ND-21-0821, Combined License Operational Programs and Other License Conditions Implementation Schedule, and the Completion Schedule for Inspections, Tests, and Analyses: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Southern Nuclear Michael J, Yox 7825 River Road | {{#Wiki_filter:Southern Nuclear Michael J, Yox Regulatory Affairs Director Vogtle 3 & 4 7825 River Road Waynesboro, Georgia 30830 706 848 6459 tel September 14, 2021 ND-21-0821 10CFR 52.99(a) 10CFR 52.103(a) | ||
Docket Nos. | |||
September 14, 2021 | 52-025 52-026 U.S. Nuclear Regulatory Commission ATTN; Document Control Desk Washington, DC 20555-0001 Ms. Andrea Veil Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generatina Plant (VEGP) - | ||
Units 3 and 4 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 3 and 4 Completion Schedule for Inspections, Tests, and Analyses (ITA) | |||
ND-21-0821 10CFR 52.99(a) 10CFR 52.103(a) | |||
Docket Nos. 52-025 52-026 | |||
U.S. Nuclear Regulatory Commission ATTN; Document Control Desk Washington, DC 20555-0001 | |||
Ms. Andrea Veil Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 | |||
Southern Nuclear Operating Company Vogtle Electric Generatina Plant (VEGP) - Units 3 and 4 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 3 and 4 Completion Schedule for Inspections, Tests, and Analyses (ITA) | |||
Ladies and Gentlemen: | Ladies and Gentlemen: | ||
The U.S. Nuclear Regulatory Commission (NRC) issued Combined Licenses (COLs) NPF-91 and NPF-92 to Southern Nuclear Operating Company (SNC) pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 52.97, "Issuance of combined licenses," on February 10, 2012. | The U.S. Nuclear Regulatory Commission (NRC) issued Combined Licenses (COLs) NPF-91 and NPF-92 to Southern Nuclear Operating Company (SNC) pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 52.97, "Issuance of combined licenses," on February 10, 2012. | ||
Two license conditions require SNC to submit, no later than twelve months after issuance of the COL, the following: | Two license conditions require SNC to submit, no later than twelve months after issuance of the COL, the following: | ||
A schedule for implementation of the operational programs listed in the Final Safety Analysis Report Table 13.4-201, including the associated estimated date for initial loading of fuel (COL section 2.D.(11)) | |||
A schedule for implementation of the license conditions listed in COL section 2.D.(12)(f)1-9 In accordance with the license conditions, the schedules shall be updated every six months until twelve months before scheduled fuel loading, and every month thereafter until each license condition has been fully implemented. | |||
In accordance with the license conditions, the schedules shall be updated every six months until twelve months before scheduled fuel loading, and every month thereafter until each license condition has been fully implemented | |||
U. S. Nuclear Regulatory Commission ND-21-0821 Page 2 of 5 SNC is also required to submit, with similar frequency, its schedule for completing the Inspections, Tests, or Analyses (ITA) for the Nuclear Regulatory Commission approved Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) per 10 CFR 52.99(a). SNC intends to submit the Unit 3 and Unit 4 updates to the ITAAC schedule every 30 days until the final notification is provided to the NRC under 10 CFR 52.99(c)(1). | |||
On January 13, 2020, SNC submitted the scheduled date for initial loading of fuel at VEGP Unit 3, Agencywide Documents Access and Management System (ADAMS) Accession Number ML20013F991, which stated updates to the scheduled date for initial loading of fuel would be made every 30 days in accordance with 10 CFR 52.103(a). The scheduled date for initial loading of fuel at VEGP Unit 3 is provided in Enclosure 1. contains the Unit 3 and 4 COL Operational Programs and Other License Conditions Implementation Schedule and the scheduled date for initial loading of fuel at VEGP Unit 3 and Unit 4. contains the Unit 3 Preoperational Test Procedure Completion Schedule. Enclosure 3 contains the Unit 3 Inspections, Tests, and Analyses Completion Schedule. Enclosure 4 contains the Unit 4 Inspections, Tests, and Analyses Completion Schedule. As is typical with a construction project, the schedule information is dynamic in nature. | |||
The schedule information provided in the enclosures is considered confidential commercial information and exempt from mandatory public disclosure pursuant to the provisions of 10 CFR 2.390(a)(4) and 10 CFR 9.17(a)(4). Following the approach described in SECY-06-0114, no additional withholding determination is needed as the schedule information was demonstrated to be confidential commercial information based on the schedule updates provided to the NRC on February 8, 2019, ADAMS Accession Number ML19039A264, and on October 6, 2017, ADAMS Accession Number ML17279A661. | The schedule information provided in the enclosures is considered confidential commercial information and exempt from mandatory public disclosure pursuant to the provisions of 10 CFR 2.390(a)(4) and 10 CFR 9.17(a)(4). Following the approach described in SECY-06-0114, no additional withholding determination is needed as the schedule information was demonstrated to be confidential commercial information based on the schedule updates provided to the NRC on February 8, 2019, ADAMS Accession Number ML19039A264, and on October 6, 2017, ADAMS Accession Number ML17279A661. | ||
Accordingly, the enclosures to this letter should be withheld from public disclosure. | Accordingly, the enclosures to this letter should be withheld from public disclosure. | ||
This letter contains no regulatory commitments. | This letter contains no regulatory commitments. | ||
Should you have questions regarding the enclosed information, please contact Steve Leighty at (706) 848-6790. | Should you have questions regarding the enclosed information, please contact Steve Leighty at (706) 848-6790. | ||
Respectfully submitted. | Respectfully submitted. | ||
Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 Southern Nuclear Operating Company MJY/KJD/sfr | |||
U. S. Nuclear Regulatory Commission ND-21-0821 Page 3 of 5 | |||
==Enclosures:== | ==Enclosures:== | ||
| Line 65: | Line 43: | ||
: 3. Unit 3 ITAAC Closure Schedule {Withhold from Public Disclosure} | : 3. Unit 3 ITAAC Closure Schedule {Withhold from Public Disclosure} | ||
: 4. Unit 4 ITAAC Closure Schedule {Withhold from Public Disclosure} | : 4. Unit 4 ITAAC Closure Schedule {Withhold from Public Disclosure} | ||
U. S. Nuclear Regulatory Commission ND-21-0821 Page 4 of 5 go: | |||
Southern Nuclear Operating Company / Georaia Power Company Mr. 8. E. Kuczynski (w/o enclosures) | Southern Nuclear Operating Company / Georaia Power Company Mr. 8. E. Kuczynski (w/o enclosures) | ||
Mr. P. P. Sena III (w/o enclosures) | Mr. P. P. Sena III (w/o enclosures) | ||
Mr. G. Chick Mr. S. Stimac Mr. P. Martino Ms. M. Lackey (w/o enclosures) | Mr. G. Chick Mr. S. Stimac Mr. P. Martino Ms. M. Lackey (w/o enclosures) | ||
Mr. T. W. Yelverton (w/o enclosures) | Mr. T. W. Yelverton (w/o enclosures) | ||
Mr. B. H. Whitley Mr. W. Levis Ms. C. A. Gayheart Ms. M. Ronnlund Mr. J. M Delano Mr. M. J. Vox Mr. C. T. Defnall Mr. J. Tupik Ms. A. C. Chamberlain Mr. S. Leighty Ms. K. Roberts Mr. J. Haswell Mr. D. T. BIythe Mr. K. Warren Mr. A. S. Parton Mr. A. Nix Document Services RTYPE: VND.LI.LOO File AR.01.02.06 | Mr. B. H. Whitley Mr. W. Levis Ms. C. A. Gayheart Ms. M. Ronnlund Mr. J. M Delano Mr. M. J. Vox Mr. C. T. Defnall Mr. J. Tupik Ms. A. C. Chamberlain Mr. S. Leighty Ms. K. Roberts Mr. J. Haswell Mr. D. T. BIythe Mr. K. Warren Mr. A. S. Parton Mr. A. Nix Document Services RTYPE: VND.LI.LOO File AR.01.02.06 Nuclear Reoulatorv Commission Mr. M. King (w/o enclosures) | ||
Nuclear Reoulatorv Commission Mr. M. King (w/o enclosures) | |||
Mr. G. Bowman Ms. M. Bailey (w/o enclosures) | Mr. G. Bowman Ms. M. Bailey (w/o enclosures) | ||
Ms. A. Veil Mr. G.J. Khouri Mr. G. Armstrong Mr. C. Santos Mr. B. Kemker Mr. J. Eargle Mr. C. J. Even Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. O. Lopez-Santiago Mr. M. Webb Mr. B. Gleaves | Ms. A. Veil Mr. G.J. Khouri Mr. G. Armstrong Mr. C. Santos Mr. B. Kemker Mr. J. Eargle Mr. C. J. Even Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. O. Lopez-Santiago Mr. M. Webb Mr. B. Gleaves | ||
Dalton Utilities Mr. T. Bundros | U. S. Nuclear Regulatory Commission ND-21-0821 Page 5 of 5 Nuclear Regulatory Commission Mr. T. Fredette Ms. K. McCurry Mr. B. Davis Mr. J. Parent Mr. B. Griman Mr. P. McKenna State of Georgia Mr. R. Dunn Oalethorpe Power Corporation Mr. M. W. Price Mr. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Mr. L. Oriani (w/o enclosures) | ||
Westinqhouse Electric Company. LLC Mr. L. Oriani (w/o enclosures) | |||
Mr. T. Rubenstein (w/o enclosures) | Mr. T. Rubenstein (w/o enclosures) | ||
Mr. M. Corletti Mr. D. Hawkins Mr. J. Coward | Mr. M. Corletti Mr. D. Hawkins Mr. J. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc. | ||
Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc. | |||
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc. | Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc. | ||
Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham}} | Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham}} | ||
Latest revision as of 23:01, 27 November 2024
| ML21257A336 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/14/2021 |
| From: | Yox M Southern Nuclear Operating Co |
| To: | Andrea Veil Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML21257A335 | List: |
| References | |
| ND-21-0821 | |
| Download: ML21257A336 (5) | |
Text
Southern Nuclear Michael J, Yox Regulatory Affairs Director Vogtle 3 & 4 7825 River Road Waynesboro, Georgia 30830 706 848 6459 tel September 14, 2021 ND-21-0821 10CFR 52.99(a) 10CFR 52.103(a)
Docket Nos.52-025 52-026 U.S. Nuclear Regulatory Commission ATTN; Document Control Desk Washington, DC 20555-0001 Ms. Andrea Veil Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generatina Plant (VEGP) -
Units 3 and 4 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule, and the Unit 3 and 4 Completion Schedule for Inspections, Tests, and Analyses (ITA)
Ladies and Gentlemen:
The U.S. Nuclear Regulatory Commission (NRC) issued Combined Licenses (COLs) NPF-91 and NPF-92 to Southern Nuclear Operating Company (SNC) pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 52.97, "Issuance of combined licenses," on February 10, 2012.
Two license conditions require SNC to submit, no later than twelve months after issuance of the COL, the following:
A schedule for implementation of the operational programs listed in the Final Safety Analysis Report Table 13.4-201, including the associated estimated date for initial loading of fuel (COL section 2.D.(11))
A schedule for implementation of the license conditions listed in COL section 2.D.(12)(f)1-9 In accordance with the license conditions, the schedules shall be updated every six months until twelve months before scheduled fuel loading, and every month thereafter until each license condition has been fully implemented.
U. S. Nuclear Regulatory Commission ND-21-0821 Page 2 of 5 SNC is also required to submit, with similar frequency, its schedule for completing the Inspections, Tests, or Analyses (ITA) for the Nuclear Regulatory Commission approved Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) per 10 CFR 52.99(a). SNC intends to submit the Unit 3 and Unit 4 updates to the ITAAC schedule every 30 days until the final notification is provided to the NRC under 10 CFR 52.99(c)(1).
On January 13, 2020, SNC submitted the scheduled date for initial loading of fuel at VEGP Unit 3, Agencywide Documents Access and Management System (ADAMS) Accession Number ML20013F991, which stated updates to the scheduled date for initial loading of fuel would be made every 30 days in accordance with 10 CFR 52.103(a). The scheduled date for initial loading of fuel at VEGP Unit 3 is provided in Enclosure 1. contains the Unit 3 and 4 COL Operational Programs and Other License Conditions Implementation Schedule and the scheduled date for initial loading of fuel at VEGP Unit 3 and Unit 4. contains the Unit 3 Preoperational Test Procedure Completion Schedule. Enclosure 3 contains the Unit 3 Inspections, Tests, and Analyses Completion Schedule. Enclosure 4 contains the Unit 4 Inspections, Tests, and Analyses Completion Schedule. As is typical with a construction project, the schedule information is dynamic in nature.
The schedule information provided in the enclosures is considered confidential commercial information and exempt from mandatory public disclosure pursuant to the provisions of 10 CFR 2.390(a)(4) and 10 CFR 9.17(a)(4). Following the approach described in SECY-06-0114, no additional withholding determination is needed as the schedule information was demonstrated to be confidential commercial information based on the schedule updates provided to the NRC on February 8, 2019, ADAMS Accession Number ML19039A264, and on October 6, 2017, ADAMS Accession Number ML17279A661.
Accordingly, the enclosures to this letter should be withheld from public disclosure.
This letter contains no regulatory commitments.
Should you have questions regarding the enclosed information, please contact Steve Leighty at (706) 848-6790.
Respectfully submitted.
Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 Southern Nuclear Operating Company MJY/KJD/sfr
U. S. Nuclear Regulatory Commission ND-21-0821 Page 3 of 5
Enclosures:
- 1. COL Operational Programs and Other License Conditions Impiementation Schedule {Withhold from Public Disclosure}
- 2. Preoperational Test Procedure Completion Schedule {Withhold from Public Disclosure}
- 3. Unit 3 ITAAC Closure Schedule {Withhold from Public Disclosure}
- 4. Unit 4 ITAAC Closure Schedule {Withhold from Public Disclosure}
U. S. Nuclear Regulatory Commission ND-21-0821 Page 4 of 5 go:
Southern Nuclear Operating Company / Georaia Power Company Mr. 8. E. Kuczynski (w/o enclosures)
Mr. P. P. Sena III (w/o enclosures)
Mr. G. Chick Mr. S. Stimac Mr. P. Martino Ms. M. Lackey (w/o enclosures)
Mr. T. W. Yelverton (w/o enclosures)
Mr. B. H. Whitley Mr. W. Levis Ms. C. A. Gayheart Ms. M. Ronnlund Mr. J. M Delano Mr. M. J. Vox Mr. C. T. Defnall Mr. J. Tupik Ms. A. C. Chamberlain Mr. S. Leighty Ms. K. Roberts Mr. J. Haswell Mr. D. T. BIythe Mr. K. Warren Mr. A. S. Parton Mr. A. Nix Document Services RTYPE: VND.LI.LOO File AR.01.02.06 Nuclear Reoulatorv Commission Mr. M. King (w/o enclosures)
Mr. G. Bowman Ms. M. Bailey (w/o enclosures)
Ms. A. Veil Mr. G.J. Khouri Mr. G. Armstrong Mr. C. Santos Mr. B. Kemker Mr. J. Eargle Mr. C. J. Even Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. O. Lopez-Santiago Mr. M. Webb Mr. B. Gleaves
U. S. Nuclear Regulatory Commission ND-21-0821 Page 5 of 5 Nuclear Regulatory Commission Mr. T. Fredette Ms. K. McCurry Mr. B. Davis Mr. J. Parent Mr. B. Griman Mr. P. McKenna State of Georgia Mr. R. Dunn Oalethorpe Power Corporation Mr. M. W. Price Mr. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Mr. L. Oriani (w/o enclosures)
Mr. T. Rubenstein (w/o enclosures)
Mr. M. Corletti Mr. D. Hawkins Mr. J. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.
Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham