| ML20135F452 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/28/1985 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Wilgus W FLORIDA POWER CORP. |
| References | |
| NUDOCS 8509170276 | |
| Download: ML20135F452 (4) | |
See also: IR 05000302/1985015
Text
..
fe//oer
-
AUG 2 8 1985
Florida Power Corporation
/ ATTN: Mr. W. S. Wilgus
Vice President Nuclear Operations
P. 0. Box 14042, M.A.C. H-2
St. Petersburg, FL 33733
Gentlemen:
SUBJECT: REPORT NO. 50-302/85-15
Thank you for your response of June 14, 1985, to our Notice of Violation issued
on May 17, 1985, concerning activities conducted under NRC Operating License
No. DPR-72.
We have reviewed your response to Violation 1 and have concluded, for the reasons
presented in the enclosure to this letter, that the violation occurred as stated
in the Notice of Violation.
The NRC observed and documented in the inspection
report that several QA audit findings were not being resolved on a timely basis.
Therefore, we conclude that previously established measures were inadequate.
Therefore, in accordance with the requirements of 10 CFR 2.201, and within 30
days of the date of this letter, please resubmit your response to the Notice.
We have examined your response to Violation 2 and found that it meets the
requirements of 10 CFR 2.201.
We have evaluated your request to change the
assigned severity level.
Although a single example was the basis for the
violation, failure ' to promptly resolve an audit finding in accordance with
established procedures is a failure to meet a regulatory requirement that had
more than minor safety significance. We understand that FPC has since identified
other audit findings and determined that these will be made nonconformance
reports.
The correct severity level was assigned. We will examine the imple-
mentation of your corrective actions during future inspections.
We have examined your response to Violation 3 and agree that imposition of this
violation will be withheld pending further NRC review of this issue. This item
will be considered as unresolved.
We have examined your response to Violation 4 and agree with the FPC position
and have deleted the violation from our records.
850917 27g 8
J)2
ADOC
G
!
I
ZAOI
,
(_.
o
.,
.
1
Florida Power Corporation
2
MG28
1985
Should you have any questions concerning this letter, we would be happy to meet
with you and discuss the matter further.
Sincerely,
(Original signed by JNGrace)
J. Nelson Grace
Regional Administrator
Enclosure:
Staff Evaluation of
Licensee Response
cc w/ encl:
E M. Howard, Director
Site Nuclear Operations
I F. McKee, Nuclear Plant Manager
E R. Westafer, Manager
Nuclear Operations Licensing
and Fuel Management
bec w/ encl:
@ C Resident Inspector
Document Control Desk
State of Florida
- .
.
Lh5
-
'
RII
RII
RII
RII
RII
ABelisle:ht
CMUpright
CAJulian
JFGibson
VP iciera
7/ /85
7/ /85
7/ /85
Wg/85
g g/85
RII
RII
RII
RII
3
LBr@ownlee W ker
G en 'ns
shinski
/,U/85
f/g/ 5
4f85
f/85
3
.__
_ _ .
-
-.
-
-,
.,.
.
'i
- g
-
.
Florida Power Corporation
2
Enclosure:
Staff Evaluation of
Licensee Response
cc w/ encl:
E. M. Howard, Director
Site Nuclear Operations
P. F. McKee, Nuclear Plant Manager
4
G. R. Westafer, Manager
Nuclear Operations Licensing
and Fuel Management
bcc w/ encl:
i
NRC Resident Inspector
Document Control Desk
State of Florida
4
,
4
i
RII,
R
RII
RII
RII
ABe isle:ht
'CMdpright
Adulian
AFGibson
VPanciera
7/f/85
7/ty/85
t4
74L/85
7/ /85
7/ /85
2
RII
RII
RII
RII
VLBrownlee
RDWalker
'GRJenkins
JA01shinski
'
r-
7/ /85
7/ /85
7/ /85
7/ /85
i
!
I
.
. . , ~ . , . _ . . ,
,-
- - , ,
,
,
,
-
-
e
.
ENCLOSURE
STAFF EVALUATION OF LICENSEE RESPONSE
DATED JUNE 14, 1985
Violation 1 cites the requirements of 10 CFR 50, Appendix B, Criterion XVI, for
the failure of Florida Power Corporation (FPC) to establish measures to assure
that conditions adverse to quality are promptly corrected.
The citation
attributes this failure to inadequate procedures for escalating unresolved QA
audit findings to higher management for resolution. The FPC response denies this
violation on the contention adequate escalation procedures have been provided.
The response correctly states that there are no NRC guidelines with respect to
when escalation is required.
We acknowledge that there are no NRC escalation guidelines and that the specific
guidelines stated as part of. the cited violation are not formal regulatory
requirements.
However, we observed and documented in the inspection report that
several QA audit findings had not been resolved on a timely basis.
Therefore,
we conclude that your previously established measures were not adequate to meet
10 CFR 50, Appendix B, Criterion XVI.
.