UNITED STATES | |||
[gR MG | |||
i | |||
?g | |||
NUCLEAR REGULATORY COMMISSION | |||
- | |||
%' ~ | |||
j | |||
REcioN sv | |||
8 | |||
611 RY AN PL AZA DRIVE. SUITE 400 | |||
o | |||
, | |||
AR LINGTON, T E X AS 760118064 | |||
e, | |||
> g, | |||
, | |||
' | |||
JAti 2 01994 | |||
. | |||
Docket: | |||
50-38i | |||
license: | |||
NPF-38 | |||
Entergy Operations, Inc. | |||
ATTN: | |||
Ross P. Barkhurst, Vice President | |||
Operations, Waterford | |||
P.O. Box B | |||
Killona, Louisiana 70066 | |||
f | |||
SUBJECT: NRC INSPECTION REPORT 50-382/93-34 (NOTICE OF VIOLATION) | |||
This refers to the inspection conducted by E. J. Ford and other inspectors of | |||
this office on October 31 through December 11, 1993. | |||
The inspection included | |||
a review of activities authorized for your Waterford Steam Electric Station, | |||
Unit 3 facility. At the conclusion of the inspection, the findings were | |||
discussed with those members of your staff identified in the enclosed report. | |||
Areas examined during the inspection are identified in the report. Within | |||
: | |||
ti.?se areas, the inspection consisted of selective examinations of procedures | |||
' | |||
and representative records, interviews with personnel, and . observation of | |||
activities in progress. | |||
The purpose of the inspection was to determine | |||
whether activities authorized by the license were conducted safely and in | |||
accordance with NRC requirements. | |||
Based on the results of this inspection, certain licensed activities appeared | |||
to be in violation of NRC requirements, as specified in the enclosed Notice of | |||
Violation (Notice). The violation is of concern because it represents a lack | |||
of control over the entrance into radiologically restricted areas. | |||
You are required to respond to this letter and should follow the instructions | |||
specified in the enclosed Notice when preparing your response. | |||
In your | |||
response, you should document the specific actions taken and any additional | |||
actions you plan to prevent recurrence. After reviewing your response to this | |||
Notice, including your proposed corrective actions and the results of future | |||
inspections, the NRC will determine whether further NRC enforcement action is | |||
necessary to ensure compliance with NRC regulatory requirements. | |||
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of | |||
this letter and its enclosures will be placed in the NRC Public Document Room. | |||
The responses directed by this letter and the enclosed Notice are not subject | |||
to the clearance procedures of the Office of Management and Budget as required | |||
by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511. | |||
, | |||
ko\\ | |||
. | |||
9401260169 940220 | |||
\\ | |||
DR | |||
ADOCK 05000382 | |||
PDR | |||
t | |||
. | . | ||
Entergy Operations, Inc. | |||
-2- | |||
Should you have any questions concerning this inspection, we will be pleased | |||
to discuss them with you. | |||
; | |||
Sincerely, | |||
' | |||
/ | |||
r | |||
f | |||
i | |||
v sai | |||
tQ | |||
/'A. Bill Beach, Director | |||
Division of Reactor Projects | |||
Enclosures: | |||
1. | |||
Appendix A - Notice of Violation | |||
2. | |||
Appendix B - NRC Inspection Report | |||
50-382/93-34 w/ attachment | |||
cc w/ enclosures: | |||
Entergy Operations, Inc. | |||
ATTH: Harry W. Keiser, Executive | |||
Vice President & Chief Operating Officer | |||
P.O. Box 31995 | |||
Jackson, Mississippi | |||
39286-1995 | |||
, | |||
Entergy Operations, Inc. | |||
ATTN: Jerrold G. Dewease, Vice President | |||
1 | |||
Operations Support | |||
P.O. Box 31995 | |||
' | |||
Jackson, Mississippi | |||
39286 | |||
Wise, Carter, Child & Caraway | |||
ATTN: | |||
Robert B. McGehee, Esq. | |||
' | |||
P.O. Box 651 | |||
Jackson, Mississippi 39205 | |||
Entergy Operations, Inc. | |||
ATTN: | |||
D. F. Packer, General | |||
, | |||
Manager Plant Operations | |||
P.O. Box B | |||
- | |||
Killona, Louisiana 70066 | |||
Entergy Operations, Inc. | |||
ATTN: | |||
L. W. Laughlin | |||
Licensing Manager | |||
P.O. Box B | |||
Killona, Louisiana 70066 | |||
< | |||
1 | |||
e | |||
i | |||
. | |||
-... | |||
- . | |||
. | |||
, | |||
* | |||
, | |||
& | & | ||
' I | |||
Entergy Operations, Inc. | |||
-3- | |||
' | |||
Chairman | |||
Louisiana Public Service Commission | |||
One American Place, Suite 1630 | |||
+ | |||
Baton Rouge, Louisiana 70825-1697 | |||
r | |||
Entergy Operations, Inc. | |||
i | |||
ATTN: | |||
R. F. Burski, Director | |||
i | |||
Nuclear Safety | |||
P.O. Box B | |||
Killona, Louisiana 70066 | |||
Hall Bohlinger, Administrator | |||
Radiation Protection Division | |||
; | |||
P.O. Box 82135 | |||
Baton Rouge, Louisiana 70884-2135 | |||
Parish President | |||
St. Charles Parish | |||
i | |||
P.O. Box 302 | |||
Hahnville, Louisiana '70057 | |||
l | |||
r | |||
Mr. William A. Cross | |||
Bethesda-Licensing Office | |||
i | |||
3 Metro Center | |||
Suite 610 | |||
, | |||
Bethesda, Maryland 20814 | |||
: | |||
i | |||
Winston & Strawn | |||
ATTN: Nicholas S. Reynolds, Esq. | |||
t | |||
1400 L Street, N.W. | |||
Washington, D.C. | |||
20005-3502 | |||
: | |||
. | |||
9 | |||
I | |||
I | |||
i | |||
t | |||
i | |||
> | |||
' | |||
i | |||
gy | |||
*e.,r' | |||
% | |||
y | |||
v | |||
= -- | |||
.-%= | |||
.,_ _ | |||
m | |||
. - - - | |||
- | |||
a | |||
.- | |||
--- | |||
---- | |||
- | |||
.- | |||
. | |||
. | |||
Entergy Operations, Inc. | |||
-4- | |||
JN12 01994 | |||
bcc to D. Sullivan (DJS) by E-Mail | |||
3 | |||
bcc to DMB (IE01) | |||
bcc distrib. by RIV: | |||
, | |||
J. L. Milhoan | |||
Resident Inspector | |||
Section Chief (DRP/D) | |||
Lisa Shea, RM/ALF, MS: MNBB 4503 | |||
, | |||
MIS System | |||
DRSS-FIPS | |||
RIV File | |||
Project Engineer (DRP/D) | |||
Section Chief (DRP/TSS) | |||
A. B. Beach, D/DRP | |||
1 | |||
10 | |||
RIV:RI NM | |||
SRI | |||
d | |||
C:DRP/D d | |||
FIPS/C D | |||
D:6@P | |||
M | |||
TFStetka | |||
Murray | |||
AEBOch | |||
JDixon-Herity | |||
EJFord | |||
1/13 /94 | |||
1/l3/94 | |||
I/l3/94 | |||
1//J/94 | |||
1/10 /94 | |||
[ | [ | ||
__ | |||
, | |||
e | |||
, | |||
v | |||
Entergy Operations, Inc. | |||
-4- | |||
JAN 2 01994 | |||
, | |||
bcc to D. Sullivan (DJS) by E-Mail | |||
~ | |||
.bcc to DMB (IE01) ' \\ | |||
' | |||
bec distrib. by RIV: | |||
J. L. Milhoan | |||
Resident Inspector. | |||
Section Chief (DRP/D) | |||
Lisa Shea, RM/ALF, MS: MNBB 4503 | |||
MIS System- | |||
DRSS-FIPS | |||
RIV File | |||
Project Engineer (DRP/D) | |||
Section Chief (DRP/TSS) | |||
A. B. Beach, D/DRP | |||
r | |||
. | |||
, | |||
! | |||
, | , | ||
,3 | |||
, | |||
RIV:RI UN)f | |||
SRI | |||
d | |||
C:DRP/D N | |||
FIPS/C,h | |||
D:$P' | |||
[ | |||
JDixon-Herity | |||
EJFord M | |||
TFStetka- | |||
Murray | |||
AE BOch | |||
! | |||
' | |||
1/l3/94- | |||
1/33/94 | |||
1/J3/94 | |||
1////94 | |||
1/t0/94 | |||
P | |||
i. | |||
i | |||
250022 | |||
- | |||
: | |||
.- | |||
_ | |||
}} | }} | ||
Latest revision as of 02:00, 17 December 2024
| ML20059H013 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 01/20/1994 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Barkhurst R ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20059H015 | List: |
| References | |
| NUDOCS 9401260169 | |
| Download: ML20059H013 (5) | |
See also: IR 05000382/1993034
Text
e
i
UNITED STATES
[gR MG
i
?g
NUCLEAR REGULATORY COMMISSION
-
%' ~
j
REcioN sv
8
611 RY AN PL AZA DRIVE. SUITE 400
o
,
AR LINGTON, T E X AS 760118064
e,
> g,
,
'
JAti 2 01994
.
Docket:
50-38i
license:
Entergy Operations, Inc.
ATTN:
Ross P. Barkhurst, Vice President
Operations, Waterford
P.O. Box B
Killona, Louisiana 70066
f
SUBJECT: NRC INSPECTION REPORT 50-382/93-34 (NOTICE OF VIOLATION)
This refers to the inspection conducted by E. J. Ford and other inspectors of
this office on October 31 through December 11, 1993.
The inspection included
a review of activities authorized for your Waterford Steam Electric Station,
Unit 3 facility. At the conclusion of the inspection, the findings were
discussed with those members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
ti.?se areas, the inspection consisted of selective examinations of procedures
'
and representative records, interviews with personnel, and . observation of
activities in progress.
The purpose of the inspection was to determine
whether activities authorized by the license were conducted safely and in
accordance with NRC requirements.
Based on the results of this inspection, certain licensed activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice). The violation is of concern because it represents a lack
of control over the entrance into radiologically restricted areas.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
,
ko\\
.
9401260169 940220
\\
DR
ADOCK 05000382
t
.
Entergy Operations, Inc.
-2-
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
'
/
r
f
i
v sai
tQ
/'A. Bill Beach, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-382/93-34 w/ attachment
cc w/ enclosures:
Entergy Operations, Inc.
ATTH: Harry W. Keiser, Executive
Vice President & Chief Operating Officer
P.O. Box 31995
Jackson, Mississippi
39286-1995
,
Entergy Operations, Inc.
ATTN: Jerrold G. Dewease, Vice President
1
Operations Support
P.O. Box 31995
'
Jackson, Mississippi
39286
Wise, Carter, Child & Caraway
ATTN:
Robert B. McGehee, Esq.
'
P.O. Box 651
Jackson, Mississippi 39205
Entergy Operations, Inc.
ATTN:
D. F. Packer, General
,
Manager Plant Operations
P.O. Box B
-
Killona, Louisiana 70066
Entergy Operations, Inc.
ATTN:
L. W. Laughlin
Licensing Manager
P.O. Box B
Killona, Louisiana 70066
<
1
e
i
.
-...
- .
.
,
,
&
' I
Entergy Operations, Inc.
-3-
'
Chairman
Louisiana Public Service Commission
One American Place, Suite 1630
+
Baton Rouge, Louisiana 70825-1697
r
Entergy Operations, Inc.
i
ATTN:
R. F. Burski, Director
i
Nuclear Safety
P.O. Box B
Killona, Louisiana 70066
Hall Bohlinger, Administrator
Radiation Protection Division
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
Parish President
St. Charles Parish
i
P.O. Box 302
Hahnville, Louisiana '70057
l
r
Mr. William A. Cross
Bethesda-Licensing Office
i
3 Metro Center
Suite 610
,
Bethesda, Maryland 20814
i
Winston & Strawn
ATTN: Nicholas S. Reynolds, Esq.
t
1400 L Street, N.W.
Washington, D.C.
20005-3502
.
9
I
I
i
t
i
>
'
i
gy
- e.,r'
%
y
v
= --
.-%=
.,_ _
m
. - - -
-
a
.-
---
-
.-
.
.
Entergy Operations, Inc.
-4-
JN12 01994
bcc to D. Sullivan (DJS) by E-Mail
3
bcc to DMB (IE01)
bcc distrib. by RIV:
,
J. L. Milhoan
Resident Inspector
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503
,
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/D)
Section Chief (DRP/TSS)
A. B. Beach, D/DRP
1
10
RIV:RI NM
d
C:DRP/D d
FIPS/C D
D:6@P
M
TFStetka
Murray
AEBOch
JDixon-Herity
EJFord
1/13 /94
1/l3/94
I/l3/94
1//J/94
1/10 /94
[
__
,
e
,
v
Entergy Operations, Inc.
-4-
JAN 2 01994
,
bcc to D. Sullivan (DJS) by E-Mail
~
.bcc to DMB (IE01) ' \\
'
bec distrib. by RIV:
J. L. Milhoan
Resident Inspector.
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System-
DRSS-FIPS
RIV File
Project Engineer (DRP/D)
Section Chief (DRP/TSS)
A. B. Beach, D/DRP
r
.
,
!
,
,3
,
RIV:RI UN)f
d
C:DRP/D N
FIPS/C,h
D:$P'
[
JDixon-Herity
EJFord M
TFStetka-
Murray
AE BOch
!
'
1/l3/94-
1/33/94
1/J3/94
1////94
1/t0/94
P
i.
i
250022
-
.-
_