ML22229A032: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:entergy                                                          Entergy Operations, Inc.
{{#Wiki_filter:Entergy Operations, Inc.
P.O. Box 756 Port Gibson, Mississippi 39150 Jeffery Hardy Manager Regulatory Assurance Grand Gulf Nuclear Station Tel 802-380-5124 GGNS TS 5.6.5 GNRO2022-00020 August 17, 2022 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
entergy P.O. Box 756 Port Gibson, Mississippi 39150
 
Jeffery Hardy Manager Regulatory Assurance Grand Gulf Nuclear Station Tel 802-380-5124
 
GGNS TS 5.6.5 GNRO2022-00020
 
August 17, 2022
 
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001


==SUBJECT:==
==SUBJECT:==
Grand Gulf Nuclear Station (GGNS) Core Operating Limits Report (COLR) Cycle 24, Revision 1 Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29 In accordance with 10 CFR 50.36 and GGNS Technical Specification Section 5.6.5.d, GGNS is required to provide to the Nuclear Regulatory Commission any updates to the COLR. Revision 1 of the GGNS Cycle 24 COLR is attached to this letter.
Grand Gulf Nuclear Station (GGNS) Core Operating Limits Report (COLR) Cycle 24, Revision 1
 
Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29
 
In accordance with 1 O CFR 50.36 and GGNS Technical Specification Section 5.6.5.d, GGNS is required to provide to the Nuclear Regulatory Commission any updates to the COLR. Revision 1 of the GGNS Cycle 24 COLR is attached to this letter.
 
There are no commitments contained in this submittal. If you have any questions or need additional information, please contact Jeff Hardy at 802-380-5124.
There are no commitments contained in this submittal. If you have any questions or need additional information, please contact Jeff Hardy at 802-380-5124.
Sincerely, JH/ram
 
Sincerely,
 
JH/ram


==Attachment:==
==Attachment:==
Core Operating Limits Report (COLR) Cycle 24, Revision 1
Core Operating Limits Report (COLR) Cycle 24, Revision 1 GNRO2022-00020 Page 2 of 2
 
cc: NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150
 
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 rand ulf Nuclear Station


GNRO2022-00020 Page 2 of 2 cc:        NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
ore perating Limits Report


rand  ulf Nuclear Station ore  perating Limits Report Cycle 24 Revision 1
Cycle 24
 
Revision 1 CORE OPERATING LIMITS REPORT
 
REASON FOR REVISION
 
Revision 0:
The Cycle 24 core operating limits are updated to provide cycle-specific MCPR and the APLHGR limits for the GNF2 and GNF3 fuel types, respectively. Figures 2-1 LHGRFAC multiplier values, independent of fuel type. Figure 1-1 and 1-2 provides through 2-5 are updated with new MCPR limits and Figures 3-1 through 3-4 are These limits are based on a core power of 4408 MWt. updated with new LHGRFAC limits. No other core operating limits are changed.


CORE OPERATING LIMITS REPORT REASON FOR REVISION Revision 0:
The Cycle 24 core operating limits are updated to provide cycle-specific MCPR and LHGRFAC multiplier values, independent of fuel type. Figure 1-1 and 1-2 provides the APLHGR limits for the GNF2 and GNF3 fuel types, respectively. Figures 2-1 through 2-5 are updated with new MCPR limits and Figures 3-1 through 3-4 are updated with new LHGRFAC limits. No other core operating limits are changed.
These limits are based on a core power of 4408 MWt.
Revision 1:
Revision 1:
The Cycle 24 core operating limit reports is updated due to the F024-02 core shuffle to replace two failed fuel bundles. This revision is to update the GESTAR analysis reference which concludes that the Cycle 24 SRLR is still applicable to the core. There are no changes to the Cycle 24 limits in this revision.
The Cycle 24 core operating limit reports is updated due to the F024-02 core shuffle to replace two failed fuel bundles. This revision is to update the GESTAR analysis reference which concludes that the Cycle 24 SRLR is still applicable to the core. There are no changes to the Cycle 24 limits in this revision.
COLR Page 2                                                        LBDCR 2022-054


CORE OPERATING LIMITS REPORT TABLE OF CONTENTS 1.0      PURPOSE                                            4 2.0      SCOPE                                              4
COLR Page 2 LBDCR 2022-054 CORE OPERATING LIMITS REPORT


==3.0      REFERENCES==
TABLE OF CONTENTS
5 3.1  Current Cycle References                            5 4.0      DEFINITIONS                                          7 5.0      GENERAL REQUIREMENTS                                9 5 .1 Averaqe Planar Linear Heat Generation Rates          9 5.2  Minimum Critical Power Ratio                        9 5.3  Linear Heat Generation Rate                        10 5 .4 Stabilitv                                          10 5.5  Applicability                                      11 5.6  Limitations and Conditions                          11 Table 1      OPRM Upscale CDA Amplitude Discriminator            13 Setpoint Table 2      BSP Endpoints for Normal Feedwater Temperature      13 Table 3      BSP Endpoints for Reduced Feedwater                13 Temnerature Table 4      ABSP Setpoints for the Scram Region                13 Table 5      Margin to Thermal Overpower and Mechanical          13 Overpower Limits Table 6      Application Conditions                              14 Table 7      Rated OLMCPR Summary Table                          14 Figure(s) 1 APLHGR Operating Limits                              15 Figure(s) 2 MCPR Operating Limits                                16 Figure(s) 3 LHGR Operatina Limits                                25 Figure 4    Backup Stability Protection Region Boundaries      27 for Normal Feedwater Temperature Figure 5      Backup Stability Protection Region Boundaries      28 for Reduced Feedwater Temperature Figure 6    MCPRP Limit and K(P) Multiplier for EIS, FWH        29 OOS, EOC-RPT OOS, FHW & EOC-RPT OOS Figure 7      MCPRP Limit and K(P} Multiplier for PR OOS, PR    30
                      & FWH OOS, PR & EOC-RPT OOS, PR & FHW & EOC-RPT OOS COLR Page 3                                                          LBDCR 2022-054


CORE OPERATING LIMITS REPORT 1.0 PURPOSE The COLR is controlled as a License Basis Document and revised accordingly for each fuel cycle or remaining portion of a fuel cycle. Any revisions to the COLR must be submitted to the NRC for information as required by Tech Spec 5.6.5 and tracked by Licensing Commitment 29132. This COLR reports the Cycle 24 core operating limits and stability setpoint confirmation and regions.
1.0 PURPOSE 4 2.0 SCOPE 4
2.0 SCOPE As defined in Technical Specification 1.1, the COLR is the GGNS document that provides the core operating limits for the current fuel cycle. This document is prepared in accordance with Technical Specification 5.6.5 for each reload cycle using NRC-approved analytical methods.
 
==3.0 REFERENCES==
5 3.1 Current Cycle References 5 4.0 DEFINITIONS 7 5.0 GENERAL REQUIREMENTS 9 5.1 Averaqe Planar Linear Heat Generation Rates 9 5.2 Minimum Critical Power Ratio 9 5.3 Linear Heat Generation Rate 10 5.4 Stabilitv 10 5.5 Applicability 11 5.6 Limitations and Conditions 11
 
Table 1 OPRM Upscale CDA Amplitude Discriminator 13 Setpoint Table 2 BSP Endpoints for Normal Feedwater Temperature 13 Table 3 BSP Endpoints for Reduced Feedwater 13 Temnerature Table 4 ABSP Setpoints for the Scram Region 13 Table 5 Margin to Thermal Overpower and Mechanical 13 Overpower Limits Table 6 Application Conditions 14 Table 7 Rated OLMCPR Summary Table 14 Figure(s) 1 APLHGR Operating Limits 15 Figure(s) 2 MCPR Operating Limits 16 Figure(s) 3 LHGR Operatina Limits 25 Figure 4 Backup Stability Protection Region Boundaries 27 Figure 5 Backup Stability Protection Region Boundaries 28 for Normal Feedwater Temperature for Reduced Feedwater Temperature Figure 6 MCPRP Limit and K(P) Multiplier for EIS, FWH 29 OOS, EOC-RPT OOS, FHW & EOC-RPT OOS Figure 7 MCPRP Limit and K(P} Multiplier for PR OOS, PR 30 & FWH OOS, PR & EOC-RPT OOS, PR & FHW & EOC-RPT OOS
 
COLR Page 3 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
1.0 PURPOSE The COLR is controlled as a License Basis Document and revised accordingly for each fuel cycle or remaining portion of a fuel cycle. Any revisions to the COLR must be submitted to the NRC for information as required by Tech Spec 5.6.5 and tracked by Licensing Commitment 29132. This COLR reports the Cycle 24 core operating limits and stability setpoint confirmation and regions.
 
2.0 SCOPE As defined in Technical Specification 1.1, the COLR is the GGNS document that provides the core operating limits for the current fuel cycle. This document is prepared in accordance with Technical Specification 5.6.5 for each reload cycle using NRC-approved analytical methods.
The Cycle 24 core operating and stability limits included in this report are:
The Cycle 24 core operating and stability limits included in this report are:
* the Average Planar Linear Heat Generation Rate (APLHGR),
* the Average Planar Linear Heat Generation Rate (APLHGR),
Line 51: Line 82:
* the Linear Heat Generation Rate (LHGR) limit, and
* the Linear Heat Generation Rate (LHGR) limit, and
* the DSS-CD stability setpoint confirmation and regions.
* the DSS-CD stability setpoint confirmation and regions.
COLR Page 4                                                          LBDCR 2022-054


CORE OPERATING LIMITS REPORT
COLR Page 4 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
==3.0 REFERENCES==
This section contains the cycle-specific references used in the safety analysis of Grand Gulf Cycle 24.
Methodology references are documented in Technical Specification 5.6.5b
 
3.1 Current Cycle References
 
3.1.1 ECH-NE-22-00002 Revision 0, Supplemental Reload Licensing Report for Grand Gulf-1 Reload 23 Cycle 24, March 2022.
 
3.1.2 ECH-NE-10-00021 for Entergy Grand Gulf Nuclear Station, February 2020. Revision 5, GNF2 Fuel Design Cycle-Independent Analyses
 
3.1.3 ECH-NE-22-00001 1 Reload 23 Cycle 24, November 2019. Revision 0, Fuel Bundle Information Report for Grand Gulf-
 
3.1.4 NEDC-32910P, Revision 1, Grand Gulf Nuclear Station SAFER/GESTR-LOCA Accident Analysis With Relaxed ECCS Parameters, October 1999 (GEXI-1999-00174).
 
3.1.5 GGNS-NE-12-00022 Revision 0, Grand Gulf Nuclear Station MELLLA+ Task T0407, ECCS-LOCA Performance, September 2012.
 
3.1.6 GGNS-SA-09-00002 Revision 1, Grand Gulf Nuclear Station GNF2 ECCS-LOCA Evaluation, December 2009.
 
3.1.7 NEDC-33173P-A, Revision 5, Applicability of GE Methods to Expanded Operating Domains (with Supplements SP-A Rev. 1, and 6P-A Rev. 1), October 2019.
 
3.1.8 NEDC-33006P-A, Revision 3, GE BWR Maximum Extended Load Line Limit Analysis Plus, June 2009.
 
3.1.9 ECH-NE-22-00010, Revision 1, GGNS Cycle 24 GESTAR Assessment, July 2022.
 
3.1.10 ECH-NE-20-00006 Revision 0, GNF3 Fuel Design Cycle-Independent Analyses for Grand Gulf Nuclear Station, February 2020.
 
3.1.11 GGNS-SA-19-00001 Evaluation Revision 1, October 2019. Revision O Grand Gulf Nuclear Station GNF3 ECCS-LOCA
 
3.1.12 GEH-GGNS-AEP-632, GGNS MELLLA+ Final DSS-CD Settings Report, October 23, 2013.
 
3.1.13 NEDE-24011-P-A-31, General Electric Standard Application for Reactor Fuel CGESTAR-II), November 2020, (KGO-ENO-GEN-21-039).
 
3.1.14 ECH-NE-21-00025, Grand Gulf Nuclear Station TRACG Implementation for Reload Transient Analysis (T1309), December 2020.
 
3.1.15 NED0-33612-A, Revision 0, Safety Analysis Report for GGNS Maximum Extended Load Line Limit Analysis Plus, September 2013.
COLR Page 5 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
3.1.16 NEDC-33292P, Revision 3, GEXL17 Correlation for GNF2 Fuel, June 2009 (RAENO-GEN-10-034).
 
3.1.17 NEDC-33880P, Revision 1, GEXL21 Correlation for GNF3 Fuel, November 2017 (KGO-ENO-GEN-20-031).
 
3.1.18 NEDC-33840P-A, Revision 1, The PRIME Model for Transient Analysis of Fuel Rod Thermal - Mechanical Performance, August 2017.
 
3.1.19 GGNS-NE-10-00076, Revision O (GEH 0000-0121-1122-RO), GGNS EPU Option B Scram Times, September 2010.
 
3.1.20 NEDC-33270P, Revision 9, GNF2 Advantage Generic Compliance with NEDE-24011-P-A (GESTAR II), Dec 2017. (KGO-ENO-JBl-18-068).
 
3.1.21 NEDC-33879P, Revision 4, GNF3 Generic Compliance with NEDE-24011-P-A (GESTAR II), August 2020.
 
3.1.22 GGNS-SA-21-00002, Revision O (GEH 0000-0158-7807-Rl), Grand Gulf Nuclear Station PRNM System DSS-CD Settings, April 2020
 
3.1.23 SC 21-04 Revision 1, Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors, June 2021.
 
3.1.24 GNF006N2281 Revision 0, Nuclear Design Report for Grand Gulf Nuclear Station Cycle 24, August 2021.
 
COLR Page 6 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
4.0 DEFINITIONS
 
4.1 Average Planar Linear Heat Generation Rate (APLHGR) - the APLHGR shall be applicable to a specific planar height and is equal to the sum of the linear heat generation rates for all the fuel rods in the specified bundle at the specified height divided by the number of fuel rods in the fuel bundle at 4.2 Average Planar Exposure - the Average Planar Exposure shall be applicable to the specified height.
a specific planar height and is equal to the sum of the exposure of all the fuel rods in the specified bundle at the specified height divided by the 4.3 Critical Power Ratio (CPR) - the ratio of that power in the assembly, which number of fuel rods in the fuel bundle at the specified height.
is calculated by application of the fuel vendor's appropriate boiling correlation, to cause some point in the assembly to experience boiling 4.4 Core Operating Limits Report (COLR) - The Grand Gulf Nuclear Station transition, divided by the actual assembly operating power.
specific document that provides core operating limits for the current reload cycle in accordance with Technical Specification 5.6.5.
4.5 Linear Heat Generation Rate (LHGR) - the LHGR shall be the heat generation per unit length of fuel rod. It is the integral of the heat flux over the 4.6 Minimum Critical Power Ratio (MCPR) - the MCPR shall be the smallest CPR heat transfer area associated with the unit length.
4.7 MCPR Safety Limit - cycle specific SLMCPR, known as MCPRn.~, is the minimum which exists in the core.
value of the CPR at which the fuel could be operated to ensure that 99.9%
percent of the fuel in the core is not susceptible to the boiling 4.8 Oscillation Power Range Monitor (OPRM) - Provides automatic detection and transition.
suppression of reactor core thermal-hydraulic instabilities through 4.9 Backup Stability Protection (BSP) Boundary - Defines the operation domain monitoring neutron flux changes.
where potential instability events can be effectively addressed by specific operator action. Region of the power and flow operating domain that is not expected to be susceptible to instability events associated with a high 4.10 Backup Stability Protection (BSP) Scram Region - The area of the core power initial growth rate.
and flow operating domain where the reactor is susceptible to reactor instabilities under conditions exceeding the licensing basis of the current 4.11 Backup Stability Protection (BSP) Controlled Entry Region - The area of the reactor system. An immediate manual scram is required upon entry.
core power and flow operating domain where the reactor is susceptible to control is required upon entry. reactor instabilities. Compliance with at least one alternate stability 4.12 Automated Backup Stability Protection (ABSP) Scram Region - An automated the APRM flow-biased scram setpoint upon entry. reactor scram region that bounds the BSP Scram Region and is initiated by 4.13 End of Rated (EOR) - The Cycle exposure corresponding to all rods out, 100% power, 100% flow, and normal feedwater temperature [3.1.1].
4.14 Middle of Cycle (MOC) - The Cycle 24 MOC Core Average Exposure (CAE) is MOC= EOR-3,996 MWd/ST [3.1.1].
4.15 End of Cycle (EOC) - The Cycle 24 EOC CAE is 32,487 MWd/ST [3.1.24].
4.16 Maximum Extended Load Line Limit Analysis Plus (MELLLA+) - The GGNS MELLLA+ operating domain is depicted in Figure 4.
4.17 Maximum Number of OPRM Cells Along an Instability Symmetry Axis (MAx) - An OPRM configuration constant representing maximum number of OPRM cells along an instability symmetry axis. It is used to calculate the number of
 
COLR Page 7 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
unresponsive 0PRM cells. Per [3.1.12] the GGNS specific value is five 4.18 Application Conditions - The combination of equipment out of service (MAA = 5).
Application Conditions are specified in Table 6. conditions for which LHGRFAC and MCPR limits are determined [3.1.1]. The


==3.0  REFERENCES==
4.19 MCPRgs;95 Safety Limit - Cycle-independent Technical Specification (TS) 2.1.1 SLMCPR, ensures there is a 95 percent probability at a 95 percent confidence level that no fuel rods will be susceptible to transition boiling.


This section contains the cycle-specific references used in the safety analysis of Grand Gulf Cycle 24.
COLR Page 8 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
Methodology references are documented in Technical Specification 5.6.5b 3.1  Current Cycle References 3.1.1    ECH-NE-22-00002 Revision 0, Supplemental Reload Licensing Report for Grand Gulf-1 Reload 23 Cycle 24, March 2022.
3.1.2    ECH-NE-10-00021 Revision 5, GNF2 Fuel Design Cycle-Independent Analyses for Entergy Grand Gulf Nuclear Station, February 2020.
3.1.3    ECH-NE-22-00001 Revision 0, Fuel Bundle Information Report for Grand Gulf-1 Reload 23 Cycle 24, November 2019.
3.1.4    NEDC-32910P, Revision 1, Grand Gulf Nuclear Station SAFER/GESTR-LOCA Accident Analysis With Relaxed ECCS Parameters, October 1999 (GEXI-1999-00174).
3.1.5    GGNS-NE-12-00022 Revision 0, Grand Gulf Nuclear Station MELLLA+ Task T0407, ECCS-LOCA Performance, September 2012.
3.1.6    GGNS-SA-09-00002 Revision 1, Grand Gulf Nuclear Station GNF2 ECCS-LOCA Evaluation, December 2009.
3.1.7      NEDC-33173P-A, Revision 5, Applicability of GE Methods to Expanded Operating Domains (with Supplements SP-A Rev. 1, and 6P-A Rev. 1), October 2019.
3.1.8      NEDC-33006P-A, Revision 3, GE BWR Maximum Extended Load Line Limit Analysis Plus, June 2009.
3.1.9      ECH-NE-22-00010, Revision 1, GGNS Cycle 24 GESTAR Assessment, July 2022.
3.1.10    ECH-NE-20-00006 Revision 0, GNF3 Fuel Design Cycle-Independent Analyses for Grand Gulf Nuclear Station, February 2020.
3.1.11    GGNS-SA-19-00001 Revision O Grand Gulf Nuclear Station GNF3 ECCS-LOCA Evaluation Revision 1, October 2019.
3.1.12    GEH-GGNS-AEP-632, GGNS MELLLA+ Final DSS-CD Settings Report, October 23, 2013.
3.1.13    NEDE-24011-P-A-31, General Electric Standard Application for Reactor Fuel CGESTAR-II), November 2020, (KGO-ENO-GEN-21-039).
3.1.14    ECH-NE-21-00025, Grand Gulf Nuclear Station TRACG Implementation for Reload Transient Analysis (T1309), December 2020.
3.1.15    NED0-33612-A, Revision 0, Safety Analysis Report for GGNS Maximum Extended Load Line Limit Analysis Plus, September 2013.
COLR Page 5                                                          LBDCR 2022-054


CORE OPERATING LIMITS REPORT 3.1.16  NEDC-33292P, Revision 3, GEXL17 Correlation for GNF2 Fuel, June 2009 (RA-ENO-GEN-10-034).
5.0 GENERAL REQUIREMENTS
3.1.17  NEDC-33880P, Revision 1, GEXL21 Correlation for GNF3 Fuel, November 2017 (KGO-ENO-GEN-20-031).
3.1.18  NEDC-33840P-A, Revision 1, The PRIME Model for Transient Analysis of Fuel Rod Thermal - Mechanical Performance, August 2017.
3.1.19  GGNS-NE-10-00076, Revision O (GEH 0000-0121-1122-RO), GGNS EPU Option B Scram Times, September 2010.
3.1.20  NEDC-33270P, Revision 9, GNF2 Advantage Generic Compliance with NEDE-24011-P-A (GESTAR II), Dec 2017. (KGO-ENO-JBl-18-068).
3.1.21  NEDC-33879P, Revision 4, GNF3 Generic Compliance with NEDE-24011-P-A (GESTAR II), August 2020.
3.1.22  GGNS-SA-21-00002, Revision O (GEH 0000-0158-7807-Rl), Grand Gulf Nuclear Station PRNM System DSS-CD Settings, April 2020 3.1.23    SC 21-04 Revision 1, Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors, June 2021.
3.1.24    GNF006N2281 Revision 0, Nuclear Design Report for Grand Gulf Nuclear Station Cycle 24, August 2021.
COLR Page 6                                                        LBDCR 2022-054


CORE OPERATING LIMITS REPORT 4.0  DEFINITIONS 4.1   Average Planar Linear Heat Generation Rate (APLHGR) - the APLHGR shall be applicable to a specific planar height and is equal to the sum of the linear heat generation rates for all the fuel rods in the specified bundle at the specified height divided by the number of fuel rods in the fuel bundle at the specified height.
5.1 Average Planar Linear Heat Generation Rates Consistent with Technical Specification 3.2.1, all APLHGRs shall not exceed the fuel type and exposure-dependent limits reported in Figures 1-1 and 1-2 [3.1.1].
4.2  Average Planar Exposure - the Average Planar Exposure shall be applicable to a specific planar height and is equal to the sum of the exposure of all the fuel rods in the specified bundle at the specified height divided by the number of fuel rods in the fuel bundle at the specified height.
4.3  Critical Power Ratio (CPR) - the ratio of that power in the assembly, which is calculated by application of the fuel vendor's appropriate boiling correlation, to cause some point in the assembly to experience boiling transition, divided by the actual assembly operating power.
4.4  Core Operating Limits Report (COLR) - The Grand Gulf Nuclear Station specific document that provides core operating limits for the current reload cycle in accordance with Technical Specification 5.6.5.
4.5    Linear Heat Generation Rate (LHGR) - the LHGR shall be the heat generation per unit length of fuel rod. It is the integral of the heat flux over the heat transfer area associated with the unit length.
4.6  Minimum Critical Power Ratio (MCPR) - the MCPR shall be the smallest CPR which exists in the core.
4.7  MCPR Safety Limit - cycle specific SLMCPR, known as MCPRn.~, is the minimum value of the CPR at which the fuel could be operated to ensure that 99.9%
percent of the fuel in the core is not susceptible to the boiling transition.
4.8    Oscillation Power Range Monitor (OPRM) - Provides automatic detection and suppression of reactor core thermal-hydraulic instabilities through monitoring neutron flux changes.
4.9    Backup Stability Protection (BSP) Boundary - Defines the operation domain where potential instability events can be effectively addressed by specific operator action. Region of the power and flow operating domain that is not expected to be susceptible to instability events associated with a high initial growth rate.
4.10  Backup Stability Protection (BSP) Scram Region - The area of the core power and flow operating domain where the reactor is susceptible to reactor instabilities under conditions exceeding the licensing basis of the current reactor system. An immediate manual scram is required upon entry.
4.11  Backup Stability Protection (BSP) Controlled Entry Region - The area of the core power and flow operating domain where the reactor is susceptible to reactor instabilities. Compliance with at least one alternate stability control is required upon entry.
4.12  Automated Backup Stability Protection (ABSP) Scram Region - An automated reactor scram region that bounds the BSP Scram Region and is initiated by the APRM flow-biased scram setpoint upon entry.
4.13  End of Rated (EOR) - The Cycle exposure corresponding to all rods out, 100%
power, 100% flow, and normal feedwater temperature [3.1.1].
4.14  Middle of Cycle (MOC) - The Cycle 24 MOC Core Average Exposure (CAE) is MOC= EOR-3,996 MWd/ST [3.1.1].
4.15  End of Cycle (EOC) - The Cycle 24 EOC CAE is 32,487 MWd/ST [3.1.24].
4.16  Maximum Extended Load Line Limit Analysis Plus (MELLLA+) - The GGNS MELLLA+
operating domain is depicted in Figure 4.
4.17  Maximum Number of OPRM Cells Along an Instability Symmetry Axis (MAx) - An OPRM configuration constant representing maximum number of OPRM cells along an instability symmetry axis. It is used to calculate the number of COLR Page 7                                                          LBDCR 2022-054


CORE OPERATING LIMITS REPORT unresponsive 0PRM cells. Per [3.1.12] the GGNS specific value is five (MAA = 5).
5.2 Minimum Critical Power Ratio Operation (TLO), and 1.12 for Single Loop Operation (SLO) [3.1.1]. For Cycle 24, the cycle-specific MCPR Safety Limit (MCPR99.9%), is 1.12 for Two Loop
4.18  Application Conditions - The combination of equipment out of service conditions for which LHGRFAC and MCPR limits are determined [3.1.1]. The Application Conditions are specified in Table 6.
4.19  MCPRgs; 95 Safety Limit - Cycle-independent Technical Specification (TS) 2.1.1 SLMCPR, ensures there is a 95 percent probability at a 95 percent confidence level that no fuel rods will be susceptible to transition boiling.
COLR Page 8                                                          LBDCR 2022-054


CORE OPERATING LIMITS REPORT 5.0    GENERAL REQUIREMENTS 5.1    Average Planar Linear Heat Generation Rates Consistent with Technical Specification 3.2.1, all APLHGRs shall not exceed the fuel type and exposure-dependent limits reported in Figures 1-1 and 1-2 [3.1.1].
GEH Safety Communication 21-04 [3.1.23] identifies a metastable flow condition that may exist in a BWR/6 in core locations fed by a side entry orifice adjacent to two core support cross beams. The vendor has been unable to determine the frequency of occurrence of this flow condition, if any. This flow condition results in a higher loss coefficient and lower CPR (applied as higher MCPR limits). To be conservative, All MCPR limits in the COLR Figures apply the penalty recommended by SC 21-04 Rev. it is assumed this condition always exists, so an MCPR penalty is always applied.
5.2    Minimum Critical Power Ratio For Cycle 24, the cycle-specific MCPR Safety Limit (MCPR99.9%), is 1.12 for Two Loop Operation (TLO), and 1.12 for Single Loop Operation (SLO) [3.1.1].
GEH Safety Communication 21-04 [3.1.23] identifies a metastable flow condition that may exist in a BWR/6 in core locations fed by a side entry orifice adjacent to two core support cross beams. The vendor has been unable to determine the frequency of occurrence of this flow condition, if any. This flow condition results in a higher loss coefficient and lower CPR (applied as higher MCPR limits). To be conservative, it is assumed this condition always exists, so an MCPR penalty is always applied.
All MCPR limits in the COLR Figures apply the penalty recommended by SC 21-04 Rev.
1 [3.1.23].
1 [3.1.23].
Consistent with Technical Specification 3.2.2, the MCPR shall be equal to or greater than the limits reported in Figure(s) 2 as functions of power, flow, exposure, and scram speed [3.1.1, 3.1.2, 3.1.10, 3.1.19]. For operation at powers
Consistent with Technical Specification 3.2.2, the MCPR shall be equal to or greater than the limits reported in Figure(s) 2 as functions of power, flow, exposure, and scram speed [3.1.1, 3.1.2, 3.1.10, 3.1.19]. For operation at powers
~35.4%, the power-dependent MCPR shall be determined based on scram time surveillance data as follows. [3.1.19]
~35.4%, the power-dependent MCPR shall be determined based on scram time surveillance data as follows. [3.1.19]
: 1)   If the average scram time (TAVE) satisfies the following:
: 1) If the average scram time (TAVE) satisfies the following:
                'AVE~'B*
 
'AVE~'B*
 
then the power dependent MCPR shall be equal to or greater than the Option B limits reported in Figure(s) 2 as a function of exposure.
then the power dependent MCPR shall be equal to or greater than the Option B limits reported in Figure(s) 2 as a function of exposure.
: 2)   If the average scram time then the power-dependent MCPR shall be equal to or greater than the Tau = 0.2 limits reported in Figure(s) 2 as a function of exposure,
: 2) If the average scram time
: 3)   If the average scram time
 
                            'AVE >Ts and r>0.2, then the power-dependent MCPR shall be equal to or greater than the Option A limits reported in Figure(s) 2 as a function of exposure.
then the power-dependent MCPR shall be equal to or greater than the Tau = 0.2 limits reported in Figure(s) 2 as a function of exposure,
: 3) If the average scram time
 
'AVE >Ts and r>0.2, then the power-dependent MCPR shall be equal to or greater than the Option A limits reported in Figure(s) 2 as a function of exposure.
In the above equations:
In the above equations:
        'AVE= average scram time to the 20% insertion position as calculated by equation 1 of Reference 3.1.19, COLR Page  9                                                        LBDCR 2022-054


CORE OPERATING LIMITS REPORT 8
'AVE= average scram time to the 20% insertion position as calculated by equation 1 of Reference 3.1.19,
            = adjusted analysis mean scram time for 20% insertion as calculated by equation 3 of Reference 3.1.19 and r =~~-~
 
            ~-~
COLR Page 9 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
, 8 = adjusted analysis mean scram time for 20% insertion as calculated by equation 3 of Reference 3.1.19 and r=---'-~~-~
~-~
where
where
        'A   = the technical specification limit on core average scram time to the 20 percent insertion position (0.503 seconds).
'A = the technical specification limit on core average scram time to the 20 percent insertion position (0.503 seconds).
The limits determined above support operation with Turbine Bypass Valves Out of Service as described in Technical Specification 3.7.7. Additional MCPR operating limits are provided to support operation with EOC-RPT inoperable as described in Technical Specification 3.3.4.1.
 
The limits determined above support operation with Turbine Bypass Valves Out of Service as described in Technical Specification 3.7.7. Additional MCPR operating Technical Specification 3.3.4.1. limits are provided to support operation with EOC-RPT inoperable as described in
 
Rated Operating Limit MCPR values (equipment in service, 100% power, OLMCPR's) are provided in Table 7. These can be used with the Kp factors in Figures 6 and 7 to determine the appropriate power-dependent OLMCPR at a certain power level. The SC 21-04 Rev. 1 Attachment 5 [3.1.23] penalties must be applied after determining a power-dependent OLMCPR. The MCPR graphs in Figures 2-1 through 2-5 already incorporate the Kp factors and the SC 21-04 Rev. 1 [3.1.23] penalties.
Rated Operating Limit MCPR values (equipment in service, 100% power, OLMCPR's) are provided in Table 7. These can be used with the Kp factors in Figures 6 and 7 to determine the appropriate power-dependent OLMCPR at a certain power level. The SC 21-04 Rev. 1 Attachment 5 [3.1.23] penalties must be applied after determining a power-dependent OLMCPR. The MCPR graphs in Figures 2-1 through 2-5 already incorporate the Kp factors and the SC 21-04 Rev. 1 [3.1.23] penalties.
When using Table 7 and Figures 6 & 7 to calculate power-dependent OLMCPR's, an intermediate OLMCPR should be calculated using the appropriate rated OLMCPR and Kp factors (see Figures 6 & 7). This intermediate value should be rounded to two decimals, then the SC 21-04 Rev. 1 [3.1.23] Attachment 5 penalties should be applied, and the final value rounded again to two decimals. For assistance in using Table 7 and Figures 6 & 7 to determine an OLMCPR value, contact Reactor Engineering or the BWR Core Design department.
When using Table 7 and Figures 6 & 7 to calculate power-dependent OLMCPR's, an intermediate OLMCPR should be calculated using the appropriate rated OLMCPR and Kp factors (see Figures 6 & 7). This intermediate value should be rounded to two decimals, then the SC 21-04 Rev. 1 [3.1.23] Attachment 5 penalties should be applied, and the final value rounded again to two decimals. For assistance in using Table 7 and Figures 6 & 7 to determine an OLMCPR value, contact Reactor Engineering or the BWR Core Design department.
When calculating SLO MCPR's, 0.03 should be added to Table 7 values before applying Kp factors. If the value after adding 0.03 is less than 1.29, it should be increased to 1.29 before applying Kp factors.
When calculating SLO MCPR's, 0.03 should be added to Table 7 values before applying Kp factors. If the value after adding 0.03 is less than 1.29, it should be increased to 1.29 before applying Kp factors.
Note that all MCPR Figures (2-1 through 2-5) already apply the Kp factors and the SC 21-04 Rev. 1 penalties.
Note that all MCPR Figures (2-1 through 2-5) already apply the Kp factors and the SC 21-04 Rev. 1 penalties.
5.3   Linear Heat Generation Rate Consistent with Technical Specification 3.2.3, the LHGRs for any GNF2 or GNF3 fuel rod at any axial location shall not exceed the nodal exposure-dependent limits reported in Reference 3.1.3 (by reference reported in [3.1.20] for GNF2 and
5.3 Linear Heat Generation Rate Consistent with Technical Specification 3.2.3, the LHGRs for any GNF2 or GNF3 fuel rod at any axial location shall not exceed the nodal exposure-dependent limits reported in Reference 3.1.3 (by reference reported in [3.1.20] for GNF2 and dependent LHGR factors reported in Figures 3-1 and 3-2, and Figures 3-3 and 3-4, [3.1.21] for GNF3) multiplied by the smaller of either the power-dependent or flow Bypass Valves Out of Service as described in Technical Specification 3.7.7. respectively [3.1.1]. The limits determined above support operation with Turbine
[3.1.21] for GNF3) multiplied by the smaller of either the power-dependent or flow-dependent LHGR factors reported in Figures 3-1 and 3-2, and Figures 3-3 and 3-4, respectively [3.1.1]. The limits determined above support operation with Turbine Bypass Valves Out of Service as described in Technical Specification 3.7.7.
 
5.4   Stability The OPRM Upscale Confirmation Density Algorithm (CDA) Amplitude Discriminator setpoint is reported in Table 1.
5.4 Stability The OPRM Upscale Confirmation Density Algorithm (CDA) Amplitude Discriminator setpoint is reported in Table 1.
The Backup Stability Protection (BSP) regions boundaries are reported in Figures 4 and 5 [3.1.1]. BSP measures support operation with the OPRM upscale trip function COLR Page 10                                                         LBDCR 2022-054
The Backup Stability Protection (BSP) regions boundaries are reported in Figures 4 and 5 [3.1.1]. BSP measures support operation with the OPRM upscale trip function COLR Page 10 LBDCR 2022-054 CORE OPERATING LIMITS REPORT


CORE OPERATING LIMITS REPORT inoperable as described in Technical Specification 3.3.1.1 Condition J. The endpoints for the BSP region boundaries are provided for normal (NFWT) and reduced (RFWT) feedwater temperature operations in Tables 2 and 3, respectively. Figures 4 and 5 depict the BSP region boundaries for NFWT and RFWT operations. Note that Figures 4 and 5 also depict the MELLLA+ and MELLLA domains, consistent with feedwater temperature operating limitations.
inoperable as described in Technical Specification 3.3.1.1 Condition J. The endpoints for the BSP region boundaries are provided for normal (NFWT) and reduced (RFWT) feedwater temperature operations in Tables 2 and 3, respectively. Figures 4 and 5 depict the BSP region boundaries for NFWT and RFWT operations. Note that Figures 4 and 5 also depict the MELLLA+ and MELLLA domains, consistent with feedwater temperature operating limitations.
The ABSP APRM Simulated Thermal Power (STP) setpoints associated with the ABSP Scram Region are provided in Table 4. The ABSP setpoints are applicable to TLO and SLO, and to both normal and reduced feedwater temperature operations.
The ABSP APRM Simulated Thermal Power (STP) setpoints associated with the ABSP Scram Region are provided in Table 4. The ABSP setpoints are applicable to TLO and SLO, and to both normal and reduced feedwater temperature operations.
The BSP Boundary and Manual BSP region boundaries for normal feedwater temperature operations are valid for reductions in normal feedwater temperature as much as (and including) -10.0 °F [3.1.1].
The BSP Boundary and Manual BSP region boundaries for normal feedwater temperature operations are valid for reductions in normal feedwater temperature as much as (and including) -10.0 °F [3.1.1].
5.5   Applicability The following core operating limits are applicable for operation in the Maximum Extended Operating Domain (MEOD), with Feedwater Heaters Out of Service (FWHOOS),
 
5.5 Applicability The following core operating limits are applicable for operation in the Maximum Extended Operating Domain (MEOD), with Feedwater Heaters Out of Service (FWHOOS),
Turbine Bypass Out of Service (TBVOOS), EOC-RPT inoperable, and Pressure Regulator Out of Service (PROOS). For operation with one of the previous conditions mentioned, the alternate MCPR limits described in Section 5.2 above must be implemented. Table 6 provides an applicability condition list of events related to the Figures. For SLO, the following additional requirements must be satisfied.
Turbine Bypass Out of Service (TBVOOS), EOC-RPT inoperable, and Pressure Regulator Out of Service (PROOS). For operation with one of the previous conditions mentioned, the alternate MCPR limits described in Section 5.2 above must be implemented. Table 6 provides an applicability condition list of events related to the Figures. For SLO, the following additional requirements must be satisfied.
: 1. THE APLHGRs shall not exceed the exposure-dependent limits determined in accordance with Section 5.1 reduced by a 0.83 SLO multiplier for GNF2 fuel bundles, and reduced by a 0.90 SLO multiplier for GNF3 fuel bundles.
: 1. THE APLHGRs shall not exceed the exposure-dependent limits determined in accordance with Section 5.1 reduced by a 0.83 SLO multiplier for GNF2 fuel bundles, and reduced by a 0.90 SLO multiplier for GNF3 fuel bundles. [3.1.1].
[3 .1.1].
: 2. THE LHGRs shall not exceed the smaller of the nodal exposure-dependent limits determined in accordance with Section 5.3 above or the nodal exposure-dependent limits reported in Reference 3.1.3. During SLO operation the SLO values will be used from Figures 3-3 and 3-4 [3.1.1].
: 2. THE LHGRs shall not exceed the smaller of the nodal exposure-dependent limits determined in accordance with Section 5.3 above or the nodal exposure-dependent limits reported in Reference 3.1.3. During SLO operation the SLO values will be used from Figures 3-3 and 3-4 [3.1.1].
: 3. The MCPR shall be equal to or greater than the limits determined in accordance with Section 5.2. Due to the application of SC 21-04 Rev. 1 penalties to the MCPR limits, a flat adder is not appropriate for SLO limits. SLO MCPR operating limits are displayed in Figures 2-1 through 2-4 "C" & "D" and Figure 2-SB [3.1.1].
: 3. The MCPR shall be equal to or greater than the limits determined in accordance with Section 5.2. Due to the application of SC 21-04 Rev. 1 penalties to the MCPR limits, a flat adder is not appropriate for SLO limits. SLO MCPR operating limits are displayed in Figures 2-1 through 2-4 "C" & "D" and Figure 2-SB [3.1.1].
5.6   Limitations and Conditions As required by Limitation and Condition 9.10/9.ll of licensing topical report NEDC-33173P-A [3.1.7], the limiting Thermal and Mechanical Overpower results are reported in Table 5. The results are summarized as a percent margin to both of these limits. The results are confirmed to meet the required 10% margin to the design limits [3.1.1].
5.6 Limitations and Conditions As required by Limitation and Condition 9.10/9.ll of licensing topical report NEDC-33173P-A [3.1.7], the limiting Thermal and Mechanical Overpower results are these limits. The results are confirmed to meet the required 10% margin to the reported in Table 5. The results are summarized as a percent margin to both of design limits [3.1.1].
As required by Limitation and Condition 12.10.b of licensing topical report NEDC-33006P-A [3.1.8], the off-rated limits assumed in the ECCS-LOCA analyses are confirmed to be consistent with the off-rated LHGR multipliers provided Figures 3-1 through 3-4. These off-rated LHGR multipliers provide adequate protection for MELLLA+ operation.
As required by Limitation and Condition 12.10.b of licensing topical report NEDC-33006P-A [3.1.8], the off-rated limits assumed in the ECCS-LOCA analyses are confirmed to be consistent with the off-rated LHGR multipliers provided Figures 3-1 through 3-4. These off-rated LHGR multipliers provide adequate protection for MELLLA+ operation.
As required by Limitation and Condition 12.5.c of licensing topical report NEDC-33006P-A [3.1.8], the plant specific power/flow map specifying the GGNS licensed MELLLA+ operating domain is included as Figure 4.
As required by Limitation and Condition 12.5.c of licensing topical report NEDC-33006P-A [3.1.8], the plant specific power/flow map specifying the GGNS licensed MELLLA+ operating domain is included as Figure 4.
COLR Page 11                                                         LBDCR 2022-054
COLR Page 11 LBDCR 2022-054 CORE OPERATING LIMITS REPORT


CORE OPERATING LIMITS REPORT As required by Limitation and Condition 12.5.b of licensing topical report NEDC-33006P-A [3.1.8], operation with Feedwater Heaters Out of Service (FWHOOS) is prohibited while in the MELLLA+ operating domain [3.1.1]. In addition, as required by Limitation and Condition 12.5.a of licensing topical report NEDC-33006P-A
As required by Limitation and Condition 12.5.b of licensing topical report NEDC-33006P-A [3.1.8], operation with Feedwater Heaters Out of Service (FWHOOS) is prohibited while in the MELLLA+ operating domain [3.1.1]. In addition, as required by Limitation and Condition 12.5.a of licensing topical report NEDC-33006P-A [3.1.8], and described in GGNS TS 3.4.1 LCO, SLO is prohibited in the MELLLA+
[3.1.8], and described in GGNS TS 3.4.1 LCO, SLO is prohibited in the MELLLA+
operating domain [3.1.1].Therefore, operations with RFWT and/or SLO must adhere to the operating domain shown in Figure 5.
operating domain [3.1.1].Therefore, operations with RFWT and/or SLO must adhere to the operating domain shown in Figure 5.
COLR Page 12                                                        LBDCR 2022-054


CORE OPERATING LIMITS REPORT Table 1 OPRM Upscale CDA Amplitude Discriminator Setpoint Amplitude Discriminator Trip 1.10 Table 2 BSP Endpoints for Normal Feedwater Temperature Endpoint     Power(%)       Flow(%)                       Definition Al           72.3           44.2             Scram Reaion Boundary, HFCL Bl           34.2           25.2             Scram Region Boundary, NCL A2           67.3           50.0       Controlled Entry Reaion Boundary, HFCL B2           26.4           24.4       Controlled Entry Reaion Boundary, NCL Table 3 BSP Endpoints for Reduced Feedwater Temperature Endpoint     Power(%)       Flow(%)                       Definition Al'           67.5         50.2             Scram Reaion Boundary HFCL Bl'            28.2          24.5              Scram Region Boundary, NCL A2'           69.7         52.9       Controlled Entry Reaion Boundary, HFCL B2'           26.4         24.4       Controlled Entry Reaion Boundary, NCL Table 4 ABSP Setpoints for the Scram Region Parameter                               Symbol         Value Slope of ABSP APRM fl ow-biased trip linear segment                   mTRIP         0.77 ABSP APRM flow-biased trip setpoint power intercept.               PssP-TRIP 31.0% RTP 1 Constant Power Line for Trip from zero Drive Flow to Flow Breakpoint.
COLR Page 12 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
ABSP APRM flow-biased trip setpoint drive flow                 WssP-TRIP 39.0% RDP intercept. Constant Flow Line for Trip.
 
Flow Breakpoint value                         WssP-BREAK
OPRM Upscale CDA Amplitude Discriminator Setpoint Table 1
: 7. 5% RDP
 
: 1. RTP - Rated Thermal Power         2. RDF - Recirculation Drive Flow Table 5 Margin to Thermal Overpower and Mechanical Overpower Limits Criteria                     GNF3 Thermal Overpower Margin               30.21%
Amplitude Discriminator Trip 1.10
Mechanical Overpower Margin           49. 54%
 
COLR Page 13                                                                       LBDCR 2022-054
BSP Endpoints for Normal Feedwater Temperature Table 2
 
Endpoint Power(%) Flow(%) Definition Al 72.3 44.2 Scram Reaion Boundary, HFCL Bl 34.2 25.2 Scram Region Boundary, NCL A2 67.3 50.0 Controlled Entry Reaion Boundary, HFCL B2 26.4 24.4 Controlled Entry Reaion Boundary, NCL
 
BSP Endpoints for Reduced Feedwater Temperature Table 3
 
Endpoint Power(%) Flow(%) Definition Al' 67.5 50.2 Scram Reaion Boundary HFCL A2' 69.7 52.9 Controlled Entry Reaion Boundary, HFCL Bl' 28.2 24.5 Scram Region Boundary, NCL B2' 26.4 24.4 Controlled Entry Reaion Boundary, NCL
 
ABSP Setpoints for the Scram Region Table 4
 
Parameter Symbol Value Slope of ABSP APRM fl ow-biased trip linear segment mTRIP 0.77 ABSP APRM flow-biased trip setpoint power intercept. PssP-TRIP 31.0% RTP 1 Constant Power Line for Trip from zero Drive Flow to Flow Breakpoint.
 
ABSP APRM flow-biased trip setpoint drive flow WssP-TRIP 39.0% RDP intercept. Constant Flow Line for Trip.
 
Flow Breakpoint value WssP-BREAK 7. 5% RDP
: 1. RTP - Rated Thermal Power 2. RDF - Recirculation Drive Flow
 
Margin to Thermal Overpower and Mechanical Overpower Limits Table 5
 
Criteria GNF3 Thermal Overpower Margin 30.21%
Mechanical Overpower Margin 49. 54%
 
COLR Page 13 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
Table 6 Application Conditions
 
Application FWH 005 EOC-RPT PR 005 TBV 005 Condition
 
1 X 2 X X 3 X X 4 X X X 5 X X 6 X X X 7 X X X 8 X X X X
 
Table 7 Rated OLMCPR 5unvnary Table
 
Application GNF3 OPT A GNF3 OPT A GNF3 OPT B GNF3 OPT B Condition BOC-MOC MOC-EOC BOC-MOC MOC-EOC
 
1 1.33 1.36 1.25 1.28 2 1.33 1. 36 1.25 1.28 3 1. 33 1. 37 1.25 1.29 4 1.33 1.37 1.25 1.29 5 1.35 1.37 1. 35 1.37 6 1.35 1.41 1.35 1.41 7 1. 35 1. 37 1. 35 1. 37 8 1. 35 1.41 1. 35 1.41
 
COLR Page 14 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
15 14 0.00. 13.78 17.52, 13.78
 
13 12 E' 11 3:
~ 10 tt:
~ 9 i 8 7
 
6
 
5 4 +-_,__..__.,__'---l----'~~__,_-_.__.__._~-_,__..__.,__'--11--'----'~--'--_.__.__.__._ _ _.___.__..__'---i 0 10 20 30 40 50 60 70 Average Planar Exposure (GWd/ST)
 
Figure1-1 GNF2 Maximum Average Planar Linear Heat Generation Rate Note: Actual Limits described in Sections 5.1 and 5.5
 
15 o.oo. 14.36
 
14 13
 
12 E' 11 3:
~ 10 tt:
~ 9 0.
i 8 7
 
6 63.50, 6.00
 
5 4
0 10 20 30 40 50 60 70 Average Planar Exposure (GWd/ST)
 
Figure 1-2 GNF3 Maximum Average Planar Linear Heat Generation Rate Note: Actual Limits described in Sections 5.1 and 5.5
 
COLR Page 15 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
2.2 2.1 218, 2.12
 
2.0 218,200 35.4, 2.00
 
1.9 1.8 < 50% Co,, Flow / Option A 35.4, 1.72 40, 1.72 0: 1.7 35 4, 1.54 Tau* 0,2 ix 1.6 0.. 354,162 u
2: 1.5 70, 1.52 50, 1 55 1.4 40, 1 62 50, 1 54 / 70, 144 100, 1.40 1.3 / 70. 1 41 70,142 ts. 1 41 100,133 70, 1 39 as. 1 39 100, 1 31 1.2 Option B 1.1 1.0 0 10 20 40 50 60 70 80 90 100 Core Power (% Rated)
 
Figure 2-1A Cycle 24 Power-Dependent MCPR Limits, EIS or FWH OOS BOC to MOC, 11.0
 
2.2 ::. 50% Core Flow 2.1 21.8, 2 12
 
2.0 21.8, 2.00 ------=* 35.4, 2.00 1.9 Option A 18 < 50% Core Flow~ 4, 1.77 40, 1.77
 
0: 1.7 35 4, 1.69 70, 1.55 Tall* 0.2 ix 1.6 35... 1.66 Cl.
~ 1.5 40, 1.69 50. 1 60
: 40. 166 50. 1 57 /10, 1.4& 100, 1.43 1 4 / ~o. 1 44 10, 1 46 as. 1 44 100, 1 36 1.3 Option 8 70, 1 42 t.S, 1 -42 100, 1 34 1.2 11 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power(% Rated)
 
Figure 2-1B Cycle 24 Power-Dependent MCPR Limits, EIS or FWH oos MOC to EOC, 11.0
 
COLR Page 16 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
2.2.:: 50% Core Flow 218,215 2.1 2.0 218,203 35.4, 2.03
 
1.9 40, 1.77 1.8 < 50% c,,. Fl~ l. 1.71 a: 1.7 35.4. 1.69 Tau~ 0.2 1.6 35 4. 167 0..
" !i 1.5
 
14 100, 1 43 70, 1 45 70. 1 47 35. 1 45 100, 1.37 1.3 70, 1.43 35, 1 43 100, 1.35
 
1.2 Option B 1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (&deg;lo Rated)
 
Figure 2*1C cycle 24 Power-Dependent MCPR Limits, EIS or FWH oos BOC to MOC, SLO
 
2.2 21.8, 2.15 2.1 21 8, 2 03 ___....;::,. 35 4, 2.03 2.0
 
1.9 40, 1.80 1.8 < 50% Co<e Fl= f
* 1 BO
 
35.4, 1 72 70, 1.59 Tau= 0.2 a: 1.7 35 4, 1 69
 
Q. 1.6
" so. 1 64
~ 1.5 40. 1 69 so, 1 "/ 70, 1 52 100, 1.46 1.4 70, 147 70. 1 so 35, 1 47 100, 1 40 1.3 Option B 70* us 85,145 100, 1 38
 
1.2 1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power ("lo Rated)
 
Figure 2-1D cycle 24 Power-Dependent MCPR Limits, EIS or FWH OOS MOC to EOC, SLO
 
COLR Page 17 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
2.2 2.1 21.8,2.12
 
2.0 21 8, 2.00 354, 2.00
 
1.9 1.8 < 50% Co" FOw I 40, 1.72 35.4,1.72 ci: 1.7 c2" 35 4, 1 6" Tau* 0.2 Q. 1.6
~ 1.5 35 4, 1 62
 
1 4 100, 1.40 u 70. 1 44 as, 1 41 100, 1 33 70, 1.41 as, 1.39 100,131 12 Option B 70, 1.42 1.1 70,139
 
1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)


CORE OPERATING LIMITS REPORT Table 6 Application Conditions Application    FWH 005  EOC-RPT  PR 005    TBV 005 Condition 1                                          X 2           X                            X 3                      X                  X 4            X          X                  X 5                              X          X 6            X                  X          X 7                      X      X          X 8            X        X      X          X Table 7 Rated OLMCPR 5unvnary Table Application      GNF3 OPT A GNF3 OPT A GNF3 OPT B GNF3 OPT B Condition        BOC-MOC      MOC-EOC     BOC-MOC      MOC-EOC 1              1.33          1.36        1.25        1.28 2              1.33          1. 36      1.25        1.28 3              1. 33        1. 37      1.25        1.29 4              1.33          1.37        1.25        1.29 5              1.35          1.37        1. 35        1.37 6              1.35          1.41        1.35        1.41 7              1. 35        1. 37      1. 35        1. 37 8              1. 35        1.41        1. 35        1.41 COLR Page 14                                                            LBDCR 2022-054
Figure 2-2A cycle 24 Power-Dependent MCPR Limits with EOC-RPT 00S, or EOC-RPT & FWH 00S BOC to MOC, TLO


CORE OPERATING LIMITS REPORT 15 14  0.00. 13.78            17.52, 13.78 13 12 E'  11 3:
2.2 2.1 21.8, 2.12
  ~ 10 tt:
  ~    9 i    8 7
6 5
4 +-_,__..__.,__'---l----'~~__,_-_.__.__._~-_,__..__.,__'--11--'----'~--'--_.__.__.__.__  _.___.__..__'---i 0            10            20              30          40          50            60                70 Average Planar Exposure (GWd/ST)
Figure1-1 GNF2 Maximum Average Planar Linear Heat Generation Rate Note: Actual Limits described in Sections 5.1 and 5.5 15  o.oo. 14.36 14 13 12 E' 11 3:
  ~ 10 tt:
  ~
0.
9 8
i 7
6                                                                                                63.50, 6.00 5
4 0            10              20              30          40            50            60                  70 Average Planar Exposure (GWd/ST)
Figure 1-2 GNF3 Maximum Average Planar Linear Heat Generation Rate Note: Actual Limits described in Sections 5.1 and 5.5 COLR Page 15                                                                                          LBDCR 2022-054


CORE OPERATING LIMITS REPORT 2.2 218, 2.12 2.1 2.0                                           35.4, 2.00 218,200 1.9 Option A 1.8     < 50% Co,, Flow /                      40, 1.72 35.4, 1.72 0: 1.7                           35 4, 1.54 Tau* 0,2 ix 0.. 1.6                         354,162 u
2.0 35.4, 2.00 1.9 "'*"" I 40,178 1.8 < 50% Core Flow 35., 1.78 ci: 1.7 35 4, 1.70 70, 1.56 c2" 1.6 3S., 1.67 Q. 85, 1.53
2:  1.5                                                                                    70, 1.52 50, 1 55 40, 1 62 1.4                                                    50, 1 54    /  70, 144                                          100, 1.40
  ~ 1.5 40, 1 67 100, 1.44 1.4 ::: :.: / 10.~1=..4:=~==:a~s~.1~4~5=::::::::::::::::l~ 100, 1 37 71!, 1 47 1 45 as. 1 3 100, 1 35 u 10, 1.43 70 *
                                                                        /      70. 1 41 70,142 ts. 1 41                100,133 1.3 70, 1 39 as. 1 39        100, 1 31 1.2                                                  Option B 1.1 1.0 0      10          20                      40          50        60          70          80          90    100 Core Power (% Rated)
* 12 Option B u
Figure 2-1A Cycle 24 Power-Dependent MCPR Limits, EIS or FWH OOS BOC to MOC, 11.0 2.2                                        ::. 50% Core Flow 21.8, 2 12 2.1 2.0          21.8, 2.00  ------=*          35.4, 2.00 1.9 40, 1.77                        Option A 18      < 50% Core Flow~ 4, 1.77 35 4, 1.69                                                                          Tall* 0.2 0: 1.7                                                                                    70, 1.55 ix Cl. 1.6 35 ... 1.66
1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (0.4 Rated)
    ~   1.5 40, 1.69
: 50. 1 60 14
: 40. 166
: 50. 1 57    /10,   1.4&                                        100, 1.43
                                                                          /      ~o. 1 44  10, 1 46      as. 1 44                100, 1 36 1.3                                                                                               t.S, 1 -42      100, 1 34 Option 8                  70, 1 42 1.2 11 1.0 0       10         20         30           40           50         60         70         80           90     100 Core Power(% Rated)
Figure 2-1B Cycle 24 Power-Dependent MCPR Limits, EIS or FWH oos MOC to EOC, 11.0 COLR Page 16                                                                                                              LBDCR 2022-054


CORE OPERATING LIMITS REPORT 2.2                                          .:: 50% Core Flow 218,215 2.1 218,203                            35.4, 2.03 2.0 a:
Figure2-2B cycle 24 Power-Dependent MCPR Limits with EOC-RPT 00S, or EOC-RPT & FWH 00S MOC to EOC, TLO
1.9 1.8 1.7
                    < 50%  c,,. Fl~    l. 1.71 35.4. 1.69 35 4. 167 40, 1.77 Tau~ 0.2
    "!i 0.. 1.6 1.5 100, 1 43 14                                                                                            35. 1 45                100, 1.37 70, 1 45 70. 1 47 1.3                                                                                            35, 1 43        100, 1.35 70, 1.43 1.2                                                      Option B 1.1 1.0 0        10          20        30            40          50    60        70        80          90      100 Core Power (&deg;lo Rated)
Figure 2*1C cycle 24 Power-Dependent MCPR Limits, EIS or FWH oos BOC to MOC, SLO 2.2 21.8, 2.15 2.1 21 8, 2 03      _ _ _....;::,. 35 4, 2.03 2.0 a:
1.9 1.8 1.7
                      < 50% Co<e Fl=      f*    1 BO 35.4, 1 72 35 4, 1 69 40, 1.80 70, 1.59                  Tau= 0.2 "Q.
        ~
1.6 1.5                                            40. 1 69 so. 1 64 1                                                    100, 1.46 so,  " / 70, 1 52 1.4                                                                    70, 147 70. 1 so      35, 1 47 100, 1 40 100, 1 38 1.3                                                        Option B              70* us        85,145 1.2 1.1 1.0 0        10          20          30            40          50    60        70        80          90      100 Core Power ("lo Rated)
Figure 2-1D cycle 24 Power-Dependent MCPR Limits, EIS or FWH OOS MOC to EOC, SLO COLR Page 17                                                                                                              LBDCR 2022-054


CORE OPERATING LIMITS REPORT 2.2 21.8,2.12 2.1 2.0          21 8, 2.00                    354, 2.00 1.9 1.8 ci: 1.7
COLR Page 18 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
                  < 50% Co" FOw      I35.4,1.72 40, 1.72 c2" 1.6 Q.
35 4, 1 6"                                                                            Tau* 0.2
    ~    1.5                          35 4, 1 62 14                                                                                                                          100, 1.40
: 70. 1 44        as, 1 41                      100, 1 33 u                                                                            70, 1.41        as, 1.39              100,131 12                                                          Option B        70, 1.42 70,139 1.1 1.0 0        10        20            30    40          50      60            70        80          90            100 Core Power (% Rated)
Figure 2-2A cycle 24 Power-Dependent MCPR Limits with EOC-RPT 00S, or EOC-RPT & FWH 00S BOC to MOC, TLO 2.2 2.1          21.8, 2.12 2.0 1.9 1.8
                        "'*"" I                      35.4, 2.00 40,178
                    < 50% Core Flow    35 . , 1.78 70, 1.56 ci: 1.7                            35 4, 1.70 c2" 1.6 Q.
3S.,  1.67 85, 1.53
    ~    1.5                                        40, 1 67 100, 1.44 1.4                                                    ::: :.: /              10.~1=..4:=~==:a~s~.1~4~5=::::::::::::::::l~ 100, 1 37 71!, 1 47 u                                                                  10, 1.43 70 1 45
                                                                                            *
* as. 1 3                    100, 1 35 12                                                          Option B u
1.0 0        10        20            30    40          50        60            70        80            90            100 Core Power (0.4 Rated)
Figure2-2B cycle 24 Power-Dependent MCPR Limits with EOC-RPT 00S, or EOC-RPT & FWH 00S MOC to EOC, TLO COLR Page 18                                                                                                               LBDCR 2022-054


CORE OPERATING LIMITS REPORT 22                                         :::. 50% Core Flow 21 21J!,2.03                       35.4, 2 03 20 1.9 u                            I "50% Core Flow 35 .4, 1.77 40, 1.77 a:  1.7                          3S'4, J.69
22 :::. 50% Core Flow 21 20 21J!,2.03 I 35.4, 2 03
    ~                                35 4, 1.67                                                                  Tauu(U Cl. H
    ~    1.5 100, 1.43 1.4                                                                          70, l 49                          100, 1 37 115,  1. 5 u                                                                            70, 1 '4S  11S, 1 '43 100,135
: 10. 147 1.2                                                            Optlon B 70, 1.43 1.1 1.0 0        10          20          30        40        50        60        70    80            90    100 Core Power (% Rated)
Figure 2-2C Cycle 24 Power-Dependent MCPR Limits with EOC-RPT 00S, or EOC-RPT & FWH 00S BOC to MOC, SLO 2.2 21.8, 2.15 2.1 2.0 1.9
                          "'*"'1.                        35.4, 2.03 1.8      < 50% Core Flow    35 .4. 1*82 35 ... 1 74
                                                                        . ,I 70, 1.60 a:  1.7 35.'4. 1.71
      ~                                                                                                85, 1.56    Tau* 0.2 CL  1.6 u
                                                                    ~so. 163
:Ii                                            40. t 71 1.5                                                                                                            100, 1.47 1.4                                                                          70, 1.53  115, 1.49              100, 1 41 70, 1.49  115, 147 1.3                                                                                                      100, 1 39 70, 1.51 1.2                                                          Option B    70,147 1.1 10 0        10          20            30      40          50        60        70    80            90    100 Core Power (% Rated)
Figure 2-20 Cycle 24 Power-Dependent MCPR Limits with EOC-RPT 00S, or EOC-RPT & FWH 00S MOC to EOC, SLO COLR  Page    19                                                                                                  LBDCR 2022-054


CORE OPERATING LIMITS REPORT 22                                    ::. 50% Core Flow 21.8, 2.12 2.1 2.0          21 8, 2 00 _ _ ____...,. 35.4, 2.00 1.9 1.8    < 50% Co,e Flow /          35.4, 1 89        so, 1.89 a.: 1.7 ix Q. 1.6
1.9 u "50% Core Flow 35.4, 1.77 40, 1.77 a: 1.7 3S'4, J.69 Cl. ~ H 35 4, 1.67 Tauu(U
    ~   1.5 1.4 100, 1.42 1.3 12 11 1.0 0    10          20      30          40        50      60  70 80  90    100 Core Power (% Rated)
~ 1.5 1.4 100, 1.43 70, l 49 115, 1. 5 100, 1 37 u 70, 1 '4S 11S, 1 '43 100,135 1.2 Optlon B 10. 147 70, 1.43 1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)
Figure 2-3A Cycle 24 Power-Dependent MCPR Limits with PR 00S or PR & EOC RPT 00S BOC to MOC, TLO 2.2                                    ::. 50% Core Flow 21.8, 2.12 2.1 2.0          211!, 2.00  _ _ _ _ _ _.,. 35.4, 2.00 1.9 35.4, 1.92          so, 1.92 1.8    < 50% Core Flow /
a.: 1.7 ix Q. 1.6
    ~  1.5 1.4                                                                                100, 1.44 1.3 12 1.1 10 0     10           20       30           40         50       60 70 80 90     100 Core Power (% Rated)
Figure2-3B Cycle 24 Power-Dependent MCPR Limits with PR 00S or PR & EOC RPT 00S MOC to EOC, TLO COLR Page 20                                                                            LBDCR 2022-054


CORE OPERATING LIMITS REPORT 22                                    ::_ 50% Core Flow 218,215 2.1 21 8, 2 03 _ _ _...;;:... 35.4, 2.03 2.0 1.9 35.4, 1.93            50, 1.93 1.8    < 50% Cora F*w /
Figure 2-2C Cycle 24 Power-Dependent MCPR Limits with EOC-RPT 00S, or EOC-RPT & FWH 00S BOC to MOC, SLO
i:i: 1.7 2"
a.. 1.6
    ~    1.5 1.4                                                                              100, 1.45 1.3 1.2 u
1.0 0    10          20    30            40        50        60  70  80  90    100 Core Power(% Rated)
Figure 2-3C Cycle 24 Power-Dependent MCPR Limits with PR 00S or PR & EOC RPT 00S BOC to MOC, SLO 22                                    ~  50% Core Flow 21.8, 2.15 21 21.8, 2.03 20 1.9                              35.4, 1.96        50, 1.96 18    < 50% Core Flow /
i:i: 1.7 2"
Q. 16 u
:E    1.5 1.4                                                                              100, 1.47 1.3 1.2 1.1 1.0 0    10          20    30            40        50        60  70  80  90    100 Core Power (% Rated)
Figure 2-30 Cycle 24 Power-Dependent MCPR Limits with PR 00S or PR & EOC RPT 00S MOC to EOC, SLO COLR Page 21                                                                              LBDCR 2022-054


CORE OPERATING LIMITS REPORT 22
2.2 21.8, 2.15 2.1 2.0 35.4, 2.03 1.9 "'*"' 1.
:'.: 50% Core Flow 2.1           21.8,2.12 2.0 70,Ul9 1.9 1.8                               35.4,Ul9             50, 1!19 ii u cE' 1.6 a.
 
    ~   1.5 1.4 100, 142 1.3 1.2 1.1 1.0 0       10         20   30               40         50   60     70   80 90     100 Core Power(% Rated)
1.8 < 50% Core Flow 35.4. 1*82
Figure 2-4A Cycle 24 Power-Dependent MCPR Limits with PR & FWH 00S or PR & FWH & EOC-RPT 00S BOC to MOC, TLO 2.2                                       :'.: 50% Core Flow 21.8, 2.12 2.1 70, 197 2.0           218,200 1.9                               35 4, 1 97           50, 1.97 1.8
 
35... 1 74 70, 1.60 a: 1.7 35.'4. 1.71
~ 1.6 CL 85, 1.56 Tau* 0.2
:Ii 1.5 u 40. t 71 ~..
so. 163, I 100, 1.47 1.4 70, 1.53 115, 1.49 100, 1 41 1.3 70, 1.49 115, 147 100, 1 39 70, 1.51 1.2 Option B 70,147
 
1.1 10 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)
 
Figure 2-20 Cycle 24 Power-Dependent MCPR Limits with EOC-RPT 00S, or EOC-RPT & FWH 00S MOC to EOC, SLO
 
COLR Page 19 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
22 ::. 50% Core Flow 2.1 21.8, 2.12
 
2.0 21 8, 2 00 ___ ___...,. 35.4, 2.00
 
1.9 1.8 < 50% Co,e Flow / 35.4, 1 89 so, 1.89 a.: 1.7 ix 1.6 Q.
~ 1.5
 
1.4 100, 1.42 1.3 12 11 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)
 
Figure 2-3A Cycle 24 Power-Dependent MCPR Limits with PR 00S or PR & EOC RPT 00S BOC to MOC, TLO
 
2.2 ::. 50% Core Flow 2.1 21.8, 2.12
 
2.0 211!, 2.00 ______.,. 35.4, 2.00
 
1.9 35.4, 1.92 so, 1.92 1.8 < 50% Core Flow /
a.: 1.7 ix 1.6 Q.
~ 1.5
 
1.4 100, 1.44 1.3
 
12
 
1.1 10 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)
 
Figure2-3B Cycle 24 Power-Dependent MCPR Limits with PR 00S or PR & EOC RPT 00S MOC to EOC, TLO
 
COLR Page 20 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
22 2.1 218,215 ::_ 50% Core Flow 2.0 21 8, 2 03 ___...;;:... 35.4, 2.03
 
1.9 35.4, 1.93 50, 1.93 1.8 < 50% Cora F*w /
i:i: 1.7 2" 1.6 a..
~ 1.5
 
1.4 100, 1.45 1.3
 
1.2 u
1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power(% Rated)
 
Figure 2-3C Cycle 24 Power-Dependent MCPR Limits with PR 00S or PR & EOC RPT 00S BOC to MOC, SLO
 
22 ~ 50% Core Flow 21.8, 2.15 21 20 21.8, 2.03
 
1.9 35.4, 1.96 50, 1.96 18 < 50% Core Flow /
i:i: 1.7 2" 16 Q.
:E 1.5 u
 
1.4 100, 1.47
 
1.3 1.2
 
1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)
 
Figure 2-30 Cycle 24 Power-Dependent MCPR Limits with PR 00S or PR & EOC RPT 00S MOC to EOC, SLO
 
COLR Page 21 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
22 :'.: 50% Core Flow 2.1 21.8,2.12 2.0 70,Ul9 1.9 1.8 35.4,Ul9 50, 1!19
 
ii u cE' 1.6 a.
~ 1.5
 
1.4 100, 142 1.3 1.2 1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power(% Rated)
 
Figure 2-4A Cycle 24 Power-Dependent MCPR Limits with PR & FWH 00S or PR & FWH & EOC-RPT 00S BOC to MOC, TLO
 
2.2 :'.: 50% Core Flow 2.1 21.8, 2.12 70, 197 2.0 218,200 1.9 35 4, 1 97 50, 1.97 1.8
* 50% Co" Flow/
* 50% Co" Flow/
ii 1.7 cE' 1.6 0..
ii 1.7 cE' 1.6 0..
u
u
::e 1.5 100, 1.48 1.4 1.3 1.2 1.1 1.0 0       10         20     30               40         50   60     70   80 90     100 Core Power (% Rated)
::e 1.5 1.4 100, 1.48
Figure2-4B Cycle 24 Power-Dependent MCPR Limits with PR & FWH 00S or PR & FWH & EOC-RPT 00S MOC to EOC, TLO COLR Page 22                                                                                 LBDCR 2022-054
 
1.3 1.2
 
1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)
 
Figure2-4B Cycle 24 Power-Dependent MCPR Limits with PR & FWH 00S or PR & FWH & EOC-RPT 00S MOC to EOC, TLO
 
COLR Page 22 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
2.2 :: 50% Core Flow 2Ul,2.15 2.1 2.0 21.8, 2.03 35.4, 2.03 70, 193
 
1.9 /35.4,1.93 50,193 1.8 < 50% Core Flow a: 1.7 ii' 1.6 0..
~ 1.5
 
1.4 100, 1.45 1.3 1.2 1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)
 
Figure 2-4C Cycle 24 Power-Dependent MCPR Limits with PR & FWH 00S or PR & FWH & EOC-RPT OOS BOC to MOC, SLO


CORE OPERATING LIMITS REPORT 2.2                                     :: 50% Core Flow 2Ul,2.15 2.1 21.8, 2.03                  35.4, 2.03            70, 193 2.0 1.9
2.2 :: 50% Core Flow 21.8, 2.15 2.1 35.4, 2.03 70, 2.02 2.0 218,203 35.4, 2.02 50,202 1.9 1.8 < 50% CM,, ** I a: u ii'
                                      /35.4,1.93                50,193 1.8      < 50% Core Flow a:  1.7 ii' 1.6 0..
    ~    1.5 1.4                                                                                100, 1.45 1.3 1.2 1.1 1.0 0        10        20      30          40          50  60    70    80 90    100 Core Power (% Rated)
Figure 2-4C Cycle 24 Power-Dependent MCPR Limits with PR & FWH 00S or PR & FWH & EOC-RPT OOS BOC to MOC, SLO 2.2                                        :: 50% Core Flow 21.8, 2.15 2.1                                         35.4, 2.03 70, 2.02 2.0         218,203 35.4, 2.02           50,202 a: u 1.9 1.8       < 50% CM, , *
* I ii'
: 0. 1.6
: 0. 1.6
    ~ 15 100, 1.52 1.4 1.3 1.2 1.1 1.0 0       10         20     30           40           50 60     70   80 90     100 Core Power(% Rated)
~ 15 100, 1.52 1.4 1.3 1.2 1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power(% Rated)
Figure2-40 Cycle 24 Power-Dependent MCPR Limits with PR & FWH 00S or PR & FWH & EOC-RPT 00S MOC to EOC, SLO COLR Page 23                                                                               LBDCR 2022-054
 
Figure2-40 Cycle 24 Power-Dependent MCPR Limits with PR & FWH 00S or PR & FWH & EOC-RPT 00S MOC to EOC, SLO
 
COLR Page 23 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
1.90 1.85 1.80 1.75 1.70 1.65 1.60 E 1.55
~ 1.50 0
:::E 1.45 90, 1-38 110, 1.38 1.40 1.35 81.5, 1.38 100, 1.38 1.30 1.25 1.20 115 1.10 +-~--~----,;--~--t-~-+-~--+--~-t-~--~--;--~-;--~----,;--~--1 0 10 20 30 40 50 60 70 80 90 100 110 Core Flow (% Rated)
 
Figure 2-5A Cycle 24 Flow-Dependent MCPR Limits, TLO, All Application Conditions
 
1.90 1.85 1.80 1.75 1.70 1.65 1.60 C' 1.55 ix 1.50 a.
0 1.45
:::E 90, 1.4 1 110, 1.41 1.40 1.35 81.5, 1.41 100, 1.41 1.30 1.25 1.20 1.15 1.10 0 10 20 30 40 50 60 70 80 90 100 110 Core Flow (% Rated)
 
Figure 2-58 Cycle 24 Flow-Dependent MCPR Limits, SLO, All Application Conditions
 
COLR Page 24 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
1.05 354, 1.000 50, 1.000 70, 1 000 85, 1000 100, 1 000 100


CORE OPERATING LIMITS REPORT 1.90 1.85 1.80 1.75 1.70 1.65 1.60 E      1.55
0.95
    ~ 1.50 0
:::E 1.45 90 , 1-38              110, 1.38 1.40 1.35                                                                                      81.5, 1.38              100, 1.38 1.30 1.25 1.20 115 1.10 + - ~ - - ~ - - - - , ; - - ~ - - t - ~ - + - ~ - - + - - ~ - t - ~ - - ~ - - ; - - ~ - ; - - ~ - - - - , ; - - ~ - - 1 0      10        20          30        40        50        60        70        80        90          100        110 Core Flow (% Rated)
Figure 2-5A Cycle 24 Flow-Dependent MCPR Limits, TLO, All Application Conditions 1.90 1.85 1.80 1.75 1.70 1.65 1.60 C' 1.55 ix
: a. 1.50 0                                                                                                          90 , 1.4 1
:::E  1.45                                                                                                                        110, 1.41 1.40 1.35                                                                                      81.5, 1.41              100, 1.41 1.30 1.25 1.20 1.15 1.10 0        10        20          30        40        50        60        70        80        90          100        110 Core Flow (% Rated)
Figure 2-58 Cycle 24 Flow-Dependent MCPR Limits, SLO, All Application Conditions COLR Page 24                                                                                                                  LBDCR 2022-054


CORE OPERATING LIMITS REPORT 1.05 354, 1.000        50, 1.000            70, 1 000      85, 1000        100, 1 000 100 0.95 0.90                                           35 4, 0.896
0.90 35 4, 0.896
                      < 50% Core Flow
'ii: < 50% Core Flow ~
    'ii:                                  ~
u 0.85
u 0.85
    ~
~
0::
0:: 0.80
(,!) 0.80
(,!)
:x:
:x:
    ..I 21 8, 0.760 0.75 0.70 0.65
..I 0.75 21 8, 0.760
:::. 50% Core Flow 21.8, 0.645
 
                                        -                35.4, 0730 0.60 0           10         20         30         40         50       60       70         80         90         100     110 Power (% Rated)
35.4, 0730 0.70 :::. 50% Core Flow -
Figure 3-1 Cycle 24 Power-Dependent LHGR Factor, EIS, FWH 00S, EOC-RPT 00S, EOC-RPT & FWH 00S Note: These factors to be applied to the exposure-dependent limits as descibed in Section 5.3 1.05 85, 1.000       100. 1.000 1.00 0.95
 
                    < 50% Core Flow 0.90
0.65 21.8, 0.645
    'ii:
 
u 0.85                               ~                                 50, 0.849
0.60 0 10 20 30 40 50 60 70 80 90 100 110 Power (% Rated)
    ~
 
0::
Figure 3-1 Cycle 24 Power-Dependent LHGR Factor, EIS, FWH 00S, EOC-RPT 00S, EOC-RPT & FWH 00S Note: These factors to be applied to the exposure-dependent limits as descibed in Section 5.3
(,!) 0.80
 
1.05 85, 1.000 100. 1.000 1.00
 
0.95 0.90 < 50% Core Flow
'ii:
u 0.85 ~ 50, 0.849
~
0:: 0.80
(,!)
:x:
:x:
    ..I                 21 8, 0.760 0.75 0.70 0.65
..I 0.75 21 8, 0.760
                  ~   50% Core Flow 21.8, 0.645 0.60 0            10        20        30        40        50        60        70        80        90          100    110 Power (% Rated)
 
Figure 3-2 Cycle 24 Power-Dependent LHGR Factor PR 00S, PR & FWH 00S, PR & EOC-RPT 00S, PR & EOC-RPT & FWH 00S Note: These factors to be applied to the exposure-dependent limits as descibed in Section 5.3 C0LR Page 25                                                                                                                LBDCR 2022-054
0.70 ~ 50% Core Flow --
 
0.65 21.8, 0.645


CORE OPERATING LIMITS REPORT 1.05 80,3, 1.000 90, 1.000           110, 1.000 1.00 TLO     ~998                                         , 1.000 100 0.95 0.90
0.60 0 10 20 30 40 50 60 70 80 90 100 110 Power (% Rated)
  &#xa3;
 
  ~ 0.85 12O    0.80
Figure 3-2 Cycle 24 Power-Dependent LHGR Factor PR 00S, PR & FWH 00S, PR & EOC-RPT 00S, PR & EOC-RPT & FWH 00S Note: These factors to be applied to the exposure-dependent limits as descibed in Section 5.3
 
C0LR Page 25 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
1.05 80,3, 1.000 90, 1.000 110, 1.000 1.00 TLO ~998 100, 1.000
 
0.95
 
0.90
&#xa3;
~ 0.85 12 O 0.80
::c
::c
  .J 0.75 0.70 0.65 0.60 +-~----'---+-....__--+_........_       ___,_ ____.__ ___,___ __.__ __.__ __.___ _.__-+-___.-----i 0       10       20       30       40         50       60     70         80       90       100       110     120 Core Flow(% Rated)
.J 0.75
Figure 3-3 Cycle 24 GNF2 Flow-Dependent LHGR Factor Note: These factors to be applied to the exposure-dependent limits as descibed in Section 5.3 1.05 80.3, 1.000 90, 1.000           110, 1.000 1.00 0.95 0.90
 
      &#xa3;
0.70
      ~   0.85 12o  0.80
 
0.65 0.60 +-~----'---+-....__--+_........ _ ___, __ ___._ __ __,__ __ _._ __ _._ __ _.__ __.__-+-___.-----i 0 10 20 30 40 50 60 70 80 90 100 110 120 Core Flow(% Rated)
 
Figure 3-3 Cycle 24 GNF2 Flow-Dependent LHGR Factor Note: These factors to be applied to the exposure-dependent limits as descibed in Section 5.3
 
1.05 80.3, 1.000 90, 1.000 110, 1.000 1.00
 
0.95
 
0.90
&#xa3;
~ 0.85 12 o 0.80
::c
::c
      .J 0.75 0.70 0.65 0 .60 +---'--+--~--+-....__--+---+----'--+------+-_._---1_ _._--+-..._--+-___,_ ____.__+-~--;
.J 0.75
0       10       20       30       40       50       60       70         80       90       100       110     120 Core Flow (0/4 Rated)
 
Figure 3-4 Cycle GNF3 24 Flow-Dependent LHGR Factor Note: These factors to be applied to the exposure-dependent limits as descibed in Section 5.3 COLR Page 26                                                                                                             LBDCR 2022-054
0.70
 
0.65
 
0.60 +---'--+--~--+-....__--+---+----'--+------+-_._---1 _ _._--+-..._--+-___, __ ___.__+-~--;
0 10 20 30 40 50 60 70 80 90 100 110 120 Core Flow (0/4 Rated)
 
Figure 3-4 Cycle GNF3 24 Flow-Dependent LHGR Factor Note: These factors to be applied to the exposure-dependent limits as descibed in Section 5.3
 
COLR Page 26 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
 
CORE FLOW (% rated) 0 10 20 30 40 50 60 70 80 90 100 110 110 I, 1 I 1 1 I 1 1 I 1.1 I I I 11 I I I l I 11 I I I 11 i I I I I I l I
 
100 Cycle 24 BSP Region I Implemented BSP Boundary 1--L Boundaries for NFWT 05,1~
 
90 1---+--+---1-----1---1--J-----LI MELLLA+ Boundary
 
80 11-r--r-t--t-t--t--t--t-+~~~F-1-+~~~:::::.;i----t---i------+--+---+-l--!--ll-L_J
 
- 70 1-----1----1 MELLLA Bounda,v I. I"'- / -~~5 71.3 1 lo " o,.,.. I..
~so ',_ :..,.--,
~ ~.....,.....v / I
~ 50.__ I Scram Region 1 ~,_,,,,-/ I - **~ OPRM Armed Region
~ 1, _,._ I " / 1
$ /'
* A 'lif I 2~ / -~ I
~ I/ V Controlled Entry I Ii I I I I I I 1.-
030 ** i l/ I II I 1 I~
 
(.) D '-"' ~ ~
20 /-* -
* u:;;,;;;.;;-,1 I I I I I I I I I / Ca *itatii n Pr1 tectl 1>n 1
/ ~ 7 Note:
10 ~* 1/"'..I I SLO is prohibited in MELLI.A+ region
 
0 ~ /
0 10 20 30 40 50 60 70 80 90 100 110 120 CORE FLOW (MLB/HR)


CORE OPERATING LIMITS REPORT CORE FLOW (% rated) 0              10        20              30                40                50              60            70                  80        90          100        110 110                  1                            1                                  1              I              1                            1          I          I I,    1      I    1  I 1 1 I      .1      I        I        I    1      I      I    l    I      1    I          I  I    1    i    I    I    I    l I Cycle 24 BSP Region                                    I Implemented BSP Boundary 1--L 100    Boundaries for NFWT                                                                                                                                              05,1~
90  1---+--+---1-----1---1--J-----LI                  MELLLA+ Boundary 80 11-r--r-t--t-t--t--t--t-+~~~F-1-+~~~:::::.;i----t---i------+--+---+-l--!--ll-L_J
  - 70 lo
  ~so 1-----1----1 I
MELLLA Bounda,v
                                          . I"'-
                                                                                /      - ~ ~ 5 71.3 o    ,
1 I
  ~                                                          ~    .....,.....v /                                              I
  ~ 50
  ~
          .__ I Scram Region 1
1
                                      , _,._          I
                                                          ~ ,_,,,,-/
                                                                "            /
I                                    -    *1~            OPRM Armed Region
  $                                                /'
* A        'lif                                                    I 2~                                                        /          -~                                                      I
  ~                                              I/              V              Controlled Entry    I                          Ii            I  I    I    I    I I 1.-
030                                  **    i          l/                                        I                          II            I 1 I~
(.)                                  D    '-"'                                                                              ~                ~
20
                                          /- * -
* u:;;,;;;.;;-,1  I    I    I    I      I  I      I I I                  /                                Ca *itatii n Pr1 tectl 1>n                  1
                                    /                    ~                                                                            7 Note:
10                      ~*                1/"'..I                                                                                  I SLO is prohibited in MELLI.A+ region 0    ~                            /
0          10        20            30            40                50          60            70          80              90      100        110        120 CORE FLOW (MLB/HR)
Figure 4 Backup Stability Protection Region Boundaries for Normal Feedwater Temperature (NFWT)
Figure 4 Backup Stability Protection Region Boundaries for Normal Feedwater Temperature (NFWT)
COLR Page 27                                                                                                                                                            LBDCR 2022-054


CORE OPERATING LIMITS REPORT CORE FLOW (% rated) 0.0         10.0           20.0           30.0                   40.0         50.0           60.0           70.0           80.0           90.0       100.0       110.0 110
COLR Page 27 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
        ._ Cycle 24 BSP Region                                                                                                             (~2.s,i ,100) 100 ,_ Boundaries for RFWT                                                                                                                             _,,,,.
 
90 I Implemented BSP Boundary I
CORE FLOW (% rated) 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 110
1 I   -r-- ,._               L.,  ~
._ Cycle 24 BSP Region (~2.s,i,100) 100,_ Boundaries for RFWT ~* _,,,,. 105,,,10(
                                                                                                                                                --      ~*
I Implemented BSP Boundary 1 --
_..,,.. v-105, ,,10(
I I -r-- L.,,._ _..,,.. ~ v-90.- ~- ~
                                                                                                                            .- ~- ~
 
                                                                                                                    ~ '"'........-1 80
80 ~ '"'........-1
                                                                                                          .... ,:. / '           I
....,:. /' I
  -10 A2'   ~     ~-                           I
-10 A2' ~ ~- I
                                                                                                                                  .*I 1                   l MELLLA Boundary           I                               1\1'
* 1 l MELLLA Boundary I _,, ~ 'l I 1\\1',z -/'. I
                                                                                      -,z / '
 
1!50
1!50 l '" ~ _/ ~ / i, I
_,, ~ 'l                                             I l                            '"
~                                                          ~     _/ ~             /   i,                                       I I
  ~
  ~
50 ......_
~ 1,..,-" 11'/
0..40 1 Scram Region        I I
* OPRM Armed Region
                                                ~~
                                            - r----
                                                          ~
1,..,-"
A 'A 11'/
                                                                            /. II' I
OPRM Armed Region
  ~
  ~
030 0
I 50......_ 1 Scram Region I - r----I ~~ /. II' I
Fi1' 1,.-
* 0..40 A 'A *
_,,,,,,, ~
 
                                                            ,,,; ~I           Controlled Entry   I I
,,,; ~ I Controlled Entry I I 1-
I I
~ Fi1' _,,,,,,, ~ I I ~ -
I
030 i..----
                                                                                                                                          - i..----
0 D'l 1,.- -,_ I -
                                                                                                                                                          ~
Ii----
                                                                                                                                                                  -    1-D'l Ii----
20 I / -- -- Ca '1itati pn Pr t>tecti pn
20 I                 /                               Ca '1itati pn Pr t>tecti pn 10                   _,,,,,,,,,/               /
 
V 0
10 _,,,,,,,,, V / /
0 10         20
 
                                          /
0 --
30             40               50           60           70           80             90         100         110         120 CORE FLOW (MLB/HR)
0 10 20 30 40 50 60 70 80 90 100 110 120 --- -- /
CORE FLOW (MLB/HR)
 
Figure 5 Backup Stability Protection Region Boundaries for Reduced Feedwater Temperature (RFWT)
Figure 5 Backup Stability Protection Region Boundaries for Reduced Feedwater Temperature (RFWT)
COLR Page 28                                                                                                                                                            LBDCR 2022-054


CORE OPERATING LIMITS REPORT 2100 Ill Ill 1111 Operating Limit MCPR (P) = K(P)
COLR Page 28 LBDCR 2022-054
* Operating Limit
 
: a.                                                       MCPR(100)
CORE OPERATING LIMITS REPORT
  ~   2.000
 
                ~
Ill 2100 Ill Operating Limit MCPR (P) = K(P)
Q.
* Operating Limit 1111
For P<21.8%: No Thermal limits Monitoring V
: a. MCPR(100)
Q.                                                       Required, No limits specified.
~ 2.000 Q.
  ._   1900 J!             I           I                           For 21.8%S:Ps:P(Bypass), P(Bypass)=35.4%
V For P<21.8%: No Thermal limits Monitoring Q. Required, No limits specified.
I                                         OLMCPR(P)==1.88,                     Flow<50%
._ 1900 ~
I                                         OLMCPR(P)=1.88 +0.00809.(35.4%-P), Flow~50%
J! I I For 21.8%S:Ps:P(Bypass), P(Bypass)=35.4%
I OLMCPR(P)==1.88, Flow<50%
I OLMCPR(P)=1.88 +0.00809.(35.4%-P), Flow~50%
 
For P>P(Bypass)
For P>P(Bypass)
K(P)=1.225,                   35.4% < P s: 40%
K(P)=1.225, 35.4% < P s: 40%
K(P)=1.166+0.00590*(50%-P), 40% < P s: 50%
K(P)=1.166+0.00590*(50%-P), 40% < P s: 50%
K(P)=1.083+0.00415*(70%-P), 50% < P s: 70%
K(P)=1.083+0.00415*(70%-P), 50% < P s: 70%
K(P)=1.057,                   70% < P s 85%
K(P)=1.057, 70% < P s 85%
K(P)=1.000+0.00380*(100%-P), 85% < P S:100%
K(P)=1.000+0.00380*(100%-P), 85% < P S:100%
1.000 20        30                  50          60          70        80                100        110 Power {% rated)
Fi111re 6 MCPRp Limit and K(P} Multiplier for EIS, FWH OOS, EOC-RPT OOS, FWH & EOC-RPT OOS COLR Page 29                                                                                            LBDCR 2022-054


CORE OPERATING LIMITS REPORT Operating Limit MCPR (P) = K(P)
1.000 20 30 50 60 70 80 100 110 Power {% rated)
* Operating limit 2   I           I                           MCPR(100)
Fi111re 6 MCPRp Limit and K(P} Multiplier for EIS, FWH OOS, EOC-RPT OOS, FWH & EOC-RPT OOS
              ~
 
For P<21.8%: No Thermal Limits Monitoring 1.9                                             Required, No limits specified.
COLR Page 29 LBDCR 2022-054 CORE OPERATING LIMITS REPORT
I           f I                                       For 21.8%s:Ps;P(Bypass), P(Bypass)=35.4%
 
OLMCPR(P)=1.88,                       Flow<50%
Operating Limit MCPR (P) = K(P)
* Operating limit 2 I I MCPR(100)
 
For P<21.8%: No Thermal Limits Monitoring 1.9 Required, No limits specified.
~ I f I For 21.8%s:Ps;P(Bypass), P(Bypass)=35.4%
OLMCPR(P)=1.88, Flow<50%
OLMCPR(P)=1.88 +0.00809*(35.4%-P), Flow~50%
OLMCPR(P)=1.88 +0.00809*(35.4%-P), Flow~50%
17 For P>P(Bypass)
17 For P>P(Bypass)
K(P)=1.319,                   35.4% < P s 70%
K(P)=1.319, 35.4% < P s 70%
K{P)=1.160+0.01060*(85%-P), 70% < P s 85%
K{P)=1.160+0.01060*(85%-P), 70% < P s 85%
K(P)=1.000+0.00693*(100%-P), 85% < P S:100%
1.6 K(P)=1.000+0.00693*(100%-P), 85% < P S:100%
1.6 1.5 14 1.3 12 1.1 20       30       40       so         60         10                             100       110 Power (% rated}
 
1.5
 
14
 
1.3
 
12
 
1.1
 
20 30 40 so 60 10 100 110 Power (% rated}
 
figure 7 MCPRp Limit and K(P} Multiplier for PR OOS, PR & FWH OOS, PR & EOC-RPT OOS, PR & FWH
figure 7 MCPRp Limit and K(P} Multiplier for PR OOS, PR & FWH OOS, PR & EOC-RPT OOS, PR & FWH
                                                  & EOC-RPT OOS COLR Page 30                                                                                       LBDCR 2022-054}}
& EOC-RPT OOS
 
COLR Page 30 LBDCR 2022-054}}

Revision as of 05:13, 16 November 2024

(Ggns), Unit 1, Core Operating Limits Report (COLR) Cycle 24, Revision 1
ML22229A032
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/17/2022
From: Hardy J
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GGNS TS 5.6.5, GNRO2022-00020
Download: ML22229A032 (32)


Text

Entergy Operations, Inc.

entergy P.O. Box 756 Port Gibson, Mississippi 39150

Jeffery Hardy Manager Regulatory Assurance Grand Gulf Nuclear Station Tel 802-380-5124

GGNS TS 5.6.5 GNRO2022-00020

August 17, 2022

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Grand Gulf Nuclear Station (GGNS) Core Operating Limits Report (COLR) Cycle 24, Revision 1

Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29

In accordance with 1 O CFR 50.36 and GGNS Technical Specification Section 5.6.5.d, GGNS is required to provide to the Nuclear Regulatory Commission any updates to the COLR. Revision 1 of the GGNS Cycle 24 COLR is attached to this letter.

There are no commitments contained in this submittal. If you have any questions or need additional information, please contact Jeff Hardy at 802-380-5124.

Sincerely,

JH/ram

Attachment:

Core Operating Limits Report (COLR) Cycle 24, Revision 1 GNRO2022-00020 Page 2 of 2

cc: NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 rand ulf Nuclear Station

ore perating Limits Report

Cycle 24

Revision 1 CORE OPERATING LIMITS REPORT

REASON FOR REVISION

Revision 0:

The Cycle 24 core operating limits are updated to provide cycle-specific MCPR and the APLHGR limits for the GNF2 and GNF3 fuel types, respectively. Figures 2-1 LHGRFAC multiplier values, independent of fuel type. Figure 1-1 and 1-2 provides through 2-5 are updated with new MCPR limits and Figures 3-1 through 3-4 are These limits are based on a core power of 4408 MWt. updated with new LHGRFAC limits. No other core operating limits are changed.

Revision 1:

The Cycle 24 core operating limit reports is updated due to the F024-02 core shuffle to replace two failed fuel bundles. This revision is to update the GESTAR analysis reference which concludes that the Cycle 24 SRLR is still applicable to the core. There are no changes to the Cycle 24 limits in this revision.

COLR Page 2 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

TABLE OF CONTENTS

1.0 PURPOSE 4 2.0 SCOPE 4

3.0 REFERENCES

5 3.1 Current Cycle References 5 4.0 DEFINITIONS 7 5.0 GENERAL REQUIREMENTS 9 5.1 Averaqe Planar Linear Heat Generation Rates 9 5.2 Minimum Critical Power Ratio 9 5.3 Linear Heat Generation Rate 10 5.4 Stabilitv 10 5.5 Applicability 11 5.6 Limitations and Conditions 11

Table 1 OPRM Upscale CDA Amplitude Discriminator 13 Setpoint Table 2 BSP Endpoints for Normal Feedwater Temperature 13 Table 3 BSP Endpoints for Reduced Feedwater 13 Temnerature Table 4 ABSP Setpoints for the Scram Region 13 Table 5 Margin to Thermal Overpower and Mechanical 13 Overpower Limits Table 6 Application Conditions 14 Table 7 Rated OLMCPR Summary Table 14 Figure(s) 1 APLHGR Operating Limits 15 Figure(s) 2 MCPR Operating Limits 16 Figure(s) 3 LHGR Operatina Limits 25 Figure 4 Backup Stability Protection Region Boundaries 27 Figure 5 Backup Stability Protection Region Boundaries 28 for Normal Feedwater Temperature for Reduced Feedwater Temperature Figure 6 MCPRP Limit and K(P) Multiplier for EIS, FWH 29 OOS, EOC-RPT OOS, FHW & EOC-RPT OOS Figure 7 MCPRP Limit and K(P} Multiplier for PR OOS, PR 30 & FWH OOS, PR & EOC-RPT OOS, PR & FHW & EOC-RPT OOS

COLR Page 3 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

1.0 PURPOSE The COLR is controlled as a License Basis Document and revised accordingly for each fuel cycle or remaining portion of a fuel cycle. Any revisions to the COLR must be submitted to the NRC for information as required by Tech Spec 5.6.5 and tracked by Licensing Commitment 29132. This COLR reports the Cycle 24 core operating limits and stability setpoint confirmation and regions.

2.0 SCOPE As defined in Technical Specification 1.1, the COLR is the GGNS document that provides the core operating limits for the current fuel cycle. This document is prepared in accordance with Technical Specification 5.6.5 for each reload cycle using NRC-approved analytical methods.

The Cycle 24 core operating and stability limits included in this report are:

  • the Average Planar Linear Heat Generation Rate (APLHGR),
  • the Linear Heat Generation Rate (LHGR) limit, and
  • the DSS-CD stability setpoint confirmation and regions.

COLR Page 4 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

3.0 REFERENCES

This section contains the cycle-specific references used in the safety analysis of Grand Gulf Cycle 24.

Methodology references are documented in Technical Specification 5.6.5b

3.1 Current Cycle References

3.1.1 ECH-NE-22-00002 Revision 0, Supplemental Reload Licensing Report for Grand Gulf-1 Reload 23 Cycle 24, March 2022.

3.1.2 ECH-NE-10-00021 for Entergy Grand Gulf Nuclear Station, February 2020. Revision 5, GNF2 Fuel Design Cycle-Independent Analyses

3.1.3 ECH-NE-22-00001 1 Reload 23 Cycle 24, November 2019. Revision 0, Fuel Bundle Information Report for Grand Gulf-

3.1.4 NEDC-32910P, Revision 1, Grand Gulf Nuclear Station SAFER/GESTR-LOCA Accident Analysis With Relaxed ECCS Parameters, October 1999 (GEXI-1999-00174).

3.1.5 GGNS-NE-12-00022 Revision 0, Grand Gulf Nuclear Station MELLLA+ Task T0407, ECCS-LOCA Performance, September 2012.

3.1.6 GGNS-SA-09-00002 Revision 1, Grand Gulf Nuclear Station GNF2 ECCS-LOCA Evaluation, December 2009.

3.1.7 NEDC-33173P-A, Revision 5, Applicability of GE Methods to Expanded Operating Domains (with Supplements SP-A Rev. 1, and 6P-A Rev. 1), October 2019.

3.1.8 NEDC-33006P-A, Revision 3, GE BWR Maximum Extended Load Line Limit Analysis Plus, June 2009.

3.1.9 ECH-NE-22-00010, Revision 1, GGNS Cycle 24 GESTAR Assessment, July 2022.

3.1.10 ECH-NE-20-00006 Revision 0, GNF3 Fuel Design Cycle-Independent Analyses for Grand Gulf Nuclear Station, February 2020.

3.1.11 GGNS-SA-19-00001 Evaluation Revision 1, October 2019. Revision O Grand Gulf Nuclear Station GNF3 ECCS-LOCA

3.1.12 GEH-GGNS-AEP-632, GGNS MELLLA+ Final DSS-CD Settings Report, October 23, 2013.

3.1.13 NEDE-24011-P-A-31, General Electric Standard Application for Reactor Fuel CGESTAR-II), November 2020, (KGO-ENO-GEN-21-039).

3.1.14 ECH-NE-21-00025, Grand Gulf Nuclear Station TRACG Implementation for Reload Transient Analysis (T1309), December 2020.

3.1.15 NED0-33612-A, Revision 0, Safety Analysis Report for GGNS Maximum Extended Load Line Limit Analysis Plus, September 2013.

COLR Page 5 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

3.1.16 NEDC-33292P, Revision 3, GEXL17 Correlation for GNF2 Fuel, June 2009 (RAENO-GEN-10-034).

3.1.17 NEDC-33880P, Revision 1, GEXL21 Correlation for GNF3 Fuel, November 2017 (KGO-ENO-GEN-20-031).

3.1.18 NEDC-33840P-A, Revision 1, The PRIME Model for Transient Analysis of Fuel Rod Thermal - Mechanical Performance, August 2017.

3.1.19 GGNS-NE-10-00076, Revision O (GEH 0000-0121-1122-RO), GGNS EPU Option B Scram Times, September 2010.

3.1.20 NEDC-33270P, Revision 9, GNF2 Advantage Generic Compliance with NEDE-24011-P-A (GESTAR II), Dec 2017. (KGO-ENO-JBl-18-068).

3.1.21 NEDC-33879P, Revision 4, GNF3 Generic Compliance with NEDE-24011-P-A (GESTAR II), August 2020.

3.1.22 GGNS-SA-21-00002, Revision O (GEH 0000-0158-7807-Rl), Grand Gulf Nuclear Station PRNM System DSS-CD Settings, April 2020

3.1.23 SC 21-04 Revision 1, Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors, June 2021.

3.1.24 GNF006N2281 Revision 0, Nuclear Design Report for Grand Gulf Nuclear Station Cycle 24, August 2021.

COLR Page 6 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

4.0 DEFINITIONS

4.1 Average Planar Linear Heat Generation Rate (APLHGR) - the APLHGR shall be applicable to a specific planar height and is equal to the sum of the linear heat generation rates for all the fuel rods in the specified bundle at the specified height divided by the number of fuel rods in the fuel bundle at 4.2 Average Planar Exposure - the Average Planar Exposure shall be applicable to the specified height.

a specific planar height and is equal to the sum of the exposure of all the fuel rods in the specified bundle at the specified height divided by the 4.3 Critical Power Ratio (CPR) - the ratio of that power in the assembly, which number of fuel rods in the fuel bundle at the specified height.

is calculated by application of the fuel vendor's appropriate boiling correlation, to cause some point in the assembly to experience boiling 4.4 Core Operating Limits Report (COLR) - The Grand Gulf Nuclear Station transition, divided by the actual assembly operating power.

specific document that provides core operating limits for the current reload cycle in accordance with Technical Specification 5.6.5.

4.5 Linear Heat Generation Rate (LHGR) - the LHGR shall be the heat generation per unit length of fuel rod. It is the integral of the heat flux over the 4.6 Minimum Critical Power Ratio (MCPR) - the MCPR shall be the smallest CPR heat transfer area associated with the unit length.

4.7 MCPR Safety Limit - cycle specific SLMCPR, known as MCPRn.~, is the minimum which exists in the core.

value of the CPR at which the fuel could be operated to ensure that 99.9%

percent of the fuel in the core is not susceptible to the boiling 4.8 Oscillation Power Range Monitor (OPRM) - Provides automatic detection and transition.

suppression of reactor core thermal-hydraulic instabilities through 4.9 Backup Stability Protection (BSP) Boundary - Defines the operation domain monitoring neutron flux changes.

where potential instability events can be effectively addressed by specific operator action. Region of the power and flow operating domain that is not expected to be susceptible to instability events associated with a high 4.10 Backup Stability Protection (BSP) Scram Region - The area of the core power initial growth rate.

and flow operating domain where the reactor is susceptible to reactor instabilities under conditions exceeding the licensing basis of the current 4.11 Backup Stability Protection (BSP) Controlled Entry Region - The area of the reactor system. An immediate manual scram is required upon entry.

core power and flow operating domain where the reactor is susceptible to control is required upon entry. reactor instabilities. Compliance with at least one alternate stability 4.12 Automated Backup Stability Protection (ABSP) Scram Region - An automated the APRM flow-biased scram setpoint upon entry. reactor scram region that bounds the BSP Scram Region and is initiated by 4.13 End of Rated (EOR) - The Cycle exposure corresponding to all rods out, 100% power, 100% flow, and normal feedwater temperature [3.1.1].

4.14 Middle of Cycle (MOC) - The Cycle 24 MOC Core Average Exposure (CAE) is MOC= EOR-3,996 MWd/ST [3.1.1].

4.15 End of Cycle (EOC) - The Cycle 24 EOC CAE is 32,487 MWd/ST [3.1.24].

4.16 Maximum Extended Load Line Limit Analysis Plus (MELLLA+) - The GGNS MELLLA+ operating domain is depicted in Figure 4.

4.17 Maximum Number of OPRM Cells Along an Instability Symmetry Axis (MAx) - An OPRM configuration constant representing maximum number of OPRM cells along an instability symmetry axis. It is used to calculate the number of

COLR Page 7 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

unresponsive 0PRM cells. Per [3.1.12] the GGNS specific value is five 4.18 Application Conditions - The combination of equipment out of service (MAA = 5).

Application Conditions are specified in Table 6. conditions for which LHGRFAC and MCPR limits are determined [3.1.1]. The

4.19 MCPRgs;95 Safety Limit - Cycle-independent Technical Specification (TS) 2.1.1 SLMCPR, ensures there is a 95 percent probability at a 95 percent confidence level that no fuel rods will be susceptible to transition boiling.

COLR Page 8 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

5.0 GENERAL REQUIREMENTS

5.1 Average Planar Linear Heat Generation Rates Consistent with Technical Specification 3.2.1, all APLHGRs shall not exceed the fuel type and exposure-dependent limits reported in Figures 1-1 and 1-2 [3.1.1].

5.2 Minimum Critical Power Ratio Operation (TLO), and 1.12 for Single Loop Operation (SLO) [3.1.1]. For Cycle 24, the cycle-specific MCPR Safety Limit (MCPR99.9%), is 1.12 for Two Loop

GEH Safety Communication 21-04 [3.1.23] identifies a metastable flow condition that may exist in a BWR/6 in core locations fed by a side entry orifice adjacent to two core support cross beams. The vendor has been unable to determine the frequency of occurrence of this flow condition, if any. This flow condition results in a higher loss coefficient and lower CPR (applied as higher MCPR limits). To be conservative, All MCPR limits in the COLR Figures apply the penalty recommended by SC 21-04 Rev. it is assumed this condition always exists, so an MCPR penalty is always applied.

1 [3.1.23].

Consistent with Technical Specification 3.2.2, the MCPR shall be equal to or greater than the limits reported in Figure(s) 2 as functions of power, flow, exposure, and scram speed [3.1.1, 3.1.2, 3.1.10, 3.1.19]. For operation at powers

~35.4%, the power-dependent MCPR shall be determined based on scram time surveillance data as follows. [3.1.19]

1) If the average scram time (TAVE) satisfies the following:

'AVE~'B*

then the power dependent MCPR shall be equal to or greater than the Option B limits reported in Figure(s) 2 as a function of exposure.

2) If the average scram time

then the power-dependent MCPR shall be equal to or greater than the Tau = 0.2 limits reported in Figure(s) 2 as a function of exposure,

3) If the average scram time

'AVE >Ts and r>0.2, then the power-dependent MCPR shall be equal to or greater than the Option A limits reported in Figure(s) 2 as a function of exposure.

In the above equations:

'AVE= average scram time to the 20% insertion position as calculated by equation 1 of Reference 3.1.19,

COLR Page 9 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

, 8 = adjusted analysis mean scram time for 20% insertion as calculated by equation 3 of Reference 3.1.19 and r=---'-~~-~

~-~

where

'A = the technical specification limit on core average scram time to the 20 percent insertion position (0.503 seconds).

The limits determined above support operation with Turbine Bypass Valves Out of Service as described in Technical Specification 3.7.7. Additional MCPR operating Technical Specification 3.3.4.1. limits are provided to support operation with EOC-RPT inoperable as described in

Rated Operating Limit MCPR values (equipment in service, 100% power, OLMCPR's) are provided in Table 7. These can be used with the Kp factors in Figures 6 and 7 to determine the appropriate power-dependent OLMCPR at a certain power level. The SC 21-04 Rev. 1 Attachment 5 [3.1.23] penalties must be applied after determining a power-dependent OLMCPR. The MCPR graphs in Figures 2-1 through 2-5 already incorporate the Kp factors and the SC 21-04 Rev. 1 [3.1.23] penalties.

When using Table 7 and Figures 6 & 7 to calculate power-dependent OLMCPR's, an intermediate OLMCPR should be calculated using the appropriate rated OLMCPR and Kp factors (see Figures 6 & 7). This intermediate value should be rounded to two decimals, then the SC 21-04 Rev. 1 [3.1.23] Attachment 5 penalties should be applied, and the final value rounded again to two decimals. For assistance in using Table 7 and Figures 6 & 7 to determine an OLMCPR value, contact Reactor Engineering or the BWR Core Design department.

When calculating SLO MCPR's, 0.03 should be added to Table 7 values before applying Kp factors. If the value after adding 0.03 is less than 1.29, it should be increased to 1.29 before applying Kp factors.

Note that all MCPR Figures (2-1 through 2-5) already apply the Kp factors and the SC 21-04 Rev. 1 penalties.

5.3 Linear Heat Generation Rate Consistent with Technical Specification 3.2.3, the LHGRs for any GNF2 or GNF3 fuel rod at any axial location shall not exceed the nodal exposure-dependent limits reported in Reference 3.1.3 (by reference reported in [3.1.20] for GNF2 and dependent LHGR factors reported in Figures 3-1 and 3-2, and Figures 3-3 and 3-4, [3.1.21] for GNF3) multiplied by the smaller of either the power-dependent or flow Bypass Valves Out of Service as described in Technical Specification 3.7.7. respectively [3.1.1]. The limits determined above support operation with Turbine

5.4 Stability The OPRM Upscale Confirmation Density Algorithm (CDA) Amplitude Discriminator setpoint is reported in Table 1.

The Backup Stability Protection (BSP) regions boundaries are reported in Figures 4 and 5 [3.1.1]. BSP measures support operation with the OPRM upscale trip function COLR Page 10 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

inoperable as described in Technical Specification 3.3.1.1 Condition J. The endpoints for the BSP region boundaries are provided for normal (NFWT) and reduced (RFWT) feedwater temperature operations in Tables 2 and 3, respectively. Figures 4 and 5 depict the BSP region boundaries for NFWT and RFWT operations. Note that Figures 4 and 5 also depict the MELLLA+ and MELLLA domains, consistent with feedwater temperature operating limitations.

The ABSP APRM Simulated Thermal Power (STP) setpoints associated with the ABSP Scram Region are provided in Table 4. The ABSP setpoints are applicable to TLO and SLO, and to both normal and reduced feedwater temperature operations.

The BSP Boundary and Manual BSP region boundaries for normal feedwater temperature operations are valid for reductions in normal feedwater temperature as much as (and including) -10.0 °F [3.1.1].

5.5 Applicability The following core operating limits are applicable for operation in the Maximum Extended Operating Domain (MEOD), with Feedwater Heaters Out of Service (FWHOOS),

Turbine Bypass Out of Service (TBVOOS), EOC-RPT inoperable, and Pressure Regulator Out of Service (PROOS). For operation with one of the previous conditions mentioned, the alternate MCPR limits described in Section 5.2 above must be implemented. Table 6 provides an applicability condition list of events related to the Figures. For SLO, the following additional requirements must be satisfied.

1. THE APLHGRs shall not exceed the exposure-dependent limits determined in accordance with Section 5.1 reduced by a 0.83 SLO multiplier for GNF2 fuel bundles, and reduced by a 0.90 SLO multiplier for GNF3 fuel bundles. [3.1.1].
2. THE LHGRs shall not exceed the smaller of the nodal exposure-dependent limits determined in accordance with Section 5.3 above or the nodal exposure-dependent limits reported in Reference 3.1.3. During SLO operation the SLO values will be used from Figures 3-3 and 3-4 [3.1.1].
3. The MCPR shall be equal to or greater than the limits determined in accordance with Section 5.2. Due to the application of SC 21-04 Rev. 1 penalties to the MCPR limits, a flat adder is not appropriate for SLO limits. SLO MCPR operating limits are displayed in Figures 2-1 through 2-4 "C" & "D" and Figure 2-SB [3.1.1].

5.6 Limitations and Conditions As required by Limitation and Condition 9.10/9.ll of licensing topical report NEDC-33173P-A [3.1.7], the limiting Thermal and Mechanical Overpower results are these limits. The results are confirmed to meet the required 10% margin to the reported in Table 5. The results are summarized as a percent margin to both of design limits [3.1.1].

As required by Limitation and Condition 12.10.b of licensing topical report NEDC-33006P-A [3.1.8], the off-rated limits assumed in the ECCS-LOCA analyses are confirmed to be consistent with the off-rated LHGR multipliers provided Figures 3-1 through 3-4. These off-rated LHGR multipliers provide adequate protection for MELLLA+ operation.

As required by Limitation and Condition 12.5.c of licensing topical report NEDC-33006P-A [3.1.8], the plant specific power/flow map specifying the GGNS licensed MELLLA+ operating domain is included as Figure 4.

COLR Page 11 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

As required by Limitation and Condition 12.5.b of licensing topical report NEDC-33006P-A [3.1.8], operation with Feedwater Heaters Out of Service (FWHOOS) is prohibited while in the MELLLA+ operating domain [3.1.1]. In addition, as required by Limitation and Condition 12.5.a of licensing topical report NEDC-33006P-A [3.1.8], and described in GGNS TS 3.4.1 LCO, SLO is prohibited in the MELLLA+

operating domain [3.1.1].Therefore, operations with RFWT and/or SLO must adhere to the operating domain shown in Figure 5.

COLR Page 12 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

OPRM Upscale CDA Amplitude Discriminator Setpoint Table 1

Amplitude Discriminator Trip 1.10

BSP Endpoints for Normal Feedwater Temperature Table 2

Endpoint Power(%) Flow(%) Definition Al 72.3 44.2 Scram Reaion Boundary, HFCL Bl 34.2 25.2 Scram Region Boundary, NCL A2 67.3 50.0 Controlled Entry Reaion Boundary, HFCL B2 26.4 24.4 Controlled Entry Reaion Boundary, NCL

BSP Endpoints for Reduced Feedwater Temperature Table 3

Endpoint Power(%) Flow(%) Definition Al' 67.5 50.2 Scram Reaion Boundary HFCL A2' 69.7 52.9 Controlled Entry Reaion Boundary, HFCL Bl' 28.2 24.5 Scram Region Boundary, NCL B2' 26.4 24.4 Controlled Entry Reaion Boundary, NCL

ABSP Setpoints for the Scram Region Table 4

Parameter Symbol Value Slope of ABSP APRM fl ow-biased trip linear segment mTRIP 0.77 ABSP APRM flow-biased trip setpoint power intercept. PssP-TRIP 31.0% RTP 1 Constant Power Line for Trip from zero Drive Flow to Flow Breakpoint.

ABSP APRM flow-biased trip setpoint drive flow WssP-TRIP 39.0% RDP intercept. Constant Flow Line for Trip.

Flow Breakpoint value WssP-BREAK 7. 5% RDP

1. RTP - Rated Thermal Power 2. RDF - Recirculation Drive Flow

Margin to Thermal Overpower and Mechanical Overpower Limits Table 5

Criteria GNF3 Thermal Overpower Margin 30.21%

Mechanical Overpower Margin 49. 54%

COLR Page 13 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

Table 6 Application Conditions

Application FWH 005 EOC-RPT PR 005 TBV 005 Condition

1 X 2 X X 3 X X 4 X X X 5 X X 6 X X X 7 X X X 8 X X X X

Table 7 Rated OLMCPR 5unvnary Table

Application GNF3 OPT A GNF3 OPT A GNF3 OPT B GNF3 OPT B Condition BOC-MOC MOC-EOC BOC-MOC MOC-EOC

1 1.33 1.36 1.25 1.28 2 1.33 1. 36 1.25 1.28 3 1. 33 1. 37 1.25 1.29 4 1.33 1.37 1.25 1.29 5 1.35 1.37 1. 35 1.37 6 1.35 1.41 1.35 1.41 7 1. 35 1. 37 1. 35 1. 37 8 1. 35 1.41 1. 35 1.41

COLR Page 14 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

15 14 0.00. 13.78 17.52, 13.78

13 12 E' 11 3:

~ 10 tt:

~ 9 i 8 7

6

5 4 +-_,__..__.,__'---l----'~~__,_-_.__.__._~-_,__..__.,__'--11--'----'~--'--_.__.__.__._ _ _.___.__..__'---i 0 10 20 30 40 50 60 70 Average Planar Exposure (GWd/ST)

Figure1-1 GNF2 Maximum Average Planar Linear Heat Generation Rate Note: Actual Limits described in Sections 5.1 and 5.5

15 o.oo. 14.36

14 13

12 E' 11 3:

~ 10 tt:

~ 9 0.

i 8 7

6 63.50, 6.00

5 4

0 10 20 30 40 50 60 70 Average Planar Exposure (GWd/ST)

Figure 1-2 GNF3 Maximum Average Planar Linear Heat Generation Rate Note: Actual Limits described in Sections 5.1 and 5.5

COLR Page 15 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

2.2 2.1 218, 2.12

2.0 218,200 35.4, 2.00

1.9 1.8 < 50% Co,, Flow / Option A 35.4, 1.72 40, 1.72 0: 1.7 35 4, 1.54 Tau* 0,2 ix 1.6 0.. 354,162 u

2: 1.5 70, 1.52 50, 1 55 1.4 40, 1 62 50, 1 54 / 70, 144 100, 1.40 1.3 / 70. 1 41 70,142 ts. 1 41 100,133 70, 1 39 as. 1 39 100, 1 31 1.2 Option B 1.1 1.0 0 10 20 40 50 60 70 80 90 100 Core Power (% Rated)

Figure 2-1A Cycle 24 Power-Dependent MCPR Limits, EIS or FWH OOS BOC to MOC, 11.0

2.2 ::. 50% Core Flow 2.1 21.8, 2 12

2.0 21.8, 2.00 ------=* 35.4, 2.00 1.9 Option A 18 < 50% Core Flow~ 4, 1.77 40, 1.77

0: 1.7 35 4, 1.69 70, 1.55 Tall* 0.2 ix 1.6 35... 1.66 Cl.

~ 1.5 40, 1.69 50. 1 60

40. 166 50. 1 57 /10, 1.4& 100, 1.43 1 4 / ~o. 1 44 10, 1 46 as. 1 44 100, 1 36 1.3 Option 8 70, 1 42 t.S, 1 -42 100, 1 34 1.2 11 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power(% Rated)

Figure 2-1B Cycle 24 Power-Dependent MCPR Limits, EIS or FWH oos MOC to EOC, 11.0

COLR Page 16 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

2.2.:: 50% Core Flow 218,215 2.1 2.0 218,203 35.4, 2.03

1.9 40, 1.77 1.8 < 50% c,,. Fl~ l. 1.71 a: 1.7 35.4. 1.69 Tau~ 0.2 1.6 35 4. 167 0..

" !i 1.5

14 100, 1 43 70, 1 45 70. 1 47 35. 1 45 100, 1.37 1.3 70, 1.43 35, 1 43 100, 1.35

1.2 Option B 1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (°lo Rated)

Figure 2*1C cycle 24 Power-Dependent MCPR Limits, EIS or FWH oos BOC to MOC, SLO

2.2 21.8, 2.15 2.1 21 8, 2 03 ___....;::,. 35 4, 2.03 2.0

1.9 40, 1.80 1.8 < 50% Co<e Fl= f

  • 1 BO

35.4, 1 72 70, 1.59 Tau= 0.2 a: 1.7 35 4, 1 69

Q. 1.6

" so. 1 64

~ 1.5 40. 1 69 so, 1 "/ 70, 1 52 100, 1.46 1.4 70, 147 70. 1 so 35, 1 47 100, 1 40 1.3 Option B 70* us 85,145 100, 1 38

1.2 1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power ("lo Rated)

Figure 2-1D cycle 24 Power-Dependent MCPR Limits, EIS or FWH OOS MOC to EOC, SLO

COLR Page 17 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

2.2 2.1 21.8,2.12

2.0 21 8, 2.00 354, 2.00

1.9 1.8 < 50% Co" FOw I 40, 1.72 35.4,1.72 ci: 1.7 c2" 35 4, 1 6" Tau* 0.2 Q. 1.6

~ 1.5 35 4, 1 62

1 4 100, 1.40 u 70. 1 44 as, 1 41 100, 1 33 70, 1.41 as, 1.39 100,131 12 Option B 70, 1.42 1.1 70,139

1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)

Figure 2-2A cycle 24 Power-Dependent MCPR Limits with EOC-RPT 00S, or EOC-RPT & FWH 00S BOC to MOC, TLO

2.2 2.1 21.8, 2.12

2.0 35.4, 2.00 1.9 "'*"" I 40,178 1.8 < 50% Core Flow 35., 1.78 ci: 1.7 35 4, 1.70 70, 1.56 c2" 1.6 3S., 1.67 Q. 85, 1.53

~ 1.5 40, 1 67 100, 1.44 1.4 ::: :.: / 10.~1=..4:=~==:a~s~.1~4~5=::::::::::::::::l~ 100, 1 37 71!, 1 47 1 45 as. 1 3 100, 1 35 u 10, 1.43 70 *

  • 12 Option B u

1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (0.4 Rated)

Figure2-2B cycle 24 Power-Dependent MCPR Limits with EOC-RPT 00S, or EOC-RPT & FWH 00S MOC to EOC, TLO

COLR Page 18 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

22 :::. 50% Core Flow 21 20 21J!,2.03 I 35.4, 2 03

1.9 u "50% Core Flow 35.4, 1.77 40, 1.77 a: 1.7 3S'4, J.69 Cl. ~ H 35 4, 1.67 Tauu(U

~ 1.5 1.4 100, 1.43 70, l 49 115, 1. 5 100, 1 37 u 70, 1 '4S 11S, 1 '43 100,135 1.2 Optlon B 10. 147 70, 1.43 1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)

Figure 2-2C Cycle 24 Power-Dependent MCPR Limits with EOC-RPT 00S, or EOC-RPT & FWH 00S BOC to MOC, SLO

2.2 21.8, 2.15 2.1 2.0 35.4, 2.03 1.9 "'*"' 1.

1.8 < 50% Core Flow 35.4. 1*82

35... 1 74 70, 1.60 a: 1.7 35.'4. 1.71

~ 1.6 CL 85, 1.56 Tau* 0.2

Ii 1.5 u 40. t 71 ~..

so. 163, I 100, 1.47 1.4 70, 1.53 115, 1.49 100, 1 41 1.3 70, 1.49 115, 147 100, 1 39 70, 1.51 1.2 Option B 70,147

1.1 10 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)

Figure 2-20 Cycle 24 Power-Dependent MCPR Limits with EOC-RPT 00S, or EOC-RPT & FWH 00S MOC to EOC, SLO

COLR Page 19 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

22 ::. 50% Core Flow 2.1 21.8, 2.12

2.0 21 8, 2 00 ___ ___...,. 35.4, 2.00

1.9 1.8 < 50% Co,e Flow / 35.4, 1 89 so, 1.89 a.: 1.7 ix 1.6 Q.

~ 1.5

1.4 100, 1.42 1.3 12 11 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)

Figure 2-3A Cycle 24 Power-Dependent MCPR Limits with PR 00S or PR & EOC RPT 00S BOC to MOC, TLO

2.2 ::. 50% Core Flow 2.1 21.8, 2.12

2.0 211!, 2.00 ______.,. 35.4, 2.00

1.9 35.4, 1.92 so, 1.92 1.8 < 50% Core Flow /

a.: 1.7 ix 1.6 Q.

~ 1.5

1.4 100, 1.44 1.3

12

1.1 10 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)

Figure2-3B Cycle 24 Power-Dependent MCPR Limits with PR 00S or PR & EOC RPT 00S MOC to EOC, TLO

COLR Page 20 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

22 2.1 218,215 ::_ 50% Core Flow 2.0 21 8, 2 03 ___...;;:... 35.4, 2.03

1.9 35.4, 1.93 50, 1.93 1.8 < 50% Cora F*w /

i:i: 1.7 2" 1.6 a..

~ 1.5

1.4 100, 1.45 1.3

1.2 u

1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power(% Rated)

Figure 2-3C Cycle 24 Power-Dependent MCPR Limits with PR 00S or PR & EOC RPT 00S BOC to MOC, SLO

22 ~ 50% Core Flow 21.8, 2.15 21 20 21.8, 2.03

1.9 35.4, 1.96 50, 1.96 18 < 50% Core Flow /

i:i: 1.7 2" 16 Q.

E 1.5 u

1.4 100, 1.47

1.3 1.2

1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)

Figure 2-30 Cycle 24 Power-Dependent MCPR Limits with PR 00S or PR & EOC RPT 00S MOC to EOC, SLO

COLR Page 21 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

22 :'.: 50% Core Flow 2.1 21.8,2.12 2.0 70,Ul9 1.9 1.8 35.4,Ul9 50, 1!19

ii u cE' 1.6 a.

~ 1.5

1.4 100, 142 1.3 1.2 1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power(% Rated)

Figure 2-4A Cycle 24 Power-Dependent MCPR Limits with PR & FWH 00S or PR & FWH & EOC-RPT 00S BOC to MOC, TLO

2.2 :'.: 50% Core Flow 2.1 21.8, 2.12 70, 197 2.0 218,200 1.9 35 4, 1 97 50, 1.97 1.8

  • 50% Co" Flow/

ii 1.7 cE' 1.6 0..

u

e 1.5 1.4 100, 1.48

1.3 1.2

1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)

Figure2-4B Cycle 24 Power-Dependent MCPR Limits with PR & FWH 00S or PR & FWH & EOC-RPT 00S MOC to EOC, TLO

COLR Page 22 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

2.2 :: 50% Core Flow 2Ul,2.15 2.1 2.0 21.8, 2.03 35.4, 2.03 70, 193

1.9 /35.4,1.93 50,193 1.8 < 50% Core Flow a: 1.7 ii' 1.6 0..

~ 1.5

1.4 100, 1.45 1.3 1.2 1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power (% Rated)

Figure 2-4C Cycle 24 Power-Dependent MCPR Limits with PR & FWH 00S or PR & FWH & EOC-RPT OOS BOC to MOC, SLO

2.2 :: 50% Core Flow 21.8, 2.15 2.1 35.4, 2.03 70, 2.02 2.0 218,203 35.4, 2.02 50,202 1.9 1.8 < 50% CM,, ** I a: u ii'

0. 1.6

~ 15 100, 1.52 1.4 1.3 1.2 1.1 1.0 0 10 20 30 40 50 60 70 80 90 100 Core Power(% Rated)

Figure2-40 Cycle 24 Power-Dependent MCPR Limits with PR & FWH 00S or PR & FWH & EOC-RPT 00S MOC to EOC, SLO

COLR Page 23 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

1.90 1.85 1.80 1.75 1.70 1.65 1.60 E 1.55

~ 1.50 0

E 1.45 90, 1-38 110, 1.38 1.40 1.35 81.5, 1.38 100, 1.38 1.30 1.25 1.20 115 1.10 +-~--~----,;--~--t-~-+-~--+--~-t-~--~--;--~-;--~----,;--~--1 0 10 20 30 40 50 60 70 80 90 100 110 Core Flow (% Rated)

Figure 2-5A Cycle 24 Flow-Dependent MCPR Limits, TLO, All Application Conditions

1.90 1.85 1.80 1.75 1.70 1.65 1.60 C' 1.55 ix 1.50 a.

0 1.45

E 90, 1.4 1 110, 1.41 1.40 1.35 81.5, 1.41 100, 1.41 1.30 1.25 1.20 1.15 1.10 0 10 20 30 40 50 60 70 80 90 100 110 Core Flow (% Rated)

Figure 2-58 Cycle 24 Flow-Dependent MCPR Limits, SLO, All Application Conditions

COLR Page 24 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

1.05 354, 1.000 50, 1.000 70, 1 000 85, 1000 100, 1 000 100

0.95

0.90 35 4, 0.896

'ii: < 50% Core Flow ~

u 0.85

~

0:: 0.80

(,!)

x:

..I 0.75 21 8, 0.760

35.4, 0730 0.70 :::. 50% Core Flow -

0.65 21.8, 0.645

0.60 0 10 20 30 40 50 60 70 80 90 100 110 Power (% Rated)

Figure 3-1 Cycle 24 Power-Dependent LHGR Factor, EIS, FWH 00S, EOC-RPT 00S, EOC-RPT & FWH 00S Note: These factors to be applied to the exposure-dependent limits as descibed in Section 5.3

1.05 85, 1.000 100. 1.000 1.00

0.95 0.90 < 50% Core Flow

'ii:

u 0.85 ~ 50, 0.849

~

0:: 0.80

(,!)

x:

..I 0.75 21 8, 0.760

0.70 ~ 50% Core Flow --

0.65 21.8, 0.645

0.60 0 10 20 30 40 50 60 70 80 90 100 110 Power (% Rated)

Figure 3-2 Cycle 24 Power-Dependent LHGR Factor PR 00S, PR & FWH 00S, PR & EOC-RPT 00S, PR & EOC-RPT & FWH 00S Note: These factors to be applied to the exposure-dependent limits as descibed in Section 5.3

C0LR Page 25 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

1.05 80,3, 1.000 90, 1.000 110, 1.000 1.00 TLO ~998 100, 1.000

0.95

0.90

£

~ 0.85 12 O 0.80

c

.J 0.75

0.70

0.65 0.60 +-~----'---+-....__--+_........ _ ___, __ ___._ __ __,__ __ _._ __ _._ __ _.__ __.__-+-___.-----i 0 10 20 30 40 50 60 70 80 90 100 110 120 Core Flow(% Rated)

Figure 3-3 Cycle 24 GNF2 Flow-Dependent LHGR Factor Note: These factors to be applied to the exposure-dependent limits as descibed in Section 5.3

1.05 80.3, 1.000 90, 1.000 110, 1.000 1.00

0.95

0.90

£

~ 0.85 12 o 0.80

c

.J 0.75

0.70

0.65

0.60 +---'--+--~--+-....__--+---+----'--+------+-_._---1 _ _._--+-..._--+-___, __ ___.__+-~--;

0 10 20 30 40 50 60 70 80 90 100 110 120 Core Flow (0/4 Rated)

Figure 3-4 Cycle GNF3 24 Flow-Dependent LHGR Factor Note: These factors to be applied to the exposure-dependent limits as descibed in Section 5.3

COLR Page 26 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

CORE FLOW (% rated) 0 10 20 30 40 50 60 70 80 90 100 110 110 I, 1 I 1 1 I 1 1 I 1.1 I I I 11 I I I l I 11 I I I 11 i I I I I I l I

100 Cycle 24 BSP Region I Implemented BSP Boundary 1--L Boundaries for NFWT 05,1~

90 1---+--+---1-----1---1--J-----LI MELLLA+ Boundary

80 11-r--r-t--t-t--t--t--t-+~~~F-1-+~~~:::::.;i----t---i------+--+---+-l--!--ll-L_J

- 70 1-----1----1 MELLLA Bounda,v I. I"'- / -~~5 71.3 1 lo " o,.,.. I..

~so ',_ :..,.--,

~ ~.....,.....v / I

~ 50.__ I Scram Region 1 ~,_,,,,-/ I - **~ OPRM Armed Region

~ 1, _,._ I " / 1

$ /'

  • A 'lif I 2~ / -~ I

~ I/ V Controlled Entry I Ii I I I I I I 1.-

030 ** i l/ I II I 1 I~

(.) D '-"' ~ ~

20 /-* -

  • u:;;,;;;.;;-,1 I I I I I I I I I / Ca *itatii n Pr1 tectl 1>n 1

/ ~ 7 Note:

10 ~* 1/"'..I I SLO is prohibited in MELLI.A+ region

0 ~ /

0 10 20 30 40 50 60 70 80 90 100 110 120 CORE FLOW (MLB/HR)

Figure 4 Backup Stability Protection Region Boundaries for Normal Feedwater Temperature (NFWT)

COLR Page 27 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

CORE FLOW (% rated) 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 110

._ Cycle 24 BSP Region (~2.s,i,100) 100,_ Boundaries for RFWT ~* _,,,,. 105,,,10(

I Implemented BSP Boundary 1 --

I I -r-- L.,,._ _..,,.. ~ v-90.- ~- ~

80 ~ '"'........-1

....,:. /' I

-10 A2' ~ ~- I

  • 1 l MELLLA Boundary I _,, ~ 'l I 1\\1',z -/'. I

1!50 l '" ~ _/ ~ / i, I

~

~ 1,..,-" 11'/

~

I 50......_ 1 Scram Region I - r----I ~~ /. II' I

  • 0..40 A 'A *

,,,; ~ I Controlled Entry I I 1-

~ Fi1' _,,,,,,, ~ I I ~ -

030 i..----

0 D'l 1,.- -,_ I -

Ii----

20 I / -- -- Ca '1itati pn Pr t>tecti pn

10 _,,,,,,,,, V / /

0 --

0 10 20 30 40 50 60 70 80 90 100 110 120 --- -- /

CORE FLOW (MLB/HR)

Figure 5 Backup Stability Protection Region Boundaries for Reduced Feedwater Temperature (RFWT)

COLR Page 28 LBDCR 2022-054

CORE OPERATING LIMITS REPORT

Ill 2100 Ill Operating Limit MCPR (P) = K(P)

  • Operating Limit 1111
a. MCPR(100)

~ 2.000 Q.

V For P<21.8%: No Thermal limits Monitoring Q. Required, No limits specified.

._ 1900 ~

J! I I For 21.8%S:Ps:P(Bypass), P(Bypass)=35.4%

I OLMCPR(P)==1.88, Flow<50%

I OLMCPR(P)=1.88 +0.00809.(35.4%-P), Flow~50%

For P>P(Bypass)

K(P)=1.225, 35.4% < P s: 40%

K(P)=1.166+0.00590*(50%-P), 40% < P s: 50%

K(P)=1.083+0.00415*(70%-P), 50% < P s: 70%

K(P)=1.057, 70% < P s 85%

K(P)=1.000+0.00380*(100%-P), 85% < P S:100%

1.000 20 30 50 60 70 80 100 110 Power {% rated)

Fi111re 6 MCPRp Limit and K(P} Multiplier for EIS, FWH OOS, EOC-RPT OOS, FWH & EOC-RPT OOS

COLR Page 29 LBDCR 2022-054 CORE OPERATING LIMITS REPORT

Operating Limit MCPR (P) = K(P)

  • Operating limit 2 I I MCPR(100)

For P<21.8%: No Thermal Limits Monitoring 1.9 Required, No limits specified.

~ I f I For 21.8%s:Ps;P(Bypass), P(Bypass)=35.4%

OLMCPR(P)=1.88, Flow<50%

OLMCPR(P)=1.88 +0.00809*(35.4%-P), Flow~50%

17 For P>P(Bypass)

K(P)=1.319, 35.4% < P s 70%

K{P)=1.160+0.01060*(85%-P), 70% < P s 85%

1.6 K(P)=1.000+0.00693*(100%-P), 85% < P S:100%

1.5

14

1.3

12

1.1

20 30 40 so 60 10 100 110 Power (% rated}

figure 7 MCPRp Limit and K(P} Multiplier for PR OOS, PR & FWH OOS, PR & EOC-RPT OOS, PR & FWH

& EOC-RPT OOS

COLR Page 30 LBDCR 2022-054