ML24136A077: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:PROCEDURE REVIEW FORM (PRF) 1.0 Initiation Initiator: John Bassford Date : 3/25/2024 Procedure De pt: EP Document#: EIP-ZZ-00240 ADDENDUM H New Rev.# 009 (3 diM 1ls req uir ed)
{{#Wiki_filter:PROCEDURE REVIEW FORM (PRF) 1.0 Initiation Initiator: John Bassford Date: 3/25/2024 Procedure Dept:
EP Document#: EIP-ZZ-00240 ADDENDUM H New Rev.#
009 (3 diM1ls required)


==Title:==
==Title:==
SECURITY COORDINATOR CHECKLIST Level of Use: OContinuous Reference (g!Information Multiple NIA 2.0 Reason for Change/Description of Change (List commitments, CRs, eB Change Requests, OERs, Plam Mods etc. and record numbers here.)
SECURITY COORDINATOR CHECKLIST Level of Use:
OContinuous Reference (g!Information Multiple NIA 2.0 Reason for Change/Description of Change (List commitments, CRs, eB Change Requests, OERs, Plam Mods etc. and record numbers here.)
202402110: Update phone number listed in attachment 1 step 7 from 573-751-2748 to 573-526-9146 for the SEMA Watch Center.
202402110: Update phone number listed in attachment 1 step 7 from 573-751-2748 to 573-526-9146 for the SEMA Watch Center.
Continued: D 3.0. Document Disposition OTemp Change ONew DQ:p ~Major Revision OMinor Revision Cancellation
Continued: D 3.0. Document Disposition OTemp Change ONew DQ:p ~Major Revision OMinor Revision Cancellation
[g!Administrative Correction ~ J 1. J '\\ '1..,,,~,.,.-.,'f Dept. Head or Designated Approver required for Adminislrntivt! Correelii,ns (Siunauuc/PIN/Datc ) - rm 11thcr signa1u1l*s req uired 4.0 Interim Approval (Temp. Change Only) Temp. Change #: Expiration Date:
[g!Administrative Correction  
 
~
Cognizant Supervisor (Signature/PIN/Date) SRO (Sign ature/PIN/Date)
J 1. J '\\ '1  
..,,,~,.,.-.,'f Dept. Head or Designated Approver required for Adminislrntivt! Correelii,ns (Siunauuc/PIN/Datc) - rm 11thcr signa1u1l*s required 4.0 Interim Approval (Temp. Change Only)
Temp. Change #:
Expiration Date:
Cognizant Supervisor (Signature/PIN/Date)
SRO (Signature/PIN/Date)  


==5.0 Comments==
==5.0 Comments==
Continued: D 6.0 Reviews and Signatures (NOT required for Administrative Corrections)
Continued: D 6.0 Reviews and Signatures (NOT required for Administrative Corrections)
Reviews Required Dept PIN Signature Date CAOJ 39 Attached Preparer Er L)l }(, 1 ~ ~ L--\\ -~'t... ),\\ NIA Technical Review 0Yes 0No Technical Review 0Yes 0No Add'l Review 0Yes 0No Add'I Review 0Yes 0No Additional Reviews (See Attached CAO/ 39 forms). Number of additional CA0139s :
Reviews Required Dept PIN Signature Date CAOJ 39 Attached Preparer Er L)l }(, 1  
Type Coordinator - PIN I Signature Date CA0139 Attached Validation I 0Yes No
~~
 
L--\\ -~'t... ),\\
50.59 Review 0CA2510 0CA2511 0CA2512 / ONIA (pe r APA -ZZ-00 143) Screener In itia l I PIN R eviewe r /11ilia l I PI N (Dept. Head or Designated Approver) Is a Change Management Plan required? 0Yes 0No ( II' YES, attach CA2773 or CA2774)
NIA Technical Review 0Yes 0No Technical Review 0Yes 0No Add'l Review 0Yes 0No Add'I Review 0Yes 0No Additional Reviews (See Attached CAO/ 39 forms).
Is a Cross-Disciplinary review required? 0Yes ONo 7.0 Approval (Eith e r approval must be qu a lifiPd as PATIAPVR o r PAT/GAPR i11 Qua/Maste r)
Number of additional CA0139s:
D Se ni or Director Nuclear Operations Approval (per APA -ZZ-00101) 0 ORC is required in ac cordance with APA-ZZ-0009I D De partment Head Final Review and Approval OR C Meeting:
Validation I Type Coordinator - PIN I
 
Signature Date CA0139 Attached 0Yes No 50.59 Review 0CA2510 0CA2511 0CA2512 / ONIA (perAPA-ZZ-00143)
Dept. Head o r Des igna ted Ap prover Senior Director Nuclear Operations (Signature /PIN/Date) ( Siguaturdl'IN/UaLG 1 Note: Page 2 provide, 1111tr11ction1 to rnmplete tlzi, f,nm and may be drscarded
Screener Initial I PIN Reviewer /11ilial I PIN (Dept. Head or Designated Approver) Is a Change Management Plan required? 0Yes 0No (II' YES, attach CA2773 or CA2774)
 
Is a Cross-Disciplinary review required? 0Yes ONo 7.0 Approval (Either approval must be qualifiPd as PATIAPVR or PAT/GAPR i11 Qua/Master)
A 190.0 00 I, 2, 5, 35 - A2 I 0.006 2, 65, 6 9 : M 190.000 I Page I of 2 CA00 33 A P A-Z Z -0 0 101 Re v.0 0 2}}
D Senior Director Nuclear Operations Approval (per APA-ZZ-00101) 0 ORC is required in accordance with APA-ZZ-0009I D Department Head Final Review and Approval Dept. Head or Designated Approver (Signature/PIN/Date)
Note: Page 2 provide, 1111tr11ction1 to rnmplete tlzi, f,nm and may be drscarded A 190.000 I, 2, 5, 35 - A2 I 0.0062, 65, 69: M 190.000 I Page I of 2 APA-ZZ-00 101 ORC Meeting:
Senior Director Nuclear Operations
( Siguaturdl'IN/UaLG 1 CA0033 Rev.002}}

Latest revision as of 18:19, 24 November 2024

Security Coordinator Checklist - EIP-ZZ-00240 Addendum H, Rev. 9
ML24136A077
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/25/2024
From: Bassford J
Ameren Missouri
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
EIP-ZZ-00240 Addendum H, Rev. 9
Download: ML24136A077 (1)


Text

PROCEDURE REVIEW FORM (PRF) 1.0 Initiation Initiator: John Bassford Date: 3/25/2024 Procedure Dept:

EP Document#: EIP-ZZ-00240 ADDENDUM H New Rev.#

009 (3 diM1ls required)

Title:

SECURITY COORDINATOR CHECKLIST Level of Use:

OContinuous Reference (g!Information Multiple NIA 2.0 Reason for Change/Description of Change (List commitments, CRs, eB Change Requests, OERs, Plam Mods etc. and record numbers here.)

202402110: Update phone number listed in attachment 1 step 7 from 573-751-2748 to 573-526-9146 for the SEMA Watch Center.

Continued: D 3.0. Document Disposition OTemp Change ONew DQ:p ~Major Revision OMinor Revision Cancellation

[g!Administrative Correction

~

J 1. J '\\ '1

..,,,~,.,.-.,'f Dept. Head or Designated Approver required for Adminislrntivt! Correelii,ns (Siunauuc/PIN/Datc) - rm 11thcr signa1u1l*s required 4.0 Interim Approval (Temp. Change Only)

Temp. Change #:

Expiration Date:

Cognizant Supervisor (Signature/PIN/Date)

SRO (Signature/PIN/Date)

5.0 Comments

Continued: D 6.0 Reviews and Signatures (NOT required for Administrative Corrections)

Reviews Required Dept PIN Signature Date CAOJ 39 Attached Preparer Er L)l }(, 1

~~

L--\\ -~'t... ),\\

NIA Technical Review 0Yes 0No Technical Review 0Yes 0No Add'l Review 0Yes 0No Add'I Review 0Yes 0No Additional Reviews (See Attached CAO/ 39 forms).

Number of additional CA0139s:

Validation I Type Coordinator - PIN I

Signature Date CA0139 Attached 0Yes No 50.59 Review 0CA2510 0CA2511 0CA2512 / ONIA (perAPA-ZZ-00143)

Screener Initial I PIN Reviewer /11ilial I PIN (Dept. Head or Designated Approver) Is a Change Management Plan required? 0Yes 0No (II' YES, attach CA2773 or CA2774)

Is a Cross-Disciplinary review required? 0Yes ONo 7.0 Approval (Either approval must be qualifiPd as PATIAPVR or PAT/GAPR i11 Qua/Master)

D Senior Director Nuclear Operations Approval (per APA-ZZ-00101) 0 ORC is required in accordance with APA-ZZ-0009I D Department Head Final Review and Approval Dept. Head or Designated Approver (Signature/PIN/Date)

Note: Page 2 provide, 1111tr11ction1 to rnmplete tlzi, f,nm and may be drscarded A 190.000 I, 2, 5, 35 - A2 I 0.0062, 65, 69: M 190.000 I Page I of 2 APA-ZZ-00 101 ORC Meeting:

Senior Director Nuclear Operations

( Siguaturdl'IN/UaLG 1 CA0033 Rev.002