IR 05000413/1978008: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 21: | Line 21: | ||
{{#Wiki_filter:_ _ __ _ _ _ _ _ _ _ _ _ _ _ | {{#Wiki_filter:_ _ __ _ _ _ _ _ _ _ _ _ _ _ | ||
e O' | e O' | ||
UNITED STATES | |||
>m Atou | |||
. | |||
, | |||
f o | |||
NUCLEAR REGULATORY COMMISSION | |||
o* | * | ||
REGION 11 y | |||
)7 g | |||
101 M ARIETT A sTR E ET, N.W. | |||
- | |||
*4 | |||
' | |||
,g o* | |||
ATLANTA, GEORGI A 30303 | |||
%.....*' | |||
SEP 211978 | |||
, | |||
In Reply Refer To: | In Reply Refer To: | ||
RII:JJB 50-413/78-8 50-414/78-7 Duke Power Corpany Attn: Mr. L. C. Dail, Vice President Design Engineering P. O. Box 2178 Charlotte, North Carolina 28242 Gentlemen: | RII:JJB 50-413/78-8 50-414/78-7 Duke Power Corpany Attn: Mr. L. C. Dail, Vice President Design Engineering P. O. Box 2178 Charlotte, North Carolina 28242 Gentlemen: | ||
This refers to the inspection conducted by Mr. J. J. Blake of this office on August 15-18, 1978, of activities authorized by NRC Construction Permit | This refers to the inspection conducted by Mr. J. J. Blake of this office on August 15-18, 1978, of activities authorized by NRC Construction Permit Nos. | ||
CPPR-116 and CPPR-117 for the Catawba Nuclear Power Station, Unit I and 2 facilities, and to the discussion of our findings held with Messrs. D. L. Freeze and R. A. Morgan at the conclusion of the inspection. | |||
Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. | |||
Within the scope of this inspection, no items of noncompliance were disclosed. | |||
One new unresolved item resulted from this inspection and is discussed in the enclosed report. | |||
This item will be examined during subsequent inspections. | |||
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. | |||
If this report contains any information that you (or your contractor) believe to be | |||
; | |||
proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. | |||
l Any such application must include a full statement of the reasons on the basis of which it is claimed that the infomation is proprietary, and should I | |||
be prepared so that proprietary infomation identified in the application is contained in a separate part of the document. | |||
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room. | |||
- | |||
--_ | |||
_ | |||
_ _ _ _ _ _ _ - | _ _ _ _ _ _ _ - | ||
. *. | |||
. | |||
. | |||
'. | |||
bEIPhl,}hha | bEIPhl,}hha | ||
' | |||
Duke Power Company-2- | |||
Duke Power Company | - | ||
.. | |||
Should you have any questions concerning this letter, we will be glad to discuss them with you. | |||
Sincerely, C. E. Murphy, Chief | |||
. | |||
Reactor Construction and Engineering Support Branch Enclosure: | |||
Inspection Report Nos. | |||
50-413/78-8 and 50-414/78-7 cc w/ encl: Mr. D. G. Beam, Project Manager Catawba Nuclear Station P. O. Box 223 Clover, South Carolina 29710 l | |||
l l | l l | ||
. | . | ||
. | |||
... _ _ _. _. _. _ _ _ _ _ _ | |||
_.. | |||
}} | }} | ||
Latest revision as of 13:30, 11 December 2024
| ML20147C722 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 09/21/1978 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dail L DUKE POWER CO. |
| Shared Package | |
| ML20147C713 | List: |
| References | |
| NUDOCS 7810130098 | |
| Download: ML20147C722 (2) | |
Text
_ _ __ _ _ _ _ _ _ _ _ _ _ _
e O'
UNITED STATES
>m Atou
.
,
f o
NUCLEAR REGULATORY COMMISSION
REGION 11 y
)7 g
-
- 4
'
,g o*
ATLANTA, GEORGI A 30303
%.....*'
SEP 211978
,
In Reply Refer To:
RII:JJB 50-413/78-8 50-414/78-7 Duke Power Corpany Attn: Mr. L. C. Dail, Vice President Design Engineering P. O. Box 2178 Charlotte, North Carolina 28242 Gentlemen:
This refers to the inspection conducted by Mr. J. J. Blake of this office on August 15-18, 1978, of activities authorized by NRC Construction Permit Nos.
CPPR-116 and CPPR-117 for the Catawba Nuclear Power Station, Unit I and 2 facilities, and to the discussion of our findings held with Messrs. D. L. Freeze and R. A. Morgan at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
One new unresolved item resulted from this inspection and is discussed in the enclosed report.
This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.
l Any such application must include a full statement of the reasons on the basis of which it is claimed that the infomation is proprietary, and should I
be prepared so that proprietary infomation identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
-
--_
_
_ _ _ _ _ _ _ -
. *.
.
.
'.
bEIPhl,}hha
'
Duke Power Company-2-
-
..
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, C. E. Murphy, Chief
.
Reactor Construction and Engineering Support Branch Enclosure:
Inspection Report Nos.
50-413/78-8 and 50-414/78-7 cc w/ encl: Mr. D. G. Beam, Project Manager Catawba Nuclear Station P. O. Box 223 Clover, South Carolina 29710 l
l l
.
.
... _ _ _. _. _. _ _ _ _ _ _
_..