved by the NRC may be used voluntarily by licensees as an alternative to compliance with ASME Code provisions that have been incorporated by reference into 10 CFR 50.55a. Because of continuing change in the status of Code Cases, the staff plans periodic updates to 10 CFR 50.55a and this guide to accommodate new Code Cases and any revisions of existing Code Cases.

Paperwork Reduction Act

This RG contains and references information collections covered by 10 CFR Part 50 that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), control number 3150-0011.

Public Protection Notification

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.

DG-1296, Page 3

B. DISCUSSION

Reason for Revision

This revision (Revision 18) of RG 1.147 includes new information reviewed by the NRC that is provided in Section XI Code Cases listed in Supplement 11 to the 2007 Edition and Supplements 0

through 10 to the 2010 Edition of the ASME BPV Code. This is an update to RG 1.147, Revision 17, which included information from Supplements 1 through 10 to the 2007 Edition.

Background

Provisions of the ASME BPV Code have been used since 1971 as one part of the framework to establish the necessary design, fabrication, construction, testing, and performance requirements for structures, systems, and components important to safety in nuclear power plants. Among other things, ASME standards committees develop improved methods for the construction and inservice inspection (ISI) of ASME Class 1, 2, 3, MC (metal containment), and CC (concrete containment) nuclear power plant components. A broad spectrum of stakeholders participates in the ASME process, which helps to ensure that the various interests are considered.

The ASME publishes a new edition of the BPV Code, which includesSection XI, every 2 years.

The latest edition of Section XI that the NRC has approved for use is referenced in 10 CFR

50.55a(a)(1)(ii). The ASME also publishes Code Cases quarterly. Code Cases provide alternatives developed and approved by ASME. This regulatory guide identifies the Code Cases that have been determined by the NRC to be acceptable alternatives to applicable parts of Section XI. Section XI Code Cases not yet endorsed by the NRC may be used by a licensee or applicant through 10 CFR 50.55a(z).

That section permits the use of alternatives to the Code requirements referenced in 10 CFR 50.55a provided that the proposed alternatives result in an acceptable level of quality and safety, and that their use is authorized by the Director of the Office of Nuclear Reactor Regulation.

The ASME Code is incorporated by reference into 10 CFR 50.55a. Code Cases approved by the NRC provide an acceptable voluntary alternative to the mandatory ASME Code provisions.

Requirements related to Code Case implementation are provided in 10 CFR 50.55a(b). When a licensee initially applies a Code Case listed in Tables 1 or 2, the licensee must implement the most recent version of that Code Case incorporated by reference in 10 CFR 50.55a.

Code Cases may be annulled because the provisions have been incorporated into the Code, the application for which it was specifically developed no longer exists, or experience has shown that an examination or testing method is no longer adequate. After the ASME annuls a Code Case and the NRC

amends 10 CFR 50.55a and this guide, licensees may not implement that Code Case for the first time.

However, a licensee who implemented the Code Case prior to annulment may continue to use that Code Case through the end of the present ISI interval. An annulled Code Case cannot be used in the subsequent ISI interval unless implemented as an approved alternative under 10 CFR 50.55a(z). If a Code Case is incorporated by reference into 10 CFR 50.55a and later annulled by the ASME because experience has shown that an examination or testing method is inadequate, the NRC will amend 10 CFR 50.55a and this guide to remove the approval of the annulled Code Case. Licensees should not begin to implement such annulled Code Cases in advance of the rulemaking. Notwithstanding these requirements, the Commission may impose new or revised Code requirements, including implementation schedules, which it determines are consistent with the Backfit Rule (10 CFR 50.109).

A Code Case may be revised, for example, to incorporate user experience. The older or superseded version of the Code Case cannot be applied by the licensee or applicant for the first tim

e. If

DG-1296, Page 4 an applicant or a licensee applied a Code Case before it was listed as superseded, the applicant or the licensee may continue to use the Code Case until the applicant or the licensee updates its construction Code of Record (in the case of an applicant, updates its application) or until the licensees 120-month ISI/IST update interval expires, after which the continued use of the Code Case is prohibited unless NRC

approval is granted under 10 CFR Part 50.55a(z). If a Code Case is incorporated by reference into 10

CFR Part 50.55a and later a revised version is issued by the ASME because experience has shown that the design analysis, construction method, examination method, or testing method is inadequate; the NRC will amend 10 CFR Part 50.55a and the relevant RG to remove the approval of the superseded Code Case.

Applicants and licensees should not begin to implement such superseded Code Cases in advance of the rulemaking.

With regard to the use of any Code Case, it is the responsibility of the user to make certain that the provisions of the Code Case do not conflict with licensee commitments or regulatory requirements.

RG 1.147, Page 5 C. STAFF REGULATORY GUIDANCE

For Revision 18 of Regulatory Guide 1.147, the NRC reviewed the Section XI Code Cases listed in Supplement 11 to the 2007 Edition and Supplement 0 through Supplement 10 to the 2010 Edition of the ASME BPV Code. Appendix A to this guide lists the supplements reviewed, the edition, the supplement number, and the date on which the supplement was approved by the ASME Board on Nuclear Codes and Standards. Appendix B is a list of the Section XI Code Cases published by the ASME in the eleven supplements. Finally, Appendix C is a current list of all Section XI Code Cases. The Code Cases addressed by this regulatory guide are listed in five tables:

(1)

Table 1, Acceptable Section XI Code Cases, lists the Code Cases that are acceptable to the NRC for implementation in the ISI of light-water-cooled nuclear power plants.

(2)

Table 2, Conditionally Acceptable Section XI Code Cases, lists the Code Cases that are acceptable, provided that they are used with the identified conditions (i.e., the Code Case is generally acceptable but the NRC has determined that the requirements in the Code Case, which are an alternative to requirements in the BPV Code, must be supplemented in order to provide an acceptable level of quality and safety).

(3)

Table 3, Annulled Unconditionally Approved Section XI Code Cases, lists Code Cases annulled by the ASME that the NRC previously determined to be fully acceptable.

(4)

Table 4, Annulled Conditionally Acceptable Section XI Code Cases, lists Code Cases that the NRC determined to be acceptable, provided that they were used with the identified conditions, but were subsequently annulled by the ASME.

(5)

Table 5,Section XI Code Cases That Have Been Superseded by Revised Code Cases, lists Code Cases that have been superseded through revision.

1.

Acceptable Section XI Code Cases

The Code Cases listed in Table 1 are acceptable to the NRC for application in licenseesSection XI inservice inspection programs. The 2010 Edition of the ASME BPV Code was published on July 1, 2010. An addenda was issued in 2011; no addenda was issued in 2012. Beginning with 2013, new editions of the BPV Code will be issued every two years. Code Cases will continue to be published quarterly in supplements to each edition. For Code Cases previously listed in this guide, the third column of Table 1 lists the date of ASME approval. For new or revised Code Cases, the third column of Table 1 lists the supplement and edition in which each Code Case was published (e.g., 5/10E means Code Case Supplement 5 to the 2010 Edition).

Code Cases that the NRC determined to be unacceptable are listed in Regulatory Guide 1.193, ASME Code Cases Not Approved for Use.

RG 1.147, Page 6 Table 1. Acceptable Section XI Code Cases

Code Case Number Table 1 Acceptable Section XI Code Cases

Date or Supplement/

Edition N-432-1 Repair Welding Using Automatic or Machine Gas Tungsten-Arc Welding (GTAW) Temper Bead Technique,Section XI, Division 1

3/28/01 N-460

Alternative Examination Coverage for Class 1 and Class 2 Welds,Section XI, Division 1

2/14/03 N-491-2 Rules for Examination of Class 1, 2, 3, and MC Component Supports of Light- Water Cooled Power Plants,Section XI, Division 1

2/14/03 N-494-4 Pipe Specific Evaluation Procedures and Acceptance Criteria for Flaws in Class 1 Ferritic Piping that Exceed the Acceptance Standards of IWB-3514.2 and in Class 1 Austenitic Piping that Exceed the Acceptance Standards of IWB-3514.3,Section XI, Division

1/12/05 N-496-2 Helical-Coil Threaded Inserts,Section XI, Division 1

8/04/04 N-517-1 Quality Assurance Program Requirements for Owners,Section XI, Division 1

3/28/01 N-526 Alternative Requirements for Successive Inspections of Class 1 and 2 Vessels,Section XI, Division 1

8/20/02 N-532-5 Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1

1/04/11 N-534 Alternative Requirements for Pneumatic Pressure Testing,Section XI,

Division 1

5/09/03 N-537 Location of Ultrasonic Depth-Sizing Flaws,Section XI, Division 1

3/28/01 N-553-1 Inservice Eddy Current Surface Examination of Pressure Retaining Pipe Welds and Nozzle-to-Safe End Welds,Section XI, Division 1

3/28/01 N-554-3 Alternative Requirements for Reconciliation of Replacement Items and Addition of New Systems,Section XI, Division 1

2/14/03 N-566-2 Corrective Action for Leakage Identified at Bolted Connections,Section XI,

Division 1

3/28/01 N-567-1 Alternative Requirements for Class 1, 2, and 3 Replacement Components,Section XI, Division 1

4/19/02 N-573 Transfer of Procedure Qualification Records Between Owners,Section XI,

Division 1

2/14/03 N-586-1 Alternative Additional Examination Requirements for Classes 1, 2, and 3 Piping, Components, and Supports,Section XI, Division 1

5/04/04 N-600

Transfer of Welder, Welding Operator, Brazer, and Brazing Operator Qualifications Between Owners,Section XI, Division 1

9/18/01

RG 1.147, Page 7 Code Case Number Table 1 Acceptable Section XI Code Cases

Date or Supplement/

Edition N-609-1 Alternative Requirements to Stress-Based Selection Criteria for Category B-J

Welds,Section XI, Division 1

3/10E

N-613-2 Ultrasonic Examination of Full Penetration Nozzles in Vessels, Examination Category B-D, Reactor Nozzle-To-Vessel Welds, and Nozzle Inside Radius Section Figs. IWB-2500-7(a), (b), (c), and (d),Section XI, Division 1

4/10E

N-624 Successive Inspections,Section XI, Division 1

4/19/02 N-629 Use of Fracture Toughness Test Data to Establish Reference Temperature for Pressure Retaining Materials,Section XI, Division 1

8/20/02 N-641 Alternative Pressure-Temperature Relationship and Low Temperature Overpressure Protection System Requirements,Section XI, Division 1

2/03/03 N-643-2 Fatigue Crack Growth Rate Curves for Ferritic Steels in PWR Water Environment,Section XI, Division 1

5/04/04 N-649 Alternative Requirements for IWE-5240 Visual Examination,Section XI,

Division 1

3/28/01 N-651 Ferritic and Dissimilar Metal Welding Using SMAW Temper Bead Technique Without Removing the Weld Bead Crown for the First Layer,Section XI,

Division 1

8/14/01 N-652-2 Alternative Requirements to Categorize B-G-1, B-G-2, and C-D Bolting Examination Methods and Selection Criteria,Section XI, Division 1

9/10E

N-653-1 Qualification Requirements for Full Structural Overlaid Wrought Austenitic Piping Welds,Section XI, Division 1

9/10E

N-658 Qualification Requirements for Ultrasonic Examination of Wrought Austenitic Piping Welds,Section XI, Division 1

4/4/02 N-663 Alternative Requirements for Classes 1 and 2 Surface Examinations,Section XI, Division 1

9/17/02 N-664 Performance Demonstration Requirements for Examination of Unclad Reactor Pressure Vessel Welds, Excluding Flange Welds,Section XI, Division 1

8/20/02 N-665 Alternative Requirements for Beam Angle Measurements Using Refracted Longitudinal Wave Search Units,Section XI, Division 1

2/28/03 N-683 Method for Determining Maximum Allowable False Calls When Performing Single-Sided Access Performance Demonstration in Accordance with Appendix VIII, Supplements 4 and 6,Section XI, Division 1

2/28/03 N-685 Lighting Requirements for Surface Examination,Section XI, Division 1

2/28/03 N-686-1 Alternative Requirements for Visual Examinations, VT-1, VT-2, and VT-3,Section XI, Division

1/10/07

RG 1.147, Page 8 Code Case Number Table 1 Acceptable Section XI Code Cases

Date or Supplement/

Edition N-694-2 Evaluation Procedure and Acceptance Criteria for PWR Reactor Vessel Head Penetration Nozzles,Section XI, Division 1

1/13E

N-695 Qualification Requirements for Dissimilar Metal Piping Welds,Section XI

Division 1

5/21/03 N-696 Qualification Requirements for Appendix VIII Piping Examinations Conducted from the Inside Surface,Section XI, Division 1

5/21/03 N-697 Pressurized Water Reactor (PWR) Examination and Alternative Examination Requirements for Pressure Retaining Welds in Control Rod Drive and Instrument Nozzle Housings,Section XI, Division 1

11/18/03 N-700

Alternative Rules for Selection of Classes 1, 2, and 3 Vessel Welded Attachments for Examination,Section XI, Division 1

11/18/03 N-705 Evaluation Criteria for Temporary Acceptance of Degradation in Moderate Energy Class 2 or 3 Vessels and Tanks,Section XI, Division 1

10/12/06 N-706-1 Alternative Examination Requirements of Table IWB-2500-1 and Table IWC-2500-1 for PWR Stainless Steel Residual and Regenerative Heat Exchangers,Section XI, Division 1 (Note: Code Case N-706 was unconditionally approved in Revision 15 to Regulatory Guide 1.147)

1/10/07 N-712 Class 1 Socket Weld Examinations,Section XI, Division 1

5/12/04 N-716-1 Alternative Piping Classification and Examination Requirements,Section XI,

Division 1

1/27/13 N-730-1 Roll Expansion of Class 1 Control Rod Drive Bottom Head Penetrations in BWRs,Section XI, Division 1

10/10E

N-731 Alternative Class 1 System Leakage Test Pressure Requirements,Section XI,

Division 1

2/22/05 N-733 Mitigation of Flaws in NPS 2 (DN 50) and Smaller Nozzles and Nozzle Partial Penetration Welds in Vessels and Piping by Use of a Mechanical Connection Modification,Section XI, Division 1

7/01/05 N-735 Successive Inspection of Class 1 and 2 Piping Welds,Section XI, Division 1

10/12/06 N-739-1 Alternative Qualification Requirements for Personnel Performing Class CC

Concrete and Post-Tensioning System Visual Examinations,Section XI,

Division 1

1/21/07 N-747 Reactor Vessel Head-to-Flange Weld Examinations,Section XI, Division 1

1/13/06 N-753 Vision Tests,Section XI, Division 1

7/14/06

RG 1.147, Page 9 Code Case Number Table 1 Acceptable Section XI Code Cases

Date or Supplement/

Edition N-762 Temper Bead Procedure Qualification Requirements for Repair/Replacement Activities Without Post Weld Heat Treatment,Section XI, Division 1

1/27/07 N-765 Alternative to Inspection Interval Scheduling Requirements of IWA-2430,

Section XI, Division 1

1/26/09 N-769-2 Roll Expansion of Class 1 In-Core Housing Bottom Head Penetrations in BWRs,Section XI, Division 1

10/10E

N-771 Alternative Requirements for Additional Examinations of Class 2 or 3 Items,Section XI, Division 1

7/10E

N-773 Alternative Qualification Criteria for Eddy Current Examinations of Piping Inside Surfaces,Section XI, Division 1

1/26/09 N-775 Alternative Requirements for Bolting Affected by Borated Water Leakage,Section XI, Division 1

2/10E

N-776 Alternative to IWA-5244 Requirements for Buried Piping,Section XI,

Division 1

1/10E

N-786-1 Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate- Energy Carbon Steel Piping,Section XI, Division 1

5/10E

N-798 Alternative Pressure Testing Requirements for Class 1 Piping Between the First and Second Vent, Drain, and Test Isolation Devices,Section XI,

Division 1

4/10E

N-800

Alternative Pressure Testing Requirements for Class 1 Piping Between the First and Second Injection Valves,Section XI, Division 1

4/10E

N-803 Similar and Dissimilar Metal Welding Using Ambient Temperature Automatic or Machine Dry Underwater Laser Beam Welding (ULBW) Temper Bead Technique,Section XI, Division 1

5/10E

N-805 Alternative to Class 1 Extended Boundary End of Interval or Class 2 System Leakage Testing of the Reactor Vessel Head Flange O-Ring Leak-Detection System,Section XI, Division 1

6/10E

N-823 Visual Examination,Section XI, Division 1

9/10E

N-825 Alternative Requirements for Examination of Control Rod Drive Housing Welds,Section XI, Division 1

3/13E

N-845 Qualification Requirements for Bolts and Studs,Section XI, Division 1

6/13E

RG 1.147, Page 10

2.

Conditionally Acceptable Section XI Code Cases

The Code Cases listed in Table 2 are acceptable to the NRC for application in licenseesSection XI inservice inspection programs within the limitations imposed by the NRC staff. Unless otherwise stated, limitations imposed by the NRC are in addition to the conditions specified in the Code Case. The 2010 Edition of the ASME BPV Code was published on July 1, 2010. An addenda was issued in 2011; no addenda was issued in 2012. Beginning with 2013, new editions of the BPV Code will be issued every two years. Code Cases will continue to be published quarterly in supplements to each edition. For Code Cases previously listed in this guide, the third column of Table 1 lists the date of ASME approval. For new or revised Code Cases, the third column of Table 1 lists the supplement and edition in which each Code Case was published (e.g., 5/10E means Code Case Supplement 5 to the

2010 Edition).

Table 2. Conditionally Acceptable Section XI Code Cases

Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/

Edition Condition N-416-4 Alternative Pressure Test Requirement for Welded or Brazed Repairs, Fabrication Welds or Brazed Joints for Replacement Parts and Piping Subassemblies, or Installation of Replacement Items by Welding or Brazing, Classes 1, 2, and 3,Section XI, Division 1

1/12/05 Nondestructive examination shall be performed on welded or brazed repairs and fabrication and installation joints in accordance with the methods and acceptance criteria of the applicable subsection of the 1992 Edition of Section III.

N-498-4 Alternative Requirements for 10-Year System Hydrostatic Testing for Class 1, 2, and 3 Systems,Section XI, Division 1

4/08/02 Prior to conducting the VT-2 examination of Class 2 and Class 3 components not required to operate during normal plant operation, a 10-minute holding time is required after attaining test pressure. Prior to conducting the VT-2 examination of Class 2 and Class 3 components required to operate during normal plant operation, no holding time is required, provided the system has been in operation for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for insulated components or 10 minutes for non-insulated components.

RG 1.147, Page 11 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/

Edition Condition N-504-4 Alternative Rules for Repair of Class 1, 2, and 3 Austenitic Stainless Steel Piping,Section XI, Division 1

7/14/06 The provisions of Section XI, Nonmandatory Appendix Q, Weld Overlay Repair of Class 1, 2, and 3 Austenitic Stainless Steel Piping Weldments, must also be met. In addition, the following conditions shall be met: (a) the sum of laminar flaw length in any direction shall be less than 10% of the overlay with a total reduction in area equal to or less than Table IWB-3514-3; (b) the finished overlay surface shall be 250 micro-in (6.3 micrometers) root mean square or smoother; (c)

the surface flatness shall be adequate for ultrasonic examination; and (d)

radiography shall not be used to detect planar flaws under or masked by laminar flaws.

N-508-4

Rotation of Serviced Snubbers and Pressure Retaining Items for the Purpose of Testing,Section XI, Division 1

1/26/09 When Section XI requirements are used to govern the examination and testing of snubbers and the ISI Code of Record is earlier than Section XI, 2006 Addenda, Footnote 1 shall not be applied.

N-513-3 Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping,Section XI, Division 1

1/26/09 The repair or replacement activity temporarily deferred under the provisions of this Code Case shall be performed during the next scheduled outage.

N-516-3 Underwater Welding,Section XI, Division 1

4/08/02 Licensees must obtain NRC approval in accordance with 10 CFR 50.55a(z)

regarding the technique to be used in the weld repair or replacement of irradiated material underwater.

N-528-1 Purchase, Exchange, or Transfer of Material Between Nuclear Plant Sites,Section XI, Division 1

4/19/02 The requirements of 10 CFR Part 21, Reporting of Defects and Noncompliance (Ref. 6), are to be applied to the nuclear plant site supplying the material as well as to the nuclear plant site receiving the material that has been purchased, exchanged, or transferred between sites.

N-533-1 Alternative Requirements for VT-2 Visual Examination of Class 1, 2, and 3 Insulated Pressure-Retaining Bolted Connections,Section XI, Division 1

4/08/02 Prior to conducting the VT-2 examination of Class 2 and Class 3 components not required to operate during normal plant operation, a 10 minute holding time is required after attaining test pressure. Prior to conducting the VT-2 examination of Class 2 and Class 3 components required to operate during normal plant operation, no holding time is required, provided the system has been in operation for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for insulated components or 10 minutes for non-insulated components.

RG 1.147, Page 12 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/

Edition Condition N-552-1 Alternative Methods - Qualification for Nozzle Inside Radius Section from the Outside Surface,Section XI, Division 1

10/10E

To achieve consistency with the 10 CFR 50.55a rule change published September 22, 1999 (64 FR 51370), incorporating Appendix VIII, Performance Demonstration for Ultrasonic Examination Systems, to Section XI, add the following to the specimen requirements:

At least 50 percent of the flaws in the demonstration test set must be cracks and the maximum misorientation must be demonstrated with cracks. Flaws in nozzles with bore diameters equal to or less than 4 inches may be notches.

Add to detection criteria, The number of false calls must not exceed three.

Note: The above conditions are identical to those imposed on Code Case N-552, Rev. 16, RG 1.147.

N-557-1 In-Place Dry Annealing of a PWR Nuclear Reactor Vessel,Section XI,

Division 1

8/20/02 The secondary stress allowable of 3Sm, shown in Figure 1 of the Code Case, must be applied to the entire primary plus secondary stress range during the anneal.

N-561-2 Alternative Requirements for Wall Thickness Restoration of Class 2 and High Energy Class 3 Carbon Steel Piping,Section XI, Division 1

1/22/07

(1) Paragraph 5(b): for repairs performed on a wet surface, the overlay is only acceptable until the next refueling outage.

(2) Paragraph 7(c): if the cause of the degradation has not been determined, the repair is only acceptable until the next refueling outage.

(3) The area where the weld overlay is to be applied must be examined using ultrasonic methods to demonstrate that no crack-like defects exist.

(4) Piping with wall thickness less than the diameter of the electrode shall be depressurized before welding.

N-562-2 Alternative Requirements for Wall Thickness Restoration of Class 3 Moderate Energy Carbon Steel Piping,Section XI, Division 1

1/22/07

(1) Paragraph 5(b): for repairs performed on a wet surface, the overlay is only acceptable until the next refueling outage.

(2) Paragraph 7(c): if the cause of the degradation has not been determined, the repair is only acceptable until the next refueling outage.

(3) The area where the weld overlay is to be applied must be examined using ultrasonic methods to demonstrate that no crack-like defects exist.

(4) Piping with wall thickness less than the diameter of the electrode shall be depressurized before welding.

RG 1.147, Page 13 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/

Edition Condition N-569-1 Alternative Rules for Repair by Electrochemical Deposition of Class 1 and 2 Steam Generator Tubing,Section XI, Division 1

4/19/02 NOTES: Steam generator tube repair methods require prior NRC approval through the Technical Specifications. This Code Case does not address certain aspects of this repair, e.g., the qualification of the inspection and plugging criteria necessary for staff approval of the repair method. In addition, if the user plans to reconcile, as described in Footnote 2, the reconciliation is to be performed in accordance with IWA-4200 in the 1995 Edition, 1996 Addenda of ASME

Section XI.

N-576-2 Repair of Class 1 and 2 SB-163, UNS N06600 Steam Generator Tubing,Section XI, Division 1

9/10E

NOTES: Steam generator tube repair methods require prior NRC approval through the Technical Specifications. This Code Case does not address certain aspects of this repair, e.g., the qualification of the inspection and plugging criteria necessary for staff approval of the repair method.

N-583 Annual Training Alternative,Section XI, Division 1

2/14/03

(1) Supplemental practice shall be performed on material or welds that contain cracks, or by analyzing prerecorded data from material or welds that contain cracks.

(2) The training must be completed no earlier than 6 months prior to performing ultrasonic examinations at a licensees facility.

N-593-2 Alternative Examination Requirements for Steam Generator Nozzle to Vessel Welds,Section XI, Division 1

8/10E

(1) Essentially 100 percent (not less than 90 percent) of the examination volume A-B-C-D-E-F-G-H must be inspected.

(Note: the above condition is identical to condition on the use of Code Case N-593, RG 1.147, Rev. 17)

(2) The examination volume specified in Section XI, Table IWB-2500-1, Examination Category B-D, must be used for the examination of steam generator nozzle-to-vessel welds at least once prior to using the reduced examination volume allowed by Code Case N-593-2.

RG 1.147, Page 14 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/

Edition Condition N-597-2 Requirements for Analytical Evaluation of Pipe Wall Thinning,Section XI,

Division 1

11/18/03

(1) Code Case must be supplemented by the provisions of EPRI Nuclear Safety Analysis Center Report 202L-R2,Recommendations for an Effective Flow Accelerated Corrosion Program (Ref. 7), April 1999, for developing the inspection requirements, the method of predicting the rate of wall thickness loss, and the value of the predicted remaining wall thickness. As used in NSAC-202L-R2, the term should is to be applied as shall (i.e., a requirement).

(2) Components affected by flow-accelerated corrosion to which this Code Case are applied must be repaired or replaced in accordance with the construction code of record and Owners requirements or a later NRC approved edition of Section III, Rules for Construction of Nuclear Power Plant Components, of the ASME Code (Ref. 8) prior to the value of tp reaching the allowable minimum wall thickness, tmin, as specified in -3622.1(a)(1) of this Code Case. Alternatively, use of the Code Case is subject to NRC review and approval per 10 CFR 50.55a(z).

(3) For Class 1 piping not meeting the criteria of -3221, the use of evaluation methods and criteria is subject to NRC review and approval per 10 CFR

50.55a(z).

(4) For those components that do not require immediate repair or replacement, the rate of wall thickness loss is to be used to determine a suitable inspection frequency so that repair or replacement occurs prior to reaching allowable minimum wall thickness, tmin.

(5) For corrosion phenomenon other than flow accelerated corrosion, use of the Code Case is subject to NRC review and approval. Inspection plans and wall thinning rates may be difficult to justify for certain degradation mechanisms such as MIC and pitting.

(6) The evaluation criteria in Code Case N-513-2 may be applied to Code Case N-597-2 for temporary acceptance of wall thinning (until the next refueling outage) for moderate-energy Class 2 and 3 piping. Moderate-energy piping is defined as Class 2 and 3 piping whose maximum operating temperature does not exceed 200 °F (93 °C) and whose maximum operating pressure does not exceed 275 psig (1.9MPa). Code Case N-597-2 shall not be used to evaluate through-wall leakage conditions.

RG 1.147, Page 15 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/

Edition Condition N-606-1 Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique for BWR CRD Housing/Stub Tube Repairs,Section XI, Division 1

8/20/02 Prior to welding, an examination or verification must be performed to ensure proper preparation of the base metal, and that the surface is properly contoured so that an acceptable weld can be produced. This verification is to be required in the welding procedures.

N-616 Alternative Requirements for VT-2 Visual Examination of Classes 1, 2, 3 Insulated Pressure Retaining Bolted Connections,Section XI, Division 1

4/08/02

(1) Insulation must be removed for VT-2 examination during the system pressure test for any 17-4 PH stainless steel of 410 stainless steel stud or bolt aged at a temperature below 1100 °F or with hardness above Rc 30.

(2) For A-286 stainless steel studs or bolts, the preload must be verified to be below 100 Ksi or the thermal insulation must be removed and the joint visually examined.

(3) Prior to conducting the VT-2 examination of Class 2 and Class 3 components not required to operate during normal plant operation, a 10-

minute holding time is required after attaining test pressure. Prior to conducting the VT-2 examination of Class 2 and Class 3 components required to operate during normal plant operation, no holding time is required, provided the system has been in operation for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for insulated components or 10 minutes for non-insulated components.

N-619 Alternative Requirements for Nozzle Inner Radius Inspections for Class 1 Pressurizer and Steam Generator Nozzles,Section XI, Division 1

4/08/02 In lieu of a UT examination, licensees may perform a VT-1 examination in accordance with the code of record for the Inservice Inspection Program utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio.

RG 1.147, Page 16 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/

Edition Condition N-638-6 Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique,Section XI, Division 1

6/10E

Demonstration for ultrasonic examination of the repaired volume is required using representative samples which contain construction type flaws.

(Note: the above condition is identical to the condition on the use of Code Case N 638-4, RG 1.147, Rev. 17)

N-639

Alternative Calibration Block Material,Section XI, Division 1

8/20/02 Chemical ranges of the calibration block may vary from the materials specification if (1) it is within the chemical range of the component specification to be inspected, and (2) the phase and grain shape are maintained in the same ranges produced by the thermal process required by the material specification.

N-647 Alternative to Augmented Examination Requirements of IWE-2500,Section XI,

Division 1

11/18/03 A VT-1 examination is to be used in lieu of the detailed visual examination.

[Note: Draft Regulatory Guide DG-1070, Sampling Plans Used for Dedicating Simple Metallic Commercial Grade Items for Use in Nuclear Power Plants (Ref. 9), is being developed to provide acceptable guidelines for sampling criteria.]

N-648-1 Alternative Requirements for Inner Radius Examination of Class 1 Reactor Vessel Nozzles,Section XI Division 1

9/18/01 In lieu of a UT examination, licensees may perform a VT-1 examination in accordance with the code of record for the Inservice Inspection Program utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio.

N-660

Risk-Informed Safety Classification for Use in Risk-Informed Repair/Replacement Activities,Section XI, Division 1

7/23/02 The Code Case must be applied only to ASME Code Classes 2 and 3, and non- Code Class pressure retaining components and their associated supports.

RG 1.147, Page 17 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/

Edition Condition N-661-2 Alternative Requirements for Wall Thickness Restoration of Classes 2 and 3 Carbon Steel Piping for Raw Water Service,Section XI, Division 1

3/22/07

(1) Paragraph 4(b): for repairs performed on a wet surface, the overlay is only acceptable until the next refueling outage.

(2) Paragraph 7(c): if the cause of the degradation has not been determined, the repair is only acceptable until the next refueling outage.

(3) The area where the weld overlay is to be applied must be examined using ultrasonic methods to demonstrate that no crack-like defects exist.

(4) Piping with wall thickness less than the diameter of the electrode shall be depressurized before welding.

N-662-1 Alternative Repair/Replacement Requirements for Items Classified in Accordance with Risk-Informed Processes,Section XI, Division 1

6/10E

The Code Case must be applied only to ASME Code Classes 2 and 3, and non- Code Class pressure retaining components and their associated supports.

(Note: this condition is identical to condition on the use of Code Case N-662, RG 1.147, Rev. 17).

N-666-1 Weld Overlay of Class 1, 2, and 3 Socket Welded Connections,Section XI,

Division 1

9/10E

A surface examination (magnetic particle or liquid penetrant) must be performed after installation of the weld overlay on Class 1 and 2 piping socket welds.

Fabrication defects, if detected, must be dispositioned using the surface examination acceptance criteria of the Construction Code identified in the Repair/Replacement Plan.

(Note: Code Case N-666 was unconditionally approved in Rev. 17, RG 1.147.)

RG 1.147, Page 18 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/

Edition Condition N-702 Alternative Requirements for Boiling Water Reactor (BWR) Nozzle Inner Radius and Nozzle-to-Shell Welds,Section XI, Division 1

2/20/04 The technical basis supporting the implementation of this Code Case is addressed by BWRVIP-108: BWR Vessel and Internals Project, Technical Basis for the Reduction of Inspection Requirements for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Blend Radii, EPRI

Technical Report 1003557, October 2002 (ML023330203) and BWRVIP-241:

BWR Vessels and Internals Project, Probabilistic Fracture Mechanics Evaluation for the Boiling Water Reactor Nozzle-to-Vessel Shell Welds and Nozzle Blend Radii, EPRI Technical Report 1021005, October 2010

(ML11119A041). The applicability of Code Case N-702 must be shown by demonstrating that the criteria in Section 5.0 of NRC Safety Evaluation regarding BWRVIP-108 dated December 18, 2007 (ML073600374) or Section

5.0 of NRC Safety Evaluation regarding BWRVIP-241 dated April 19, 2013 (ML13071A240) are met. The evaluation demonstrating the applicability of the Code Case shall be reviewed and approved by the NRC prior to the application of the Code Case.

N-749 Alternative Acceptance Criteria for Flaws in Ferritic Steel Components Operating in the Upper Shelf Temperature Range,Section XI, Division 1

9/10E

In lieu of the upper shelf transition temperature, Tc, as defined in the Code Case, the following shall be used:

Tc = 154.8 °F + 0.82 x RTNDT (in U.S Customary Units), and Tc = 82.8 °C + 0.82 x RTNDT (in SI Units).

Tc is the temperature above which the elastic plastic fracture mechanics (EPFM)

method must be applied. Additionally, the NRC defines temperature Tc1 below which the linear elastic fracture mechanics (LEFM) method must be applied:

Tc1 = 95.36 °F + 0.703 x RTNDT (in U.S Customary Units), and Tc1 = 47.7 °C + 0.703 x RTNDT (in SI Units).

Between Tc1 and Tc, while the fracture mode is in transition from LEFM to EPFM, users should consider whether or not it is appropriate to apply the EPFM

method. Alternatively, the licensee may use a different Tc value if it can be justified by plant specific Charpy curves.

N-751 Pressure Testing of Containment Penetration Piping,Section XI, Division 1

8/03/06 When a 10 CFR 50, Appendix J, Type C test is performed as an alternative to the requirements of IWA-4540 (IWA-4700 in the 1989 edition through the 1995 edition) during repair and replacement activities, nondestructive examination must be performed in accordance with IWA-4540(a)(2) of the 2002 Addenda of Section XI.

RG 1.147, Page 19 Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/

Edition Condition N-754 Optimized Structural Dissimilar Metal Weld Overlay for Mitigation of PWR

Class 1 Items,Section XI, Division 1

6/10E

1) The conditions imposed on the optimized weld overlay design in the NRC

safety evaluation for MRP-169, Revision 1-A (Agencywide Document Access and Management System Nos. ML101620010 and ML101660468)

must be satisfied.

2) The preservice and inservice inspections of the overlaid weld must satisfy

10 CFR 50.55a(g)(6)(ii)(F).

3) The first layer of weld metal deposited shall not be credited toward the required optimized weld overlay thickness unless the chromium content of the first layer is at least 24 percent. The presence of the first layer shall be considered in the design analysis requirements of paragraph 2(b) of Code Case N-754 regardless of the chromium content.

N-778 Alternative Requirements for Preparation and Submittal of Inservice Inspection Plans, Schedules, and Preservice and Inservice Inspection Summary Reports,Section XI, Division 1

0/10E

Licensees must submit the following reports to the regulatory authority:

1) The preservice inspection summary report must be submitted prior to the date of placement of the unit into commercial service.

2) The inservice inspection summary report must be submitted within 90

calendar days of the completion of each refueling outage.

N-789 Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate- Energy Carbon Steel Piping,Section XI, Division 1

6/10E

Areas containing pressure pads shall be visually observed at least once per month to monitor for evidence of leakage. If the areas containing pressure pads are not accessible for direct observation, then monitoring will be accomplished by visual assessment of surrounding areas or ground surface areas above pressure pads on buried piping, or monitoring of leakage collection systems, if available.

RG 1.147, Page 20

Code Case Number Table 2 Conditionally Acceptable Section XI Code Cases Date or Supplement/

Edition Condition N-795 Alternative Requirements for BWR Class 1 System Leakage Test Pressure Following Repair/Replacement Activities,Section XI, Division 1

3/10E

1) The use of nuclear heat to conduct the BWR Class 1 system leakage test is prohibited (i.e., the reactor must be in a non-critical state), except during refueling outages in which the ASME Section XI Category B-P pressure test has already been performed, or at the end of mid-cycle maintenance outages fourteen (14) days or less in duration.

2) The test condition holding time, after pressurization to test conditions, and before the visual examinations commence, shall be 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for non-insulated components.

N-799 Dissimilar Metal Welds Joining Vessel Nozzles to Components,Section XI,

Division 1

4/10E

1) The gap between the ultrasonic probe and component surface shall not exceed 1/32 in. If the gap exceeds 1/32 in., the weld shall be considered to be unexamined unless the examination technique is successfully demonstrated on representative mockups.

2) The following requirements must be implemented when applying this Code Case to ensure that welds are adequately inspected:

a. Examination requirements of Section XI, Mandatory Appendix I,

paragraph I-3200(c) must be applied.

b. Ultrasonic depth and sizing qualifications for cast austenitic stainless steel components must follow Appendix VIII, Supplement 10, using representative cast austenitic stainless steel mockups containing representative cracks and be independent of other Supplement 10

qualifications.

c. Cracks detected and not depth sized to Appendix VIII type performance-based procedures, equipment, and personnel qualifications shall be repaired or removed.

RG 1.147, Page 21

3.

Annulled Unconditionally Approved Section XI Code Cases

The Code Cases listed in Table 3 were previously unconditionally approved by the NRC and have been annulled by the ASME.

Table 3. Annulled Unconditionally Approved Section XI Code Cases

Code Case Number Table 3 Annulled Unconditionally Approved Section XI Code Cases Annulment Date N-34

(1551)

Inservice Inspection of Welds of Nuclear Components,Section XI

11/20/81 N-72

(1646)

Partial Postponement of Category B-C Examination for Class 1 Components,Section XI

1/1/81 N-73

(1647)

Partial Postponement of Category B-D Examination for Class 1 Components,Section XI

1/1/81 N-98

(1705-1)

Ultrasonic Examination - Calibration Block Tolerances,Section XI,

Division 1

8/9/96 N-112

(1730)

Acceptance Standards for Class 2 and 3 Components,Section XI,

Division 1

7/1/79 N-113-1 Basic Calibration Block for Ultrasonic Examination of Weld 10 in. to

14 in. Thick,Section XI, Division 1

8/9/96 N-167

(1804)

Minimum Section Thickness Requirements for Repair of Nozzles,Section XI, Division 1

1/14/80

N-198-1 Exemption from Examination for ASME Class 1 and 2 Piping Located at Containment Penetrations,Section XI, Division 1

3/28/01 N-211 Recalibration of Ultrasonic Equipment Upon Change of Personnel,Section XI, Division 1 (The Code Case was annulled on 3/20/81 and reinstated on 7/13/81.

There was no change in the Code Case, and the NRC considers that the Code Case was in effect during the period 3/20/81 through 7/13/81)

4/30/93 N-216 Alternative Rules for Reactor Vessel Closure Stud Examination,Section XI, Division 1

5/7/90

N-234 Time Between Ultrasonic Calibration Checks,Section XI, Division 1

12/3/90

N-235 Ultrasonic Calibration Checks per Section V,Section XI,

Division 1

8/9/96 N-236-1 Repair and Replacement of Class MC Vessels,Section XI,

Division 1

8/5/97 N-288 Hydrostatic Test Requirements for Class 1 and Class 2 Components,Section XI, Division 1

5/25/83 N-306 Calibration Block Material Selection, Appendix 1, 1-3121,Section XI, Division 1

5/7/90

RG 1.147, Page 22 Code Case Number Table 3 Annulled Unconditionally Approved Section XI Code Cases Annulment Date N-307-3 Revised Ultrasonic Examination Volume for Class 1 Bolting, Table IWB-2500-1, Examination Category B-G-1, When the Examinations Are Conducted from the End of the Bolt or Stud or from the Center-Drilled Hole,Section XI, Division 1

1/21/07 N-308 Documentation of Repairs and Replacements of Components in Nuclear Power Plants,Section XI, Division 1

9/30/90

N-311 Alternative Examination of Outlet Nozzle on Secondary Side of Steam Generators,Section XI, Division 1

11/18/03 N-322 Examination Requirements for Integrally Welded or Forged Attachments to Class 1 Piping at Containment Penetrations,Section XI, Division 1

2/14/03 N-323-1 Alternative Examination for Welded Attachments to Pressure Vessels,Section XI, Division 1

1/21/07 N-334 Examination Requirements for Integrally Welded or Forged Attachments to Class 2 Piping at Containment Penetrations,Section XI,

Division 1

7/14/06 N-335-1 Rules for Ultrasonic Examination of Similar and Dissimilar Metal Piping Welds,Section XI, Division 1

5/11/97 N-343 Alternative Scope of Examination of Attachment Welds for Examination Categories B-H, B-K-1, and C-C,Section XI,

Division 1

12/3/90

N-355 Calibration Block for Angle Beam Ultrasonic Examination of Large Fittings in Accordance with Appendix III-3410,Section XI,

Division 1

8/9/96 N-356 Certification Period for Level III NDE Personnel,Section XI,

Division 1 (Note: July 1, 1988, is the date that the provisions of the Code Case were acceptable to the NRC.)

8/5/97 N-375-2 Rules for Ultrasonic Examination of Bolds and Studs,Section XI,

Division 1

5/7/90

N-389-1 Alternative Rules for Repairs, Replacements, or Modifications,Section XI, Division 1

4/19/02 N-401-1 Eddy Current Examination,Section XI, Division 1

5/11/97 N-402-1 Eddy Current Calibration Standards,Section XI, Division 1

5/11/97 N-406 Alternative Rules for Replacement,Section XI, Division 1

5/7/90

N-408-3 Alternative Rules for Examination of Class 2 Piping,Section XI,

Division 1

4/19/02

RG 1.147, Page 23 Code Case Number Table 3 Annulled Unconditionally Approved Section XI Code Cases Annulment Date N-409-3 Procedure and Personnel Qualification Requirements for Ultrasonic Detection and Sizing of Flaws in Piping Welds,Section XI,

Division 1

4/30/96 N-415 Alternative Rules for Testing Pressure Relief,Section XI, Division 1

8/14/94 N-419 Extent of VT-1 Examinations, Category B-G-1 of Table IWB-2500-1,Section XI, Division 1

5/13/94 N-424 Qualification of Visual Examination Personnel,Section XI,

Division 1

7/18/88 N-426 Extent of VT-1 Examinations, Category B-G-2 of Table IWB-2500-1,Section XI, Division 1

5/13/94 N-427 Code Cases in Inspection Plans,Section XI, Division 1

12/16/94 N-429-2 Alternative Rules for Ultrasonic Instrument Calibration,Section XI,

Division 1

7/27/95 N-435-1 Alternative Examination Requirements for Vessels With Wall Thickness

2 in. or Less,Section XI, Division 1

5/4/04 N-436-1 Alternative Methods for Evaluation of Flaws in Austenitic Piping,Section XI, Division 1

12/3/90

N-437 Use of Digital Readout and Digital Measurement Devices for Performing Pressure Tests,Section XI, Division 1

7/27/95 N-444 Preparation of Inspection Plans,Section XI, Division 1 (Valve stroke times may be documented outside of the IST program.

However, if included within the IST program and it becomes necessary to revise the maximum stroke time required by Supplement 4 Content of IWV Valve Test Tables, it is not necessary to submit a revised IST program to the NRC solely to document a revision in valve stroke time.)

12/30/90

N-445 Use of Later Editions of SNT-TC-1A for Qualification of Nondestructive Examination Personnel,Section XI, Division 1, 2 and 3

5/7/90

N-446 Recertification of Visual Examination Personnel,Section XI,

Division 1

5/7/90

N-448 Qualification of VT-2 and VT-3 Visual Examination Personnel,Section XI, Division 1

4/30/96 N-449 Qualification of VT-4 Visual Examination Personnel,Section XI,

Division 1

4/30/96 N-457 Qualification Specimen Notch Location for Ultrasonic Examination of Bolts and Studs,Section XI, Division 1

4/19/02 N-458-1 Magnetic Particle Examination of Coated Materials,Section XI,

Division 1

3/38/01

RG 1.147, Page 24 Code Case Number Table 3 Annulled Unconditionally Approved Section XI Code Cases Annulment Date N-461-1 Alternative Rules for Piping Calibration Block Thickness,Section XI, Division 1

3/28/01 N-463-1 Evaluation Procedures and Acceptance Criteria for Flaws in Class 1 Ferritic Piping That Exceed the Acceptance Standards of IWB-3514.2,Section XI, Division 1

3/28/01 N-471 Acoustic Emission for Successive Inspections,Section XI, Division 1

4/19/02 N-472 Use of Digital Readout and Digital Measurement Devices for Performing Pump Vibration Testing,Section XI, Division 1

8/14/97 N-478 Inservice Inspection for Class CC Concrete Components Of Light-Water Cooled Power Plants,Section XI, Division 1

3/2/98 N-479-1 Boiling Water Reactor (BWR) Main Steam Hydrostatic Test,Section XI, Division 1

4/19/02 N-481 Alternative Examination Requirements for Cast Austenitic Pump Casings,Section XI, Division 1

3/28/04 N-485-1 Eddy Current Examination of Coated Ferritic Surfaces as an Alternative to Surface Examination,Section XI, Division 1

2/14/03 N-489 Alternative Rules for Level III NDE Qualification Examinations,Section XI, Divisions 1, 2, and 3

4/19/02 N-490-1 Alternative Vision Test Requirements for Nondestructive Examiners,Section XI, Divisions 1, 2, and 3

2/14/03 N-495 Hydrostatic Testing of Relief Valves,Section XI, Division 1

4/19/02 N-496-1 Helical-Coil Threaded Inserts,Section XI, Division 1

5/11/97 N-503 Limited Certification of Nondestructive Examination Personnel,Section XI, Division 1 (Note: Because of the statistical screening criteria used for Appendix VIII to Section XI qualifications, this Code Case is not applicable to Appendix VIII, Performance Demonstration for Ultrasonic Examination Systems.)

2/14/03 N-514 Low Temperature Overpressure Protection,Section XI, Division 1

4/19/02 N-515 Class 1 Mechanical Joint Pressure Tests,Section XI, Division 1

4/19/02 N-521 Alternative Rules for Deferral of Inspections of Nozzle-to-Vessel Welds, Inside Radius Sections, and Nozzle-to-Safe End Welds of a Pressurized Water Reactor (PWR) Vessel,Section XI, Division 1

4/19/02 N-522 Pressure Testing of Containment Penetration Piping,Section XI,

Division 1

4/8/02 N-523-2 Mechanical Clamping Devices for Class 2 and 3 Piping,Section XI,

Division 1

3/28/04

RG 1.147, Page 25 Code Case Number Table 3 Annulled Unconditionally Approved Section XI Code Cases Annulment Date N-524 Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping,Section XI, Division 1

4/19/02 N-535 Alternative Requirements for Inservice Inspection Intervals,Section XI, Division 1

3/28/01 N-538 Alternative Requirements for Length Sizing Performance Demonstration in Accordance with Appendix VIII, Supplements 2, 3, 10, 11, and 12,Section XI, Division 1

4/19/02 N-541 Alternative Requirements for Performance Demonstration in Accordance with Appendix VIII, Supplements 4 and 6,Section XI,

Division 1

3/28/01 N-543 Alternative to Performing Periodic Calibration Checks,Section XI,

Division 1

9/18/01 N-544 Repair/Replacement of Small Items,Section XI, Division 1

3/28/01 N-545 Alternative Requirements for Conduct of Performance Demonstration Detection Test of Reactor Vessel,Section XI, Division 1

5/20/98 N-555 Use of Section II, V, and IX Code Cases,Section XI, Division 1

4/8/02 N-556 Alternative Requirements for Verification of Acceptability Of Replacements,Section XI, Division 1

4/19/02 N-563 Grading of Examinations, IWA-2320,Section XI, Division 1

4/19/02 N-588 Attenuation to Reference Flaw Orientation of Appendix G

for Circumferential Welds in Reactor Vessels,Section XI, Division 1

3/28/04 N-592 ASNT Central Certification Program,Section XI, Division 1

3/28/04 N-598 Alternative Requirements to Required Percentages of Examinations,Section XI, Division 1

3/28/04 N-601 Extent and Frequency of VT-3 Visual Examination for Inservice Inspection of Metal Containments,Section XI, Division 1

3/28/04 N-603 Alternative to the Requirements of IWL-2421, Sites with Two Plants,Section XI, Division 1

3/28/04 N-604 Alternative to Bolt Torque or Tension Test Requirements of Table IWE-2500-1, Category E-G, Item E8.20,Section XI, Division 1

9/18/04 N-605 Alternative to the Requirements of IWE-2500(c)

[sic, should state IWE-2500(b)] for Augmented Examination of Surface Areas,Section XI, Division 1

[Note: Draft Regulatory Guide DG-1070 is being developed to provide acceptable guidelines for sampling criteria.]

3/28/04 N-617 Alternative Examination Distribution Requirements for Table IWC-2500-1, Examination Category C-G, Pressure Retaining Welds in Pumps and Valves,Section XI, Division 1

4/19/02

RG 1.147, Page 26 Code Case Number Table 3 Annulled Unconditionally Approved Section XI Code Cases Annulment Date N-623 Deferral of Inspections of Shell-to-Flange and Head-to-Flange Welds of a Reactor Vessel,Section XI, Division 1

4/19/02 N-627 VT-1 Visual Examination in Lieu of Surface Examination for RPV

Closure Nuts,Section XI, Division 1

5/7/02 N-640

Alternative Reference Fracture Toughness for Development of P-T

Limit Curves,Section XI, Division 1

4/19/02

RG 1.147, Page 27

4.

Annulled Conditionally Acceptable Section XI Code Cases

The Code Cases listed in Table 4 were conditionally approved by the NRC but were subsequently annulled by the ASME.

Table 4. Annulled Conditionally Acceptable Section XI Code Cases

Code Case Number Table 4 Annulled Conditionally Acceptable Section XI Code Cases Annulment Date N-118

(1738)

ExaminationAcceptance Standards for Surface Indications in Cladding,Section XI

12/3/90

The last sentence of the Reply is to be replaced with the following:

The provisions of this Code Case may not be applied for the examination of clad surfaces of nozzles, including the inner surface of the nozzle-to-vessel insert welds.

N-210

Exemption to Hydrostatic Tests After Repairs,Section XI, Division 1

3/20/81 Paragraph (3) of the Reply is to be replaced with the following:

Repairs to piping, pumps, and valves where the depth of the repaired cavity does not exceed 25 percent of the wall thickness.

N-252 Low Energy Capacitive Discharge Welding Method for Temporary or Permanent Attachments to Components and Supports,Section III,

Division 1, and Section XI

7/16/82 The applicant should indicate in the safety analysis report the application, the material, and the thickness of the material to which the strain gage or thermocouple will be attached by CD welding.

N-278 Alternative Ultrasonic Calibration Block Configuration I-3131 and T-434.3,Section XI, Division 1 (Code Case N-278 was inadvertently allowed to expire because of an ASME administrative error on 3/17/83. The Code Case was reinstated without technical change on May 25, 1993. Thus, the NRC considered the Code Case to be in effect during the period from March 17, 1983, through May 25, 1993.)

2/19/92 When a universal calibration block is used and some or all of the reference holes are larger than the reflector holes at comparable depths recommended by Article IV,Section V, 1980 Edition of the ASME

Code, a correction factor should be used to adjust the DAC level to compensate for the larger reflector holes. Also, if the reactor pressure vessel was previously examined using a conventional block, a ratio between the DAC curves obtained from the two blocks should be noted (for reference) with the significant indication data.

RG 1.147, Page 28 Code Case Number Table 4 Annulled Conditionally Acceptable Section XI Code Cases Annulment Date N-509 Alternative Rules for the Selection and Examination of Class 1, 2, and 3 Integrally Welded Attachments,Section XI, Division 1

5/20/01 A minimum 10% sample of integrally welded attachments for each item in each Code class per interval should be examined.

N-512-1 Assessment of Reactor Vessels With Low Upper Shelf Charpy Impact Energy Levels,Section XI, Division 1

5/20/01 The material properties and transient selection must follow the guidance in Regulatory Guide 1.161, Evaluation of Reactor Pressure Vessels with Charpy Upper-Shelf Energy Less Than 50 ft-lb (Ref. 10),

or an equivalent method approved by the NRC staff.

N-546 Alternative Requirements for Qualification of VT-2 Examination Personnel,Section XI, Division 1

9/18/04 This Code Case is applicable only to the performance of VT-2 examinations and may not be applied to other VT-2 functions such as verifying the adequacy of procedures and training VT-2 personnel.

N-568 Alternative Examination Requirements for Welded Attachments,Section XI, Division 1

2/14/03 This Code Case may only be used for examination of the accessible portions of lugs on piping where riser clamps (i.e., clamps on vertical runs of pipe) obstruct access to welded surfaces.

N-599 Alternatives to Qualification of Nondestructive Examination Personnel for Inservice Inspection of Metal (Class MC) and Concrete (Class CC)

Containments,Section XI, Division 1

9/18/04 This Code Case may not be used when a licensee updates to the 1992 or later Edition of Section XI that requires the use of ANSI/ASNT CP-

189, Standard for Qualification and Certification of Nondestructive Testing Personnel (Ref. 11).

N-630

Alternatives to VT-1C and VT-3C Visual Examination for Inservice Inspection of Concrete and VT-1 Visual Examination for Inservice Inspection of Anchorage Hardware and Surrounding Concrete for Concrete Containments,Section XI, Division 1

4/8/02 The Responsible Engineers written practice must define qualification requirements for concrete and tendon hardware examination personnel in accordance with IWA-2300 in lieu of the Owner defined qualification requirements specified in Paragraph (c) of the Code Case.

However, limited certification in accordance with IWA-2350 is permitted.

RG 1.147, Page 29

5.

Code Cases That Have Been Superseded

Table 5 lists Code Cases that have been superseded by revision. The third column of the table indicates the date on which each Code Case was superseded. The older or superseded version of the Code Case, if listed in Table 5, cannot be applied by the licensee or applicant for the first time. Note: Some of these Code Cases were not approved for use by the NRC in previous versions of this guide.

Table 5. Section XI Code Cases That Have Been Superseded

Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-113

(1731)

Basic Calibration Block for Ultrasonic Examination of Weld 10 in.

To 14 in. Thick,Section XI, Division 1 N-113-1 Published on

12/31/82 N-236

Repair and Replacement of Class MC Vessels,Section XI,

Division 1 N-236-1 Published on

9/5/85 (a) In paragraph 1.0(a), second sentence, the phrase, while the plant is not in service, refers to a refueling outage.

(b) In paragraph 1.0(a), third sentence, the phrase, the next scheduled plant outage, refers to the next scheduled refueling outage.

For clarification, Repair and Replacement of Class MC Vessels means Repair and Replacement of Class MC Vessels and Components (systems). Acceptance of this Code Case in no way provides/constitutes NRC approval to violate the technical specification or any NRC requirements with regard to breach of containment during repair and replacement procedures while the plant is in operation.

Where a numbered Code paragraph is not identified by a particular edition of the Code, the Code in effect at the time of the ASME

meeting (November 3, 1978) that approved the Code Case should be governing.

N-307 N-307-1 N-307-2 Revised Ultrasonic Examination Volume for Class 1 Bolting, Table IWB-2500-1, Examination Category B-G-1, When the Examinations Are Conducted from the Center-Drilled Hole,Section XI, Division 1 N-307-1 Published on

12/5/84 N-307-2 Published on

9/24/99 N-307-3 Published on

3/28/01 N-335 Rules for Ultrasonic Examination of Similar and Dissimilar Metal Piping Welds,Section XI, Division 1 N-335-1 Published on

6/20/85 N-375 N-375-1 Rules for Ultrasonic Examination of Bolds and Studs,Section XI, Division 1 N-375-1 Published on

4/14/83;

N-375-2 Published on

4/5/84

RG 1.147, Page 30

Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-389 Alternative Rules for Repairs, Replacements, or Modifications,Section XI, Division 1 N-389-1 Published on

12/9/93 The applicant should submit for approval the appropriate edition and addenda of the Code that is to be used for the repair, replacement, or modification before the start of the work.

N-401 Eddy Current Examination,Section XI, Division 1 N-401-1 Published on

5/4/88 N-402 Eddy Current Calibration Standards,Section XI, Division 1 N-402-1 Published on

3/14/91 N-408 Alternative Rules for Examination of Class 2 Piping,Section XI,

Division 1 N-408-1 Published on

3/8/89 N-408-1 N-408-2 Alternative Rules for Examination of Class 2 Piping,Section XI, Division 1 N-408-2 Published on

7/24/89 N-408-3 Published on

8/9/93 The applicant for an operating license should define the Class 2 piping subject to volumetric and surface examination in the Preservice Inspection for determination of acceptability by the NRC

staff.

N-409 Procedure and Personnel Qualification Requirements for Ultrasonic Detection and Sizing of Flaws in Piping Welds,Section XI, Division 1 N-409-1 Published on

12/7/87 N-409-1 N-409-2 Procedure and Personnel Qualification Requirements for Ultrasonic Detection and Sizing of Flaws in Piping Welds,Section XI, Division 1 N-409-2 Published on

7/27/88;

N-409-3 Published on

4/30/93 The applicant should give prior notification to the NRC of the intention to use the Code Case.

N-416 N-416-1 N-416-2 N-416-3 Alternative Pressure Test Requirements for Welded Repairs or Installation of Replacement Items by Welding, Class 1, 2, and 3,Section XI, Division 1 N-416-1 Published on

2/15/94 N-416-2 Published on

5/5/00

N-416-3 Published on

7/7/01 N-416-3 Published on

1/12/05 N-416-4 Published on

1/12/05 N-429 N-429-1 Alternative Rules for Ultrasonic Instrument Calibration,Section XI, Division 1 N-429-1 Published on

2/23/87;

N-429-2 Published on

7/27/92 N-432 Repair Welding Using Automatic or Machine Gas Tungsten-Arc Welding (GTAW) Temper Bead Technique,Section XI, Division 1 N-432-1 Published on

3/28/01

RG 1.147, Page 31 Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-435 Alternative Examination Requirements for Vessels With Wall Thickness 2 in. Or Less,Section XI, Division 1 N-435-1 Published on

7/30/86 N-436 Alternative Methods for Evaluation of Flaws in Austenitic Piping,Section XI, Division 1 N-436-1 Published on

12/7/87 N-458 Magnetic Particle Examination of Coated Materials,Section XI, Division 1 N-458-1 Published on

3/14/95 N-461 Alternative Rules for Piping Calibration Block Thickness,Section XI, Division 1 N-461-1 Published on

3/14/95 N-463 Evaluation Procedures and Acceptance Criteria for Flaws in Class 1 Ferritic Piping That Exceed the Acceptance Standards of IWB-3514.2,Section XI, Division 1 N-463-1 Published on

3/5/90

N-479 Boiling Water Reactor (BWR) Main Steam Hydrostatic Test,Section XI, Division 1 N-479-1 Published on

12/3/90

N-485 Eddy Current Examination of Coated Ferritic Surfaces as an Alternative to Surface Examination,Section XI, Division 1 N-485 Published on

8/14/91 N-490

Alternative Vision Test Requirements for Nondestructive Examiners,Section XI, Divisions 1, 2, and 3 N-490-1 Published on

5/13/91 N-491 N-491-1 Alternative Rules for Examination of Class 1, 2, 3, and MC

Component Supports of Light-Water Cooled Power Plants,Section XI, Division 1 N-491-1 Published on

4/30/93;

N-491-2 Published on

3/12/97 N-494 N-494-1 N-494-2 N-494-3 Pipe Specific Evaluation Procedures and Acceptance Criteria for Flaws in Class 1 Ferritic Piping that Exceed the Acceptance Standards of IWB-3514.2,Section XI, Division 1 N-494-1 Published on

7/27/92;

N-494-2 Published on

12/9/93 N-494-3 Published on

8/9/96 N-494-4 Published on

10/11/05 N-496 N-496-1 Helical-Coil Threaded Inserts,Section XI, Division 1 N-496-1 Published on

5/11/94;

N-496-1 Annulled on

5/11/97 N-496-2 Published on

9/18/01

RG 1.147, Page 32 Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-498 N-498-1 N-498-2 N-498-3 Alternative Rules for 10-Year System Hydrostatic Testing for Class 1, 2, and 3 Systems,Section XI, Division 1 N-498-1 Published on

5/11/94 N-498-2 Published on

6/9/95 N-498-3 Published on

5/20/98 N-498-4 Published on

2/15/99 N-504 N-504-1 N-504-2 N-504-3 Alternative Rules for Repair of Class 1, 2, and 3 Austenitic Stainless Steel Piping,Section XI, Division 1 N-504-1 Published on

8/9/93 N-504-2 Published on

3/12/97 N-504-3 Published on

8/4/04 N-504-4 Published on

7/14/06 N-508 N-508-1 N-508-2 N-508-3 Rotation of Serviced Snubbers and Pressure Relief Valves for the Purpose of Testing,Section XI, Division 1 N-508-1 Published on

5/11/94 N-508-2 Published on

3/28/01 N-508-3 Published on

11/18/03 N-508-4 Published on

1/26/09 N-512 Assessment of Reactor Vessels With Low Upper Shelf Charpy Impact Energy Levels,Section XI, Division 1 N-512-1 Published on

8/24/95 N-513 Evaluation Criteria for Temporary Acceptance of Flaws in Class 3 Piping,Section XI, Division 1 N-513-1 Published on

3/28/01 N-513-1

N-513-2 Evaluation Criteria for Temporary Acceptance of Flaws in Class 3 Piping,Section XI, Division 1 N-513-2 Published on

2/20/04 N-513-3 Published on

1/26/09

(1)

Specific safety factors in paragraph 4.0 must be satisfied.

(2)

Code Case N-513 may not be applied to:

(a) Components other than pipe and tube.

(b) Leakage through a gasket.

(c) Threaded connections employing nonstructural seal welds for leakage prevention (through seal weld leakage is nota structural flaw; thread integrity must be maintained).

(d) Degraded socket welds N-516 N-516-1 Underwater Welding,Section XI, Division 1 N-516-1 Published on

12/31/96;

N-516-2 Published on

1/17/00

When welding is to be performed on high neutron fluence Class 1 material, then a mockup, using material with similar fluence levels, should be welded to verify that adequate crack prevention measures were used.

RG 1.147, Page 33 Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-516-2 Underwater Welding,Section XI, Division 1 N-516-3 Published on

4/8/02 Licensees must obtain NRC approval in accordance with 10 CFR

50.55a(z) regarding the method to be used in the weld repair or replacement of irradiated material underwater.

N-517 Quality Assurance Program Requirements for Owners,Section XI,

Division 1 N-517-1 Published on

7/30/98 N-523 N-523-1 Mechanical Clamping Devices for Class 2 and 3 Piping,Section XI, Division 1 N-523-1 Published on

8/24/95 N-523-2 Published on

10/2/00

N-528 Purchase, Exchange, or Transfer of Material Between Nuclear Plant Sites,Section XI, Division 1 N-528-1 Published on

5/7/99 N-532 N-532-1 N-532-2 N-532-3 N-532-4 Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1 N-532-1 Published on

3/28/01 N-532-2 Published on

7/23/02 N-532-3 Published on

2/20/04 N-532-4 Published on

4/19/06 N-532-5 Published on

1/04/11 N-533 Alternative Requirements for VT-2 Visual Examination of Class 1 Insulated Pressure-Retaining Bolted Connections,Section XI,

Division 1 N-533-1 Published

2/26/99 N-552 Alternative Methods - Qualification for Nozzle Inside Radius Section from the Outside Surface,Section XI, Division 1 N-552-1 Published on

6/22/12 To achieve consistency with the 10 CFR 50.55a rule change published September 22, 1999 (64 FR 51370), incorporating Appendix VIII, Performance Demonstration for Ultrasonic Examination Systems, to Section XI, add the following to the specimen requirements:

At least 50 percent of the flaws in the demonstration test set must be cracks and the maximum misorientation must be demonstrated with cracks. Flaws in nozzles with bore diameters equal to or less than 4 inches may be notches.

Add to detection criteria, The number of false calls must not exceed three.

RG 1.147, Page 34 Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-553 Inservice Eddy Current Surface Examination of Pressure Retaining Pipe Welds and Nozzle-to-Safe End Welds,Section XI, Division 1 N-553-1 Published on

3/28/01 N-554 N-554-1 N-554-2 Alternative Requirements for Reconciliation of Replacement Items,Section XI, Division 1 N-554-1 Published on

7/98E;

N-554-2 Published on

2/25/00

N-554-3 Published on

2/14/03 N-557 In-Place Dry Annealing of a PWR Nuclear Reactor Vessel,Section XI, Division 1 N-557-1 Published on

12/31/96 N-560

N-560-1 Alternative Examination Requirements for Class 1, Category B-J

Piping Welds,Section XI, Division 1 N-560-1 Published on

8/9/96;

N-560-2 Published on

3/28/00

N-561

N-561-1 Alternative Requirements for Wall Thickness Restoration of Class 2 and High Energy Class 3 Carbon Steel Piping,Section XI, Division 1 N-561-1 Published on

7/30/98 N-561-2 Published on

3/22/07 N-562

N-562-1 Alternative Requirements for Wall Thickness Restoration of Class 3 Moderate Energy Carbon Steel Piping,Section XI,

Division 1 N-562-1 Published on

7/30/98 N-562-2 Published on

3/22/07 N-566 N-566-1 Corrective Action for Leakage Identified at Bolted Connections,Section XI, Division 1 N-566-1 Published on

2/15/99 N-566-2 Published on

3/28/01 N-567 Alternative Requirements for Class 1, 2, and 3 Replacement Components,Section XI, Division 1 N-567-1 Published on

2/26/99 N-569 Alternative Rules for Repair by Electrochemical Deposition of Class 1 and 2 Steam Generator Tubing,Section XI, Division 1 N-569-1 Published on

5/7/99 N-576 N-576-1 Repair of Class 1 and 2 SB-163, UNS N06600 Steam Generator Tubing,Section XI, Division 1 N-576-1 Published on

5/7/99 N-576-2 Published on

3/16/12 N-577 Risk-Informed Requirements for Class 1, 2, and 3 Piping, Method A,Section XI, Division 1 N-577-1 Published on

3/28/00

N-578 Risk-Informed Requirements for Class 1, 2, and 3 Piping, Method B,Section XI, Division 1 N-578-1 Published on

3/28/00

RG 1.147, Page 35 Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-586 Alternative Additional Examination Requirements for Class 1, 2, and

3 Piping, Components, and Supports,Section XI, Division 1 N-586-1 Published on

5/4/04 The engineering evaluations addressed under Item (a) and the additional examinations addressed under Item (b) shall be performed during this outage. If the additional examinations performed under Item (b) reveal indications exceeding the applicable acceptance criteria of Section XI, the engineering evaluations and the examinations shall be further extended to include additional evaluations and examinations at this outage.

N-589 Class 3 Nonmetallic Cured-in-Place Piping,Section XI,

Division 1 N-589-1 Published on

7/23/02 N-593 N-593-1 Alternative Examination Requirements for Steam Generator Nozzle to Vessel Welds,Section XI, Division 1 N-593-1 Published on

10/8/04 N-593-2 Published on

11/8/11 N-597 N-597-1 Requirements for Analytical Evaluation of Pipe Wall Thinning,Section XI, Division 1 N-597-1 Published on

7/7/01 N-597-2 Published on

11/18/03 N-606 Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique,Section XI, Division 1 N-606-1 Published on

9/24/99 N-609 Alternative Requirements to Stress-Based Selection Criteria for Category B-J Welds,Section XI, Division 1 N-609-1 Published on

9/17/10

N-613 N-613-1 Ultrasonic Examination of Penetration Nozzles in Vessels, Examination Category B-D, Item Nos. B3.10 and B3.90, Reactor Nozzle-to-Vessel Welds, Figs. IWB-2500-7(a), (b), and (c),

Section XI, Division 1 N-613-1 Published on

8/20/02 N-613-2 Published on

12/10/10

N-638 N-638-1 N-638-2 N-638-3

Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique,Section XI, Division 1 N-638-1 Published on

5/9/03 N-638-2 Published on

7/1/05 N-638-3 Published on

4/19/06 N-638-4 Published on

10/12/06

The Construction Code of Record acceptance criteria must be used for volumetric examinations.

RG 1.147, Page 36 Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-638-4 N-638-5 Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temper Bead Technique,Section XI, Division 1 N-638-5 Published on

4/27/09 N-638-6 Published on

6/25/11

(1) Demonstration for ultrasonic examination of the repaired volume is required using representative samples which contain construction type flaws.

(2) The provisions of 3(e)(2) or 3(e)(3) may only be used when it is impractical to use the interpass temperature measurement methods described in 3(e)(1), such as in situations where the weldment area is inaccessible (e.g., internal bore welding) or when there are extenuating radiological conditions.

N-643 N-643-1 Fatigue Crack Growth Rate Curves for Ferritic Steels in PWR Water Environment,Section XI, Division 1 N-643-1 Published on

2/3/03 N-643-2 Published on

5/4/04 N-648 Alternative Requirements for Inner Radius Examination of Class 1 Reactor Vessel Nozzles,Section XI, Division 1 N-648-1 Published on

7/7/01 N-652 N-652-1 Alternative Requirements to Categorize B-G-1, B-G-2, and C-D Bolting Examination Methods and Selection Criteria,Section XI, Division 1 N-652-1 Published on

2/20/04 N-652-2 Published on

9/3/10

N-653 Qualification Requirements for Full Structural Overlaid Wrought Austenitic Piping Welds,Section XI, Division 1 N-653-1 Published on

4/4/12 N-661 Alternative Requirements for Wall Thickness Restoration of Classes

2 and 3 Carbon Steel Piping for Raw Water Service,Section XI,

Division 1 N-661-1 Published on

10/11/05 (a) If the root cause of the degradation has not been determined, the repair is only acceptable for one cycle.

(b) Weld overlay repair of an area can only be performed once in the same location.

(c) When through-wall repairs are made by welding on surfaces that are wet or exposed to water, the weld overlay repair is only acceptable until the next refueling outage.

N-661-1 Alternative Requirements for Wall Thickness Restoration of Class 2 and 3 Carbon Steel Piping for Raw Water Service,Section XI,

Division 1 N-661-2 Published on

3/22/07 N-662 Alternative Repair/Replacement Requirements for Items Classified in Accordance with Risk-Informed Processes,Section XI, Division 1 N-662-1 Published on

6/25/11

RG 1.147, Page 37 Code Case Number Table 5 Section XI Code Cases That Have Been Superseded Date N-666 Weld Overlay of Class 1, 2, and 3 Socket Welded Connections,Section XI, Division 1 N-666-1 Published on

3/12/12 N-686 Alternative Requirements for Visual Examinations, VT-1, VT-2, and VT-3,Section XI, Division 1 N-686-1 Published on

1/10/07 N-694-2 Evaluation Procedure and Acceptance Criteria for PWR Reactor Vessel Upper Head Penetration,Section XI, Division 1 N-694-2 Published on

1/16/13 (a) The maximum instantaneous through-thickness stress distribution along the crack front and in the crack-length path must be used to calculate the crack driving force.

(b) The stress intensity factor expression Raju and Newman (Ref.

12) is only applicable to cylindrical products having a ratio of wall thickness to inside radius between 0.1 and 0.25.

N-706 Alternative Examination Requirements of Table IWB-2500-1 and Table IWC-2500-1 for PWR Stainless Steel Residual and Regenerative Heat Exchangers,Section XI, Division 1 N-706-1 Published on

1/10/07 N-716 Alternative Piping Classification and Examination Requirements,Section XI, Division 1 N-716-1 Published on

1/27/13 N-730

Roll Expansion of Class 1 Control Rod Drive Bottom Head Penetrations in BWRs,Section XI, Division 1 N-730-1 Published on

7/16/12 N-739 Alternative Qualification Requirements for Personnel Performing Class CC Concrete and Post-Tensioning System Visual Examinations,Section XI, Division 1 N-739-1 Published on

1/21/07 N-769 N-769-1 Roll Expansion of Class 1 In-Core Housing Bottom Head Penetrations in BWRs,Section XI, Division 1 N-769-1 Published on

9/17/10

N-769-2 Published on

7/16/12

RG 1.147, Page 38

D. IMPLEMENTATION

The purpose of this section is to provide information to applicants and licensees regarding the NRC staffs plans for using this regulatory guide. The requirements addressing implementation of Section XI Code Cases are contained in 10 CFR 50.55a(b)(5). No backfitting is intended or approved in connection with the issuance of this guide.

REGULATORY ANALYSIS

A separate regulatory analysis was not prepared for this regulatory guide. The regulatory analysis for this guide is the regulatory analysis prepared for the amendment to 10 CFR 50.55a, Codes and Standards. The amendment to 10 CFR 50.55a incorporates this regulatory guide by reference.

RG 1.147, Page 39 REFERENCES1

1.

Code of Federal Regulations, Title 10, Energy, Part 50, Domestic Licensing of Production and Utilization Facilities (10 CFR Part 50), U.S. Nuclear Regulatory Commission, Washington, DC.

2.

ASME Boiler and Pressure Vessel Code,Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, American Society of Mechanical Engineers, New York, NY.2

3.

Regulatory Guide 1.84, Design, Fabrication, and Materials Code Case Acceptability, ASME

Section III, U.S. Nuclear Regulatory Commission, Washington, DC.

4.

Regulatory Guide 1.192, Operation and Maintenance Code Case Acceptability, ASME OM

Code, U.S. Nuclear Regulatory Commission, Washington, DC.

5.

Regulatory Guide 1.193, ASME Code Cases Not Approved for Use, U.S. Nuclear Regulatory Commission, Washington, DC.

6.

Code of Federal Regulations, Title 10, Energy, Part 21, Reporting of Defects and Noncompliance (10 CFR Part 21), U.S. Nuclear Regulatory Commission, Washington, DC.

7.

Recommendations for an Effective Flow-Accelerated Corrosion Program, EPRI, Palo Alto, CA: 1999. NSAC-202L-R2.3

8.

ASME Boiler and Pressure Vessel Code,Section III, Rules for Construction of Nuclear Power Plant Components, American Society of Mechanical Engineers, New York, NY.2

9.

Draft Regulatory Guide DG-1070, Sampling Plans Used for Dedicating Simple Metallic Commercial Grade Items for Use in Nuclear Power Plants, U.S. Nuclear Regulatory Commission, Washington, DC. [DG-1070 was issued in October 1997.]

10.

Regulatory Guide 1.161, Evaluation of Reactor Pressure Vessels with Charpy Upper-Shelf Energy Less Than 50 ft-lb, U.S. Nuclear Regulatory Commission, Washington, DC.

11.

ANSI/ASNT CP-189, Standard for Qualification and Certification of Nondestructive Testing Personnel, American Society for Nondestructive Testing, Columbus, OH.4

12.

Raju, I. S. and J. C, Newman. Jr., Stress Intensity Factor Influence Coefficients for Internal and External Surface Cracks in Cylindrical Vessels, ASME PVP 58, Aspects of Fracture Mechanics in Pressure Vessel and Piping, pp, 35-41, 1982

1 Publicly available NRC published documents are available electronically through the NRC Library on the NRCs public Web site at: http://www.nrc.gov/reading-rm/doc-collections/. The documents can also be viewed on-line or printed for a fee in the NRCs Public Document Room (PDR) at 11555 Rockville Pike, Rockville, MD; the mailing address is USNRC PDR,

Washington, DC 20555; telephone 301-415-4737 or (800) 397-4209; fax (301) 415-3548; and e-mail pdr.resource@nrc.gov.

2 Copies may be purchased from the American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-

5990; phone (212) 591-8500; fax (212) 591-8501; www.asme.org.

3 Copies of the listed EPRI standards and reports may be purchased from the Electric Power Research Institute (EPRI), 3420

Hillview Ave., Palo Alto, California 94304; telephone (800) 313-3774; fax (925) 609-1310.

4 Copies may be obtained from the American Society for Nondestructive Testing, 1711 Arlingate Lane, Columbus, OH,

43228-0518; telephone (800) 222-2768 or (614) 274-6003; fax (614) 274-6899. Purchase information is available through the ASNT Web-based store at http://www.asnt.org/publications/standards/cp-189/index.htm

Appendix A to RG 1.147, Page A-1 APPENDIX A

SUPPLEMENTS ADDRESSED IN PROPOSED REVISION 18 OF REGULATORY GUIDE 1.147

Edition Supplement Number BNCS1 Approval Date of Code Cases in Supplement2

2007

11 November 10, 2009

2010

0

December 25, 2009

2010

1 April 9, 2010

2010

2 June 24, 2010

2010

3 September 20, 2010

2010

4 December 23, 2010

2010

5 March 24, 2011

2010

6 July 15, 2011

2010

7 October 14, 2011

2010

8 December 29, 2011

2010

9 April 4, 2012

2010

10

July 16, 2012

1 BNCS = ASME Board on Nuclear Codes and Standards

2 Publication of supplements approximately 6 months after BNCS approval.

Appendix B to RG 1.147, Page B-1 APPENDIX B

NUMERICAL LISTING OF SECTION XI CODE CASES IN

SUPPLEMENT 11 TO THE 2007 EDITION AND SUPPLEMENT 0

THROUGH SUPPLEMENT 10 TO THE 2010 EDITION

Legend

1 Code Case N-532-5 was approved in Revision 17 to Regulatory Guide 1.147

2 Code Case in unacceptable for use. See Revision 5 of Regulatory Guide 1.193.

3 Code Case is directly addressed in 10 CFR 50.55a.

4 Code Case published in Supplement 1 to the 2013 Edition; included at request of ASME

5 Code Case published in Supplement 3 to the 2013 Edition; included at request of ASME

6 Code Case published in Supplement 6 to the 2013 Edition; included at request of ASME

N-532-51 N-7802 N-552-1 N-7842 N-576-2 N-786-1 N-593-2 N-789 N-609-1 N-795 N-613-2 N-798 N-638-6 N-799 N-652-2 N-800

N-653-1 N-803 N-662-1 N-805 N-666-1 N-8062 N-694-24 N-8132 N-722-23 N-823 N-729-23 N-8255 N-729-33 N-8262 N-730-1 N-8456 N-749

N-754

N-7662

N-769-1

N-769-2

N-770-13

N-770-23

N-771

N-775

N-776

N-778

Appendix C to RG 1.147, Page C-1

APPENDIX C

NUMERICAL LISTING OF SECTION XI CODE CASES

AND TABLE WHERE EACH CODE CASE IS LISTED

Legend

1 Code Case in unacceptable for use. See Draft Regulatory Guide DG-1298, proposed Revision 5 of Regulatory Guide 1.193.

2 Code Case is directly addressed in 10 CFR 50.55a.

N-34 [T3]

N-72 [T3]

N-73 [T3]

N-98 [T3]

N-112 [T3]

N-113 [T5]

N-113-1 [T3]

N-118 [T4]

N-167 [T3]

N-198-1 [T3]

N-210 [T4]

N-211 [T3]

N-216 [T3]

N-234 [T3]

N-235 [T3]

N-236 [T5]

N-236-1 [T3]

N-252 [T4]

N-278 [T4]

N-288 [T3]

N-306 [T3]

N-307 [T5]

N-307-1 [T5]

N-307-2 [T5]

N-307-3 [T3]

N-308 [T3]

N-311 [T3]

N-322 [T3]

N-323-1 [T3]

N-334 [T3]

N-335 [T5]

N-335-1 [T3]

N-343 [T3]

N-355 [T3]

N-356 [T3]

N-375 [T5]

N-375-1 [T5]

N-375-2 [T3]

N-389 [T5]

N-389-1 [T3]

N-401 [T5]

N-401-1 [T3]

N-402 [T5]

N-402-1 [T3]

N-406 [T3]

N-408 [T5]

N-408-1 [T5]

N-408-2 [T5]

N-408-3 [T3]

N-409 [T5]

N-409-1 [T5]

N-409-2 [T5]

N-409-3 [T3]

N-415 [T3]

N-416 [T5]

N-416-1 [T5]

N-416-2 [T5]

N-416-3 [T5]

N-416-4 [T2]

N-419 [T3]

N-424 [T3]

N-426 [T3]

N-427 [T3]

N-429 [T5]

N-429-1 [T5]

N-429-2 [T3]

N-432 [T5]

N-432-1 [T1]

N-435 [T5]

N-435-1 [T3]

N-436 [T5]

N-436-1 [T3]

N-437 [T3]

N-444 [T3]

N-445 [T3]

N-446 [T3]

N-448 [T3]

N-449 [T3]

N-457 [T3]

N-458 [T5]

N-458-1 [T3]

N-460 [T1]

N-461 [T5]

N-461-1 [T3]

N-463 [T5]

N-463-1 [T3]

N-4651 N-465-11 N-471 [T3]

N-472 [T3]

N-4731 N-473-11 N-478 [T3]

N-479 [T5]

N-479-1 [T3]

N-4801 N-481 [T3]

N-485 [T5]

N-485-1 [T3]

N-489 [T3]

N-490 [T5]

N-490-1 [T3]

N-491 [T5]

N-491-1 [T5]

N-491-2 [T1]

N-494 [T5]

N-494-1 [T5]

N-494-2 [T5]

N-494-3 [T5]

N-494-4 [T1]

N-495 [T3]

N-496 [T5]

N-496-1 [T3] [T5]

N-496-2 [T1]

N-498 [T5]

N-498-11 [T5]

Appendix C to DG-1296, Page C-2 N-498-21 [T5]

N-498-31 [T5]

N-498-4 [T2]

N-503 [T3]

N-504 [T5]

N-504-1 [T5]

N-504-2 [T5]

N-504-3 [T5]

N-504-4 [T2]

N-508 [T5]

N-508-1 [T5]

N-508-2 [T5]

N-508-3 [T5]

N-508-4 [T2]

N-509 [T4]

N-512 [T5]

N-512-1 [T4]

N-513 [T5]

N-513-1 [T5]

N-513-2 [T5]

N-513-32 N-514 [T3]

N-515 [T3]

N-516 [T5]

N-516-1 [T5]

N-516-2 [T5]

N-516-3 [T2]

N-517 [T5]

N-517-1 [T1]

N-521 [T3]

N-522 [T3]

N-523 [T5]

N-523-1 [T5]

N-523-2 [T3]

N-524 [T3]

N-526 [T1]

N-528 [T5]

N-528-1 [T2]

N-532 [T5]

N-532-1 [T5]

N-532-2 [T5]

N-532-3 [T5]

N-532-4 [T5]

N-532-5 [T1]

N-533 [T5]

N-533-1 [T2]

N-534 [T1]

N-535 [T3]

N-537 [T1]

N-538 [T3]

N-541 [T3]

N-5421 N-543 [T3]

N-544 [T3]

N-545 [T3]

N-546 [T4]

N-5471 N-552 [T5]

N-552-1 [T2]

N-553 [T5]

N-553-1 [T1]

N-554 [T5]

N-554-1 [T5]

N-554-2 [T5]

N-554-3 [T1]

N-555 [T3]

N-556 [T3]

N-557 [T5]

N-557-1 [T2]

N-5601 [T5]

N-560-11 [T5]

N-560-21 N-5611 [T5]

N-561-11 [T5]

N-561-2 [T2]

N-5621 [T5]

N-562-11 N-562-2 [T2]

N-563 [T3]

N-566 [T5]

N-566-1 [T5]

N-566-2 [T1]

N-567 [T5]

N-567-1 [T1]

N-568 [T4]

N-569 [T5]

N-569-1 [T2]

N-573 [T1]

N-5741 N-5751 N-576 [T5]

N-576-1 [T5]

N-576-2 [T2]

N-5771 [T5]

N-577-11 N-5781 [T5]

N-578-11 N-583 [T2]

N-586 [T5]

N-586-1 [T1]

N-5871 N-588 [T3]

N-5891 [T5]

N-589-11 N-5901 N-5911 N-592 [T3]

N-5931 N-593-1 [T5]

N-593-2 [T2]

N-597 [T5]

N-597-1 [T5]

N-597-2 [T2]

N-598 [T3]

N-599 [T4]

N-600 [T1]

N-601 [T3]

N-603 [T3]

N-604 [T3]

N-605 [T3]

N-606 [T5]

N-606-1 [T2]

N-609 [T5]

N-609-1 [T1]

N-6131 N-613-1 [T5]

N-613-2 [T1]

N-6151 N-616 [T2]

N-617 [T3]

N-6181 N-618-11 N-619 [T2]

N-6221 N-623 [T3]

N-624 [T1]

N-627 [T3]

N-629 [T1]

N-630 [T4]

N-638 [T5]

N-638-1 [T5]

N-638-3 [T5]

N-638-4 [T5]

N-638-5 [T5]

N-638-6 [T2]

N-639 [T2]

N-640 [T3]

N-641 [T1]

N-643 [T5]

N-643-1 [T5]

N-643-2 [T1]

N-647 [T2]

N-648 [T5]

N-648-1 [T2]

N-649 [T1]

N-651 [T5]

N-652 [T5]

N-652-1 [T5]

N-652-2 [T1]

N-6531 N-653-1 [T1]

N-6541 N-658 [T1]

N-660 [T2]

N-661 [T5]

N-661-1 [T5]

N-661-2 [T2]

N-662 [T5]

N-662-1 [T2]

N-663 [T1]

N-664 [T1]

N-665 [T1]

N-666 [T5]

N-666-1 [T2]

N-683 [T1]

N-685 [T1]

Appendix C to DG-1296, Page C-3 N-686 [T5]

N-686-1 [T1]

N-6911 N-694-1 [T5]

N-694-2 [T1]

N-695 [T1]

N-696 [T1]

N-697 [T1]

N-700 [T1]

N-702 [T2]

N-705 [T1]

N-706 [T5]

N-706-1 [T1]

N-7111 N-712 [T1]

N-7131 N-7161 N-716-1 [T1]

N-7222 N-722-12 N-722-21 N-7291 N-729-12 N-729-22 N-729-32 N-729-42 N-730 [T5]

N-730-1 [T1]

N-731 [T1]

N-733 [T1]

N-735 [T1]

N-739 [T5]

N-739-1 [T1]

N-7401 N-740-11 N-740-21 N-747 [T1]

N-749 N-751 [T2]

N-753 [T1]

N-754 [T2]

N-7551 N-762 [T1]

N-765 [T1]

N-7661 N-769 [T5]

N-769-1 [T5]

N-769-2 [T1]

N-7702 N-770-12 N-770-22 N-771 [T1]

N-773 [T1]

N-775 [T1]

N-776 [T1]

N-778 [T2]

N-7801 N-7841 N-786-1 [T1]

N-789 [T2]

N-795 [T2]

N-799 [T2]

N-798 [T1]

N-800 [T1]

N-803 [T1]

N-805 [T1]

N-8061 N-8131 N-823 [T1]

N-8242 N-825 [T1]

N-8261 N-845 [T1]

N-8522