ML23356A079: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML23356A079 | | number = ML23356A079 | ||
| issue date = 12/22/2023 | | issue date = 12/22/2023 | ||
| title = Kairos Power, LLC, Transmittal of Changes to Hermes 2 Construction Permit Application PSAR Chapter 13 and KP-TR-022 | | title = Kairos Power, LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 13 and KP-TR-022 | ||
| author name = Hastings P | | author name = Hastings P | ||
| author affiliation = Kairos Power, LLC | | author affiliation = Kairos Power, LLC | ||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:KP-NRC-2312-004 December 22, 2023 | {{#Wiki_filter:KP-NRC-2312- 004 | ||
December 22, 2023 Docket No. 50-611 Docket No. 50-612 | |||
US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 | |||
==Subject:== | ==Subject:== | ||
| Line 27: | Line 31: | ||
: 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor, July 14, 2023 (ML23195A122) | : 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor, July 14, 2023 (ML23195A122) | ||
: 2. Audit Plan, Nuclear Regulatory Commission, Plan for a General Audit of the Hermes 2 Construction Permit Application, October 3, 2023 (ML23268A446) | : 2. Audit Plan, Nuclear Regulatory Commission, Plan for a General Audit of the Hermes 2 Construction Permit Application, October 3, 2023 (ML23268A446) | ||
In July 2023, Kairos Power submitted Revision 0 of the Preliminary Safety Analysis Report (PSAR) and the Hermes 2 Postulated Event Analysis Methodology technical report (KP-TR-022) as part of the Construction Permit Application (CPA) for the Hermes 2 non-power reactor (Reference 1). This letter transmits changes to the pages of the PSAR to address NRC feedback received on PSAR Chapter 13 in the General Audit (Reference 2), and corresponding changes to the technical report. Changes to the pages of the PSAR are provided in Enclosure 1. Changes to the pages of the technical report are provided in . Kairos Power requests NRC review of these changes as part of the continued review of the Hermes CPA. | |||
In July 2023, Kairos Power submitted Revision 0 of the Preliminary Safety Analysis Report (PSAR) and the Hermes 2 Postulated Event Analysis Methodology technical report (KP -TR-022) as part of the Construction Permit Application (CPA) for the Hermes 2 non-power reactor (Reference 1). This letter transmits changes to the pages of the PSAR to address NRC feedback received on PSAR Chapter 13 in the General Audit (Reference 2), and corresponding changes to the technical report. Changes to the pages of the PSAR are provided in Enclosure 1. Changes to the pages of the technical report are provided in. Kairos Power requests NRC review of these changes as part of the continued review of the Hermes CPA. | |||
If you have any questions or need any additional information, please contact Delaney Simmons at simmons@kairospower.com or (505) 218-7013, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226. | If you have any questions or need any additional information, please contact Delaney Simmons at simmons@kairospower.com or (505) 218-7013, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226. | ||
I declare under penalty of perjury that the foregoing is true and correct. | I declare under penalty of perjury that the foregoing is true and correct. | ||
Executed on December 22, 2023 Sincerely, Peter Hastings, PE Vice President, Regulatory Affairs and Quality | Executed on December 22, 2023 | ||
Sincerely, | |||
Peter Hastings, PE Vice President, Regulatory Affairs and Quality | |||
==Enclosure:== | ==Enclosure:== | ||
(1) Changes to PSAR Chapter 13 (2) Changes to KP-TR-022 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A | (1) Changes to PSAR Chapter 13 (2) Changes to KP-TR-022 | ||
Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2312- 004 Page 2 | |||
xc (w/enclosure): | |||
William Jessup, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensing Branch}} | William Jessup, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensing Branch}} | ||
Revision as of 20:47, 5 October 2024
| ML23356A079 | |
| Person / Time | |
|---|---|
| Site: | Hermes File:Kairos Power icon.png |
| Issue date: | 12/22/2023 |
| From: | Hastings P Kairos Power |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| Shared Package | |
| ML23356A078 | List: |
| References | |
| KP-NRC-2312-004 | |
| Download: ML23356A079 (1) | |
Text
KP-NRC-2312- 004
December 22, 2023 Docket No. 50-611 Docket No. 50-612
US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 13 and KP-TR-022
References:
- 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor, July 14, 2023 (ML23195A122)
- 2. Audit Plan, Nuclear Regulatory Commission, Plan for a General Audit of the Hermes 2 Construction Permit Application, October 3, 2023 (ML23268A446)
In July 2023, Kairos Power submitted Revision 0 of the Preliminary Safety Analysis Report (PSAR) and the Hermes 2 Postulated Event Analysis Methodology technical report (KP -TR-022) as part of the Construction Permit Application (CPA) for the Hermes 2 non-power reactor (Reference 1). This letter transmits changes to the pages of the PSAR to address NRC feedback received on PSAR Chapter 13 in the General Audit (Reference 2), and corresponding changes to the technical report. Changes to the pages of the PSAR are provided in Enclosure 1. Changes to the pages of the technical report are provided in. Kairos Power requests NRC review of these changes as part of the continued review of the Hermes CPA.
If you have any questions or need any additional information, please contact Delaney Simmons at simmons@kairospower.com or (505) 218-7013, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on December 22, 2023
Sincerely,
Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Enclosure:
(1) Changes to PSAR Chapter 13 (2) Changes to KP-TR-022
Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2312- 004 Page 2
xc (w/enclosure):
William Jessup, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensing Branch