{{#Wiki_filter:March 7, 2022 NPF-95, Appendix B, Section 3.0 NRC3-22-0001 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
{{#Wiki_filter:March 7, 2022
 
NPF-95, Appendix B, Section 3.0
 
NRC3-22-0001
 
U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001


==Reference:==
==Reference:==
Line 24: Line 30:
==Subject:==
==Subject:==
DTE Electric Company (DTE) Submittal of the Fermi 3 Michigan Department of Environment, Great Lakes, and Energy (EGLE) Wetland Permit (WRP032246 v.1)
DTE Electric Company (DTE) Submittal of the Fermi 3 Michigan Department of Environment, Great Lakes, and Energy (EGLE) Wetland Permit (WRP032246 v.1)
On March 2, 2022, Michigan EGLE approved the renewal of the DTE Fermi 3 EGLE Wetland Permit (Number WRP032246 v.1). The purpose of this letter is to transmit the enclosed copy of the subject permit, as required by Section 3.0 of the Fermi 3 Environmental Protection Plan.
On March 2, 2022, Michigan EGLE approved the renewal of the DTE Fermi 3 EGLE Wetland Permit (Number WRP032246 v.1). The purpose of this letter is to transmit the enclosed copy of the subject permit, as required by Section 3.0 of the Fermi 3 Environmental Protection Plan.
If you have any questions, or need additional information, please contact me at (313) 235-0443.
If you have any questions, or need additional information, please contact me at (313) 235-0443.
Sincerely, M.,~\ ,~~
 
Sincerely, M.,~\\,~~
 
Michael K. Brandon, Manager Nuclear Development - Licensing DTE Electric Company
Michael K. Brandon, Manager Nuclear Development - Licensing DTE Electric Company


==Enclosure:==
==Enclosure:==
EGLE Wetland Permit No. WRP032246 v.1 T
EGLE Wetland Permit No. WRP032246 v.1 T E2- $ ----
                                                                            ---- E2- $
)) o05 Nlc I(
                                                                            )) o05 Nlc I(
 
L USNRC NRC3-22-0001 Page2


USNRC NRC3-22-0001 Page2 CC:       Michael Dudek, NRC Fermi 3 Project Branch Chief (Enclosure submitted electronically)
CC: Michael Dudek, NRC Fermi 3 Project Branch Chief (Enclosure submitted electronically)
Demetrius Murray, NRC Fermi 3 Project Manager (Enclosure submitted electronically)
Demetrius Murray, NRC Fermi 3 Project Manager (Enclosure submitted electronically)
Fermi 2 Resident Inspector (w/o Enclosure)
Fermi 2 Resident Inspector (w/o Enclosure)

Revision as of 13:52, 18 November 2024

DTE Electric Company (DTE) Submittal of the Fermi 3 Michigan Department of Environment, Great Lakes, and Energy (EGLE) Wetland Permit (WRP032246 v.1)
ML22081A032
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/07/2022
From: Brandon M
DTE Electric Company
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22081A081 List:
References
NRC3-22-0001, WRP032246 v.1
Download: ML22081A032 (2)


Text

March 7, 2022

NPF-95, Appendix B, Section 3.0

NRC3-22-0001

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Reference:

Fermi 3 NRC Docket No.52-033 NRC License No. NPF-95

Subject:

DTE Electric Company (DTE) Submittal of the Fermi 3 Michigan Department of Environment, Great Lakes, and Energy (EGLE) Wetland Permit (WRP032246 v.1)

On March 2, 2022, Michigan EGLE approved the renewal of the DTE Fermi 3 EGLE Wetland Permit (Number WRP032246 v.1). The purpose of this letter is to transmit the enclosed copy of the subject permit, as required by Section 3.0 of the Fermi 3 Environmental Protection Plan.

If you have any questions, or need additional information, please contact me at (313) 235-0443.

Sincerely, M.,~\\,~~

Michael K. Brandon, Manager Nuclear Development - Licensing DTE Electric Company

Enclosure:

EGLE Wetland Permit No. WRP032246 v.1 T E2- $ ----

)) o05 Nlc I(

L USNRC NRC3-22-0001 Page2

CC: Michael Dudek, NRC Fermi 3 Project Branch Chief (Enclosure submitted electronically)

Demetrius Murray, NRC Fermi 3 Project Manager (Enclosure submitted electronically)

Fermi 2 Resident Inspector (w/o Enclosure)

Andrea D. Veil, Director, NRC Office of Nuclear Reactor Regulation (w/o Enclosure)

NRC Region Ill Regional Administrator (w/o Enclosure)

NRC Region II Regional Administrator (w/o Enclosure)

Supervisor, Electric Operators, Michigan Public Service Commission (w/o Enclosure)

Michigan Department of Environment, Great Lakes and Energy OWMRP, Radiological Protection Section (w/o Enclosure)

Craig D. Sly, Dominion Energy, Inc. (w/o Enclosure)

Kent Halac, General Electric (w/o Enclosure)

Art Zaremba, Duke Energy (w/o Enclosure)

Steve Franzone, Florida Power and Light (w/o Enclosure)