{{#Wiki_filter:p* NCo                                             UNITED STATES
{{#Wiki_filter:p* NCo
  '                              q[og            NUCLEAR REGULATORY COMMISSION
UNITED STATES
    u     3 .p. ,                   o                        REGloN 11
q[o
    2         " '                   I               101 M ARIETT A STREET, N.W.
NUCLEAR REGULATORY COMMISSION
                                                      ATLANT A, GE oRGI A 30303
'
      "% .....#                                         OCT 2 61978
g
    In Reply Refer To:                                   l
REGloN 11
    RII:MDH
o
    50-364/78-14
u
        Alabama Power Company
3 .p. ,
        Attn:                    Mr. A. R. Barton
2
                                  Executive Vice President
" '
        Post Office Box 2641
I
        Birmingham, Alabama 35291
101 M ARIETT A STREET, N.W.
ATLANT A, GE oRGI A 30303
"% .....#
OCT 2 61978
In Reply Refer To:
l
l
        Gentlemen:
RII:MDH
        This refers to the inspection conducted by Mr. M. D. Hunt of this office
50-364/78-14
        on September 12-15, 1978, of activities authorized by NRC Construction
Alabama Power Company
        Permit No. CPPR-86 for the J. M. Farley Unit 2 facility, and to the
Attn:
        discussion of our findings held with Mr. R. E. Hollands, Jr. at the
Mr. A. R. Barton
        conclusion of the inspection.
Executive Vice President
        Areas examined during the inspection and our findings are discussed in
Post Office Box 2641
        the enclosed inspection report. Within these areas, the inspection
Birmingham, Alabama 35291
        consisted of selective examinations of procedures and representative
l
        records, interviews with personnel, and observations by the inspectors.
Gentlemen:
        We have examined actions you have taken with regard to previously
This refers to the inspection conducted by Mr. M. D. Hunt of this office
        reported unresolved items. The status of these items is discussed in
on September 12-15, 1978, of activities authorized by NRC Construction
        the enclosed report.
Permit No. CPPR-86 for the J. M. Farley Unit 2 facility, and to the
        During this inspection it was found that certain activities under your
discussion of our findings held with Mr. R. E. Hollands, Jr. at the
        license appear to be in noncompliance with NRC requirements. This
conclusion of the inspection.
        item and references to pertinent requirements are listed in the Notice
Areas examined during the inspection and our findings are discussed in
        of Violation enclosed herewith as Appendix A. This notice is sent to
the enclosed inspection report. Within these areas, the inspection
        you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
consisted of selective examinations of procedures and representative
        Practice," Part 2, Title ?), Code of Federal Regulations. Section 2.201
records, interviews with personnel, and observations by the inspectors.
        requires you to submit to this office, within 20 days of your receipt of
We have examined actions you have taken with regard to previously
        this notice, a written statement or explanation in reply including: (1)
reported unresolved items.
        corrective steps which have been taken by you and the results achieved;
The status of these items is discussed in
          (2) corrective steps which will be taken to avoid further noncompliance;
the enclosed report.
        and (3) the date when full compliance will be achieved. With regard to
During this inspection it was found that certain activities under your
        item number 364/78-14-01, corrective actions to prevent recurrence were
license appear to be in noncompliance with NRC requirements. This
        completed prior to conclusion of this inspection; therefore, a reply is
item and references to pertinent requirements are listed in the Notice
        not requested for this item.
of Violation enclosed herewith as Appendix A.
              78120700^Of
This notice is sent to
                  _ _ _ _ _ - _
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title ?), Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including: (1)
corrective steps which have been taken by you and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved. With regard to
item number 364/78-14-01, corrective actions to prevent recurrence were
completed prior to conclusion of this inspection; therefore, a reply is
not requested for this item.
78120700^Of
_ _ _ _ _ - _


                                                                                          - - - -         --- -             --
- - - -
  .
--- -
                                                                          l
--
                                                Alabama Power Company                   -2-
.
                                                In accordance with Section 2.790 of the NRC's " Rules of Practice,"
l
                                                Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
Alabama Power Company
                                                the enclosed inspection report will be placed in the NRC's Public Document
-2-
                                                Room.     If this report contains eny information that you (or your contractor)
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
                                                believe to be proprietary, it is necessary that you make a written
2, Title 10, Code of Federal Regulations, a copy of this letter and
                                                application within 20 days to this of fice to withhold such information
Part
                                                from public disclosure. Any such application must include a full statement
the enclosed inspection report will be placed in the NRC's Public Document
                                                of the reasons on the basis of which it is claimed that the information
Room.
                                                  is proprietary, and should be prepared so that proprietary information
If this report contains eny information that you (or your contractor)
                                                  identified in the application is contained in a separate part of the
believe to be proprietary, it is necessary that you make a written
                                                document. If we do not hear from you in this regard within the specified
application within 20 days to this of fice to withhold such information
                                                  period, the report will be placed in the Public Document Room.
from public disclosure.
                                                  Should you have any questions concerning this letter, we will be glad
Any such application must include a full statement
                                                  to discuss them with you.
of the reasons on the basis of which it is claimed that the information
                                                                                                Sincerely,
is proprietary, and should be prepared so that proprietary information
                                                                                                                c
identified in the application is contained in a separate part of the
                                                                                    Jguts       C. E. Murphy, Chief
If we do not hear from you in this regard within the specified
                                                                                    U           Reactor Construction and
document.
                                                                                                  Engineering Support Branch
period, the report will be placed in the Public Document Room.
                                                  Enclosures:
Should you have any questions concerning this letter, we will be glad
                                                  1.   Appendix A, Notice of Violation
to discuss them with you.
                                                        Inspection Report No. 50-364/76-14
Sincerely,
                                                  cc w/ enc 1:
c
                                                  Mr. R. E. Hollands, Jr., QA Supervisor
Jguts
                                                  P. O. Box U
C. E. Murphy, Chief
                                                  Ashford, Alabama 36312
U
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
Inspection Report No. 50-364/76-14
cc w/ enc 1:
Mr. R. E. Hollands, Jr., QA Supervisor
P. O. Box U
Ashford, Alabama 36312
l
l
l
l
1
1
                                                                                                  o
o
    - - ------__ _ - _ _ _ - _ _ _ - _ _ _ _ _ _                _
- - ------__ _ - _ _ _ - _ _ _ - _ _ _ _ _ _
                                                                          _g_
_g_
_
}}
}}

Latest revision as of 10:21, 11 December 2024

Forwards IE Inspec Rept 50-364/78-14 on 780912-15 & Notice of Violation
ML20148U357
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/26/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Barton A
ALABAMA POWER CO.
Shared Package
ML20071F942 List:
References
NUDOCS 7812070024
Download: ML20148U357 (2)


See also: IR 05000364/1978014

Text

p* NCo

UNITED STATES

q[o

NUCLEAR REGULATORY COMMISSION

'

g

REGloN 11

o

u

3 .p. ,

2

" '

I

101 M ARIETT A STREET, N.W.

ATLANT A, GE oRGI A 30303

"% .....#

OCT 2 61978

In Reply Refer To:

l

RII:MDH

50-364/78-14

Alabama Power Company

Attn:

Mr. A. R. Barton

Executive Vice President

Post Office Box 2641

Birmingham, Alabama 35291

l

Gentlemen:

This refers to the inspection conducted by Mr. M. D. Hunt of this office

on September 12-15, 1978, of activities authorized by NRC Construction

Permit No. CPPR-86 for the J. M. Farley Unit 2 facility, and to the

discussion of our findings held with Mr. R. E. Hollands, Jr. at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

We have examined actions you have taken with regard to previously

reported unresolved items.

The status of these items is discussed in

the enclosed report.

During this inspection it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This

item and references to pertinent requirements are listed in the Notice

of Violation enclosed herewith as Appendix A.

This notice is sent to

you pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice," Part 2, Title ?), Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including: (1)

corrective steps which have been taken by you and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved. With regard to

item number 364/78-14-01, corrective actions to prevent recurrence were

completed prior to conclusion of this inspection; therefore, a reply is

not requested for this item.

78120700^Of

_ _ _ _ _ - _

- - - -

--- -

--

.

l

Alabama Power Company

-2-

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

2, Title 10, Code of Federal Regulations, a copy of this letter and

Part

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains eny information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this of fice to withhold such information

from public disclosure.

Any such application must include a full statement

of the reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

If we do not hear from you in this regard within the specified

document.

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

c

Jguts

C. E. Murphy, Chief

U

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

Inspection Report No. 50-364/76-14

cc w/ enc 1:

Mr. R. E. Hollands, Jr., QA Supervisor

P. O. Box U

Ashford, Alabama 36312

l

l

1

o

- - ------__ _ - _ _ _ - _ _ _ - _ _ _ _ _ _

_g_

_