IR 05000313/2014303: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 1: | Line 1: | ||
# | {{Adams | ||
| number = ML14342A145 | |||
| issue date = 12/08/2014 | |||
| title = Er 05000313/2014303; 11/14/2014 - 12/02/2014; Arkansas Nuclear One, Unit 1; Initial Operator Licensing Examination Report | |||
| author name = Gaddy V G | |||
| author affiliation = NRC/RGN-IV/DRS | |||
| addressee name = Browning J | |||
| addressee affiliation = Entergy Operations, Inc | |||
| docket = 05000313 | |||
| license number = DPR-051 | |||
| contact person = | |||
| document report number = 50-313/14-303 | |||
| document type = Letter, License-Operator, Part 55 Examination Related Material | |||
| page count = 11 | |||
}} | |||
{{IR-Nav| site = 05000313 | year = 2014 | report number = 303 }} | |||
=Text= | |||
{{#Wiki_filter: | |||
[[Issue date::December 8, 2014]] | |||
Mr. Jeremy Browning, Site Vice President Arkansas Nuclear One Entergy Operations, Inc. | |||
1448 SR 333 Russellville, AR 72802-0967 | |||
SUBJECT: ARKANSAS NUCLEAR ONE, UNIT 1 - NRC EXAMINATION REPORT 05000313/2014303 | |||
==Dear Mr. Browning:== | |||
On November 21, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Arkansas Nuclear One, Unit 1. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on November 20, 2014, with Mr. R. Martin, Operations Training Superintendent, and other members of your staff. A telephonic exit meeting was conducted on December 2, 2014, with Mr. R. Martin, Operations Training Superintendent, who was provided the NRC licensing decisions. | |||
The examination included the evaluation of seven applicants for reactor operator licenses, four applicants for instant senior reactor operator licenses and three applicants for upgrade senior reactor operator licenses. The license examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure to this letter contains the details of this report. | |||
No findings were identified during this examination. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely,/RA/ | |||
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety | |||
Docket: 50-313 License: DPR-51 | |||
===Enclosure:=== | |||
NRC Examination Report 05000313/2014303 | |||
cc w/encl: Electronic Distribution | |||
=SUMMARY= | |||
ER05000313/2014303; 11/14/2014 - 12/02/2014; Arkansas Nuclear One, Unit 1; Initial Operator Licensing Examination Report. | |||
NRC examiners evaluated the competency of seven applicants for reactor operator licenses, four applicants for instant senior reactor operator licenses, and three applicants for upgrade senior reactor operator licenses at Arkansas Nuclear One, Unit 1. The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on November 14, 2014. NRC examiners administered the operating tests during the week of November 17, 2014. The examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. | |||
===A. NRC-Identified and Self-Revealing Findings=== | |||
No findings were identified. | |||
===B. Licensee-Identified Violations=== | |||
None. | |||
=REPORT DETAILS= | |||
==OTHER ACTIVITIES (OA)== | |||
{{a|4OA5}} | |||
==4OA5 Other Activities (Initial Operator License Examination)== | |||
===.1 License Applications=== | |||
====a. Scope==== | |||
NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on-the-job training, including control manipulations that provided significant reactivity changes. | |||
====b. Findings==== | |||
No findings were identified. | |||
===.2 Examination Development=== | |||
====a. Scope==== | |||
NRC examiners reviewed integrated operational examination outlines and draft operational examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an on-site validation of the operating tests. | |||
====b. Findings==== | |||
No findings were identified. NRC examiners provided outline, draft examination, and post-validation comments to the licensee for the operating portion of the examination. The licensee satisfactorily completed comment resolution prior to examination administration. NRC examiners determined that the operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination. | |||
===.3 Operator Knowledge and Performance=== | |||
====a. Scope==== | |||
On November 14, 2014, the licensee proctored the administration of the written examinations to all 14 applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on November 21, 2014. | |||
The NRC examination team administered the various portions of the operating tests to all fourteen applicants during the week of November 17, 2014. | |||
====b. Findings==== | |||
No findings were identified. | |||
All of the applicants passed the written examination and all parts of the operating test. The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal. | |||
The examination team noted the following generic weaknesses: | |||
* There were inconsistent communication techniques being used by the different operating crews. Three-way communication was neglected in some cases, crew briefings and updates were sporadic, and in some cases not used at all. | |||
* Multiple applicants demonstrated difficulty in the ability to adequately demonstrate their expertise when performing in-plant job performance measures, particularly when simulating the operation of in-plant equipment. | |||
* Multiple applicants demonstrated difficulty in the ability to correctly line up multiple channels of plant parameters in the simulator to the "Y" channel after a loss of power occurred on the "X" channel. | |||
* Multiple senior reactor operator applicants demonstrated a difficulty in the ability to correctly make administrative changes to plant procedures. | |||
These deficiencies were entered into the licensee's corrective action program as Training Evaluation Action Request (TEAR) ANO 2013-206, Action 19. | |||
===.4 Simulation Facility Performance=== | |||
====a. Scope==== | |||
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration. | |||
====b. Findings==== | |||
No findings were identified. One observation was documented in Attachment 2 of this report. | |||
===.5 Examination Security=== | |||
====a. Scope==== | |||
The NRC examiners reviewed examination security during both the on-site validation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel. | |||
====b. Findings==== | |||
No findings were identified. | |||
{{a|4OA6}} | |||
==4OA6 Meetings, Including Exit== | |||
The chief examiner presented the preliminary examination results to Messrs. R. Martin, Operations Training Superintendent, and other members of the staff on November 20, 2014. | |||
A telephonic exit was conducted on December 2, 2014, between Messrs. Clyde Osterholtz, Senior Operations Engineer, Chief Examiner, and R. Martin, Operations Training Superintendent. | |||
The licensee did not identify any information or materials used during the examination as proprietary. | |||
A1-1 Attachment | |||
=SUPPLEMENTAL INFORMATION= | |||
==KEY POINTS OF CONTACT== | |||
===Licensee Personnel=== | |||
: [[contact::R. Alejandro]], Simulator Support | |||
: [[contact::D. Bice]], Acting Manager, Regulatory Assistance | |||
: [[contact::J. Cork]], Examination Developer | |||
: [[contact::P. Harris]], Shift Manager, Operations Training | |||
: [[contact::R. Keele]], Superintendent, Operations Training | |||
: [[contact::R. Martin]], Superintendent, Operations Training | |||
: [[contact::C. Miller]], License Class Coordinator, Unit 2 | |||
: [[contact::D. Perkins]], Senior Manager, Operations | |||
: [[contact::D. Peterson]], Manager, Operations | |||
: [[contact::D. Reed]], Training Instructor, Operations | |||
: [[contact::J. Tracy Taylor]], Superintendent, Simulator and Support | |||
: [[contact::B. Wooten]], License Class Coordinator | |||
===NRC Personnel=== | |||
: [[contact::M. Young]], Resident Inspector | |||
==ADAMS DOCUMENTS REFERENCED== | |||
Accession No. ML14336A373 - FINAL WRITTEN EXAMS (Will be released to the public on November 14, 2016) | |||
: Accession No. ML14336A376 - FINAL OPERATING EXAM | |||
: Accession No. ML14336A386 - POST EXAM ANALYSIS | |||
: Attachment | |||
: ES-501 Simulator Fidelity Report Attachment 2 Facility Licensee: Arkansas Nuclear One | |||
: Unit 1 | |||
: Facility Docket No.: 50-313 | |||
: Operating Test Administered on: Week of | |||
: November 17, 2014 | |||
: This form is to be used only to report observations. | |||
: These observations do not constitute audit or inspection findings and, without further verification and review in accordance with | |||
: IP 71111.11, are not indicative of noncompliance with 10 | |||
: CFR 55.46. | |||
: No licensee action is required in response to these observations. | |||
: While conducting the simulator portion of the operating tests, examiners observed the following item: | |||
: Item Description Nuclear Instrumentation (NI) Input to the Integrated Control System (ICS) On one occasion, the NI input to ICS spuriously transferred back to the "X" instrument from the "Y" instrument, causing an unexpected ICS plant transient. | |||
: The licensee entered this deficiency into their corrective action program as Discrepancy Report (DR)-0107. | |||
}} | |||
Revision as of 01:08, 2 March 2018
| ML14342A145 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 12/08/2014 |
| From: | Vincent Gaddy Division of Reactor Safety IV |
| To: | Jeremy G. Browning Entergy Operations |
| References | |
| 50-313/14-303 | |
| Download: ML14342A145 (11) | |
Text
December 8, 2014
Mr. Jeremy Browning, Site Vice President Arkansas Nuclear One Entergy Operations, Inc.
1448 SR 333 Russellville, AR 72802-0967
SUBJECT: ARKANSAS NUCLEAR ONE, UNIT 1 - NRC EXAMINATION REPORT 05000313/2014303
Dear Mr. Browning:
On November 21, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Arkansas Nuclear One, Unit 1. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on November 20, 2014, with Mr. R. Martin, Operations Training Superintendent, and other members of your staff. A telephonic exit meeting was conducted on December 2, 2014, with Mr. R. Martin, Operations Training Superintendent, who was provided the NRC licensing decisions.
The examination included the evaluation of seven applicants for reactor operator licenses, four applicants for instant senior reactor operator licenses and three applicants for upgrade senior reactor operator licenses. The license examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure to this letter contains the details of this report.
No findings were identified during this examination. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety
Docket: 50-313 License: DPR-51
Enclosure:
NRC Examination Report 05000313/2014303
cc w/encl: Electronic Distribution
SUMMARY
ER05000313/2014303; 11/14/2014 - 12/02/2014; Arkansas Nuclear One, Unit 1; Initial Operator Licensing Examination Report.
NRC examiners evaluated the competency of seven applicants for reactor operator licenses, four applicants for instant senior reactor operator licenses, and three applicants for upgrade senior reactor operator licenses at Arkansas Nuclear One, Unit 1. The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on November 14, 2014. NRC examiners administered the operating tests during the week of November 17, 2014. The examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
A. NRC-Identified and Self-Revealing Findings
No findings were identified.
B. Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Examination Development
a. Scope
NRC examiners reviewed integrated operational examination outlines and draft operational examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an on-site validation of the operating tests.
b. Findings
No findings were identified. NRC examiners provided outline, draft examination, and post-validation comments to the licensee for the operating portion of the examination. The licensee satisfactorily completed comment resolution prior to examination administration. NRC examiners determined that the operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
.3 Operator Knowledge and Performance
a. Scope
On November 14, 2014, the licensee proctored the administration of the written examinations to all 14 applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on November 21, 2014.
The NRC examination team administered the various portions of the operating tests to all fourteen applicants during the week of November 17, 2014.
b. Findings
No findings were identified.
All of the applicants passed the written examination and all parts of the operating test. The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal.
The examination team noted the following generic weaknesses:
- There were inconsistent communication techniques being used by the different operating crews. Three-way communication was neglected in some cases, crew briefings and updates were sporadic, and in some cases not used at all.
- Multiple applicants demonstrated difficulty in the ability to adequately demonstrate their expertise when performing in-plant job performance measures, particularly when simulating the operation of in-plant equipment.
- Multiple applicants demonstrated difficulty in the ability to correctly line up multiple channels of plant parameters in the simulator to the "Y" channel after a loss of power occurred on the "X" channel.
- Multiple senior reactor operator applicants demonstrated a difficulty in the ability to correctly make administrative changes to plant procedures.
These deficiencies were entered into the licensee's corrective action program as Training Evaluation Action Request (TEAR) ANO 2013-206, Action 19.
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings
No findings were identified. One observation was documented in Attachment 2 of this report.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security during both the on-site validation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the preliminary examination results to Messrs. R. Martin, Operations Training Superintendent, and other members of the staff on November 20, 2014.
A telephonic exit was conducted on December 2, 2014, between Messrs. Clyde Osterholtz, Senior Operations Engineer, Chief Examiner, and R. Martin, Operations Training Superintendent.
The licensee did not identify any information or materials used during the examination as proprietary.
A1-1 Attachment
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- R. Alejandro, Simulator Support
- D. Bice, Acting Manager, Regulatory Assistance
- J. Cork, Examination Developer
- P. Harris, Shift Manager, Operations Training
- R. Keele, Superintendent, Operations Training
- R. Martin, Superintendent, Operations Training
- C. Miller, License Class Coordinator, Unit 2
- D. Perkins, Senior Manager, Operations
- D. Peterson, Manager, Operations
- D. Reed, Training Instructor, Operations
- J. Tracy Taylor, Superintendent, Simulator and Support
- B. Wooten, License Class Coordinator
NRC Personnel
- M. Young, Resident Inspector
ADAMS DOCUMENTS REFERENCED
Accession No. ML14336A373 - FINAL WRITTEN EXAMS (Will be released to the public on November 14, 2016)
- Accession No. ML14336A376 - FINAL OPERATING EXAM
- Accession No. ML14336A386 - POST EXAM ANALYSIS
- Attachment
- Unit 1
- Facility Docket No.: 50-313
- Operating Test Administered on: Week of
- November 17, 2014
- This form is to be used only to report observations.
- These observations do not constitute audit or inspection findings and, without further verification and review in accordance with
- IP 71111.11, are not indicative of noncompliance with 10
- CFR 55.46.
- No licensee action is required in response to these observations.
- While conducting the simulator portion of the operating tests, examiners observed the following item:
- Item Description Nuclear Instrumentation (NI) Input to the Integrated Control System (ICS) On one occasion, the NI input to ICS spuriously transferred back to the "X" instrument from the "Y" instrument, causing an unexpected ICS plant transient.
- The licensee entered this deficiency into their corrective action program as Discrepancy Report (DR)-0107.