{{#Wiki_filter:Operational Program Inspection Status Table Scheduled or Actual              Inspection Report Operational Program        Inspection Status        Program Implementation                  Number(s)
{{#Wiki_filter:Operational Program Inspection Status Table
Milestone (d)            (ADAMS Accession No.)
1  Inservice Inspection        Not Started        Prior to commercial service                  N/A Program              (After 10 CFR 52.103(g))
2  Inservice Testing        Partially Complete    After generator online on        2021002 (ML21133A105)
Program                                          nuclear heat(a)                  2021005 (ML21316A057) 2021008 (ML22040A213) 2022002 (ML22091A316) 2022004 (ML22192A175) 3  Environmental                Complete          Prior to initial fuel load        2016004 (ML18032A756)
Qualification Program                                                              2017001 (ML17132A345) 2017002 (ML17226A034) 2017004 (ML18094A897) 2018002 (ML18226A348) 2021005 (ML21316A057) 2022004 (ML22192A175) 4  Preservice Inspection    Partially Complete    Completion prior to initial plant 2016004 (ML18032A756)
Program                                          startup                          2017003 (ML17317A527) 2019001 (ML19135A691) 2019003 (ML19309D596) 2019004 (ML20042E292) 2020008 (ML20224A009) 2021005 (ML21316A057) 5  Reactor Vessel                Complete          Prior to initial criticality      2017002 (ML17226A034)
Material Surveillance                                                              2021005 (ML21316A057)
Program Enclosure


Scheduled or Actual             Inspection Report Operational Program       Inspection Status     Program Implementation                 Number(s)
Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)
Milestone (d)           (ADAMS Accession No.)
Milestone (d) (ADAMS Accession No.)
6  Preservice Testing      Partially Complete  Prior to initial fuel load      2019004 (ML20042E292)
1 Inservice Inspection Not Started Prior to commercial service N/A Program (After 10 CFR 52.103(g))
Program                                                                       2020008 (ML20224A009) 2021002 (ML21133A105) 2021004 (ML21224A183) 2021005 (ML21316A057) 2021008 (ML22040A213) 2022002 (ML22091A316) 2022004 (ML22192A175) 7  Containment Leakage        Complete        Prior to initial fuel load      2020008 (ML20224A009)
2 Inservice Testing Partially Complete After generator online on 2021002 (ML21133A105)
Rate Testing Program 8  Fire Protection        Partially Complete   Prior to receipt of fuel on site 2020009 (ML20315A137)
Program nuclear heat(a) 2021005 (ML21316A057) 2021008 (ML22040A213) 2022002 (ML22091A316) 2022004 (ML22192A175)
Program                                     for buildings storing new fuel  2020010 (ML21041A242) and adjacent fire areas.        2021005 (ML21316A057)
Prior to initial fuel load for  2022002 (ML22091A316) other required elements.
Fire Protection        Partially Complete  Prior to initial receipt of      2020009 (ML20315A137)
Program (portions                            byproduct, source, or special    2020010 (ML21041A242) applicable to                                nuclear materials (excluding    2021005 (ML21316A057) radioactive material)                        exempt quantities as            2022002 (ML22091A316) described in Title 10 of the Code Federal Regulations (10 CFR) 30.18) 9  Process and Effluent    Partially Complete  N/A                              2017004 (ML18094A897)
Monitoring and                                                                2020008 (ML20224A009)
Sampling Program:                                                            2022002 (ML22091A316) 2022004 (ML22192A175)
Radiological Effluent  Partially Complete  Prior to initial fuel load      2022002 (ML22091A316)
Technical Specifications/Standard Radiological Effluent Controls 2


Scheduled or Actual               Inspection Report Operational Program     Inspection Status     Program Implementation                 Number(s)
3 Environmental Complete Prior to initial fuel load 2016004 (ML18032A756)
Milestone (d)           (ADAMS Accession No.)
Qualification Program 2017001 (ML17132A345) 2017002 (ML17226A034) 2017004 (ML18094A897) 2018002 (ML18226A348) 2021005 (ML21316A057) 2022004 (ML22192A175) 4 Preservice Inspection Partially Complete Completion prior to initial plant 2016004 (ML18032A756)
Offsite Dose           Partially Complete   Prior to initial fuel load       2017004 (ML18094A897)
Program startup 2017003 (ML17317A527) 2019001 (ML19135A691) 2019003 (ML19309D596) 2019004 (ML20042E292) 2020008 (ML20224A009) 2021005 (ML21316A057)
Calculation Manual                                                           2022004 (ML22192A175)
 
Radiological               Complete         Prior to initial fuel load       2017004 (ML18094A897)
5 Reactor Vessel Complete Prior to initial criticality 2017002 (ML17226A034)
Environmental                                                               2020008 (ML20224A009)
Material Surveillance 2021005 (ML21316A057)
Monitoring Program                                                           2022004 (ML22192A175)
Program
Process Control       Partially Complete   Prior to initial fuel load       2022002 (ML22091A316)
 
Program                                                                     2022004 (ML22192A175) 10   Radiation Protection       Complete         Prior to initial receipt of     2020008 (ML20224A009)
Enclosure Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)
Program (including as                       byproduct, source, or special low as reasonably                           nuclear materials (excluding achievable principle)                       exempt quantities as Radioactive Source         Complete         described in 10 CFR 30.18)
Milestone (d) (ADAMS Accession No.)
6 Preservice Testing Partially Complete Prior to initial fuel load 2019004 (ML20042E292)
Program 2020008 (ML20224A009) 2021002 (ML21133A105) 2021004 (ML21224A183) 2021005 (ML21316A057) 2021008 (ML22040A213) 2022002 (ML22091A316) 2022004 (ML22192A175) 7 Containment Leakage Complete Prior to initial fuel load 2020008 (ML20224A009)
Rate Testing Program 8 Fire Protection Partially Complete Prior to receipt of fuel on site 2020009 (ML20315A137)
Program for buildings storing new fuel 2020010 (ML21041A242) and adjacent fire areas. 2021005 (ML21316A057)
Prior to initial fuel load for 2022002 (ML22091A316) other required elements.
Fire Protection Partially Complete Prior to initial receipt of 2020009 (ML20315A137)
Program (portions byproduct, source, or special 2020010 (ML21041A242) applicable to nuclear materials (excluding 2021005 (ML21316A057) radioactive material) exempt quantities as 2022002 (ML22091A316) described in Title 10 of the Code Federal Regulations (10 CFR) 30.18) 9 Process and Effluent Partially Complete N/A 2017004 (ML18094A897)
Monitoring and 2020008 (ML20224A009)
Sampling Program: 2022002 (ML22091A316) 2022004 (ML22192A175)
Radiological Effluent Partially Complete Prior to initial fuel load 2022002 (ML22091A316)
Technical Specifications/Standard Radiological Effluent Controls
 
2 Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)
Milestone (d) (ADAMS Accession No.)
Offsite Dose Partially Complete Prior to initial fuel load 2017004 (ML18094A897)
Calculation Manual 2022004 (ML22192A175)
Radiological Complete Prior to initial fuel load 2017004 (ML18094A897)
Environmental 2020008 (ML20224A009)
Monitoring Program 2022004 (ML22192A175)
Process Control Partially Complete Prior to initial fuel load 2022002 (ML22091A316)
Program 2022004 (ML22192A175) 10 Radiation Protection Complete Prior to initial receipt of 2020008 (ML20224A009)
Program (including as byproduct, source, or special low as reasonably nuclear materials (excluding achievable principle) exempt quantities as Radioactive Source Complete described in 10 CFR 30.18)
Control (assignment of Radiation Protection Supervisor)
Control (assignment of Radiation Protection Supervisor)
Assignment of             Complete Radiation Protection Supervisor Minimization of           Complete Contamination Personnel Dosimetry       Complete         Prior to receipt of fuel on site 2020008 (ML20224A009)
Assignment of Complete Radiation Protection Supervisor Minimization of Complete Contamination Personnel Dosimetry Complete Prior to receipt of fuel on site 2020008 (ML20224A009)
Radiation Monitoring       Complete and Surveys Radiation Work Permits     Complete Assignment of             Complete         Prior to initial fuel load       2020008 (ML20224A009)
 
Radiation Protection Manager 3
Radiation Monitoring Complete and Surveys Radiation Work Permits Complete
 
Assignment of Complete Prior to initial fuel load 2020008 (ML20224A009)
Radiation Protection Manager
 
3 Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)
Milestone (d) (ADAMS Accession No.)
Respiratory Protection Complete
 
Bioassay Complete
 
Effluents and Complete Environmental Monitoring and Assessment Job Coverage Complete Prior to initial fuel load 2020008 (ML20224A009)
 
Radioactive Waste Complete Prior to first shipment of 2020008 (ML20224A009)
Shipping radioactive waste 2022004 (ML22192A175) 11 Non-Licensed Plant Complete 18 months prior to scheduled 2016002 (ML16210A448)
Staff Training Program date of initial fuel load (Portions applicable to Complete Prior to initial receipt of 2016002 (ML16210A448) radioactive material) byproduct, source, or special nuclear materials (excluding exempt quantities as described in 10 CFR 30.18) 12 Reactor Operator Complete 18 months prior to scheduled 2015301 (ML15113A028)
Training Program date of initial fuel load 2020007 (ML20114E071) 2016002 (ML16210A448) 13 Reactor Operator Complete Within 3 months after the date 2016002 (ML16210A448)
Requalification the NRC makes the finding 2022006 (report to be issued)
Program under 10 CFR 52.103(g)
 
14 Emergency Planning Complete Full-participation exercise 2020008 (ML20224A009) conducted within 2 years of scheduled date for initial loading of fuel(b)
 
4 Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)
Milestone (d) (ADAMS Accession No.)
Complete Onsite exercise conducted 2020010 (ML21041A242) within 1 year before the 2021008 (ML22040A213) scheduled date for initial loading of fuel Complete Applicants detailed 2020007 (ML20114E071) implementing procedures for its emergency plan submitted at least 180 days prior to the scheduled date for initial loading of fuel 15 Security Program Complete N/A 2017001 (ML17132A345) 2018001 (ML18134A348) 2018002 (ML18226A348) 2019002 (ML19220B678) 2019004 (ML20042E292) 2020008 (ML20224A009) 2020009 (ML20315A137) 2020010 (ML21041A242) 2021004 (ML21224A183) 2022002 (ML22091A316) 2022006 (report to be issued)
Physical Protection Complete Prior to initial receipt of 2020010 (ML21041A242)
Program (applicable to special nuclear material protection of special nuclear material prior to the protected area being declared operational)


Scheduled or Actual           Inspection Report Operational Program       Inspection Status     Program Implementation               Number(s)
5 Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)
Milestone (d)         (ADAMS Accession No.)
Milestone (d) (ADAMS Accession No.)
Respiratory Protection      Complete Bioassay                    Complete Effluents and              Complete Environmental Monitoring and Assessment Job Coverage                Complete        Prior to initial fuel load     2020008 (ML20224A009)
Physical Security Complete Prior to initial fuel load into the 2017001 (ML17132A345)
Radioactive Waste          Complete        Prior to first shipment of    2020008 (ML20224A009)
Program reactor(e) 2018001 (ML18134A348) 2018002 (ML18226A348) 2019002 (ML19220B678) 2019004 (ML20042E292) 2020008 (ML20224A009) 2020009 (ML20315A137) 2021004 (ML21224A183) 2022002 (ML22091A316) 2022006 (report to be issued)
Shipping                                    radioactive waste              2022004 (ML22192A175) 11  Non-Licensed Plant          Complete       18 months prior to scheduled  2016002 (ML16210A448)
Safeguards Complete Prior to initial fuel load into the 2019411 (ML21036A317)
Staff Training Program                     date of initial fuel load (Portions applicable to    Complete       Prior to initial receipt of    2016002 (ML16210A448) radioactive material)                      byproduct, source, or special nuclear materials (excluding exempt quantities as described in 10 CFR 30.18) 12  Reactor Operator            Complete       18 months prior to scheduled  2015301 (ML15113A028)
Contingency Program reactor(e)
Training Program                           date of initial fuel load      2020007 (ML20114E071) 2016002 (ML16210A448) 13  Reactor Operator            Complete        Within 3 months after the date 2016002 (ML16210A448)
Training and Complete Prior to initial fuel load into the 2020009 (ML20315A137)
Requalification                            the NRC makes the finding      2022006 (report to be issued)
Qualification Program reactor(e) 16 Quality Assurance Complete Combined license issuance 2020008 (ML20224A009)
Program                                    under 10 CFR 52.103(g) 14  Emergency Planning          Complete       Full-participation exercise    2020008 (ML20224A009) conducted within 2 years of scheduled date for initial loading of fuel(b) 4
Program - Operation 2020010 (ML21041A242) 2021002 (ML21133A105) 2022004 (ML22192A175) 17 Maintenance Rule Complete Prior to fuel load authorization 2020007 (ML20114E071) per 10 CFR 52.103(g) 18 Motor-Operated Valve Partially Complete Prior to initial fuel load 2021002 (ML21133A105)
Testing 2021005 (ML21316A057) 2022004 (ML22192A175)


Scheduled or Actual           Inspection Report Operational Program         Inspection Status     Program Implementation             Number(s)
6 Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)
Milestone (d)         (ADAMS Accession No.)
Milestone (d) (ADAMS Accession No.)
Complete       Onsite exercise conducted      2020010 (ML21041A242) within 1 year before the       2021008 (ML22040A213) scheduled date for initial loading of fuel Complete        Applicants detailed          2020007 (ML20114E071) implementing procedures for its emergency plan submitted at least 180 days prior to the scheduled date for initial loading of fuel 15  Security Program             Complete        N/A                            2017001 (ML17132A345) 2018001 (ML18134A348) 2018002 (ML18226A348) 2019002 (ML19220B678) 2019004 (ML20042E292) 2020008 (ML20224A009) 2020009 (ML20315A137) 2020010 (ML21041A242) 2021004 (ML21224A183) 2022002 (ML22091A316) 2022006 (report to be issued)
19 Initial Test Program Complete Prior to the first preoperational 2019004 (ML20042E292) test for the Preoperational 2020007 (ML20114E071)
Physical Protection          Complete        Prior to initial receipt of    2020010 (ML21041A242)
Test Program 2020008 (ML20224A009) 2020009 (ML20315A137)
Program (applicable to                        special nuclear material protection of special nuclear material prior to the protected area being declared operational) 5


Scheduled or Actual                  Inspection Report Operational Program    Inspection Status      Program Implementation                    Number(s)
Complete Prior to initial fuel load for the 2020008 (ML20224A009)
Milestone (d)              (ADAMS Accession No.)
Startup Test Program
Physical Security        Complete        Prior to initial fuel load into the 2017001 (ML17132A345)
Program                                    reactor(e)                          2018001 (ML18134A348) 2018002 (ML18226A348) 2019002 (ML19220B678) 2019004 (ML20042E292) 2020008 (ML20224A009) 2020009 (ML20315A137) 2021004 (ML21224A183) 2022002 (ML22091A316) 2022006 (report to be issued)
Safeguards                Complete        Prior to initial fuel load into the 2019411 (ML21036A317)
Contingency Program                        reactor(e)
Training and              Complete         Prior to initial fuel load into the 2020009 (ML20315A137)
Qualification Program                      reactor(e) 16  Quality Assurance        Complete        Combined license issuance          2020008 (ML20224A009)
Program - Operation                                                            2020010 (ML21041A242) 2021002 (ML21133A105) 2022004 (ML22192A175) 17  Maintenance Rule          Complete        Prior to fuel load authorization    2020007 (ML20114E071) per 10 CFR 52.103(g) 18  Motor-Operated Valve  Partially Complete  Prior to initial fuel load          2021002 (ML21133A105)
Testing                                                                        2021005 (ML21316A057) 2022004 (ML22192A175) 6


Scheduled or Actual                Inspection Report Operational Program    Inspection Status    Program Implementation                  Number(s)
20 Fitness-for-Duty Complete Prior to initiating 2010003 (ML102810444)
Milestone (d)            (ADAMS Accession No.)
Program for 10 CFR Part 26 construction 2011008 (ML112660579; Construction (workers activities ML112660577(c))
19  Initial Test Program      Complete        Prior to the first preoperational  2019004 (ML20042E292) test for the Preoperational        2020007 (ML20114E071)
and first-line 2012010 (ML12272A147; supervisors) ML12272A118(c))
Test Program                      2020008 (ML20224A009) 2020009 (ML20315A137)
Complete        Prior to initial fuel load for the 2020008 (ML20224A009)
Startup Test Program 20   Fitness-for-Duty         Complete       Prior to initiating               2010003 (ML102810444)
Program for                               10 CFR Part 26 construction       2011008 (ML112660579; Construction (workers                     activities                                 ML112660577(c))
and first-line                                                               2012010 (ML12272A147; supervisors)                                                                         ML12272A118(c))
2012011 (ML12356A516; ML12356A511(c))
2012011 (ML12356A516; ML12356A511(c))
2014401 (ML14290A385; ML14290A358(c))
2014401 (ML14290A385; ML14290A358(c))
2016403 (ML16302A420) 2018411 (ML18225A218) 2018413 (ML19031C931) 2019001 (ML19135A691) 7
2016403 (ML16302A420) 2018411 (ML18225A218) 2018413 (ML19031C931) 2019001 (ML19135A691)


Scheduled or Actual           Inspection Report Operational Program   Inspection Status     Program Implementation               Number(s)
7 Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)
Milestone (d)         (ADAMS Accession No.)
Milestone (d) (ADAMS Accession No.)
Fitness-for-Duty         Complete       Prior to initiating             2010003 (ML102810444)
Fitness-for-Duty Complete Prior to initiating 2010003 (ML102810444)
Program for                             10 CFR Part 26 construction     2011008 (ML112660579; Construction                             activities                               ML112660577(c))
Program for 10 CFR Part 26 construction 2011008 (ML112660579; Construction activities ML112660577(c))
(management and                                                         2012010 (ML12272A147; oversight personnel)                                                             ML12272A118(c))
(management and 2012010 (ML12272A147; oversight personnel) ML12272A118(c))
2012011 (ML12356A516; ML12356A511(c))
2012011 (ML12356A516; ML12356A511(c))
2014401 (ML14290A385; ML14290A358(c))
2014401 (ML14290A385; ML14290A358(c))
2016403 (ML16302A420) 2018411 (ML18225A218) 2018413 (ML19031C931) 2019001 (ML19135A691)
2016403 (ML16302A420) 2018411 (ML18225A218) 2018413 (ML19031C931) 2019001 (ML19135A691)
Fitness-for-Duty         Complete       Prior to initiating             2019411 (ML21036A317)
Fitness-for-Duty Complete Prior to initiating 2019411 (ML21036A317)
Program for Security                     10 CFR Part 26 construction Personnel                               activities (source requirement:
Program for Security 10 CFR Part 26 construction Personnel activities (source requirement:
10 CFR 26.4(e)(1)).
10 CFR 26.4(e)(1)).
Prior to the earlier of (1) licensees receipt of special nuclear material in the form of fuel assemblies or (2) establishment of a protected area(f) (source requirement:
Prior to the earlier of (1) licensees receipt of special nuclear material in the form of fuel assemblies or (2) establishment of a protected area(f) (source requirement:
10 CFR 26.4(a)(5) or 10 CFR 26.4(e)(1)).
10 CFR 26.4(a)(5) or 10 CFR 26.4(e)(1)).
Fitness-for-Duty         Complete       Prior to initiating             2019411 (ML20044C867)
Fitness-for-Duty Complete Prior to initiating 2019411 (ML20044C867)
Program for Fitness-                     10 CFR Part 26 construction for-Duty Program                         activities Personnel 8
Program for Fitness-10 CFR Part 26 construction for-Duty Program activities Personnel
 
8 Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)
Milestone (d) (ADAMS Accession No.)
Fitness-for-Duty Complete Prior to the conduct of the first 2019411 (ML20044C867)
Program for Persons full-participation emergency Required to Physically preparedness exercise under Report to the Technical 10 CFR Part 50, Appendix E, Support Center or Section F.2.a Emergency Operations Facility Fitness-for-Duty Complete Prior to establishment of a 2019411 (ML20044C867)
Program for Operation protected area(f)
 
21 Cyber Security Partially Complete Prior to initial fuel load into the 2020401 (ML20323A377)
Program reactor (e) 22 Special Nuclear Complete Prior to receipt of special 2017401 (ML17135A132)
Material Control and nuclear material 2018410 (ML18129A409)
Accounting Program 2019401 (ML19220B358) 23 10 CFR Part 37 Complete Prior to possession of 2020010 (ML21041A242)
Physical Protection aggregated Category 1 or Program Category 2 quantity of radioactive material
 
(a) The Inservice Testing Program will be fully implemented when turbine generator is online and on nuclear heat. Appropriate portions of the program are implemented as necessary to support the system operability requirements of the technical specifications.
 
(b) License Amendments 95 and 94 for the Vogtle Electric Generating Plant, Units 3 and 4, respectively, approved a change such that the Units 3 and 4 exercises will be partial -participation exercises. As permitted by 10 CFR Part 50, Domestic licensing of production and utilization facilities, Appendix E, Emergency Planning and Prepar edness for Production and Utilization Facilities, Section IV.F.2.a(iii), the full-participation exercise requirement will be satisfied by the biennial exercise conducted for the Vogtle Electric Generating Plant, Units 1 and 2.
 
(c) This document is not publicly available in the Agencywide Documents Access and Management System (ADAMS).
 
(d) Operational programs must be implemented by the milestones identified in license conditions, but NRC inspections may be compl eted after these milestones.
 
9 (e) On November 23, 2021, the NRC approved an exemption request authorizing VEGP Units 3 and 4 to implement the requirements of 10 CFR 73.55 and 10 CFR 73.56 for each unit after the NRC makes its finding under 10 CFR 52.103(g) for the unit but before initial fuel load into the reactor for that unit.
The stated milestones have been updated to reflect this NRC -approved exemption.


Scheduled or Actual                        Inspection Report Operational Program                          Inspection Status                  Program Implementation                              Number(s)
(f) On December 21, 2021, the NRC approved an exemption request authorizing VEGP Units 3 and 4 to implement for each unit a Fitness -for -Duty program that meets all requirements of 10 CFR Part 26, except for Subpart K, at a point after the NRC makes its finding under 10 CFR 52.103(g) for the unit but before initial fuel load for that unit. This exemption allows the licensee to continue implementing for each unit its construction Fitness -for -Duty program for those individuals in 10 CFR 26.4(e) and (f) until the licensee implements a Fitness -for -Duty program that meets all requirements of 10 CFR Part 26, except for Subpart K, for the unit.
Milestone (d)                    (ADAMS Accession No.)
Fitness-for-Duty                               Complete                  Prior to the conduct of the first          2019411 (ML20044C867)
Program for Persons                                                        full-participation emergency Required to Physically                                                    preparedness exercise under Report to the Technical                                                    10 CFR Part 50, Appendix E, Support Center or                                                          Section F.2.a Emergency Operations Facility Fitness-for-Duty                                Complete                  Prior to establishment of a                2019411 (ML20044C867)
Program for Operation                                                      protected area(f) 21    Cyber Security                            Partially Complete              Prior to initial fuel load into the       2020401 (ML20323A377)
Program                                                                    reactor (e) 22    Special Nuclear                                Complete                  Prior to receipt of special                2017401 (ML17135A132)
Material Control and                                                      nuclear material                          2018410 (ML18129A409)
Accounting Program                                                                                                    2019401 (ML19220B358) 23    10 CFR Part 37                                  Complete                  Prior to possession of                    2020010 (ML21041A242)
Physical Protection                                                        aggregated Category 1 or Program                                                                    Category 2 quantity of radioactive material (a)     The Inservice Testing Program will be fully implemented when turbine generator is online and on nuclear heat. Appropriate portions of the program are implemented as necessary to support the system operability requirements of the technical specifications.
(b)    License Amendments 95 and 94 for the Vogtle Electric Generating Plant, Units 3 and 4, respectively, approved a change such that the Units 3 and 4 exercises will be partial-participation exercises. As permitted by 10 CFR Part 50, Domestic licensing of production and utilization facilities, Appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities, Section IV.F.2.a(iii), the full-participation exercise requirement will be satisfied by the biennial exercise conducted for the Vogtle Electric Generating Plant, Units 1 and 2.
(c)    This document is not publicly available in the Agencywide Documents Access and Management System (ADAMS).
(d)    Operational programs must be implemented by the milestones identified in license conditions, but NRC inspections may be completed after these milestones.
9


(e) On November 23, 2021, the NRC approved an exemption request authorizing VEGP Units 3 and 4 to implement the requirements of 10 CFR 73.55 and 10 CFR 73.56 for each unit after the NRC makes its finding under 10 CFR 52.103(g) for the unit but before initial fuel load into the reactor for that unit.
The stated milestones have been updated to reflect this NRC-approved exemption.
(f) On December 21, 2021, the NRC approved an exemption request authorizing VEGP Units 3 and 4 to implement for each unit a Fitness-for-Duty program that meets all requirements of 10 CFR Part 26, except for Subpart K, at a point after the NRC makes its finding under 10 CFR 52.103(g) for the unit but before initial fuel load for that unit. This exemption allows the licensee to continue implementing for each unit its construction Fitness-for-Duty program for those individuals in 10 CFR 26.4(e) and (f) until the licensee implements a Fitness-for-Duty program that meets all requirements of 10 CFR Part 26, except for Subpart K, for the unit.
10}}
10}}

Revision as of 07:47, 16 November 2024

103g - Final Memorandum - Enclosure
ML22208A024
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/01/2022
From: Cayetano Santos
NRC/NRR/VPOB
To: Jeff Baran, Christopher Hanson, Wright
NRC/Chairman, NRC/OCM
Santos C
Shared Package
ML20290A280 List:
References
Download: ML22208A024 (10)


Text

Operational Program Inspection Status Table

Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)

Milestone (d) (ADAMS Accession No.)

1 Inservice Inspection Not Started Prior to commercial service N/A Program (After 10 CFR 52.103(g))

2 Inservice Testing Partially Complete After generator online on 2021002 (ML21133A105)

Program nuclear heat(a) 2021005 (ML21316A057) 2021008 (ML22040A213) 2022002 (ML22091A316) 2022004 (ML22192A175)

3 Environmental Complete Prior to initial fuel load 2016004 (ML18032A756)

Qualification Program 2017001 (ML17132A345) 2017002 (ML17226A034) 2017004 (ML18094A897) 2018002 (ML18226A348) 2021005 (ML21316A057) 2022004 (ML22192A175) 4 Preservice Inspection Partially Complete Completion prior to initial plant 2016004 (ML18032A756)

Program startup 2017003 (ML17317A527) 2019001 (ML19135A691) 2019003 (ML19309D596) 2019004 (ML20042E292) 2020008 (ML20224A009) 2021005 (ML21316A057)

5 Reactor Vessel Complete Prior to initial criticality 2017002 (ML17226A034)

Material Surveillance 2021005 (ML21316A057)

Program

Enclosure Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)

Milestone (d) (ADAMS Accession No.)

6 Preservice Testing Partially Complete Prior to initial fuel load 2019004 (ML20042E292)

Program 2020008 (ML20224A009) 2021002 (ML21133A105) 2021004 (ML21224A183) 2021005 (ML21316A057) 2021008 (ML22040A213) 2022002 (ML22091A316) 2022004 (ML22192A175) 7 Containment Leakage Complete Prior to initial fuel load 2020008 (ML20224A009)

Rate Testing Program 8 Fire Protection Partially Complete Prior to receipt of fuel on site 2020009 (ML20315A137)

Program for buildings storing new fuel 2020010 (ML21041A242) and adjacent fire areas. 2021005 (ML21316A057)

Prior to initial fuel load for 2022002 (ML22091A316) other required elements.

Fire Protection Partially Complete Prior to initial receipt of 2020009 (ML20315A137)

Program (portions byproduct, source, or special 2020010 (ML21041A242) applicable to nuclear materials (excluding 2021005 (ML21316A057) radioactive material) exempt quantities as 2022002 (ML22091A316) described in Title 10 of the Code Federal Regulations (10 CFR) 30.18) 9 Process and Effluent Partially Complete N/A 2017004 (ML18094A897)

Monitoring and 2020008 (ML20224A009)

Sampling Program: 2022002 (ML22091A316) 2022004 (ML22192A175)

Radiological Effluent Partially Complete Prior to initial fuel load 2022002 (ML22091A316)

Technical Specifications/Standard Radiological Effluent Controls

2 Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)

Milestone (d) (ADAMS Accession No.)

Offsite Dose Partially Complete Prior to initial fuel load 2017004 (ML18094A897)

Calculation Manual 2022004 (ML22192A175)

Radiological Complete Prior to initial fuel load 2017004 (ML18094A897)

Environmental 2020008 (ML20224A009)

Monitoring Program 2022004 (ML22192A175)

Process Control Partially Complete Prior to initial fuel load 2022002 (ML22091A316)

Program 2022004 (ML22192A175) 10 Radiation Protection Complete Prior to initial receipt of 2020008 (ML20224A009)

Program (including as byproduct, source, or special low as reasonably nuclear materials (excluding achievable principle) exempt quantities as Radioactive Source Complete described in 10 CFR 30.18)

Control (assignment of Radiation Protection Supervisor)

Assignment of Complete Radiation Protection Supervisor Minimization of Complete Contamination Personnel Dosimetry Complete Prior to receipt of fuel on site 2020008 (ML20224A009)

Radiation Monitoring Complete and Surveys Radiation Work Permits Complete

Assignment of Complete Prior to initial fuel load 2020008 (ML20224A009)

Radiation Protection Manager

3 Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)

Milestone (d) (ADAMS Accession No.)

Respiratory Protection Complete

Bioassay Complete

Effluents and Complete Environmental Monitoring and Assessment Job Coverage Complete Prior to initial fuel load 2020008 (ML20224A009)

Radioactive Waste Complete Prior to first shipment of 2020008 (ML20224A009)

Shipping radioactive waste 2022004 (ML22192A175) 11 Non-Licensed Plant Complete 18 months prior to scheduled 2016002 (ML16210A448)

Staff Training Program date of initial fuel load (Portions applicable to Complete Prior to initial receipt of 2016002 (ML16210A448) radioactive material) byproduct, source, or special nuclear materials (excluding exempt quantities as described in 10 CFR 30.18) 12 Reactor Operator Complete 18 months prior to scheduled 2015301 (ML15113A028)

Training Program date of initial fuel load 2020007 (ML20114E071) 2016002 (ML16210A448) 13 Reactor Operator Complete Within 3 months after the date 2016002 (ML16210A448)

Requalification the NRC makes the finding 2022006 (report to be issued)

Program under 10 CFR 52.103(g)

14 Emergency Planning Complete Full-participation exercise 2020008 (ML20224A009) conducted within 2 years of scheduled date for initial loading of fuel(b)

4 Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)

Milestone (d) (ADAMS Accession No.)

Complete Onsite exercise conducted 2020010 (ML21041A242) within 1 year before the 2021008 (ML22040A213) scheduled date for initial loading of fuel Complete Applicants detailed 2020007 (ML20114E071) implementing procedures for its emergency plan submitted at least 180 days prior to the scheduled date for initial loading of fuel 15 Security Program Complete N/A 2017001 (ML17132A345) 2018001 (ML18134A348) 2018002 (ML18226A348) 2019002 (ML19220B678) 2019004 (ML20042E292) 2020008 (ML20224A009) 2020009 (ML20315A137) 2020010 (ML21041A242) 2021004 (ML21224A183) 2022002 (ML22091A316) 2022006 (report to be issued)

Physical Protection Complete Prior to initial receipt of 2020010 (ML21041A242)

Program (applicable to special nuclear material protection of special nuclear material prior to the protected area being declared operational)

5 Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)

Milestone (d) (ADAMS Accession No.)

Physical Security Complete Prior to initial fuel load into the 2017001 (ML17132A345)

Program reactor(e) 2018001 (ML18134A348) 2018002 (ML18226A348) 2019002 (ML19220B678) 2019004 (ML20042E292) 2020008 (ML20224A009) 2020009 (ML20315A137) 2021004 (ML21224A183) 2022002 (ML22091A316) 2022006 (report to be issued)

Safeguards Complete Prior to initial fuel load into the 2019411 (ML21036A317)

Contingency Program reactor(e)

Training and Complete Prior to initial fuel load into the 2020009 (ML20315A137)

Qualification Program reactor(e) 16 Quality Assurance Complete Combined license issuance 2020008 (ML20224A009)

Program - Operation 2020010 (ML21041A242) 2021002 (ML21133A105) 2022004 (ML22192A175) 17 Maintenance Rule Complete Prior to fuel load authorization 2020007 (ML20114E071) per 10 CFR 52.103(g) 18 Motor-Operated Valve Partially Complete Prior to initial fuel load 2021002 (ML21133A105)

Testing 2021005 (ML21316A057) 2022004 (ML22192A175)

6 Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)

Milestone (d) (ADAMS Accession No.)

19 Initial Test Program Complete Prior to the first preoperational 2019004 (ML20042E292) test for the Preoperational 2020007 (ML20114E071)

Test Program 2020008 (ML20224A009) 2020009 (ML20315A137)

Complete Prior to initial fuel load for the 2020008 (ML20224A009)

Startup Test Program

20 Fitness-for-Duty Complete Prior to initiating 2010003 (ML102810444)

Program for 10 CFR Part 26 construction 2011008 (ML112660579; Construction (workers activities ML112660577(c))

and first-line 2012010 (ML12272A147; supervisors) ML12272A118(c))

2012011 (ML12356A516; ML12356A511(c))

2014401 (ML14290A385; ML14290A358(c))

2016403 (ML16302A420) 2018411 (ML18225A218) 2018413 (ML19031C931) 2019001 (ML19135A691)

7 Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)

Milestone (d) (ADAMS Accession No.)

Fitness-for-Duty Complete Prior to initiating 2010003 (ML102810444)

Program for 10 CFR Part 26 construction 2011008 (ML112660579; Construction activities ML112660577(c))

(management and 2012010 (ML12272A147; oversight personnel) ML12272A118(c))

2012011 (ML12356A516; ML12356A511(c))

2014401 (ML14290A385; ML14290A358(c))

2016403 (ML16302A420) 2018411 (ML18225A218) 2018413 (ML19031C931) 2019001 (ML19135A691)

Fitness-for-Duty Complete Prior to initiating 2019411 (ML21036A317)

Program for Security 10 CFR Part 26 construction Personnel activities (source requirement:

10 CFR 26.4(e)(1)).

Prior to the earlier of (1) licensees receipt of special nuclear material in the form of fuel assemblies or (2) establishment of a protected area(f) (source requirement:

10 CFR 26.4(a)(5) or 10 CFR 26.4(e)(1)).

Fitness-for-Duty Complete Prior to initiating 2019411 (ML20044C867)

Program for Fitness-10 CFR Part 26 construction for-Duty Program activities Personnel

8 Scheduled or Actual Inspection Report Operational Program Inspection Status Program Implementation Number(s)

Milestone (d) (ADAMS Accession No.)

Fitness-for-Duty Complete Prior to the conduct of the first 2019411 (ML20044C867)

Program for Persons full-participation emergency Required to Physically preparedness exercise under Report to the Technical 10 CFR Part 50, Appendix E, Support Center or Section F.2.a Emergency Operations Facility Fitness-for-Duty Complete Prior to establishment of a 2019411 (ML20044C867)

Program for Operation protected area(f)

21 Cyber Security Partially Complete Prior to initial fuel load into the 2020401 (ML20323A377)

Program reactor (e) 22 Special Nuclear Complete Prior to receipt of special 2017401 (ML17135A132)

Material Control and nuclear material 2018410 (ML18129A409)

Accounting Program 2019401 (ML19220B358) 23 10 CFR Part 37 Complete Prior to possession of 2020010 (ML21041A242)

Physical Protection aggregated Category 1 or Program Category 2 quantity of radioactive material

(a) The Inservice Testing Program will be fully implemented when turbine generator is online and on nuclear heat. Appropriate portions of the program are implemented as necessary to support the system operability requirements of the technical specifications.

(b) License Amendments 95 and 94 for the Vogtle Electric Generating Plant, Units 3 and 4, respectively, approved a change such that the Units 3 and 4 exercises will be partial -participation exercises. As permitted by 10 CFR Part 50, Domestic licensing of production and utilization facilities, Appendix E, Emergency Planning and Prepar edness for Production and Utilization Facilities,Section IV.F.2.a(iii), the full-participation exercise requirement will be satisfied by the biennial exercise conducted for the Vogtle Electric Generating Plant, Units 1 and 2.

(c) This document is not publicly available in the Agencywide Documents Access and Management System (ADAMS).

(d) Operational programs must be implemented by the milestones identified in license conditions, but NRC inspections may be compl eted after these milestones.

9 (e) On November 23, 2021, the NRC approved an exemption request authorizing VEGP Units 3 and 4 to implement the requirements of 10 CFR 73.55 and 10 CFR 73.56 for each unit after the NRC makes its finding under 10 CFR 52.103(g) for the unit but before initial fuel load into the reactor for that unit.

The stated milestones have been updated to reflect this NRC -approved exemption.

(f) On December 21, 2021, the NRC approved an exemption request authorizing VEGP Units 3 and 4 to implement for each unit a Fitness -for -Duty program that meets all requirements of 10 CFR Part 26, except for Subpart K, at a point after the NRC makes its finding under 10 CFR 52.103(g) for the unit but before initial fuel load for that unit. This exemption allows the licensee to continue implementing for each unit its construction Fitness -for -Duty program for those individuals in 10 CFR 26.4(e) and (f) until the licensee implements a Fitness -for -Duty program that meets all requirements of 10 CFR Part 26, except for Subpart K, for the unit.