IR 05000261/1985009: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 20: Line 20:


=Text=
=Text=
{{#Wiki_filter:( - -
{{#Wiki_filter:-
-
(
e;4 ) -.
e;4 ) -.
      %Q APR o9 gg Carolina Power and Light Company ATTN: Mr. E. E. Utley Executive Vice President Power Supply and Engineering and Construction-411 Fayetteville Street Raleigh, NC 27602 Gentlemen:
%Q APR o9 gg Carolina Power and Light Company ATTN: Mr. E. E. Utley Executive Vice President Power Supply and Engineering and Construction-411 Fayetteville Street Raleigh, NC 27602 Gentlemen:
u SUBJECT: REPORT NO. 50-261/85-09 Thank you for your response of March 29, 1985, to our Notice of Violation issued-on March 5, 1985, concerning activities conducted at your H. B.. Robinson facility. We have evaluated your response and found that it meets the require-ments of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte
u SUBJECT:
REPORT NO. 50-261/85-09 Thank you for your response of March 29, 1985, to our Notice of Violation issued-on March 5, 1985, concerning activities conducted at your H. B.. Robinson facility. We have evaluated your response and found that it meets the require-ments of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspections.


Sincerely, Roger D. Walker, Director Division of Reactor Projects cc: G. P. Beatty, Jr., Manager Robinson Nuclear Project Department R. E. Morgan, Plant General Manager bcc: NRC Resident Inspector Document Control Desk State of South Carolina RII , RI RII RII RII RII r dr e WWPeery GJ 'n s AH in PF son 4/f/85 4/7/85 4/7/85 4/8/85 4/g/85 4/ /85 RII DV relli 4/ /85 gS2gggh$5 [
We appreciate your cooperation in this matter.
 
Sincerely, Roger D. Walker, Director Division of Reactor Projects cc:
G. P. Beatty, Jr., Manager Robinson Nuclear Project Department R. E. Morgan, Plant General Manager bcc: NRC Resident Inspector Document Control Desk State of South Carolina RII RI RII RII RII RII
,
r dr e WWPeery GJ
'n s AH in PF son 4/f/85 4/7/85 4/7/85 4/8/85 4/g/85 4/ /85 RII DV relli 4/ /85 gS2gggh$5
[
G t
G t
      '
' ' <>=o (
      ) ' <>=o (
)
      -
-
}}
}}

Latest revision as of 16:49, 12 December 2024

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/85-09
ML20127E936
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/09/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20127E940 List:
References
NUDOCS 8505200266
Download: ML20127E936 (1)


Text

-

-

(

e;4 ) -.

%Q APR o9 gg Carolina Power and Light Company ATTN: Mr. E. E. Utley Executive Vice President Power Supply and Engineering and Construction-411 Fayetteville Street Raleigh, NC 27602 Gentlemen:

u SUBJECT:

REPORT NO. 50-261/85-09 Thank you for your response of March 29, 1985, to our Notice of Violation issued-on March 5, 1985, concerning activities conducted at your H. B.. Robinson facility. We have evaluated your response and found that it meets the require-ments of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspections.

We appreciate your cooperation in this matter.

Sincerely, Roger D. Walker, Director Division of Reactor Projects cc:

G. P. Beatty, Jr., Manager Robinson Nuclear Project Department R. E. Morgan, Plant General Manager bcc: NRC Resident Inspector Document Control Desk State of South Carolina RII RI RII RII RII RII

,

r dr e WWPeery GJ

'n s AH in PF son 4/f/85 4/7/85 4/7/85 4/8/85 4/g/85 4/ /85 RII DV relli 4/ /85 gS2gggh$5

[

G t

' ' <>=o (

)

-