IR 05000413/1978008: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 21: Line 21:
{{#Wiki_filter:_ _ __ _ _ _ _ _ _ _ _ _ _ _
{{#Wiki_filter:_ _ __ _ _ _ _ _ _ _ _ _ _ _
e O'
e O'
,
UNITED STATES
.
>m Atou
  >m Atou   UNITED STATES
.
o NUCLEAR REGULATORY COMMISSION f
,
y    REGION 11
f o
  )7 g 3 - ,g  101 M ARIETT A sTR E ET, *4 '
NUCLEAR REGULATORY COMMISSION
o*   ATLANTA, GEORGI A 30303
*
%.....*'   SEP 211978 ,
REGION 11 y
)7 g
101 M ARIETT A sTR E ET, N.W.
 
-
*4
'
,g o*
ATLANTA, GEORGI A 30303
%.....*'
SEP 211978
,
In Reply Refer To:
In Reply Refer To:
RII:JJB 50-413/78-8 50-414/78-7 Duke Power Corpany Attn: Mr. L. C. Dail, Vice President Design Engineering P. O. Box 2178 Charlotte, North Carolina 28242 Gentlemen:
RII:JJB 50-413/78-8 50-414/78-7 Duke Power Corpany Attn: Mr. L. C. Dail, Vice President Design Engineering P. O. Box 2178 Charlotte, North Carolina 28242 Gentlemen:
This refers to the inspection conducted by Mr. J. J. Blake of this office on August 15-18, 1978, of activities authorized by NRC Construction Permit No CPPR-116 and CPPR-117 for the Catawba Nuclear Power Station, Unit I and 2 facilities, and to the discussion of our findings held with Messrs. D. L. Freeze and R. A. Morgan at the conclusion of the inspectio Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspecto Within the scope of this inspection, no items of noncompliance were disclose One new unresolved item resulted from this inspection and is discussed in the enclosed report. This item will be examined during subsequent inspection In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Roo If this
This refers to the inspection conducted by Mr. J. J. Blake of this office on August 15-18, 1978, of activities authorized by NRC Construction Permit Nos.
; report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.
 
CPPR-116 and CPPR-117 for the Catawba Nuclear Power Station, Unit I and 2 facilities, and to the discussion of our findings held with Messrs. D. L. Freeze and R. A. Morgan at the conclusion of the inspection.
 
Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
 
Within the scope of this inspection, no items of noncompliance were disclosed.
 
One new unresolved item resulted from this inspection and is discussed in the enclosed report.
 
This item will be examined during subsequent inspections.
 
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
 
If this report contains any information that you (or your contractor) believe to be
;
proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.
 
l Any such application must include a full statement of the reasons on the basis of which it is claimed that the infomation is proprietary, and should I
be prepared so that proprietary infomation identified in the application is contained in a separate part of the document.
 
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.


l Any such application must include a full statement of the reasons on the I basis of which it is claimed that the infomation is proprietary, and should be prepared so that proprietary infomation identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Roo _ _
-
--_
_


_ _ _ _ _ _ _ -
_ _ _ _ _ _ _ -
. *. .
. *.
.
.
.
'.
bEIPhl,}hha
bEIPhl,}hha
'
'
'.
Duke Power Company-2-
Duke Power Company -2-   -
-
.. Should you have any questions concerning this letter, we will be glad to discuss them with yo
..
Should you have any questions concerning this letter, we will be glad to discuss them with you.
 
Sincerely, C. E. Murphy, Chief
.
Reactor Construction and Engineering Support Branch Enclosure:
Inspection Report Nos.


Sincerely,
50-413/78-8 and 50-414/78-7 cc w/ encl: Mr. D. G. Beam, Project Manager Catawba Nuclear Station P. O. Box 223 Clover, South Carolina 29710 l
. C. E. Murphy, Chief Reactor Construction and Engineering Support Branch Enclosure:
Inspection Report No /78-8 and 50-414/78-7 cc w/ encl: Mr. D. G. Beam, Project Manager Catawba Nuclear Station P. O. Box 223 Clover, South Carolina 29710 l
l l
l l
.
.
  .
.
    . . . _ _ _ . _ . _ . _ _ _ _ _ _ _..
... _ _ _. _. _. _ _ _ _ _ _
_..
}}
}}

Latest revision as of 13:30, 11 December 2024

Forwards IE Inspec Repts 50-413/78-08 & 50-414/78-7 on 780815-18 During Which No Items of Noncompliance Were Noted
ML20147C722
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/21/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML20147C713 List:
References
NUDOCS 7810130098
Download: ML20147C722 (2)


Text

_ _ __ _ _ _ _ _ _ _ _ _ _ _

e O'

UNITED STATES

>m Atou

.

,

f o

NUCLEAR REGULATORY COMMISSION

REGION 11 y

)7 g

101 M ARIETT A sTR E ET, N.W.

-

  • 4

'

,g o*

ATLANTA, GEORGI A 30303

%.....*'

SEP 211978

,

In Reply Refer To:

RII:JJB 50-413/78-8 50-414/78-7 Duke Power Corpany Attn: Mr. L. C. Dail, Vice President Design Engineering P. O. Box 2178 Charlotte, North Carolina 28242 Gentlemen:

This refers to the inspection conducted by Mr. J. J. Blake of this office on August 15-18, 1978, of activities authorized by NRC Construction Permit Nos.

CPPR-116 and CPPR-117 for the Catawba Nuclear Power Station, Unit I and 2 facilities, and to the discussion of our findings held with Messrs. D. L. Freeze and R. A. Morgan at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

One new unresolved item resulted from this inspection and is discussed in the enclosed report.

This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure.

l Any such application must include a full statement of the reasons on the basis of which it is claimed that the infomation is proprietary, and should I

be prepared so that proprietary infomation identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

-

--_

_

_ _ _ _ _ _ _ -

. *.

.

.

'.

bEIPhl,}hha

'

Duke Power Company-2-

-

..

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, C. E. Murphy, Chief

.

Reactor Construction and Engineering Support Branch Enclosure:

Inspection Report Nos.

50-413/78-8 and 50-414/78-7 cc w/ encl: Mr. D. G. Beam, Project Manager Catawba Nuclear Station P. O. Box 223 Clover, South Carolina 29710 l

l l

.

.

... _ _ _. _. _. _ _ _ _ _ _

_..