ML22178A231: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:LICENSEE: Energy Harbor Nuclear Corporation FACILITY: Davis Besse Nuclear Power Station
{{#Wiki_filter:LICENSEE:
Energy Harbor Nuclear Corporation FACILITY:
Davis Besse Nuclear Power Station


==SUBJECT:==
==SUBJECT:==
Line 22: Line 24:
OF THE JUNE 22, 2022, PUBLIC OUTREACH TO DISCUSS THE NRC 2021 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF DAVIS BESSE NUCLEAR POWER STATION On June 22, 2022, from 5:00 p.m. to 6:00 p.m. (EDT), an information meeting with a question-and-answer session was held by representatives of the U.S. Nuclear Regulatory Commission (NRC) to provide the public with information on the 2021 End-of-Cycle plant performance assessment of the Davis Besse Nuclear Power Station, and with general information on the NRC. The hybrid meeting was held at the Oak Harbor Public Library in Oak Harbor, OH and was accessible online. The NRC representatives discussed plant performance with members of the public and a number of state employees. Representatives from Energy Harbor were also present at the event.
OF THE JUNE 22, 2022, PUBLIC OUTREACH TO DISCUSS THE NRC 2021 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF DAVIS BESSE NUCLEAR POWER STATION On June 22, 2022, from 5:00 p.m. to 6:00 p.m. (EDT), an information meeting with a question-and-answer session was held by representatives of the U.S. Nuclear Regulatory Commission (NRC) to provide the public with information on the 2021 End-of-Cycle plant performance assessment of the Davis Besse Nuclear Power Station, and with general information on the NRC. The hybrid meeting was held at the Oak Harbor Public Library in Oak Harbor, OH and was accessible online. The NRC representatives discussed plant performance with members of the public and a number of state employees. Representatives from Energy Harbor were also present at the event.
The NRC discussed their assessment of Davis Besse Nuclear Power Stations performance during the public outreach. The assessment information was documented in the March 2, 2022, End-of-Cycle Assessment Letter (ADAMS Accession Number ML22055B117). Representatives from the NRC made copies of the above letter and other materials available to the public in attendance. At the end of the presentation, members of the public were allowed to ask questions of NRC staff and Energy Harbor representatives. The presentation for this webinar is available in ADAMS, Accession Number ML22178A195.
The NRC discussed their assessment of Davis Besse Nuclear Power Stations performance during the public outreach. The assessment information was documented in the March 2, 2022, End-of-Cycle Assessment Letter (ADAMS Accession Number ML22055B117). Representatives from the NRC made copies of the above letter and other materials available to the public in attendance. At the end of the presentation, members of the public were allowed to ask questions of NRC staff and Energy Harbor representatives. The presentation for this webinar is available in ADAMS, Accession Number ML22178A195.
Robert Ruiz for Billy C. Dickson, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERVJune 28, 2022 Signed by Ruiz, Robert on 06/28/22
Robert Ruiz for Billy C. Dickson, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV June 28, 2022 Signed by Ruiz, Robert on 06/28/22


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF THE JUNE 22, 2022, PUBLIC OUTREACH TO DISCUSS THE NRC 2021 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF DAVIS BESSE POWER STATION
OF THE JUNE 22, 2022, PUBLIC OUTREACH TO DISCUSS THE NRC 2021 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF DAVIS BESSE POWER STATION DISTRIBUTION:
Jessie Quichocho Robert Orlikowski RidsNrrDorlLpl3 RidsNrrPMDavisBesse Resource RidsNrrDroIrib Resource John Giessner Mohammed Shuaibi Shelbie Lewman Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML22178A231 OFFICE RIII RIII NAME RNg:ve RRuiz for BDickson DATE 06/27/2022 06/28/2022 OFFICIAL RECORD COPY


DISTRIBUTION:
Enclosure PUBLIC MEETING ATTENDEES June 22, 2022 U.S. Nuclear Regulatory Commission D. Curtis, Deputy Director, Division of Reactor Safety B. Dickson, Chief, Division of Reactor Projects, Branch 2 R. Skokowski, Chief, Division of Reactor Safety, Engineering Branch 3 D. Mills, Senior Resident Inspector R. Cassara, Resident Inspector C. Wolf, Congressional Affairs Officer D. Bogedain, Resident Inspector Office Assistant A. Barker, Regional Government Liaison Officer V. Mitlyng, Senior Public Affairs Officer R. Ng, Project Engineer, Division of Reactor Projects, Branch 4 J. Masse, Reactor Engineer, Division of Reactor Projects, Branch 2 D. Turpin, Reactor Engineer, Division of Reactor Projects, Branch 4 K. Fay, Reactor Inspector, Division of Reactor Safety, Engineering Branch 3 M. Abuhamdan, Reactor Inspector, Division of Reactor Safety, Engineering Branch 3 J. Barth, Student Intern, Division of Reactor Safety, Engineering Branch 3 Energy Harbor T. Brown D. Huey M. Kantz G. Michael R. Oesterle J. Pry G. Van Wey State of Ohio / Ottawa County M. Drusbacky, Ottawa County EMA R. Peterson, Ottawa County EMA M. Stahl, Ottawa County Commissioner C. Stalz, State of Ohio Members of the Public A. Bans W. Fowler J. Howes A. Jelalian L. Jones A. Rytel}}
Jessie Quichocho Robert Orlikowski RidsNrrDorlLpl3 RidsNrrPMDavisBesse Resource RidsNrrDroIrib Resource John Giessner Mohammed Shuaibi Shelbie Lewman Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov
 
ADAMS Accession Number: ML22178A231 OFFICE RIII RIII NAME RNg:ve RRuiz for BDickson DATE 06/27/2022 06/28/2022 OFFICIAL RECORD COPY PUBLIC MEETING ATTENDEES
 
June 22, 2022
 
U.S. Nuclear Regulatory Commission
 
D. Curtis, Deputy Director, Division of Reactor Safety B. Dickson, Chief, Division of Reactor Projects, Branch 2 R. Skokowski, Chief, Division of Reactor Safety, Engineering Branch 3 D. Mills, Senior Resident Inspector R. Cassara, Resident Inspector C. Wolf, Congressional Affairs Officer D. Bogedain, Resident Inspector Office Assistant A. Barker, Regional Government Liaison Officer V. Mitlyng, Senior Public Affairs Officer R. Ng, Project Engineer, Division of Reactor Projects, Branch 4 J. Masse, Reactor Engineer, Division of Reactor Projects, Branch 2 D. Turpin, Reactor Engineer, Division of Reactor Projects, Branch 4 K. Fay, Reactor Inspector, Division of Reactor Safety, Engineering Branch 3 M. Abuhamdan, Reactor Inspector, Division of Reactor Safety, Engineering Branch 3 J. Barth, Student Intern, Division of Reactor Safety, Engineering Branch 3
 
Energy Harbor
 
T. Brown D. Huey M. Kantz G. Michael R. Oesterle J. Pry G. Van Wey
 
State of Ohio / Ottawa County
 
M. Drusbacky, Ottawa County EMA R. Peterson, Ottawa County EMA M. Stahl, Ottawa County Commissioner C. Stalz, State of Ohio
 
Members of the Public
 
A. Bans W. Fowler J. Howes A. Jelalian L. Jones A. Rytel
 
Enclosure}}

Latest revision as of 16:37, 27 November 2024

Summary of the June 22, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Davis Besse Nuclear Power Station
ML22178A231
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/28/2022
From: Billy Dickson, Robert Ruiz
NRC/RGN-III/DRP/B2
To:
Energy Harbor Nuclear Corp
Shared Package
ML21362A675 List:
References
Download: ML22178A231 (3)


Text

LICENSEE:

Energy Harbor Nuclear Corporation FACILITY:

Davis Besse Nuclear Power Station

SUBJECT:

SUMMARY

OF THE JUNE 22, 2022, PUBLIC OUTREACH TO DISCUSS THE NRC 2021 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF DAVIS BESSE NUCLEAR POWER STATION On June 22, 2022, from 5:00 p.m. to 6:00 p.m. (EDT), an information meeting with a question-and-answer session was held by representatives of the U.S. Nuclear Regulatory Commission (NRC) to provide the public with information on the 2021 End-of-Cycle plant performance assessment of the Davis Besse Nuclear Power Station, and with general information on the NRC. The hybrid meeting was held at the Oak Harbor Public Library in Oak Harbor, OH and was accessible online. The NRC representatives discussed plant performance with members of the public and a number of state employees. Representatives from Energy Harbor were also present at the event.

The NRC discussed their assessment of Davis Besse Nuclear Power Stations performance during the public outreach. The assessment information was documented in the March 2, 2022, End-of-Cycle Assessment Letter (ADAMS Accession Number ML22055B117). Representatives from the NRC made copies of the above letter and other materials available to the public in attendance. At the end of the presentation, members of the public were allowed to ask questions of NRC staff and Energy Harbor representatives. The presentation for this webinar is available in ADAMS, Accession Number ML22178A195.

Robert Ruiz for Billy C. Dickson, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV June 28, 2022 Signed by Ruiz, Robert on 06/28/22

SUBJECT:

SUMMARY

OF THE JUNE 22, 2022, PUBLIC OUTREACH TO DISCUSS THE NRC 2021 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF DAVIS BESSE POWER STATION DISTRIBUTION:

Jessie Quichocho Robert Orlikowski RidsNrrDorlLpl3 RidsNrrPMDavisBesse Resource RidsNrrDroIrib Resource John Giessner Mohammed Shuaibi Shelbie Lewman Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML22178A231 OFFICE RIII RIII NAME RNg:ve RRuiz for BDickson DATE 06/27/2022 06/28/2022 OFFICIAL RECORD COPY

Enclosure PUBLIC MEETING ATTENDEES June 22, 2022 U.S. Nuclear Regulatory Commission D. Curtis, Deputy Director, Division of Reactor Safety B. Dickson, Chief, Division of Reactor Projects, Branch 2 R. Skokowski, Chief, Division of Reactor Safety, Engineering Branch 3 D. Mills, Senior Resident Inspector R. Cassara, Resident Inspector C. Wolf, Congressional Affairs Officer D. Bogedain, Resident Inspector Office Assistant A. Barker, Regional Government Liaison Officer V. Mitlyng, Senior Public Affairs Officer R. Ng, Project Engineer, Division of Reactor Projects, Branch 4 J. Masse, Reactor Engineer, Division of Reactor Projects, Branch 2 D. Turpin, Reactor Engineer, Division of Reactor Projects, Branch 4 K. Fay, Reactor Inspector, Division of Reactor Safety, Engineering Branch 3 M. Abuhamdan, Reactor Inspector, Division of Reactor Safety, Engineering Branch 3 J. Barth, Student Intern, Division of Reactor Safety, Engineering Branch 3 Energy Harbor T. Brown D. Huey M. Kantz G. Michael R. Oesterle J. Pry G. Van Wey State of Ohio / Ottawa County M. Drusbacky, Ottawa County EMA R. Peterson, Ottawa County EMA M. Stahl, Ottawa County Commissioner C. Stalz, State of Ohio Members of the Public A. Bans W. Fowler J. Howes A. Jelalian L. Jones A. Rytel