{{#Wiki_filter:USAR IX - RADIOACTIVE WASTE SYSTEMS PAGE 1.0 
{{#Wiki_filter:1.0 2.0
: 3. 0 4.0 USAR IX -
RADIOACTIVE WASTE SYSTEMS  


==SUMMARY==
==SUMMARY==
DESCRIPTION                                             IX-1-1 2.0  LIQUID RADWASTE SYSTEM                                         IX-2-1 2.1   Safety Objective                                       IX-2-1 2.2   Safety Design Basis                                     IX-2-1 2.3   Power Generation Objective                             IX-2-1 2.4   Power Generation Design Basis                           IX-2-1 2.5   Liquid Radwaste System (Non-Augmen ted)                 IX-2-1 2.5.1 Description                                     IX-2-1 2.5.2   High Purity Wastes (Waste Collector Subsystem)   IX-2-2 2.5.3 Low Purity Wastes (Floor Drain Subsystem)       IX-2-3 2.5.4   Chemical Wastes                                 IX-2-3 2.6   Augmented Liquid Radwaste (LRW) System                   IX-2-4 2.7   Safety Evaluation                                       IX-2-4
DESCRIPTION LIQUID RADWASTE SYSTEM 2.1 Safety Objective 2.2 Safety Design Basis 2.3 Power Generation Objective 2.4 Power Generation Design Basis 2.5 Liquid Radwaste System (Non-Augmented) 2.5.1 Description 2.5.2 High Purity Wastes (Waste Collector Subsystem) 2.5.3 Low Purity Wastes (Floor Drain Subsystem) 2.5.4 Chemical Wastes 2.6 Augmented Liquid Radwaste (LRW) System 2.7 Safety Evaluation
: 2. 7 .1 LRW (Non-Augmen ted)                             IX-2-4
: 2. 7.1 LRW (Non-Augmented)
: 2. 7. 2 Augmented LRW                                   IX-2-5 2.8   Power Generation Evaluation                             IX-2-5 2.9   Inspection and Testing                                   IX-2-5
: 2. 7. 2 Augmented LRW 2.8 Power Generation Evaluation 2.9 Inspection and Testing SOLID RADWASTE SYSTEM 3.1 Power Generation Objective 3.2 Power Generation Design Basis 3.3 Description 3.4 3.5
: 3. 0 SOLID RADWASTE SYSTEM                                         IX-3-1 3.1   Power Generation Objective                               IX-3-1 3.2   Power Generation Design Basis                           IX-3-1 3.3   Description                                             IX-3-1
: 3. 3. 1 General 3.3.2 Wet Solid Radwaste 3.3.3 3.3.4 3.3.5 3.3.2.1 Sludge Processing 3.3.2.2 Spent Resins 3.3.2.3 Wet Solid Radwaste Processing for Disposal Dry Solid Radwaste Miscellaneous Solid Wastes Independent Spent Fuel Storage Installation (ISFSI)
: 3. 3. 1 General                                         IX-3-1 3.3.2   Wet Solid Radwaste                               IX-3-1 3.3.2.1 Sludge Processing                       IX-3-1 3.3.2.2 Spent Resins                             IX-3-4 3.3.2.3 Wet Solid Radwaste Processing for Disposal                               IX-3-4 3.3.3  Dry Solid Radwaste                             IX-3-6 3.3.4  Miscellaneo us Solid Wastes                     IX-3-6 3.3.5  Independent Spent Fuel Storage Installation (ISFSI)                           IX-3-6 3.4  Power Generation Evaluation                             IX-3-6 3.5  Inspection and Testing                                 IX-3-6 4.0  GASEOUS RADWASTE SYSTEM                                       IX-4-1 4.1   Power Generation Objective                             IX-4-1 4.2   Power Generation Design Basis                           IX-4-1 4.3   Off-Gas System (Non-Augmen ted)                         IX-4-1 4.3.1   Description                                     IX-4-1 4.3.1.1 General                                 IX-4-1 4.3.1.2 Air Ejector Off-Gas System             IX-4-4 4.3.1.3 Gland Seal Off-Gas Subsystem           IX-4-5 4.4   Augmented Off-Gas (AOG) System                         IX-4-5 4.4.1   System Parameters                               IX-4-5 4.4.1.1 Sizing                                 IX-4-6 4.4.1.2 Decontamina tion Factor (DF)           IX-4-6 4.4.1.3 Operation                               IX-4-6 4.4.1.4 Safety and Reliability                 IX-4-6 4.4.1.5 Mechanical Design                       IX-4-6 4.4.1.6 Configurati on                          IX-4-6 4.4.2   Process Design                                 IX-4-8 4.4.2.1 Hydrogen Dilution                       IX-4-8 4.4.2.2 Recombinati on                          IX-4-10 4.4.2.3 Dehumidific ation                      IX-4-10 4.4.2.4 Drying                                 IX-4-10 4.4.2.5 Hydrogen Analyzers                     IX-4-11 4.4.2.6 Long Term Delay                         IX-4-11 ix-1-1                           12/08/15
Power Generation Evaluation Inspection and Testing GASEOUS RADWASTE SYSTEM 4.1 Power Generation Objective 4.2 Power Generation Design Basis 4.3 Off-Gas System (Non-Augmented) 4.3.1 Description 4.3.1.1 General 4.3.1.2 Air Ejector Off-Gas System 4.3.1.3 Gland Seal Off-Gas Subsystem 4.4 Augmented Off-Gas (AOG) System 4.4.1 System Parameters 4.4.1.1 Sizing 4.4.1.2 Decontamination Factor (DF) 4.4.1.3 Operation 4.4.1.4 Safety and Reliability 4.4.1.5 Mechanical Design 4.4.1.6 Configuration 4.4.2 Process Design 4.4.2.1 Hydrogen Dilution 4.4.2.2 Recombination 4.4.2.3 Dehumidification 4.4.2.4 Drying 4.4.2.5 Hydrogen Analyzers 4.4.2.6 Long Term Delay ix-1-1 PAGE IX-1-1 IX-2-1 IX-2-1 IX-2-1 IX-2-1 IX-2-1 IX-2-1 IX-2-1 IX-2-2 IX-2-3 IX-2-3 IX-2-4 IX-2-4 IX-2-4 IX-2-5 IX-2-5 IX-2-5 IX-3-1 IX-3-1 IX-3-1 IX-3-1 IX-3-1 IX-3-1 IX-3-1 IX-3-4 IX-3-4 IX-3-6 IX-3-6 IX-3-6 IX-3-6 IX-3-6 IX-4-1 IX-4-1 IX-4-1 IX-4-1 IX-4-1 IX-4-1 IX-4-4 IX-4-5 IX-4-5 IX-4-5 IX-4-6 IX-4-6 IX-4-6 IX-4-6 IX-4-6 IX-4-6 IX-4-8 IX-4-8 IX-4-10 IX-4-10 IX-4-10 IX-4-11 IX-4-11 12/08/15  


USAR IX - RADIOACTIVE WASTE SYSTEMS (Cont'd.)
5.0 4.5 4.6
PAGE
: 4. 4. 3
: 4. 4. 3 Seismic Analysis                        IX-4-13
: 4. 4. 4
: 4. 4. 4 Fabrication                              IX-4-13
: 4. 4. 5 USAR IX -
: 4. 4. 5 Instrumenta tion and Control            IX-4-14 4.Power Generation Evaluation                       IX-4-14
RADIOACTIVE WASTE SYSTEMS (Cont'd.)
: 4. 5. 1 Off-Gas ( OG) System                     IX-4-14 4.5.2   Augmented Off-Gas (AOG) System           IX-4-17 4.6  Inspection and Testing                            IX-4-17
Seismic Analysis Fabrication Instrumentation and Control Power Generation Evaluation
: 4. 5. 1 Off-Gas ( OG) System 4.5.2 Augmented Off-Gas (AOG) System Inspection and Testing REFERENCES FOR CHAPTER IX ix-1-2 PAGE IX-4-13 IX-4-13 IX-4-14 IX-4-14 IX-4-14 IX-4-17 IX-4-17 IX-5-1 11/16/00


==5.0 REFERENCES==
FOR CHAPTER IX                              IX-5-1 ix-1-2                  11/16/00
USAR LIST OF FIGURES (At end of Section IX)
Figure No.
Figure No.
None ix-2-1         10/21/98
None USAR LIST OF FIGURES (At end of Section IX) ix-2-1 10/21/98  


USAR LIST OF TABLES Table No.                       Title IX-4-1   Gaseous Radwaste System Data                          IX-4-3 IX-4-Noncondensible Gas Flow Rates (Lb/Hr) Entering Augmented Off-Gas Treatment System                   IX-4-7 IX-4-3  Stream Composition After Dilution                     IX-4-9 IX-4-4  Activity Profile                                     IX-4-12 IX-4-5  Maximum Expected Activity Release to the Environment From Gland Seal Leakage                               IX-4-15 IX-4-6  Particulates Buildup in Environment                  IX-4-16 IX-4-7  System Failure Analysis                              IX-4-18 ix-3-1                          03/20/01
Table No.
IX-4-1 IX-4-2 IX-4-3 IX-4-4 IX-4-5 IX-4-6 IX-4-7 USAR LIST OF TABLES Title Gaseous Radwaste System Data Noncondensible Gas Flow Rates (Lb/Hr) Entering Augmented Off-Gas Treatment System Stream Composition After Dilution Activity Profile Maximum Expected Activity Release to the Environment From Gland Seal Leakage Particulates Buildup in Environment System Failure Analysis ix-3-1 IX-4-3 IX-4-7 IX-4-9 IX-4-12 IX-4-15 IX-4-16 IX-4-18 03/20/01  


USAR IX - RADIOACTIVE WASTE SYSTEMS 1.0        
USAR IX -
RADIOACTIVE WASTE SYSTEMS 1.0  


==SUMMARY==
==SUMMARY==
Line 49: Line 50:
: 1) activation products resulting from irradiation of the reactor water and impurities therein (principally metallic corrosion products) and 2) fission products resulting from defective fuel cladding or tramp uranium contamination within the reactor system.
: 1) activation products resulting from irradiation of the reactor water and impurities therein (principally metallic corrosion products) and 2) fission products resulting from defective fuel cladding or tramp uranium contamination within the reactor system.
Radioactive wastes resulting from station operation are classified as liquid, gaseous, and solid. The following definitions apply to radioactive wastes:
Radioactive wastes resulting from station operation are classified as liquid, gaseous, and solid. The following definitions apply to radioactive wastes:
: 1. Liquid   Radioactive   Wastes - Liquids   directly   from   the reactor process and auxiliary systems or liquids which can become contaminated due to contact with these liquids from reactor process systems.
: 1.
: 2. Gaseous   Radioactive   Wastes - Offgases   from   the   Main Condenser evacuation and Turbine Gland Sealing Systems and ventilation system exhausts from buildings having the potential for containing radioactive materials. Gaseous radioactive wastes include noble gases,           radioiodine, particulates, Carbon-14 and tritium.
Liquid Radioactive Wastes - Liquids directly from the reactor process and auxiliary systems or liquids which can become contaminated due to contact with these liquids from reactor process systems.
: 3. Solid Radioactive Wastes - Solids       from the reactor or auxiliary systems, solids in contact with reactor or auxiliary systems operations or those materials processed through the radwaste system.
: 2.
IX-1-1                               03/21/13
Gaseous Radioactive Wastes - Offgases from the Main Condenser evacuation and Turbine Gland Sealing Systems and ventilation system exhausts from buildings having the potential for containing radioactive materials.
Gaseous radioactive wastes include noble
: gases, radioiodine, particulates, Carbon-14 and tritium.
: 3.
Solid Radioactive Wastes - Solids from the reactor or auxiliary systems, solids in contact with reactor or auxiliary systems operations or those materials processed through the radwaste system.
IX-1-1 03/21/13  


2.0         LIQUID RADWASTE SYSTEM The Liquid Radwaste (LRW) System includes an augmented treatment subsystem which is no longer in use. The LRW System (non-augmented) is described below.
2.0 LIQUID RADWASTE SYSTEM The Liquid Radwaste (LRW)
2.1         Safety Objective The safety objective of the LRW System is to provide those means necessary to maintain control over plant liquid radioactive effluents.
System includes an augmented treatment subsystem which is no longer in use.
2.2           Safety Design Basis The LRW System is designed to prevent the inadvertent release of liquid radioactive material from the exclusion area of the plant so that resulting radiation exposures are within the limits of 10CFR20, 10CFR50, Appendix I, and 10CFRl00.
The LRW System (non-augmented) is described below.
2.3           Power Generation Objective The power generation objective of the LRW System       is   that the operation or availability of the plant is not limited.
2.1 Safety Objective The safety objective of the LRW System is to provide those means necessary to maintain control over plant liquid radioactive effluents.
2.4           Power Generation Design Basis The LRW System is designed so that liquid radwastes are discharged from the plant within the limits specified in 10CFR20, 10CFR50, Appendix I, and 40CFR190, and the operation or availability of the plant is not limited.
2.2 Safety Design Basis The LRW System is designed to prevent the inadvertent release of liquid radioactive material from the exclusion area of the plant so that resulting radiation exposures are within the limits of 10CFR20,
: 10CFR50, Appendix I, and 10CFRl00.
2.3 Power Generation Objective The power generation objective of the LRW System is that the operation or availability of the plant is not limited.
2.4 Power Generation Design Basis The LRW System is designed so that liquid radwastes are discharged from the plant within the limits specified in 10CFR20, 10CFR50, Appendix I, and 40CFR190, and the operation or availability of the plant is not limited.
The LRW System collects, treats, and returns processed radioactive liquid waste to the plant for reuse. Treated radioactive wastes not suitable for reuse are discharged from the plant as releases or packaged for off site processing or disposal.
The LRW System collects, treats, and returns processed radioactive liquid waste to the plant for reuse. Treated radioactive wastes not suitable for reuse are discharged from the plant as releases or packaged for off site processing or disposal.
2.5         Liquid Radwaste System (Non-Augmented) 2.5.1        Description The LRW System for CNS was designed to accept process wastes from two nuclear units. Since CNS is only a single unit, it is larger than would normally be necessary. The LRW System collects, processes,           stores, and disposes of all radioactive liquid wastes.
2.5 2.5.1 Liquid Radwaste System (Non-Augmented)
Description The LRW System for CNS was designed to accept process wastes from two nuclear units. Since CNS is only a single unit, it is larger than would normally be necessary.
The LRW System collects, processes,
: stores, and disposes of all radioactive liquid wastes.
Included in the LRW System are the following components/systems:
Included in the LRW System are the following components/systems:
: a. Piping and equipment drains carrying potentially radioactive wastes;
: a.
: b. Floor drain systems in areas which may contain potentially radioactive wastes;
Piping and equipment drains carrying potentially radioactive wastes;
: c. Tanks, piping, pumps, process equipment, instrumentation and auxiliaries necessary to collect, process, store, and dispose of potentially radioactive wastes; and
: b.
: d. Tanks and sumps used   to collect potentially radioactive wastes.
Floor drain systems in areas which may contain potentially radioactive wastes;
Equipment   was selected,   arranged, and   shielded   to   permit operation, inspection, and maintenance with acceptable personnel doses. For example,   tanks and processing equipment which are expected to contain significant radiation sources, are located behind shielding, and similarly sumps, pumps, valves, and instruments are located in radiologically controlled access rooms or shielded spaces. In addition, the radwaste equipment was selected to minimize the need for maintenance. The radwaste system equipment IX-2-1                               03/20/01
: c.
Tanks, piping, pumps, process equipment, instrumentation and auxiliaries necessary to collect, process, store, and dispose of potentially radioactive wastes; and
: d.
Tanks and sumps used to collect potentially radioactive wastes.
Equipment was
: selected, arranged, and shielded to permit operation, inspection, and maintenance with acceptable personnel doses. For
: example, tanks and processing equipment which are expected to contain significant radiation sources, are located behind shielding, and similarly sumps, pumps, valves, and instruments are located in radiologically controlled access rooms or shielded spaces.
In addition, the radwaste equipment was selected to minimize the need for maintenance. The radwaste system equipment IX-2-1 03/20/01  


configurations are given in Burns and Roe Drawings 2032 Sheets 1-5, 2033 Sheets 1-4, 2079 Sheets 1 and 2, and 2080. Operation of the waste system is essentially manual start-automatic stop.
configurations are given in Burns and Roe Drawings 2032 Sheets 1-5, 2033 Sheets 1-4, 2079 Sheets 1 and 2, and 2080. Operation of the waste system is essentially manual start-automatic stop.
The LRW System is divided into several subsystems so that the liquid wastes from various sources can be kept segregated and processed separately. Cross connections between the subsystems provide additional flexibility for processing of the wastes by alternate methods. The liquid radwastes are classified, collected, and treated as either high purity, low purity, or chemical. The terms "high" purity and "low" purity refer to chemistry purity conductivity and not radioactivity.
The LRW System is divided into several subsystems so that the liquid wastes from various sources can be kept segregated and processed separately.
2.5.2         High Purity Wastes (Waste Collector Subsystem)
Cross connections between the subsystems provide additional flexibility for processing of the wastes by alternate methods.
The liquid radwastes are classified, collected, and treated as either high purity, low
: purity, or chemical.
The terms "high" purity and "low" purity refer to chemistry purity conductivity and not radioactivity.
2.5.2 High Purity Wastes (Waste Collector Subsystem)
High purity (low conductivity) liquid wastes are collected in the Waste Collector Tank from the following sources:
High purity (low conductivity) liquid wastes are collected in the Waste Collector Tank from the following sources:
Waste Collector Tank
Waste Collector Tank
: 1. Drywell Equipment Drain Sump
: 1.
: 2. Reactor Building Equipment Drain Sump
Drywell Equipment Drain Sump
: 3. Radwaste Building Equipment Drain Sump
: 2.
: 4. Turbine Building Equipment Drain Sump
Reactor Building Equipment Drain Sump
: 5. Startup Discharge from Reactor Water Cleanup (RWCU) Pumps
: 3.
: 6. Draining of RHR System
Radwaste Building Equipment Drain Sump
: 7. Decantate from RWCU Phase Separators
: 4.
: 8. Decantate from Condensate Phase Separators
Turbine Building Equipment Drain Sump
: 9. Fuel pool system
: 5.
: 10. Decantate from Waste Sludge Tank[lSJ
Startup Discharge from Reactor Water Cleanup (RWCU)
: 11. Chemical Waste Sample Tank [22 J
Pumps
: 12. Distillate Tank[ 22 J
: 6.
: 13. Radwaste Building Sample Rack IE
Draining of RHR System
: 14. Waste Sample Tanks
: 7.
: 15. Elevated Release Point Sump(Z sumps)
Decantate from RWCU Phase Separators
These wastes have low conductivity with variable radioactive concentrations dependent on their area of collection. The average high purity waste collected is 16,000 gallons/day with an average activity level of 1 x 10- 4 µCi/ml.
: 8.
Decantate from Condensate Phase Separators
: 9.
Fuel pool system
: 10.
Decantate from Waste Sludge Tank[lSJ
: 11.
Chemical Waste Sample Tank [22 J
: 12.
Distillate Tank[ 22 J
: 13.
Radwaste Building Sample Rack IE
: 14.
Waste Sample Tanks
: 15.
Elevated Release Point Sump(Z sumps)
These wastes have low conductivity with variable radioactive concentrations dependent on their area of collection. The average high purity waste collected is 16,000 gallons/day with an average activity level of 1 x 10-4 µCi/ml.
During treatment, the high purity wastes are filtered in the Waste Collector Filter and then demineralized in the deep bed Waste Demineralizer.
During treatment, the high purity wastes are filtered in the Waste Collector Filter and then demineralized in the deep bed Waste Demineralizer.
The   expected   decontamination   factor ( DF)     for combined filtration   and demineralization is at least 1,000. After processing, the waste is pumped to the Waste Sample Tanks where it is sampled.
The expected decontamination factor ( DF) for combined filtration and demineralization is at least 1,000. After processing, the waste is pumped to the Waste Sample Tanks where it is sampled.
If the analysis of the sample reveals water of high conductivity or high turbidity, the waste is recycled to the Waste Collector Tank for reprocessing. If the analysis of the sample reveals purity of the waste is acceptable, the waste is sent to the Condensate Storage Tank (CST). However, if the CST inventory does not permit additional water, the waste may be sent to the Waste Surge Tank or the waste can be discharged to the river, provided a minimum of one Circulating Water Pump is in operation. The flow capacity is 270 GPM.
If the analysis of the sample reveals water of high conductivity or high turbidity, the waste is recycled to the Waste Collector Tank for reprocessing. If the analysis of the sample reveals purity of the waste is acceptable, the waste is sent to the Condensate Storage Tank (CST). However, if the CST inventory does not permit additional water, the waste may be sent to the Waste Surge Tank or the waste can be discharged to the river, provided a minimum of one Circulating Water Pump is in operation. The flow capacity is 270 GPM.
The backwash resins from the demineralizer are sent to the Spent Resin Tank. The resins are then pumped to a high integrity container where they are dewatered using the NuPac dewatering system.
The backwash resins from the demineralizer are sent to the Spent Resin Tank. The resins are then pumped to a high integrity container where they are dewatered using the NuPac dewatering system.
The backwash filter material from the Waste Collector Filter is sent to the Waste Sludge Tank. Solids treatment of the contents of this tank is similar to that for the resins. However, the tank contains a mixture of IX-2-2                         03/19/01
The backwash filter material from the Waste Collector Filter is sent to the Waste Sludge Tank. Solids treatment of the contents of this tank is similar to that for the resins. However, the tank contains a mixture of IX-2-2 03/19/01  


backwashes from the Waste Collector and         Floor Drain Filters   and fuel pool demineralizer sludges.
backwashes from the Waste Collector and Floor Drain Filters and fuel pool demineralizer sludges.
2.5.3         Low Purity Wastes (Floor Drain Subsystem)
2.5.3 Low Purity Wastes (Floor Drain Subsystem)
Low purity (high conductivity) liquid wastes are collected in the Floor Drain Collector Tank from the following sources:
Low purity (high conductivity) liquid wastes are collected in the Floor Drain Collector Tank from the following sources:
Floor Drain Collector Tank
Floor
: 1.     Drywell Floor Drain Sump
: 1.
: 2.      Reactor Building Floor Drain Sumps
: 2.
: 3.      Radwaste Building Floor Drain Sumps
: 3.
: 4.      Turbine Building Floor Drain Sump
: 4.
: 5.      Chemical Waste Tank
: 5.
: 6.      Laboratory Drain Tanks
: 6.
: 7.      Elevated Release Point Sump (alternate flow path only)
: 7.
: 8.      Augmented Radwaste Building Floor Drain Sump
: 8.
: 9.      Decantate from Waste Sludge Tank (only when Waste Collector Tank is full) [lSJ These wastes generally have low radioactivity concentrations, therefore, processing consists of filtration and subsequent transfer to the Floor Drain Sample Tank for sampling and analysis.
: 9.
Drain Collector Tank Drywell Floor Drain Sump Reactor Building Floor Drain Sumps Radwaste Building Floor Drain Sumps Turbine Building Floor Drain Sump Chemical Waste Tank Laboratory Drain Tanks Elevated Release Point Sump (alternate flow path only)
Augmented Radwaste Building Floor Drain Sump Decantate from Waste Sludge Tank (only when Waste Collector Tank is full) [lSJ These wastes generally have low radioactivity concentrations, therefore, processing consists of filtration and subsequent transfer to the Floor Drain Sample Tank for sampling and analysis.
If the analysis of the sample reveals that the purity of the waste is sufficient to transfer to the High Purity Waste System then the waste is transferred to the Waste Collector Tank, if the inventory of the High Purity Waste System is such as to permit the additional volume. If the purity of the waste precludes processing to the Waste Collector Subsystem, but has low enough radioactivity concentration and acceptable purity for discharge, the waste is discharged to the river, provided a minimum of one Circulating Water Pump is in operation. If the waste cannot be processed to the Waste Collector Subsystem or the river, it is recycled back to the Floor Drain Collector Tank for further processing.
If the analysis of the sample reveals that the purity of the waste is sufficient to transfer to the High Purity Waste System then the waste is transferred to the Waste Collector Tank, if the inventory of the High Purity Waste System is such as to permit the additional volume. If the purity of the waste precludes processing to the Waste Collector Subsystem, but has low enough radioactivity concentration and acceptable purity for discharge, the waste is discharged to the river, provided a minimum of one Circulating Water Pump is in operation. If the waste cannot be processed to the Waste Collector Subsystem or the river, it is recycled back to the Floor Drain Collector Tank for further processing.
Because no radium-226 or radium-228 of plant origin will be present, and because the potential concentration of iodine-129 is very low, the discharge concentration limit for otherwise unidentified mixture of radioisotopes will not exceed the limit of 10- 7 µCi/ml above background. If other radioisotopes are shown not to be present in significant concentrations, or if analyses are made, discharge limits may meet maximum permissible concentrations.
Because no radium-226 or radium-228 of plant origin will be present, and because the potential concentration of iodine-129 is very low, the discharge concentration limit for otherwise unidentified mixture of radioisotopes will not exceed the limit of 10-7 µCi/ml above background. If other radioisotopes are shown not to be present in significant concentrations, or if analyses are made, discharge limits may meet maximum permissible concentrations.
The average "dirty waste" (i.e., Low Purity Wastes from the Floor Drain    Sumps)    volume    collected    from  the   Floor   Drain   System   is 7,000 gallons/day.
The average Drain Sumps) volume 7,000 gallons/day.
In the treatment process the wastes are filtered in the Floor Drain Collection Filter with a flow capacity of 65 gpm and an expected DF of 10 for f il tra tion. [ll 2.5.4         Chemical Wastes Chemical wastes are collected in the       Chemical Waste   Tank and Laboratory Drain Tanks from the following sources.
"dirty waste" collected (i.e.,
: 1.     Shop decontamination solutions
from Low Purity Wastes from the Floor the Floor Drain System is In the treatment process the wastes are filtered in the Floor Drain Collection Filter with a flow capacity of 65 gpm and an expected DF of 10 for f il tra tion. [ll 2.5.4 Chemical Wastes Chemical wastes are collected in the Chemical Waste Tank and Laboratory Drain Tanks from the following sources.
: 2.     Laboratory drains
: 1.
: 3.     Reactor Building and Radwaste       Building decontamination drains IX-2-3                             03/21/13
Shop decontamination solutions
: 4. RWCU, Waste, and Condensate Precoat Tank drains The chemical wastes are normally comprised of laboratory drains.
: 2.
Laboratory drains
: 3.
Reactor Building and Radwaste Building decontamination drains IX-2-3 03/21/13
: 4.
RWCU, Waste, and Condensate Precoat Tank drains The chemical wastes are normally comprised of laboratory drains.
Infrequently ( every several years) decontamination solutions may be present due to equipment decontamination for maintenance. The MPF floor drains provide some of this solution due to decontamination of equipment in the machine shop.
Infrequently ( every several years) decontamination solutions may be present due to equipment decontamination for maintenance. The MPF floor drains provide some of this solution due to decontamination of equipment in the machine shop.
The maximum activity and volumes are due to the decontamination solutions. ll 6 J Chemical wastes are of such high conductivity (ionic content) as to preclude treatment by ion exchange. The wastes are neutralized,             if necessary, using caustic or sulfuric acid as the neutralizing medium. These wastes are sent to the Floor Drain Collector Tank and processed by the Low Purity Waste System for disposal to the river. The flow rate for the Laboratory Drain Tanks to the Floor Drain Collector Tank is 38 gpm. The Chemical Waste Tank wastes are transferred to the Floor Drain Collector Tank at a rate of 50 gpm. A DF of 10 is expected in passing through the Floor Drain Collector Filter. After being shown suitable for disposal, the waste is diluted into the Circulating Water Discharge Canal at a rate to be within the unidentified mixture concentration limit of 10CFR20. lll If the radioactivity content of the waste precludes disposal to the river,       the chemical wastes are processed through the floor drain demineralizer system or processed using an approved vendor method. See USAR IX-2.5.
The maximum activity and volumes are due to the decontamination solutions. ll 6J Chemical wastes are of such high conductivity (ionic content) as to preclude treatment by ion exchange.
Corrosion of laboratory drains through the normal use of acids is minimized by recirculating unused portions of samples to waste at the sample station. In effect this retains the sample in the system until it is satisfactorily neutralized. Reactor water, Condensate and Feedwater samples which do not need to be neutralized are routed to the High Purity Waste Subsystem where the water is recovered for reuse.
The wastes are neutralized, if necessary, using caustic or sulfuric acid as the neutralizing medium. These wastes are sent to the Floor Drain Collector Tank and processed by the Low Purity Waste System for disposal to the river.
2.6             Augmented Liquid Radwaste (LRW) System 125 l The function of the Augmented Liquid Radwaste System to supplement the Liquid Radwaste System in processing wastes from the Floor Drain Collector Filter, the Floor Drain Collector Tank, the Chemical Waste Tank, and the Lab Drain Tanks. However, CNS no longer uses this system to process liquid radwaste. l 27 l Nevertheless, the equipment remains in place as shown in Burns and Roe Drawing 2079, Sheets 1 and 2.
The flow rate for the Laboratory Drain Tanks to the Floor Drain Collector Tank is 38 gpm.
2.7             Safety Evaluation
The Chemical Waste Tank wastes are transferred to the Floor Drain Collector Tank at a rate of 50 gpm. A DF of 10 is expected in passing through the Floor Drain Collector Filter. After being shown suitable for disposal, the waste is diluted into the Circulating Water Discharge Canal at a rate to be within the unidentified mixture concentration limit of 10CFR20. lll If the radioactivity content of the waste precludes disposal to the
: 2. 7 .1         LRW (Non-Augmented)
: river, the chemical wastes are processed through the floor drain demineralizer system or processed using an approved vendor method.
The Radwaste Building is located on the north side of the Reactor Building, about 600 feet from the Missouri River. All of the liquid radwaste storage and collection tanks contained in this structure are located below ground level. The liquid radwaste storage and collection tanks with capacities greater than 500 gallons are of Class I design. The attached liquid process piping is of Class I design up to the first isolation valve. The Reactor Water Clean-up (RWCU) phase separator tanks, which are considered a part of the Radwaste System, are located in the Reactor Building. The RWCU phase separator tanks and the attached liquid process piping, up to the first isolation valve, are also of Class I design. Since the Radwaste Building substructure and the IX-2-4                           03/21/13
See USAR IX-2.5.
Corrosion of laboratory drains through the normal use of acids is minimized by recirculating unused portions of samples to waste at the sample station.
In effect this retains the sample in the system until it is satisfactorily neutralized. Reactor water, Condensate and Feedwater samples which do not need to be neutralized are routed to the High Purity Waste Subsystem where the water is recovered for reuse.
2.6 Augmented Liquid Radwaste (LRW) System125 l The function of the Augmented Liquid Radwaste System to supplement the Liquid Radwaste System in processing wastes from the Floor Drain Collector Filter, the Floor Drain Collector Tank, the Chemical Waste Tank, and the Lab Drain Tanks.
: However, CNS no longer uses this system to process liquid radwaste. l 27 l Nevertheless, the equipment remains in place as shown in Burns and Roe Drawing 2079, Sheets 1 and 2.
2.7
: 2. 7.1 Safety Evaluation LRW (Non-Augmented)
The Radwaste Building is located on the north side of the Reactor Building, about 600 feet from the Missouri River. All of the liquid radwaste storage and collection tanks contained in this structure are located below ground level. The liquid radwaste storage and collection tanks with capacities greater than 500 gallons are of Class I design. The attached liquid process piping is of Class I design up to the first isolation valve. The Reactor Water Clean-up (RWCU) phase separator tanks, which are considered a part of the Radwaste System, are located in the Reactor Building. The RWCU phase separator tanks and the attached liquid process piping, up to the first isolation valve, are also of Class I design. Since the Radwaste Building substructure and the IX-2-4 03/21/13  


liquid radwaste storage and collection tanks are designed to withstand a Class I seismic occurrence, the possibility that radioactive water may escape the tanks, and then the building, and then run out into the ground through cracks is not credible. Additionally, there is a 40 mil plastic waterproofing membrane that completely envelopes the Radwaste Building substructure walls and foundation mat. These structural design features ensure that the safety objective is met.
liquid radwaste storage and collection tanks are designed to withstand a Class I seismic occurrence, the possibility that radioactive water may escape the tanks, and then the building, and then run out into the ground through cracks is not credible. Additionally, there is a 40 mil plastic waterproofing membrane that completely envelopes the Radwaste Building substructure walls and foundation mat. These structural design features ensure that the safety objective is met.
2.7.2       Augmented LRW CNS no longer uses this system to process liquid radwaste. [27 l The Augmented Liquid Radwaste         System   is located in a   seismic Class II Radwaste Building extension.
2.7.2 Augmented LRW CNS no longer uses this system to process liquid radwaste. [27 l The Augmented Liquid Radwaste System is located in a seismic Class II Radwaste Building extension.
2.8         Power Generation Evaluation Since the CNS LRW system was designed to accept process wastes from two nuclear units, and CNS only has one nuclear unit, the operation and availability of the plant is not limited.
2.8 Power Generation Evaluation Since the CNS LRW system was designed to accept process wastes from two nuclear units, and CNS only has one nuclear unit, the operation and availability of the plant is not limited.
: 2. 9         Inspection and Testing The LRW System is normally operating on an "as required" bas is during operation of the nuclear plant thereby demonstrating operability without any special inspections or testing.
: 2. 9 Inspection and Testing The LRW System is normally operating during operation of the nuclear plant thereby without any special inspections or testing.
The   LRW   System is     in   scope   for   License   Renewal   per 10 CFR 54.4(a) (1) and (a) (2) and was subject to aging management review. Aging effects are managed by the following Aging Management Programs: Bolting Integrity (see USAR Section K-2.1.2), Buried Piping and Tanks Inspection (see USAR   Section K-2.1.3),       External       Surfaces   Monitoring     (see     USAR Section K-2. 1.14),   Oil   Analyses   ( see   USAR   Section K-2. 1. 28),   One-Time Inspection ( see USAR Section K-2. 1. 2 9), Periodic Surveillance and Preventive Maintenance ( see USAR Section K-2. 1. 31), and Selective Leaching ( see USAR Section K-2.1.34). There are   no   Time-Limited Aging Analyses         that   are applicable.
on an "as required" bas is demonstrating operability The LRW System is in scope for License Renewal per 10 CFR 54.4(a) (1) and (a) (2) and was subject to aging management review. Aging effects are managed by the following Aging Management Programs: Bolting Integrity (see USAR Section K-2.1.2), Buried Piping and Tanks Inspection (see USAR Section K-2.1.3),
IX-2-5                                   01/17/14
External Surfaces Monitoring (see USAR Section K-2. 1.14),
Oil Analyses
( see USAR Section K-2. 1. 28),
One-Time Inspection ( see USAR Section K-2. 1. 2 9), Periodic Surveillance and Preventive Maintenance
( see USAR Section K-2. 1. 31),
and Selective Leaching
( see USAR Section K-2.1.34).
There are no Time-Limited Aging Analyses that are applicable.
IX-2-5 01/17/14  


USAR 3.0         SOLID RADWASTE SYSTEM 3.1          Power Generation Objective The power generation objective of the Solid Radwaste System is to collect, process, package, and provide temporary storage facilities for solid wastes prior to shipment for off-site processing and/or disposal.
3.0 3.1 SOLID RADWASTE SYSTEM Power Generation Objective USAR The power generation objective of the Solid Radwaste System is to collect, process, package, and provide temporary storage facilities for solid wastes prior to shipment for off-site processing and/or disposal.
3.2         Power Generation Design Basis
3.2 Power Generation Design Basis
: 1.     The system provides collection, processing, packaging,       and storage of solid wastes resulting from normal station operations.
: 1.
: 2.     The system provides a safe and reliable means for handling solid wastes and to minimize radiation exposure to station personnel.
The system provides collection, processing, packaging, and storage of solid wastes resulting from normal station operations.
: 3.     The   Solid     Radwaste     System     includes     equipment, instrumentation , and operating procedures such that the solid radwastes collected and prepared for off-site shipment in shielded casks, if required, will not result in radiation exposures in excess of the limits set in NRC or DOT regulations.
: 2.
: 4.     Shielded casks are provided as necessary   to conform with 10CFR71.
The system provides a safe and reliable means for handling solid wastes and to minimize radiation exposure to station personnel.
3.3         Description 3.3.1       General (See Burns and Roe Drawing 2298)
: 3.
The solid waste processing areas are located in the Radwaste and Augmented Radwaste Buildings and process both wet and dry solid wastes. Wet solid wastes     include   backwash   sludge   wastes   from   the   Reactor   Water Cleanup ( RWCU) System, the Condensate Filter Deminerali zer System, the Fuel Pool Filter Demineralizers, the Floor Drain Filter, the Waste Collector Filter, and spent resins from the Waste Demineralizer and Floor Drain Deminerali zer. Dry solid wastes include rags, paper, equipment parts, solid laboratory   wastes,     etc., which   may   be   potentially     contaminated   with radioactive material.
The Solid Radwaste System includes instrumentation, and operating procedures such that the solid collected and prepared for off-site shipment in shielded casks, if will not result in radiation exposures in excess of the limits set DOT regulations.
equipment, radwastes
: required, in NRC or
: 4.
Shielded casks are provided as necessary to conform with 10CFR71.
3.3 3.3.1 Description General (See Burns and Roe Drawing 2298)
The solid waste processing areas are located in the Radwaste and Augmented Radwaste Buildings and process both wet and dry solid wastes. Wet solid wastes include backwash sludge wastes from the Reactor Water Cleanup ( RWCU)
System, the Condensate Filter Deminerali zer System, the Fuel Pool Filter Demineralizers, the Floor Drain Filter, the Waste Collector
: Filter, and spent resins from the Waste Demineralizer and Floor Drain Deminerali zer. Dry solid wastes include rags, paper, equipment parts, solid laboratory
: wastes, etc.,
which may be potentially contaminated with radioactive material.
The function of the Solid Radwaste System is to reclaim the liquid phase of the wet solid wastes for reuse within the station and to prepare the solid waste for off-site shipment with minimum exposure of the operators to radiation. Prior to off-site shipment to a licensed burial ground, solid wastes can be temporarily stored on site in shielded areas.
The function of the Solid Radwaste System is to reclaim the liquid phase of the wet solid wastes for reuse within the station and to prepare the solid waste for off-site shipment with minimum exposure of the operators to radiation. Prior to off-site shipment to a licensed burial ground, solid wastes can be temporarily stored on site in shielded areas.
3.3.2       Wet Solid Radwaste 3.3.2.1     Sludge Processing Expended filter-deminera lizer ion exchange resins are removed when necessary by backwashing. RWCU System sludges and Condensate System sludges are collected in Phase Separators where excess backwash water is removed by decantation. The sludge is accumulated for processing,           with subsequent radioactivity level decay. The Fuel Pool Filter Demineralizer 1 Floor Drain Collector Filter and Waste Collector Filter are backwashed to the Waste Sludge Tank.
3.3.2 3.3.2.1 Wet Solid Radwaste Sludge Processing Expended filter-demineralizer ion exchange resins are removed when necessary by backwashing.
RWCU sludges, Condensate System sludges, and waste filter and Fuel Pool sludges are kept separate because of the variation in radioactive material content.     This approach minimizes shielding requirements during shipping of the solid wastes.
RWCU System sludges and Condensate System sludges are collected in Phase Separators where excess backwash water is removed by decantation.
IX-3-1                               11/16/00
The sludge is accumulated for processing, with subsequent radioactivity level decay.
The Fuel Pool Filter Demineralizer 1 Floor Drain Collector Filter and Waste Collector Filter are backwashed to the Waste Sludge Tank.
RWCU sludges, Condensate System sludges, and waste filter and Fuel Pool sludges are kept separate because of the variation in radioactive material content.
This approach minimizes shielding requirements during shipping of the solid wastes.
IX-3-1 11/16/00  


3.3.2.1.1   Reactor Water Cleanup (RWCU) Sludge The purpose of the Radwaste System for cleanup sludge is to process the highly radioactive backwash waste which is discharged from the RWCU System.
3.3.2.1.1 Reactor Water Cleanup (RWCU) Sludge The purpose of the Radwaste System for cleanup sludge is to process the highly radioactive backwash waste which is discharged from the RWCU System.
The   backwash   waste,   as discharged    from  the  RWCU Filter Demineralizers, is a relatively dilute slurry (0.5% by           weight suspended solids) which is highly radioactive.
The backwash
The backwash discharge from the RWCU Filter Demineralizers is collected and concentrated in two 4,500 gallon cleanup RWCU Phase Separators which are located below the RWCU Demineralizers in the Reactor Building. Upon sufficient backwash accumulation, the concentrated waste is transferred to the Dewatering System for dewatering.
: waste, as Demineralizers, is a relatively dilute solids) which is highly radioactive.
The RWCU Phase Separators are designed to concentrate the sludge from 0.5 weight % solids to 5% by weight solids by sedimentation and decantation of the supernatant. While the working separator is filling, the other previously filled tank is held isolated to allow additional decay of sludge activity.
discharged from slurry (0.5%
After each backwash batch is received by the working separator, it is allowed to settle for a period of time and the decantate is then transferred by pumping to the Waste Collector Tank. When sufficient sludge has accumulated, the working separator is isolated and the sludge is fluidized to a 5% (by weight) slurry and transferred by pumping to the Dewatering System for dewatering. The cleanup phase separators are Class I Seismic. All other equipment is Class II Seismic.
by the RWCU Filter weight suspended The backwash discharge from the RWCU Filter Demineralizers is collected and concentrated in two 4,500 gallon cleanup RWCU Phase Separators which are located below the RWCU Demineralizers in the Reactor Building. Upon sufficient backwash accumulation, the concentrated waste is transferred to the Dewatering System for dewatering.
The RWCU Phase Separators are designed to concentrate the sludge from 0.5 weight  
% solids to 5%
by weight solids by sedimentation and decantation of the supernatant. While the working separator is filling, the other previously filled tank is held isolated to allow additional decay of sludge activity.
After each backwash batch is received by the working separator, it is allowed to settle for a
period of time and the decantate is then transferred by pumping to the Waste Collector Tank. When sufficient sludge has accumulated, the working separator is isolated and the sludge is fluidized to a
5%
(by weight) slurry and transferred by pumping to the Dewatering System for dewatering. The cleanup phase separators are Class I Seismic. All other equipment is Class II Seismic.
3.3.2.1.1.1 Equipment Description Cleanup Phase Separators These tanks are of stainless steel construction and designed and fabricated in accordance with API-650 for atmospheric design pressure at 250°F. Each tank has a capacity of 4,500 gallons.
3.3.2.1.1.1 Equipment Description Cleanup Phase Separators These tanks are of stainless steel construction and designed and fabricated in accordance with API-650 for atmospheric design pressure at 250°F. Each tank has a capacity of 4,500 gallons.
Sludge Pumps This pump has a capacity of 200 gpm at 300 feet TDH.
3.3.2.1.2 Sludge Pumps This pump has a capacity of 200 gpm at 300 feet TDH.
Decant Pump This pump has a capacity of 50 gpm at 30 feet TDH.
Decant Pump This pump has a capacity of 50 gpm at 30 feet TDH.
3.3.2.1.2    Condensate Filter Demineralizer Sludge The purpose of this system is to process the radioactive backwash waste which is discharged from the Condensate Filter Demineralizer System.
Condensate Filter Demineralizer Sludge The purpose of this system is to process the radioactive backwash waste which is discharged from the Condensate Filter Demineralizer System.
The backwash waste as discharged   from each of seven Condensate Demineralizers is a relatively dilute slurry     ( 0. 5% weight suspended solids) which is radioactive.
The backwash waste as discharged Demineralizers is a relatively dilute slurry which is radioactive.
from each of seven Condensate
( 0. 5% weight suspended solids)
The backwash discharge from the Condensate Filter Demineralizers is collected in the Condensate Backwash and Transfer Tank which is located below the Condensate Filter Demineralizers in the Radwaste Building. After collection, the waste is transferred by pumping to one of the two Condensate Phase Separators for processing.
The backwash discharge from the Condensate Filter Demineralizers is collected in the Condensate Backwash and Transfer Tank which is located below the Condensate Filter Demineralizers in the Radwaste Building. After collection, the waste is transferred by pumping to one of the two Condensate Phase Separators for processing.
IX-3-2                             03/21/13
IX-3-2 03/21/13  


The Condensate Phase Separators are designed to concentrate the sludge from 0.5 weight % solids   to 5% by weight solids by sedimentation and decantation of the supernatant. While the working separator is filling, the other previously filled tank is   held isolated to allow additional decay of sludge activity.
The Condensate Phase Separators are designed to concentrate the sludge from 0.5 weight % solids to 5% by weight solids by sedimentation and decantation of the supernatant. While the working separator is filling, the other previously filled tank is held isolated to allow additional decay of sludge activity.
After each backwash batch is received by the working separator, it is allowed to settle for a period of time and the decantate is then transferred by pumping to the Waste Collector Tank. When sufficient sludge has accumulated, the working separator is isolated and the sludge is fluidized to a 5% (by weight) slurry and transferred by pumping to the Dewatering System for dewatering. The Condensate Phase Separators are Class I Seismic. All other equipment is Class II Seismic.
After each backwash batch is received by the working separator, it is allowed to settle for a
3.3.2.1.2.1 Equipment Description Condensate Phase Separators These tanks are of epoxy-coated carbon steel with stainless steel internals and designed and fabricated in accordance with API-650 for atmospheric design pressure     at   250°F. Each tank has     a capacity of 12,500 gallons.
period of time and the decantate is then transferred by pumping to the Waste Collector Tank. When sufficient sludge has accumulated, the working separator is isolated and the sludge is fluidized to a
5%
(by weight) slurry and transferred by pumping to the Dewatering System for dewatering. The Condensate Phase Separators are Class I Seismic. All other equipment is Class II Seismic.
3.3.2.1.2.1 Equipment Description Condensate Phase Separators These tanks are of epoxy-coated carbon steel with stainless steel internals and designed and fabricated in accordance with API-650 for atmospheric design pressure at 250°F.
Each tank has a
capacity of 12,500 gallons.
Sludge Pump This pump has a capacity of 400 gpm at 125 feet TOH.
Sludge Pump This pump has a capacity of 400 gpm at 125 feet TOH.
Decant Pump This pump has a capacity of 475 gpm at 50 feet TOH.
Decant Pump This pump has a capacity of 475 gpm at 50 feet TOH.
Condensate Backwash and Transfer Tank This tank is made of epoxy-coated carbon steel, designed and fabricated in accordance with API-650 for atmospheric design pressure at 150°F. This tank has a capacity of 12,600 gallons.
Condensate Backwash and Transfer Tank This tank is made of epoxy-coated carbon fabricated in accordance with API-650 for atmospheric 150°F. This tank has a capacity of 12,600 gallons.
Condensate Backwash Transfer Pump This pump has a capacity of 450 gpm at 30 feet TOH.
Condensate Backwash Transfer Pump steel, designed design pressure This pump has a capacity of 450 gpm at 30 feet TOH.
3.3.2.1.3   Fuel Pool Filter Demineralizer, Floor Drain Collector Filter, and Waste Collector Filter Sludge Backwash sludge wastes from the Fuel Pool Filter Demineralizer, Floor Drain Collector Filter, and Waste Collector Filter Demineralizers are drained by gravity to the Waste Sludge Tank which is located in the Radwaste Building. Provisions are incorporated in the Waste Sludge Tanks for the addition of flocculent, if required. These waste sludges are transferred on a batch basis by pumping to the Dewatering System for dewatering. The sludges are a relatively dilute slurry of 0.5 weight% of suspended solids. Piping is also provided to pump the wastes to the Condensate Phase Separators for additional concentration of the sludge for flexibility. All basement tanks are Class I Seismic; all other equipment is Class II Seismic.
and at 3.3.2.1.3 Fuel Pool Filter Demineralizer, Floor Drain Collector Filter, and Waste Collector Filter Sludge Backwash sludge wastes from the Fuel Pool Filter Demineralizer, Floor Drain Collector Filter, and Waste Collector Filter Demineralizers are drained by gravity to the Waste Sludge Tank which is located in the Radwaste Building.
IX-3-3                         03/21/13
Provisions are incorporated in the Waste Sludge Tanks for the addition of flocculent, if required. These waste sludges are transferred on a batch basis by pumping to the Dewatering System for dewatering. The sludges are a relatively dilute slurry of 0.5 weight% of suspended solids. Piping is also provided to pump the wastes to the Condensate Phase Separators for additional concentration of the sludge for flexibility. All basement tanks are Class I Seismic; all other equipment is Class II Seismic.
IX-3-3 03/21/13  


3.3.2.1.3.1 Equipment Description Waste Sludge Tank This tank is of epoxy-lined carbon steel and designed and fabricated in accordance with API-650 for atmospheric pressure and 140°F. The tank has a capacity of 15,000 gallons.
3.3.2.1.3.1 Equipment Description Waste Sludge Tank This tank is of epoxy-lined carbon steel and designed and fabricated in accordance with API-650 for atmospheric pressure and 140°F. The tank has a capacity of 15,000 gallons.
Waste Sludge Pump This pump has a capacity of 500 gpm at 125 feet TDH.
Waste Sludge Pump This pump has a capacity of 500 gpm at 125 feet TDH.
3.3.2.2     Spent Resins Spent   resin from the Waste Demineralizer and         Floor   Drain Demineralizer is sluiced into a 2,000 gallon Spent Resin Tank.
3.3.2.2 Spent Resins Spent resin from the Waste Demineralizer and Floor Drain Demineralizer is sluiced into a 2,000 gallon Spent Resin Tank.
The Waste Demineralizer contains 80 cubic feet of mixed resins which will not be regenerated. Expected spent resin volume is approximately 240 cubic feet per year.
The Waste Demineralizer contains 80 cubic feet which will not be regenerated. Expected spent resin volume 240 cubic feet per year.
After each spent resin batch is discharged to the Spent Resin Tank, the spent resins will be pumped from the tank to the Centrifuges or the Dewatering System for dewatering. The Spent Resin Tank is Class I Seismic.
of mixed resins is approximately After each spent resin batch is discharged to the Spent Resin Tank, the spent resins will be pumped from the tank to the Centrifuges or the Dewatering System for dewatering. The Spent Resin Tank is Class I Seismic.
3.3.2.3     Wet Solid Radwaste Processing for Disposal The Resin Dewatering System is available for processing wet solid wastes for disposal. The purpose of this system is to process the waste sludges (see IX-3.3.2.1) and the spent resins (see IX-3.3.2.2). This system concentrates the bulk volume of the wet solid wastes,             prepares this concentrated waste for off-site shipment, and reclaims the liquid phase of the wet solid wastes for reuse within the station.
3.3.2.3 Wet Solid Radwaste Processing for Disposal The Resin Dewatering System is available for processing wet solid wastes for disposal.
3.3.2.3.1   Resin Dewatering System Description ll 9 J Wet solid wastes are processed using a Resin Drying (Dewatering)
The purpose of this system is to process the waste sludges (see IX-3.3.2.1) and the spent resins (see IX-3.3.2.2). This system concentrates the bulk volume of the wet solid
System. This system processes powdered and bead type ion exchange resins and other filter media by removing the excess water from the resins. This is accomplished in a three step process, performed remotely in ventilated, shielded areas to minimize radiation exposure to workers.
: wastes, prepares this concentrated waste for off-site shipment, and reclaims the liquid phase of the wet solid wastes for reuse within the station.
3.3.2.3.1 Resin Dewatering System Description ll 9 J Wet solid wastes are processed using a Resin Drying (Dewatering)
System. This system processes powdered and bead type ion exchange resins and other filter media by removing the excess water from the resins. This is accomplished in a
three step process, performed remotely in ventilated, shielded areas to minimize radiation exposure to workers.
First, the liner is filled from the plant's waste tanks using excess water to keep the resin in a slurry and recirculating the waste tank so that a homogeneous mixture is achieved in the liner. During this transfer, the liner will be dewatered so that the available space in the liner is filled with resin to the maximum extent practicable.
First, the liner is filled from the plant's waste tanks using excess water to keep the resin in a slurry and recirculating the waste tank so that a homogeneous mixture is achieved in the liner. During this transfer, the liner will be dewatered so that the available space in the liner is filled with resin to the maximum extent practicable.
Second, the excess water     is pumped   out of the liner using a positive displacement diaphragm pump.
: Second, the excess water is pumped out of the liner using a positive displacement diaphragm pump.
Third, when all of the pumpable water is removed, the blower is started to recirculate air through the resin. The blower heats the air and as the warm air passes through the resin it entrains and vaporizes moisture in the resin bed. This moist air is pumped through the entrainment separator tank where refrigeration coils condense the water vapor in the air stream and any entrained water is removed. The water is pumped out of the tank using a diaphragm pump. The air is recirculated through the resin until the percent relative humidity of the air stream indicates the resin bed is dry. The system is then shut down, the fillhead removed and the container capped. The IX-3-4                           03/21/13
Third, when all of the pumpable water is removed, the blower is started to recirculate air through the resin. The blower heats the air and as the warm air passes through the resin it entrains and vaporizes moisture in the resin bed. This moist air is pumped through the entrainment separator tank where refrigeration coils condense the water vapor in the air stream and any entrained water is removed.
The water is pumped out of the tank using a diaphragm pump. The air is recirculated through the resin until the percent relative humidity of the air stream indicates the resin bed is dry. The system is then shut
: down, the fillhead removed and the container capped.
The IX-3-4 03/21/13  


USAR container is   given a   surface-wipe test     for determination of   surface contamination and then loaded for off-site shipment or transport to storage.
USAR container is given a
Containers which will be stored temporarily on-site are loaded into Temporary Storage Modules (TSMs) and transferred via truck/crane to the LLRW Storage Facility Pad. The TSMs are concrete cylinders which provide radiation shielding, physical protection, and protection from the elements during the storage period at the Pad. Storage duration at the LLRW Storage Facility Pad is limited to five years in accordance with the guidance provided by Generic Letter 81-38.
surface-wipe test for determination of surface contamination and then loaded for off-site shipment or transport to storage.
Containers which will be stored temporarily on-site are loaded into Temporary Storage Modules (TSMs) and transferred via truck/crane to the LLRW Storage Facility Pad.
The TSMs are concrete cylinders which provide radiation shielding, physical protection, and protection from the elements during the storage period at the Pad. Storage duration at the LLRW Storage Facility Pad is limited to five years in accordance with the guidance provided by Generic Letter 81-38.
The TSMs placed on the Pad for interim storage will eventually be returned to the Augmented Radwaste Building and the waste containers removed.
The TSMs placed on the Pad for interim storage will eventually be returned to the Augmented Radwaste Building and the waste containers removed.
The waste containers will then be placed into shipping casks for off-site shipment. The empty TSMs will be returned to the Pad for storage and reuse, as necessary.
The waste containers will then be placed into shipping casks for off-site shipment. The empty TSMs will be returned to the Pad for storage and reuse, as necessary.
Line 187: Line 285:
The piping skid is located on the floor, east of the shipping cask pit, and north of the Drum Handling Control Room north wall. The discharge piping is routed to an existing sump pit located in the Drum Storage Fill Station of the 903' Radwaste Building.
The piping skid is located on the floor, east of the shipping cask pit, and north of the Drum Handling Control Room north wall. The discharge piping is routed to an existing sump pit located in the Drum Storage Fill Station of the 903' Radwaste Building.
Blower Assembly This Assembly is used to pump drying air through the resin being dried in the liner after the free standing water has been pumped out. The air is filtered to remove oils and particulates prior to being directed back to the liner. The skid also contains the HEPA filter for exhaust air during the water/resin slurry fill portion of the cycle.
Blower Assembly This Assembly is used to pump drying air through the resin being dried in the liner after the free standing water has been pumped out. The air is filtered to remove oils and particulates prior to being directed back to the liner. The skid also contains the HEPA filter for exhaust air during the water/resin slurry fill portion of the cycle.
The blower skid is   located on the northeast   corner of the Drum Handling Control Room roof.
The blower skid is located on the northeast corner of the Drum Handling Control Room roof.
Chiller Assembly This assembly consists of a condensing unit with the appropriate refrigeration specialties   (i.e., filter/dryer, sight glass,   liquid line solenoid valve, thermostatic expansion valve, etc.). The condensing unit provides the cooling refrigerant to the water separator portion of the piping skid assembly.
Chiller Assembly This assembly consists of a condensing unit with the appropriate refrigeration specialties (i.e.,
The chiller is   located   on the northeast corner of the Drum Handling Control Room roof.
filter/dryer, sight
IX-3-5                           11/16/00
: glass, liquid line solenoid valve, thermostatic expansion valve, etc.).
The condensing unit provides the cooling refrigerant to the water separator portion of the piping skid assembly.
The chiller is located on the northeast corner of the Drum Handling Control Room roof.
IX-3-5 11/16/00  


Control Panel The Control Panel contains process monitoring equipment for remote controlling and monitoring of fill levels, liner temperatures, blower exhaust temperatures, blower inlet temperatures, fillhead position, resin slurry flow control valve, dewatering pump, alarms, water separator inlet air wet bulb temperature, etc. One remote television screen is also included, although it is not attached to the Control Panel.
Control Panel The Control Panel contains process monitoring equipment for remote controlling and monitoring of fill levels, liner temperatures, blower exhaust temperatures, blower inlet temperatures, fillhead position, resin slurry flow control valve, dewatering pump, alarms, water separator inlet air wet bulb temperature, etc. One remote television screen is also included, although it is not attached to the Control Panel.
The Control Panel and television screen are located along the east wall of the Drum Handling Control Room.
The Control Panel and television screen are located along the east wall of the Drum Handling Control Room.
3.3.3         Dry Solid Radwaste Two methods are presently available for processing dry, solid, radioactively contaminated waste. The preferred method is incineration, compaction, and smelting through services procured from an off-site vendor(s) due to the cost of waste disposal. However, hydraulic compaction is an alternative.
3.3.3 Dry Solid Radwaste Two methods are presently available for processing dry, solid, radioactively contaminated waste.
The preferred method of processing dry, solid, radioactively contaminated waste begins with its collection in large Sea Land containers at the site. The waste is not compacted or processed in any way prior to shipment to an off-site vendor. The vendor will sort all waste into three streams for processing: incineration, compaction and smelting. The majority of the waste will be incinerated and packaged. Any non-incinerable waste may be compacted using a super-compacto r. Any metallic waste may be smelted into blocks for use as shielding at Department of Energy facilities. The slag from the smelting process is incorporated into the packaging for the incinerated waste.
The preferred method is incineration, compaction, and smelting through services procured from an off-site vendor(s) due to the cost of waste disposal.
The last method of processing dry radioactive waste (DAW) is with the hydraulic compactor. The hydraulic compactor includes the hydraulic pump with motor,     hydraulic   oil   storage, high efficiency   filter,   fan   and accessories. The hydraulic compactor is designed to compress the wastes in a 55 gallon drum at 50 psi over the open area of the drum. During compression, ventilation air is pulled across the top of the drum through high efficiency filters by a fan. The filled 55 gallon drums are transferred to a temporary storage area.
: However, hydraulic compaction is an alternative.
3.3.4         Miscellaneous Solid Wastes Some solid materials that are not processed by the radwaste system are stored in the spent fuel pool until offsite storage or disposal. Examples are   control   blades,   neutron   detectors, and   vacuum   filters.   (See Section X-3.5.1 for further discussion).
The preferred method of processing dry,
3.3.5         Independent Spent Fuel Storage Installation (ISFSI)
: solid, radioactively contaminated waste begins with its collection in large Sea Land containers at the site. The waste is not compacted or processed in any way prior to shipment to an off-site vendor. The vendor will sort all waste into three streams for processing: incineration, compaction and smelting. The majority of the waste will be incinerated and packaged. Any non-incinerable waste may be compacted using a super-compactor. Any metallic waste may be smelted into blocks for use as shielding at Department of Energy facilities. The slag from the smelting process is incorporated into the packaging for the incinerated waste.
The last method of processing dry radioactive waste (DAW) is with the hydraulic compactor. The hydraulic compactor includes the hydraulic pump with
: motor, hydraulic oil
: storage, high efficiency
: filter, fan and accessories. The hydraulic compactor is designed to compress the wastes in a 55 gallon drum at 50 psi over the open area of the drum. During compression, ventilation air is pulled across the top of the drum through high efficiency filters by a fan. The filled 55 gallon drums are transferred to a temporary storage area.
3.3.4 Miscellaneous Solid Wastes Some solid materials that are not processed by the radwaste system are stored in the spent fuel pool until offsite storage or disposal. Examples are control
: blades, neutron detectors, and vacuum filters.
(See Section X-3.5.1 for further discussion).
3.3.5 Independent Spent Fuel Storage Installation (ISFSI)
The ISFSI augments the Spent Fuel Pool as a means for storage of spent fuel, pursuant to 10 CFR 72.210.
The ISFSI augments the Spent Fuel Pool as a means for storage of spent fuel, pursuant to 10 CFR 72.210.
3.4           Power Generation Evaluation Operation of the Solid Radwaste System is by semi-remote means, and the shielding design in the system working areas minimizes radiation dose to personnel and allows the processing of waste to be within 10CFR20 limits.
3.4 Power Generation Evaluation Operation of the Solid Radwaste System is by semi-remote means, and the shielding design in the system working areas minimizes radiation dose to personnel and allows the processing of waste to be within 10CFR20 limits.
3.5           Inspection and Testing Those Solid Radwaste System used on a routine basis do not require specific testing to assure proper operation. Those Solid Radwaste Systems not used on a routine basis are tested prior to use to assure proper operation.
3.5 Inspection and Testing Those Solid Radwaste System used on a routine basis do not require specific testing to assure proper operation. Those Solid Radwaste Systems not used on a routine basis are tested prior to use to assure proper operation.
IX-3-6                             12/08/15
IX-3-6 12/08/15  


USAR Secondary Transfer Car The Secondary Transfer Car moves on fixed rails and has a capacity of 800 lbs. The car is capable of rotating the drum for spray-cleaning and surface-wipe test at 1-2 rpm. Speed is approximately 20 feet per minute.
USAR Secondary Transfer Car The Secondary Transfer Car moves on fixed rails and has a capacity of 800 lbs. The car is capable of rotating the drum for spray-cleaning and surface-wipe test at 1-2 rpm. Speed is approximately 20 feet per minute.
Line 209: Line 318:
Capping Station This station consists of a drum capper and viewing equipment to permit capping of drum prior to storage.
Capping Station This station consists of a drum capper and viewing equipment to permit capping of drum prior to storage.
Drum Loading Conveyor The Drum Loading Conveyor is approximately 34 feet long and is suitable to hold 15 drums, half of which may be filled with cement at any one time. The conveyor operates at approximately 20 feet per minute and is capable of loading one (1) drum at a time onto the Primary Transfer Car.
Drum Loading Conveyor The Drum Loading Conveyor is approximately 34 feet long and is suitable to hold 15 drums, half of which may be filled with cement at any one time. The conveyor operates at approximately 20 feet per minute and is capable of loading one (1) drum at a time onto the Primary Transfer Car.
Storage Conveyors Each of the six (6) Storage Conveyors has a capacity of 25 drums.
Storage Conveyors Each of the six (6) Storage Conveyors has a capacity of 25 drums.
Each conveyor is capable of   accepting one (1) drum every five minutes with no impact damage to the drum,   and is capable of discharging one ( 1) drum at a time without leaving gaps in   the storage line.
Each conveyor is capable of accepting one (1) drum every five minutes with no impact damage to the drum, and is capable of discharging one ( 1) drum at a time without leaving gaps in the storage line.
Discharge Conveyor The Discharge Conveyor consists of a mechanism for removing drums from each of the Storage Conveyors.
Discharge Conveyor The Discharge Conveyor consists of a mechanism for removing drums from each of the Storage Conveyors.
3.3.3       Dry Solid Radwaste Two methods are presently available for processing dry, solid, radioactively contaminated waste.     The preferred method is incineration, compaction, and smelting through services procured from an off-site vendor(s) due to the cost of waste disposal. However, hydraulic compaction is an alternative.
3.3.3 Dry Solid Radwaste Two methods are presently available for processing dry, solid, radioactively contaminated waste.
The preferred method of processing dry,     solid, radioactively contaminated waste begins with its collection in large Sea Land containers at the site. The waste is not compacted or processed in any way prior to shipment to an off-site vendor. The vendor will sort all waste into three streams for processing: incineration, compaction and smelting. The majority of the waste will be incinerated and packaged. Any non-incinerable waste may be compacted using a super-compactor. Any metallic waste may be smelted into blocks for use as shielding at Department of Energy facilities. The slag from the smelting process is incorporated into the packaging for the incinerated waste.
The preferred method is incineration, compaction, and smelting through services procured from an off-site vendor(s) due to the cost of waste disposal.
The last method of processing dry radioactive waste (DAW) is with the hydraulic compactor. The hydraulic compactor includes the hydraulic pump IX-3-7                         05/26/09
: However, hydraulic compaction is an alternative.
The preferred method of processing dry,
: solid, radioactively contaminated waste begins with its collection in large Sea Land containers at the site. The waste is not compacted or processed in any way prior to shipment to an off-site vendor. The vendor will sort all waste into three streams for processing: incineration, compaction and smelting. The majority of the waste will be incinerated and packaged. Any non-incinerable waste may be compacted using a super-compactor. Any metallic waste may be smelted into blocks for use as shielding at Department of Energy facilities. The slag from the smelting process is incorporated into the packaging for the incinerated waste.
The last method of processing dry radioactive waste (DAW) is with the hydraulic compactor. The hydraulic compactor includes the hydraulic pump IX-3-7 05/26/09  


USAR with   motor,   hydraulic oil   storage,   high efficiency filter,   fan   and accessories. The hydraulic compactor is designed to compress the wastes in a 55 gallon drum at 50 psi over the open area of the drum. During compression, ventilation air is pulled across the top of the drum through high efficiency filters by a fan. The filled 55 gallon drums are transferred to a temporary storage area.
USAR with
3.3.4         Independent Spent Fuel Storage Installation (ISFSI)
: motor, hydraulic oil
: storage, high efficiency
: filter, fan and accessories. The hydraulic compactor is designed to compress the wastes in a 55 gallon drum at 50 psi over the open area of the drum. During compression, ventilation air is pulled across the top of the drum through high efficiency filters by a fan. The filled 55 gallon drums are transferred to a temporary storage area.
3.3.4 Independent Spent Fuel Storage Installation (ISFSI)
The ISFSI augments the Spent Fuel Pool as a means for storage of spent fuel, pursuant to 10 CFR 72.210.
The ISFSI augments the Spent Fuel Pool as a means for storage of spent fuel, pursuant to 10 CFR 72.210.
3.4           Power Generation Evaluation Operation of the Solid Radwaste System is by semi-remote means, and the shielding design in the system working areas minimizes radiation dose to personnel and allows the processing of waste to be within 10CFR20 limits.
3.4 Power Generation Evaluation Operation of the Solid Radwaste System is by semi-remote means, and the shielding design in the system working areas minimizes radiation dose to personnel and allows the processing of waste to be within 10CFR20 limits.
3.5           Inspection and Testing Those Solid Radwaste System used on a routine basis do not require specific testing to assure proper operation. Those Solid Radwaste Systems not used on a routine basis are tested prior to use to assure proper operation.
3.5 Inspection and Testing Those Solid Radwaste System used on a routine basis do not require specific testing to assure proper operation. Those Solid Radwaste Systems not used on a routine basis are tested prior to use to assure proper operation.
IX-3-8                           11/22/10
IX-3-8 11/22/10  


USAR 4.0       GASEOUS RADWASTE SYSTEM This section describes the Gaseous Radwaste System which includes the Off-Gas (OG) System and Augmented Off-Gas (AOG) System.
USAR 4.0 GASEOUS RADWASTE SYSTEM This section describes the Gaseous Radwaste System which includes the Off-Gas (OG) System and Augmented Off-Gas (AOG) System.
4.1         Power Generation Objective The Off-Gas System collects and processes gaseous radioactive wastes from the Main Condenser Steam Jet Air Ejectors ( SJAEs) , the startup Mechanical Vacuum Pumps, the Gland Steam Condensers, and other minor sources, and controls their release to the atmosphere through the Elevated Release Point (ERP) in such a way that the operation and availability of the station is not limited.
4.1 Power Generation Objective The Off-Gas System collects and processes gaseous radioactive wastes from the Main Condenser Steam Jet Air Ejectors ( SJAEs), the startup Mechanical Vacuum Pumps, the Gland Steam Condensers, and other minor sources, and controls their release to the atmosphere through the Elevated Release Point (ERP) in such a way that the operation and availability of the station is not limited.
4.2         Power Generation Design Basis
4.2 Power Generation Design Basis
: 1. The Gaseous Radwaste System is designed so that gaseous and particulate radwastes are processed and discharged such that operation and availability of the station are not limited.
: 1.
: 2. The Gaseous Radwaste System is designed to     minimize the possible explosion hazard of the hydrogen and oxygen present.
The Gaseous Radwaste System is designed so that gaseous and particulate radwastes are processed and discharged such that operation and availability of the station are not limited.
: 3. The Gaseous   Radwaste   System is designed   to  include equipment, instrumentation , and operating procedures such that the gaseous radwastes discharged from the ERP to the environment will not exceed the limits set forth in the ALARA requirements of 10CFR50, Appendix I.
: 2.
: 4. The Gaseous Radwaste System is designed to provide isolation on high off-gas radioactivity level.
The Gaseous Radwaste System is designed to minimize the possible explosion hazard of the hydrogen and oxygen present.
: 5. The Gaseous Radwaste System is designed to maintain its integrity  for  all expected operating conditions by conservative process design.
: 3.
: 6. The off-gas liquid drain line must function to drain excess liquid from the system and drain at a rate not in excess of the capacity of one Z Sump pump.
The Gaseous Radwaste System is designed equipment, instrumentation, and operating procedures such that radwastes discharged from the ERP to the environment will not limits set forth in the ALARA requirements of 10CFR50, Appendix I.
4.3         Off-Gas System (Non-Augmented) 4.3.1       Description 4.3.1.1     General The Off-Gas System (Burns and Roe Drawing 2009) includes the subsystems that process and dispose of the gases from the Main Condenser Air Ejectors, the startup Mechanical Vacuum Pumps, and the Gland Steam Condensers.
to include the gaseous exceed the
The processed gases are routed to the ERP for dilution and elevated release to the atmosphere. The Air Ejector discharge and the ERP are continuously monitored by radiation monitors. See USAR VII-12.
: 4.
Expected activity levels of activation gases leaving the reactor steam nozzles during normal operation with no fuel leaks are identified in Table IX-4-1. The corresponding activity arriving at the turbine and air ejector are less due to decay in transit and the fact that part of the N-13, N-16, and most of the 0-19 isotopes remain with the condensate and do not follow the noncondensibles . Other radioactive gases which may also be present are H-3, N-17, Ar-37, and Ar-41. These are present in amounts low enough to be deemed insignificant by comparison with the N-13. Of the activity arriving in IX-4-1                           11/16/00
The Gaseous Radwaste System is designed to provide isolation on high off-gas radioactivity level.
integrity design.
: 5.
for The Gaseous all expected Radwaste operating System is conditions designed to maintain its by conservative process
: 6.
The off-gas liquid drain line must function to drain excess liquid from the system and drain at a rate not in excess of the capacity of one Z Sump pump.
4.3 4.3.1 4.3.1.1 Off-Gas System (Non-Augmented)
Description General The Off-Gas System (Burns and Roe Drawing 2009) includes the subsystems that process and dispose of the gases from the Main Condenser Air Ejectors, the startup Mechanical Vacuum Pumps, and the Gland Steam Condensers.
The processed gases are routed to the ERP for dilution and elevated release to the atmosphere.
The Air Ejector discharge and the ERP are continuously monitored by radiation monitors. See USAR VII-12.
Expected activity levels of activation gases leaving the reactor steam nozzles during normal operation with no fuel leaks are identified in Table IX-4-1.
The corresponding activity arriving at the turbine and air ejector are less due to decay in transit and the fact that part of the N-13, N-16, and most of the 0-19 isotopes remain with the condensate and do not follow the noncondensibles. Other radioactive gases which may also be present are H-3, N-17, Ar-37, and Ar-41. These are present in amounts low enough to be deemed insignificant by comparison with the N-13. Of the activity arriving in IX-4-1 11/16/00  


USAR the primary steam at the turbine, a fraction will go to the Gland Seal Off-Gas subsystem.
USAR the primary steam at the turbine, a fraction will go to the Gland Seal Off-Gas subsystem.
Gases routed to the ERP include air ejector and gland seal off-gases, and gases from the Standby Gas Treatment System (see USAR V-3.3.4 for additional information concerning SGT System). Dilution air input to the ERP is provided to reduce the hydrogen in the Air Ejector of £-gases to a concentration of less than four percent (4%) by volume. Dilution air is supplied by one of two full capacity fans in the Off-Gas Filter Building located near the ERP. The ERP is designed such that prompt mixing of all gas inlet streams occurs in the base to provide additional dilution of hydrogen and to allow location of the sample point as near to the base as possible. The ERP drainage is routed to the Liquid Radwaste System via loop seals.
Gases routed to the ERP include air ejector and gland seal off-gases, and gases from the Standby Gas Treatment System (see USAR V-3.3.4 for additional information concerning SGT System). Dilution air input to the ERP is provided to reduce the hydrogen in the Air Ejector of £-gases to a concentration of less than four percent (4%)
by volume.
Dilution air is supplied by one of two full capacity fans in the Off-Gas Filter Building located near the ERP. The ERP is designed such that prompt mixing of all gas inlet streams occurs in the base to provide additional dilution of hydrogen and to allow location of the sample point as near to the base as possible. The ERP drainage is routed to the Liquid Radwaste System via loop seals.
The Gaseous Radwaste System is adequately shielded to minimize the dose received by station personnel.
The Gaseous Radwaste System is adequately shielded to minimize the dose received by station personnel.
IX-4-2                           11/16/00
IX-4-2 11/16/00  


USAR TABLE IX-4-1 GASEOUS RADWASTE SYSTEM DATA Basis for System Design A. Rate of evolution in steam from reactor steam nozzle.
USAR TABLE IX-4-1 GASEOUS RADWASTE SYSTEM DATA Basis for System Design A.
Isotope     Half-Life         Evolution Rate (µCi/sec)
Rate of evolution in steam from reactor steam nozzle.
N-13       10 min.         2.0 X 10 3 N-16       7.4 sec.         1.0 X 10 7 0-19       29 sec.         7.0 X 10 3 B. Flow rates of dry gases at air ejector at 130°F and 1 atm.
B.
Hydrogen (From Reactor Water Decomposition)             108 ft 3 /min.
Isotope Half-Life Evolution Rate (µCi/sec)
Oxygen (From Reactor Water Decomposition)               54 ft 3 /min.
N-13 10 min.
Air (In-leakage to Turbine Condenser)                    45 ft 3 /min.(l)
2.0 X 10 3 N-16 7.4 sec.
Water Vapor (To Saturate)                               34 ft 3 /min.
1.0 X 10 7 0-19 29 sec.
Activated and Noble Gases                               Negligible TOTAL GASES                                     241 ft 3 /min.
7.0 X 10 3 Flow rates of dry gases at air ejector at 130°F and 1 Hydrogen (From Reactor Water Decomposition)
(1)
Oxygen (From Reactor Water Decomposition)
Air (In-leakage to Turbine Condenser)
Water Vapor (To Saturate)
Activated and Noble Gases TOTAL GASES (1)
At 130°F and 15.7 psia.
At 130°F and 15.7 psia.
C. ERP release rate of N-13 = 300 µCi/sec with 30 minute holdup.
atm.
IX-4-3                               03/30/01
108 ft 3/min.
54 ft 3/min.
45 ft 3/min.(l) 34 ft 3/min.
Negligible 241 ft 3/min.
C.
ERP release rate of N-13 = 300 µCi/sec with 30 minute holdup.
IX-4-3 03/30/01  


USAR 4.3.1.2     Air Ejector Off-Gas Subsystem The Air Ejector Off-Gas Subsystem consists of a 30 minute hold-up line, high efficiency filters, isolation valves, dilution fans, and the ERP.
USAR 4.3.1.2 Air Ejector Off-Gas Subsystem The Air Ejector Off-Gas Subsystem consists of a 30 minute hold-up line, high efficiency filters, isolation valves, dilution fans, and the ERP.
During normal operation, the Air Ejector off-gas is the major contributor to the activity in the station off-gas release. The Air Ejector off-gases entering this system are noncondensibles from the Main Condenser. These noncondensibles consist essentially of hydrogen and oxygen formed in the reactor by radiolytic decomposition of water, air in-leakage to the Main Condenser, water vapor, and fission gases which are negligible in terms of volume.
During normal operation, the Air Ejector off-gas is the major contributor to the activity in the station off-gas release.
Fission gases may arise from minor amounts of tramp uranium on the surface of the fuel element or from imperfections or perforations which might develop in the fuel cladding. The release rate of activation gases is proportional to the thermal output of the reactor and to the hold-up time provided in the system prior to release at the ERP.
The Air Ejector off-gases entering this system are noncondensibles from the Main Condenser.
These noncondensibles consist essentially of hydrogen and oxygen formed in the reactor by radiolytic decomposition of water, air in-leakage to the Main Condenser, water vapor, and fission gases which are negligible in terms of volume.
Fission gases may arise from minor amounts of tramp uranium on the surface of the fuel element or from imperfections or perforations which might develop in the fuel cladding.
The release rate of activation gases is proportional to the thermal output of the reactor and to the hold-up time provided in the system prior to release at the ERP.
For normal station operation, the Air Ejector Off-Gas Subsystem provides a total hold-up time of 30 minutes, based on normal air in-leakage.
For normal station operation, the Air Ejector Off-Gas Subsystem provides a total hold-up time of 30 minutes, based on normal air in-leakage.
This time period provides for decay of short lived Xe or Kr to solid daughters to permit retention of these particulates by filters prior to off-gas vent pipe release. In addition, this holdup provides sufficient time for an operator to take appropriate action in the event that the noble gas release rate (due to fuel leaks) exceeds the instantaneous permissible release rate.
This time period provides for decay of short lived Xe or Kr to solid daughters to permit retention of these particulates by filters prior to off-gas vent pipe release.
In addition, this holdup provides sufficient time for an operator to take appropriate action in the event that the noble gas release rate (due to fuel leaks) exceeds the instantaneous permissible release rate.
The 30 minute hold-up requirement and the flow rates given in Table IX-4-1 are the basis for sizing the Air Ejector Off-Gas Subsystem.
The 30 minute hold-up requirement and the flow rates given in Table IX-4-1 are the basis for sizing the Air Ejector Off-Gas Subsystem.
Valves are placed in each of the Air Ejector Off-Gas Subsystems, which are automatically closed on an isolation signal from both air ejector process radiation monitors. A signal from both channels is required to close these valves by means of a time delay of 15 minutes when the short term release rate limit is reached.
Valves are placed in each of the Air Ejector Off-Gas Subsystems, which are automatically closed on an isolation signal from both air ejector process radiation monitors. A signal from both channels is required to close these valves by means of a time delay of 15 minutes when the short term release rate limit is reached.
The system, from the Air Ejector outlet to the Dilution Fan outlet, is designed for a pressure of 350 psi to contain a possible explosion resulting from the hydrogen and oxygen present. The Off-Gas Filter System which is located in the Off-Gas Filter Building, consists of two parallel trains, with each train containing a moisture separator, two full-flow, high-efficiency, particulate air (HEPA) filters, and a filter retainer plate.
The
: system, from the Air Ejector outlet to the Dilution Fan outlet, is designed for a pressure of 350 psi to contain a possible explosion resulting from the hydrogen and oxygen present. The Off-Gas Filter System which is located in the Off-Gas Filter Building, consists of two parallel
: trains, with each train containing a
moisture separator, two full-flow, high-efficiency, particulate air (HEPA) filters, and a filter retainer plate.
Each train is sized for 100% Air Ejector Off-Gas Capacity (one operating, one spare unit).
Each train is sized for 100% Air Ejector Off-Gas Capacity (one operating, one spare unit).
Upon possible explosion upstream of filters, the failed filter retainer plate is capable of stopping all filter pieces larger than 0 .15 x O .15 mm in cross-section and shall sustain explosion pressure from either direction. Both filter units are located below grade in a shielded pit; appropriate valving is provided to permit isolating either filter unit. The internal construction of each unit is designed to permit remote removal of the unit within its container.
Upon possible explosion upstream of filters, the failed filter retainer plate is capable of stopping all filter pieces larger than 0.15 x O.15 mm in cross-section and shall sustain explosion pressure from either direction. Both filter units are located below grade in a shielded pit; appropriate valving is provided to permit isolating either filter unit. The internal construction of each unit is designed to permit remote removal of the unit within its container.
The Off-Gas Dilution Fans supply dilution air to reduce the hydrogen concentration in the ERP and maintain suitable exit velocities at the top of the ERP. Either one of the two fans provides the required dilution air flow ( one normally operating and one spare) . The two fans are electrically interlocked. Loss of either fan is annunciated in the Main Control Room. Both IX-4-4                           01/28/05
The Off-Gas Dilution Fans supply dilution air to reduce the hydrogen concentration in the ERP and maintain suitable exit velocities at the top of the ERP. Either one of the two fans provides the required dilution air flow
( one normally operating and one spare).
The two fans are electrically interlocked. Loss of either fan is annunciated in the Main Control Room. Both IX-4-4 01/28/05  


USAR fans are on an emergency power source. Check valves are located to prevent bypass of air. The Off-Gas Dilution Fans are located in the Off-Gas Filter Building, in a room radiation shielded from all adjoining areas. Dilution flow is added to the flow of Off-Gas before the Off-Gas pipe enters the floor of the Off-Gas Filter Building to travel underground to the ERP. Dilution flow piping has been designed to contain an explosion (Off-Gas flow is within extra heavy or schedule 40 pipe) and to completely seal off an inoperative dilution run. Standard weight pipe, incorporating a check valve and a butterfly valve, is maintained up to the dilution fan outlet plenum. r2 oJ A positive pressure of approximately 1 in. w. g. exists. System operation is normal with the slight backpressure on the air ejectors because they will function with a backpressure in excess of 1 psi. A flow orifice has been located downstream of where the dilution flow enters to provide a low pressure for the Off-Gas inlet and to provide monitoring of the dilution flow. r25 J To provide an indirect indication of hydrogen leakage into the Off-Gas Building, a red light that is connected to the CAM unit has been installed inside the northwest window of the building. This light will illuminate if high activity is present in the Off-Gas Building. An increase in activity would also indicate the presence of hydrogen because they both are a result of off-gas leakage.
USAR fans are on an emergency power source. Check valves are located to prevent bypass of air. The Off-Gas Dilution Fans are located in the Off-Gas Filter Building, in a room radiation shielded from all adjoining areas. Dilution flow is added to the flow of Off-Gas before the Off-Gas pipe enters the floor of the Off-Gas Filter Building to travel underground to the ERP. Dilution flow piping has been designed to contain an explosion (Off-Gas flow is within extra heavy or schedule 40 pipe) and to completely seal off an inoperative dilution run. Standard weight pipe, incorporating a check valve and a butterfly valve, is maintained up to the dilution fan outlet plenum. r2 oJ A positive pressure of approximately 1 in. w. g. exists. System operation is normal with the slight backpressure on the air ejectors because they will function with a backpressure in excess of 1 psi. A flow orifice has been located downstream of where the dilution flow enters to provide a low pressure for the Off-Gas inlet and to provide monitoring of the dilution flow. r25 J To provide an indirect indication of hydrogen leakage into the Off-Gas Building, a red light that is connected to the CAM unit has been installed inside the northwest window of the building.
The   Air   Ejector Off-Gas   pipe meets the requirements   of ANSI B31. 1. 0 Section I and Case N-12. The Air Ejector Off-Gas pipe wall     is designed for pressures per NACA-TN-3935.
This light will illuminate if high activity is present in the Off-Gas Building. An increase in activity would also indicate the presence of hydrogen because they both are a result of off-gas leakage.
4.3.1.3       Gland Seal Off-Gas Subsystem The Gland Seal Off-Gas Subsystem collects gases from the Gland Steam Condenser and the Mechanical Vacuum Pumps and passes them through holdup piping prior to release to the stack. Gland Seal off-gases and gases from the Mechanical Vacuum Pumps (used during each startup) are routed to the stack via the Gland Seal Holdup Line which is separate from the Air Ejector Holdup Line.
The Air Ejector Off-Gas pipe meets the requirements of ANSI B31. 1. 0 Section I and Case N-12.
The Air Ejector Off-Gas pipe wall is designed for pressures per NACA-TN-3935.
4.3.1.3 Gland Seal Off-Gas Subsystem The Gland Seal Off-Gas Subsystem collects gases from the Gland Steam Condenser and the Mechanical Vacuum Pumps and passes them through holdup piping prior to release to the stack. Gland Seal off-gases and gases from the Mechanical Vacuum Pumps (used during each startup) are routed to the stack via the Gland Seal Holdup Line which is separate from the Air Ejector Holdup Line.
The Gland Seal Off-Gas Subsystem provides a one minute holdup time to allow decay of N-16. The holdup time is provided by a long 48 inch diameter pipe between the Gland Seal Exhausters and the ERP.
The Gland Seal Off-Gas Subsystem provides a one minute holdup time to allow decay of N-16. The holdup time is provided by a long 48 inch diameter pipe between the Gland Seal Exhausters and the ERP.
Operating pressure is atmospheric; however, design pressure for explosion possibilities is 900 psig. Hydrogen and oxygen are well below explosive limits. No filters, shut-off valves, or radiation monitors are required. The Mechanical Vacuum Pumps are manually stopped by remote manual switch. Upon a Main Steam Line (MSL) Radiation Monitor isolation signal, the Mechanical Vacuum Pumps trip and the inlet and outlet valves to the Mechanical Vacuum Pumps close.
Operating pressure is atmospheric; however, design pressure for explosion possibilities is 900 psig.
The   Gland   Seal Off-Gas   pipe meets  the  requirements  of ANSI B31.l.0, Section I, and Code Case N-12.
Hydrogen and oxygen are well below explosive limits.
4.4           Augmented Off-Gas (AOG) System r;~sJ 4.4.1        System Parameters It is the function of the AOG System to further delay the radioactive gases in the off-gas stream, reducing the activity level, prior to venting to the atmosphere. This system satisfies the as low as practicable requirements of 10CFR50, Appendix I. The off-gas stream enters the AOG System after passage through the 4 8 inch delay pipe at the flow rates shown in Table IX-4-2.
No filters, shut-off valves, or radiation monitors are required. The Mechanical Vacuum Pumps are manually stopped by remote manual switch. Upon a Main Steam Line (MSL) Radiation Monitor isolation signal, the Mechanical Vacuum Pumps trip and the inlet and outlet valves to the Mechanical Vacuum Pumps close.
IX-4-5                           11/16/00
The Gland Seal Off-Gas pipe ANSI B31.l.0, Section I, and Code Case N-12.
4.4 4.4.1 Augmented Off-Gas (AOG) System r;~sJ System Parameters meets the requirements of It is the function of the AOG System to further delay the radioactive gases in the off-gas stream, reducing the activity level, prior to venting to the atmosphere. This system satisfies the as low as practicable requirements of 10CFR50, Appendix I. The off-gas stream enters the AOG System after passage through the 4 8 inch delay pipe at the flow rates shown in Table IX-4-2.
IX-4-5 11/16/00  


USAR The AOG System is designed to handle off-gas flow from the plant during operation with maximum air in-leakage at 130°F. The system design parameters are as follows:
USAR The AOG System is designed to handle off-gas flow from the plant during operation with maximum air in-leakage at 130°F.
4.4.1.1     Sizing:                       The equipment is installed in two parallel       trains,       each     with 100% capacity,       except     for   the charcoal beds which can be operated in     the   following     arrangements:
The system design parameters are as follows:
4.4.1.1 4.4.1.2 4.4.1.3 4.4.1.4 4.4.1.5 4.4.1.6 Sizing:
The equipment is installed in two parallel
: trains, each with 100% capacity, except for the charcoal beds which can be operated in the following arrangements:
6 beds in parallel or 6 beds in series up to 50 scfm, or 5 beds in series up to 30 scfm.
6 beds in parallel or 6 beds in series up to 50 scfm, or 5 beds in series up to 30 scfm.
4.4.1.2    Decontamination Factor (DF):   1,000 minimum, based on 6 charcoal beds,     30 scfm     flow,     and   the 30-minute       activity     level     of 100,000 µCi/sec.         Decontamination factors for alternate charcoal bed configurations and flow rates are calculated in NEDC 10-052. [2 BJ 4.4.1.3    Operation:                     Continuous Remote control capability Reduced flow operation capability 4.4.1.4    Safety and Reliability:       Redundancy Failsafe control systems Safety monitoring and alarm systems Elimination of potential leakage of radioactive elements Elimination of potential hydrogen explosion 350 psig Design Pressure 4.4.1.5    Mechanical Design:            40 year useful life expectancy.
Decontamination Factor (DF):
: 1.     Initially designed as follows:
1,000 minimum, based on 6 charcoal
: a. Process side radioactive components       per   ASME Code,         Section III, Class 3.
: beds, 30 scfm
: b. Nonradioactive components       per   ASME Code,       Section VIII, Division 1.
: flow, and the 30-minute activity level of 100,000 µCi/sec.
: c. Seismic Class IIS.
Decontamination factors for alternate charcoal bed configurations and flow rates are calculated in NEDC 10-052. [2BJ Operation:
: 2.      After implementation of Minor Design Change 8 3-034 [lSJ design is as follows:
Continuous Remote control capability Reduced flow operation capability Safety and Reliability:
: a. Piping     and   equipment pressure parts as per USAR Appendix A.
Redundancy Mechanical Design:
: b. Other     components     per USNRC           Regulatory Guide 1.143,         Rev. 1, October 1979.
Configuration:
4.4.1.6    Configuration:                Skid-mounted     equipment   modules and individual                     components IX-4-6                                    06/19/14
IX-4-6 Failsafe control systems Safety monitoring and alarm systems Elimination of potential leakage of radioactive elements Elimination of potential hydrogen explosion 350 psig Design Pressure 40 year useful life expectancy.
: 1.
Initially designed as follows:
: 2.
: a.
Process side radioactive
: b.
: c.
components per ASME
: Code, Section III, Class 3.
Nonradioactive components per
: Code, Section Division 1.
Seismic Class IIS.
ASME
: VIII, After implementation of Minor Design Change 8 3-034 [lSJ design is as follows:
: a.
Piping and equipment pressure parts as per USAR Appendix A.
: b.
Other components per USNRC Regulatory Guide 1.143, Rev. 1, October 1979.
Skid-mounted equipment modules and individual components 06/19/14  


USAR TABLE IX-4-2 NONCONDENSIBLE GAS FLOW RATES (LB/HR)
Component Air Hydrogen Oxygen Water Total USAR TABLE IX-4-2 NONCONDENSIBLE GAS FLOW RATES (LB/HR)
ENTERING AUGMENTED OFF-GAS TREATMENT SYSTEM Normal           Maximum In-leakage       In-Leakage Component        Startup             at 130°F        at 130°F Air                  1,150.0               138.0           181.8 Hydrogen                  1. 6               31. 8           31. 8 Oxygen                  12.8               254.0            254.0 Water                  132.0                 91. 8           91. 8 Total                1,296.4               515.6           559.4 IX-4-7                         11/16/00
ENTERING AUGMENTED OFF-GAS TREATMENT SYSTEM Normal In-leakage Startup at 130°F 1,150.0 138.0
: 1. 6
: 31. 8 12.8 254.0 132.0
: 91. 8 1,296.4 515.6 IX-4-7 Maximum In-Leakage at 130°F 181.8
: 31. 8 254.0
: 91. 8 559.4 11/16/00  


USAR 4.4.2           Process Design The processes required to satisfy the system parameters are basically 30 minute delay, dilution, recombinati on, dehumidific ation, and long term delay, as shown below:
4.4.2 Process Design The processes required basically 30 minute delay, dilution, term delay, as shown below:
Decontamina ted Off-gas                                                         Stream l                                                              i 30 minute         Dilution     Recombina- Dehumidi-         Long delay                         tion         fication           term delay After the off-gas stream passes through the 30 minute delay pipe and existing filters, the SJAE dilutes the off-gas stream raising pressure to the required system inlet pressure. In the recombinatio n process, the hydrogen and oxygen     are   recombined   stoichiome trically. Dehumidific ation  consists   of moisture removal prior to long term delay to reduce the dewpoint of the gas to a very low level. Long term delay for the decay of the noble gas isotopes is achieved in a series of charcoal beds. These processes are shown in detail on the flow diagram, Cosmodyne Drawing 6000302, Sheets 1 and 2, and are described in detail in the following paragraphs.
Off-gas l
: 4. 4. 2. 1       Hydrogen Dilution The Off-Gas stream, after a 30 minute delay in an existing delay pipe, enters the AOG System. The normal hydrogen concentratio n is much greater than the lower hydrogen flammability limit of 4.1% and requires dilution of the Off-Gas stream to reduce hydrogen concentratio n to a safe level. The dilution requirement s are based on minimum bleed air flow, which results in the     highest     concentratio n  of   hydrogen   as   the   worst-case   condition (Table IX-4-3)
USAR to satisfy the system parameters are recombination, dehumidification, and long Decontaminated Stream 30 minute delay Dilution Recombina-Dehumidi-i Long term delay tion fication After the off-gas stream passes through the 30 minute delay pipe and existing filters, the SJAE dilutes the off-gas stream raising pressure to the required system inlet pressure. In the recombination process, the hydrogen and oxygen are recombined stoichiometrically.
Dehumidification consists of moisture removal prior to long term delay to reduce the dewpoint of the gas to a very low level. Long term delay for the decay of the noble gas isotopes is achieved in a series of charcoal beds. These processes are shown in detail on the flow diagram, Cosmodyne Drawing 6000302, Sheets 1 and 2, and are described in detail in the following paragraphs.
: 4. 4. 2. 1 Hydrogen Dilution The Off-Gas stream, after a 30 minute delay in an existing delay pipe, enters the AOG System. The normal hydrogen concentration is much greater than the lower hydrogen flammability limit of 4.1% and requires dilution of the Off-Gas stream to reduce hydrogen concentration to a safe level.
The dilution requirements are based on minimum bleed air flow, which results in the highest concentration of hydrogen as the worst-case condition (Table IX-4-3)
The Off-Gas stream is diluted with steam prior to entering the Recombiner. The Recombiner trains utilize nuclear plant steam to eliminate the recycle loop as a potential source of catalyst migration to undiluted portions of the Off-Gas process. This process of dilution is described below.
The Off-Gas stream is diluted with steam prior to entering the Recombiner. The Recombiner trains utilize nuclear plant steam to eliminate the recycle loop as a potential source of catalyst migration to undiluted portions of the Off-Gas process. This process of dilution is described below.
Up to 7000 lbm/hr of steam is utilized for Off-Gas dilution.
Up to 7000 lbm/hr of steam is utilized for Off-Gas dilution.
2400 lbm/hr of this steam is provided by motive steam to the third stage ejector. The remaining steam is provided at the suction of the third stage ejector via a pressure reducing nozzle. Both of these sources of dilution steam are supplied from plant nuclear steam. The action of throttling the high pressure nuclear plant steam into the low pressure AOG stream superheats the stream, therein, assuring that the gas temperature entering the Recombiner is well above saturation temperature to prevent condensatio n of moisture on the Recombiner catalyst bed.
2400 lbm/hr of this steam is provided by motive steam to the third stage ejector. The remaining steam is provided at the suction of the third stage ejector via a pressure reducing nozzle. Both of these sources of dilution steam are supplied from plant nuclear steam. The action of throttling the high pressure nuclear plant steam into the low pressure AOG stream superheats the stream, therein, assuring that the gas temperature entering the Recombiner is well above saturation temperature to prevent condensation of moisture on the Recombiner catalyst bed.
IX-4-8                               11/16/00
IX-4-8 11/16/00  


USAR TABLE IX-4-3 STREAM COMPOSITION AFTER DILUTION VOLUME                       MASS
USAR TABLE IX-4-3 STREAM COMPOSITION AFTER DILUTION VOLUME MASS Rate Rate COMPONENT by Vol.
                %              Rate             %          Rate COMPONENT by Vol.         Lb-mol/hr       by Wt.       lb/hr.
Lb-mol/hr by Wt.
Hydrogen (Hx)   3. 96         15.77           0.45         31.80 Oxygen (Ox)     1. 98           7.88           3.61       254.00 Air             0.23           0.93           0.38         26.97 Steam (H2O)     93.82         373.30         95.55     6,719.40 Total         100.00         397.90         100.00     7,032.20 IX-4-9                         11/16/00
lb/hr.
Hydrogen (Hx)
: 3. 96 15.77 0.45 31.80 Oxygen (Ox)
: 1. 98 7.88 3.61 254.00 Air 0.23 0.93 0.38 26.97 Steam (H2O) 93.82 373.30 95.55 6,719.40 Total 100.00 397.90 100.00 7,032.20 IX-4-9 11/16/00  


USAR
USAR
: 4. 4. 2. 2   Recombination The recombination process is carried out in a single stage Catalytic Recombiner. Prior to entering the Recombiner, the AOG stream must have hydrogen concentration lower than 4% for safety and must be preheated above the saturation temperature. As explained previously, the stream entering the Recombiner is sufficiently diluted and is also preheated to about 250°F-320°F during normal operation. This dilution is also sufficient for minimum bleed air flow of 6.0 scfm; in this worst case condition, the hydrogen concentration is still only 3.96%.
: 4. 4. 2. 2 Recombination The recombination process is carried out in a
single stage Catalytic Recombiner. Prior to entering the Recombiner, the AOG stream must have hydrogen concentration lower than 4% for safety and must be preheated above the saturation temperature. As explained previously, the stream entering the Recombiner is sufficiently diluted and is also preheated to about 250°F-320°F during normal operation.
This dilution is also sufficient for minimum bleed air flow of 6.0 scfm; in this worst case condition, the hydrogen concentration is still only 3.96%.
It is important that the Recombiner catalyst remain dry at all times to preserve its reactivity; therefore, to prevent condensation of moisture on the catalyst bed during startup, a steam-heated preheater is used to raise the temperature of the AOG stream from 250°F to 320°F. Since the SJAE is not operating prior to startup, service air provides the motive force. The Recombiner is also preheated prior to startup by an external electric heater.
It is important that the Recombiner catalyst remain dry at all times to preserve its reactivity; therefore, to prevent condensation of moisture on the catalyst bed during startup, a steam-heated preheater is used to raise the temperature of the AOG stream from 250°F to 320°F. Since the SJAE is not operating prior to startup, service air provides the motive force. The Recombiner is also preheated prior to startup by an external electric heater.
The SJAE will be running, and service air may be used for additional off-gas flow.
The SJAE will be running, and service air may be used for additional off-gas flow.
In the Recombiner, most of the hydrogen and oxygen present in the inlet stream are catalytically combined, reducing the hydrogen concentration from 4% on a wet basis to 1% maximum, dry basis. The heat of reaction, with the formation of water vapor, raises the temperature of the gas stream as it passes through the Recombiner catalyst bed. With inlet temperature maintained at 320°F, the temperature of the effluent gas stream will equal [preheater outlet     temperature]+[%H2 Into     Recombiner x 125°F]. Example: preheater temperature of 320°F plus Recombiner H2 concentration of 2%, Recombiner outlet temperature equals [320°F] + [2%xl25°F] = 570°F. r17 J The hot effluent consists principally of steam, with air and very small quantities of radioactive gases ( krypton and xenon) . On leaving the Recombiner, the AOG stream flows to a Post-Recombiner Condenser.
In the Recombiner, most of the hydrogen and oxygen present in the inlet stream are catalytically combined, reducing the hydrogen concentration from 4% on a wet basis to 1% maximum, dry basis. The heat of reaction, with the formation of water vapor, raises the temperature of the gas stream as it passes through the Recombiner catalyst bed. With inlet temperature maintained at 320°F, the temperature of the effluent gas stream will equal [preheater outlet temperature]+[%H2 Into Recombiner x 125°F].
4.4.2.3       Dehumidification The steam in the Post-Recombiner Condenser is desuperheated, condensed, and cooled to approximately 150°F. Condensate at 120°F (maximum) is used as the cooling medium. The AOG stream is further cooled, then flows to a water separator where the condensed liquid is separated from the gas stream and cycled back to the Hotwell.
Example: preheater temperature of 320°F plus Recombiner H2 concentration of 2%, Recombiner outlet temperature equals [320°F] + [2%xl25°F] = 570°F. r17 J The hot effluent consists principally of steam, with air and very small quantities of radioactive gases
( krypton and xenon).
On leaving the Recombiner, the AOG stream flows to a Post-Recombiner Condenser.
4.4.2.3 Dehumidification The steam in the Post-Recombiner Condenser is desuperheated, condensed, and cooled to approximately 150°F. Condensate at 120°F (maximum) is used as the cooling medium. The AOG stream is further cooled, then flows to a water separator where the condensed liquid is separated from the gas stream and cycled back to the Hotwell.
The effluent AOG gas from the water separator is cooled further to approximately 40°F in a cooler-condenser. A Glycol Cooler System provides the necessary refrigeration. Condensate is removed in a Moisture Separator and is sent to the Chemical Drain Sump.
The effluent AOG gas from the water separator is cooled further to approximately 40°F in a cooler-condenser. A Glycol Cooler System provides the necessary refrigeration. Condensate is removed in a Moisture Separator and is sent to the Chemical Drain Sump.
4.4.2.4       Drying The AOG stream is then dried to approximately -60°F dewpoint by passing it through an adsorbent bed of a Cyclic Dryer System. The Cyclic Dryer System contains two dryer beds, each of which has the capacity of adsorbing water contained in the AOG stream at maximum flow rate for 24 hours. The two dryer beds are alternately placed in service every 24 hours, at which time the exhausted dryer bed is regenerated. For regeneration, a portion of the AOG stream is withdrawn upstream of the Dryer System, is heated by an electric heater, and fed to the exhausted dryer bed. This gas stream is returned to the inlet of the AOG System by the Third Stage SJAE. The regeneration accomplished in this manner is a closed loop operation, eliminating the possibility of accidental release of residual gases to the atmosphere.
4.4.2.4 Drying The AOG stream is then dried to approximately -60°F dewpoint by passing it through an adsorbent bed of a Cyclic Dryer System. The Cyclic Dryer System contains two dryer beds, each of which has the capacity of adsorbing water contained in the AOG stream at maximum flow rate for 24 hours.
IX-4-10                           12/21/04
The two dryer beds are alternately placed in service every 24 hours, at which time the exhausted dryer bed is regenerated. For regeneration, a portion of the AOG stream is withdrawn upstream of the Dryer System, is heated by an electric heater, and fed to the exhausted dryer bed. This gas stream is returned to the inlet of the AOG System by the Third Stage SJAE. The regeneration accomplished in this manner is a closed loop operation, eliminating the possibility of accidental release of residual gases to the atmosphere.
IX-4-10 12/21/04  


USAR 4.4.2.5     Hydrogen Analyzers Hydrogen analyzers are installed at the downstream end of the AOG System. Also, the Recombiners are equipped with temperature sensors and alarms. This instrumentation system will indicate any anomalies in the hydrogen concentration and permit corrective action as required.
USAR 4.4.2.5 Hydrogen Analyzers Hydrogen analyzers are installed at the downstream end of the AOG System. Also, the Recombiners are equipped with temperature sensors and alarms.
: 4. 4. 2. 6 Long Term Delay For decay of radioactive isotopes,     the AOG stream is passed through a series of charcoal adsorber beds. A lower than ambient operating temperature of 0°F is selected since the adsorption coefficients, K, of krypton and xenon increase with decrease in temperature. Experiments were conducted by Oak Ridge using tracer gases to determine K values at various temperatures. Also, the contractor conducted its own experiments utilizing argon as a sweep gas and krypton,       xenon, and carbon dioxide as the constituents. Based on this and other published data, adsorption coefficients of 75 and 1,500 cc/gm are selected for krypton and xenon, respectively.
This instrumentation system will indicate any anomalies in the hydrogen concentration and permit corrective action as required.
: 4. 4. 2. 6 Long Term Delay For decay of radioactive isotopes, the AOG stream is passed through a series of charcoal adsorber beds. A lower than ambient operating temperature of 0°F is selected since the adsorption coefficients, K,
of krypton and xenon increase with decrease in temperature. Experiments were conducted by Oak Ridge using tracer gases to determine K values at various temperatures. Also, the contractor conducted its own experiments utilizing argon as a
sweep gas and
: krypton, xenon, and carbon dioxide as the constituents. Based on this and other published data, adsorption coefficients of 75 and 1,500 cc/gm are selected for krypton and xenon, respectively.
A quantity of 33.3 tons of charcoal at 0°F temperature will delay krypton isotopes for 44.5 hours and xenon isotopes for 37 days. This is based on 30 scfm flow rate at 0°F temperature and about O. 5 psig pressure. These specified delays will reduce the effluent activity to less than 100 µCi/sec.
A quantity of 33.3 tons of charcoal at 0°F temperature will delay krypton isotopes for 44.5 hours and xenon isotopes for 37 days. This is based on 30 scfm flow rate at 0°F temperature and about O. 5 psig pressure. These specified delays will reduce the effluent activity to less than 100 µCi/sec.
Table IX-4-4 shows the activity profile for the system based upon 0.1 Ci/sec input to the AOG System. A maximum flow of 50 scfm was assessed per calculation NEDC 04-056.
Table IX-4-4 shows the activity profile for the system based upon 0.1 Ci/sec input to the AOG System.
IX-4-11                           06/19/14
A maximum flow of 50 scfm was assessed per calculation NEDC 04-056.
IX-4-11 06/19/14  


USAR TABLE IX-4-4 ACTIVITY PROFILE ACTIVITY    30 SCFM ACTIVITY           40 SCFM ACTIVITY 50 SCFM ACTIVITY AFTER    OF CHARCOAL BED            OF CHARCOAL BED OF CHARCOAL BED 30-MINUTE          EFFLUENT                 EFFLUENT         EFFLUENT DELAY      (NOTE 1 & 3)               (NOTE 2 & 3)    (NOTE 2 & 3) 6 BEDS (5 BEDS)                 6 BEDS           6 BEDS ISOTOPE    (µCi/sec)         (µCi/sec)              (µCi/sec)       (µCi/sec)
ACTIVITY AFTER 30-MINUTE DELAY ISOTOPE
Kr-89            180      0,   ( 0)                         0               0 Kr-87        15,000      0,    (0)                         0              0 Kr-83m          2,900      0,   ( 0)                         0.01           0.149 Kr-88        18,000          . 3,   (2 .1)                 4.74         25.5 Kr-85m        5,600        5.1,     ( 18 .1)             29.54           86.2 Kr-85              20    20,     (20. 0)                   20             20 Xe-137            670    0,     (0)                         0              0 Xe-135m          6,900    0,     ( 0)                         0             0 Xe-138        21,000      0,     (0)                         0             0 Xe-135        22,000      0,    ( 0)                         0             0 Xe-133m            280        .003,     (0.016)             0.07           0.362 Xe-133          8,200      64.3,       (138. 3)             214.73         450 Xe-131m            15      1. 8,     (2. 5)                 3.03           4.19 N-13            1,500          0,         (0)               0               0 TOTAL        102,265      91.5,       (181)               272.1           586.6 Notes
(µCi/sec)
: 1. The 6 bed values are based on the original Cosmodyne Contract. The 5 bed values are based on NEDC 10-052. r2 si
Kr-89 180 Kr-87 15,000 Kr-83m 2,900 Kr-88 18,000 Kr-85m 5,600 Kr-85 20 Xe-137 670 Xe-135m 6,900 Xe-138 21,000 Xe-135 22,000 Xe-133m 280 Xe-133 8,200 Xe-131m 15 N-13 1,500 TOTAL 102,265 Notes USAR TABLE IX-4-4 ACTIVITY PROFILE 30 SCFM ACTIVITY 40 SCFM ACTIVITY OF CHARCOAL BED OF CHARCOAL BED EFFLUENT EFFLUENT (NOTE 1 & 3)
: 2. The 6 bed values are based on NEDC 04-056.
(NOTE 2 & 3) 6 BEDS (5 BEDS) 6 BEDS
: 3. Charcoal bed arrangements which correspond to the listed release rates are validated in NEDC 10-052. l 281 IX-4-12                           06/19/14
(µCi/sec)
(µCi/sec) 0,
( 0) 0 0,
(0) 0 0,
( 0) 0.01  
. 3, (2.1) 4.74 5.1, ( 18.1) 29.54 20, (20. 0) 20 0,
(0) 0 0,
( 0) 0 0,
(0) 0 0,
( 0) 0  
.003, (0.016) 0.07 64.3, (138. 3) 214.73
: 1. 8, (2. 5) 3.03 0,
(0) 0 91.5, (181) 272.1 50 SCFM ACTIVITY OF CHARCOAL BED EFFLUENT (NOTE 2 & 3) 6 BEDS
(µCi/sec) 0 0
0.149 25.5 86.2 20 0
0 0
0 0.362 450 4.19 0
586.6
: 1.
The 6 bed values are based on the original Cosmodyne Contract. The 5 bed values are based on NEDC 10-052. r2si
: 2.
The 6 bed values are based on NEDC 04-056.
: 3.
Charcoal bed arrangements which correspond to the listed release rates are validated in NEDC 10-052. l281 IX-4-12 06/19/14  


USAR In the safety evaluation of the AOG System, the NRC estimated that approximately 900 Ci/yr of the noble gases and negligible iodines would be released from the Condenser Off-Gas System. The estimates of Table IX-4-4, corresponding to an annual release of approximately 2300 Ci, are based upon a higher condenser inleakage rate and conditions yielding 100,000 µCi/sec Off-Gas activity after a 30-minute holdup for a 3400 MWt reactor. The NRC estimate was normalized for a 2486 MWt reactor.
USAR In the safety evaluation of the AOG System, the NRC estimated that approximately 900 Ci/yr of the noble gases and negligible iodines would be released from the Condenser Off-Gas System. The estimates of Table IX-4-4, corresponding to an annual release of approximately 2300 Ci, are based upon a higher condenser inleakage rate and conditions yielding 100,000 µCi/sec Off-Gas activity after a
The   NRC calculated the     DDE   at   the   site boundary to be 0.35 mrem/year and the potential dose to a child's thyroid from drinking milk from the nearest farm with cows to be 5. 8 mrem/year. [l 4 l The activity of F-18 is not considered in calculating the effluent activity, since it is expected that fluoride will be removed from the Off-Gas stream along with condensed steam prior to entering the AOG System.
30-minute holdup for a
The six Charcoal Beds, each containing approximately 11,000 pounds of charcoal, are arranged to operate in series, in parallel, and with a bypass of first vessel. To meet the values specified in Table IX-4-4 the charcoal beds must be operated in one of the following configurations: 6 beds in parallel (up to 40 scfm), 6 beds in series (up to 50 scfm), or 5 beds in series up to 30 scfm. [2 BJ Following the Charcoal Beds, the air stream is filtered to remove charcoal dust and/or solid daughter particles.
3400 MWt reactor.
4.4.3       Seismic Analysis Original design for seismic loading the Off-Gas System is based on Class IIS and:
The NRC estimate was normalized for a 2486 MWt reactor.
Horizontal Coefficient             0.10 g Vertical                          0   g Seismic design analysis, based on analytical models for each skid, provided qualification for the structural design in lieu of testing. The analytical approach utilized the multidegree-of-freedom model.
The NRC calculated the DDE at the site boundary to be 0.35 mrem/year and the potential dose to a child's thyroid from drinking milk from the nearest farm with cows to be 5. 8 mrem/year. [l 4 l The activity of F-18 is not considered in calculating the effluent activity, since it is expected that fluoride will be removed from the Off-Gas stream along with condensed steam prior to entering the AOG System.
In   this   procedure,     each   structural     system   (skid)   was mathematically modeled using a sufficient number of mass points to ensure adequate representation of motion throughout all parts of the skid. This technique   utilized   modal     participation     factors     to   determine   the multidegree-of-freedom modal response. (See Section XII 2.3.5.2).
The six Charcoal Beds, each containing approximately 11,000 pounds of charcoal, are arranged to operate in series, in parallel, and with a bypass of first vessel. To meet the values specified in Table IX-4-4 the charcoal beds must be operated in one of the following configurations: 6 beds in parallel (up to 40 scfm),
6 beds in series (up to 50 scfm), or 5 beds in series up to 30 scfm. [2 BJ Following the Charcoal Beds, the air stream is filtered to remove charcoal dust and/or solid daughter particles.
4.4.3 Seismic Analysis Original design for seismic loading the Off-Gas System is based on Class IIS and:
Horizontal Coefficient Vertical 0.10 g 0
g Seismic design analysis, based on analytical models for each skid, provided qualification for the structural design in lieu of testing.
The analytical approach utilized the multidegree-of-freedom model.
In this procedure, each structural system (skid) was mathematically modeled using a sufficient number of mass points to ensure adequate representation of motion throughout all parts of the skid. This technique utilized modal participation factors to determine the multidegree-of-freedom modal response. (See Section XII 2.3.5.2).
Following implementation of MDC 83-034 [lSJ seismic analyses are to be performed in accordance with the criteria specified in Regulatory Guide 1.143, Rev. 1, October, 1979.
Following implementation of MDC 83-034 [lSJ seismic analyses are to be performed in accordance with the criteria specified in Regulatory Guide 1.143, Rev. 1, October, 1979.
: 4. 4. 4     Fabrication The AOG System original design and         fabrication   was conducted in accordance with the following standards:
: 4. 4. 4 Fabrication The AOG System original design and fabrication was conducted in accordance with the following standards:
Pressure Vessels:               ASME Section III, Class 3 Heat Exchangers:                 ASME Section III, Class 3, TEMA R Process Piping:                 ASME Section III, Class 3     & ANSI Pumps and Valves:               ASME Section III, Class 3 (NPVC)
Pressure Vessels:
Materials:                       ASTM Electrical & Instruments:       NEC, NEMA, IEEE, IES Metal Treatment:                 SSPC IX-4-13                                 06/19/14
ASME Section III, Class 3 Heat Exchangers:
ASME Section III, Class 3, TEMA R Process Piping:
ASME Section III, Class 3 & ANSI Pumps and Valves:
ASME Section III, Class 3 (NPVC)
Materials:
ASTM Electrical & Instruments:
NEC, NEMA, IEEE, IES Metal Treatment:
SSPC IX-4-13 06/19/14  


USAR Those components which are not in direct contact with the radioactive stream were designed and fabricated in accordance with ASME Code Section VIII, Division 1.
USAR Those components which are not in direct contact with the radioactive stream were designed and fabricated in accordance with ASME Code Section VIII, Division 1.
Welding materials are in accordance with the requirement s of the American Welding Society (AWS) specificatio ns.
Welding materials are in accordance with the requirements of the American Welding Society (AWS) specifications.
Quality group classificati on and quality assurance provisions are in accordance with criteria specified in USAR Appendix A for piping and equipment pressure parts,       and per USNRC Regulatory Guide 1.143,     Rev. 1, October, 197 9, for other components. [lSJ
Quality group classification and quality assurance provisions are in accordance with criteria specified in USAR Appendix A for piping and equipment pressure
: 4. 4. 5     Instrumenta tion and Control A continuous     indication of   system operating conditions     is displayed in the AOG Control Room. The system operates automatical ly and by remote control; temperature s, pressures, humidity, hydrogen concentratio n, and flow rates are continuousl y monitored to ensure correct operation and proper control function. Radioactivi ty is monitored at the ERP. Instrumenta tion related to critical parameters is connected to an alarm system allowing abnormal conditions to be promptly observed and remedied. Comparison of the alarm signal(s) and the various indicators will accurately pinpoint the source of the trouble.
: parts, and per USNRC Regulatory Guide 1.143, Rev. 1, October, 197 9, for other components. [lSJ
The system is also operated by a logic network of interlocked controls which maintain proper flow paths at all times. This is particularl y important in controlling flow through one or the other dual equipment trains and in operation of the Cyclic Dryer Subsystems.
: 4. 4. 5 Instrumentation and Control A
4.5         Power Generation Evaluation 4.5.1       Off-Gas (OG) System The 30 minute holdup time provides for the radioactive decay of the short-lived activation and fission gases and thereby reduces the stack release rate. The short-lived fission gases decay to solid daughter products and are removed on the high efficiency filters which have a manufacture rs design capability to remove 99.97% of particulate s greater than 0.3 microns in size.
continuous indication of system operating conditions is displayed in the AOG Control Room.
The routine release to the environment of noncondensi ble coolant activation products and noble gas fission products for gland seal leakage is given in Table IX-4-5. This data was developed based on a diffusion mixture of noble gases which would result in a release rate of O. 1 Curies/ sec after 30 minutes holdup. The equilibrium activity level for particulate daughter products of decay of the noble gases is given in Table IX-4-6. [9 l Data in Tables IX-4-5 and IX-4-6 does not take into consideratio n the operation of the AOG System (see USAR Section 4.4).
The system operates automatically and by remote control; temperatures, pressures, humidity, hydrogen concentration, and flow rates are continuously monitored to ensure correct operation and proper control function.
The Air Ejector Off-Gas System is monitored and controlled to ensure that the radiation dose limits at the site boundary as prescribed by 10CFR20 are not exceeded. Duplicate continuous radiation monitors record the radiation level in the off-gases and alarms in the Main Control Room on high radiation. Radiation monitors are also provided in the ERP for detection of ERP activity release. Radiation levels at the Air Ejector in excess of the allowable "instantaneo us" release rate alarms in the Main Control Room and after a 15 minute delay isolates the Off-Gas System. The time delay is provided to permit corrective action to be taken by the operator when possible to avoid station shutdown.
Radioactivity is monitored at the ERP.
IX-4-14                         11/16/00
Instrumentation related to critical parameters is connected to an alarm system allowing abnormal conditions to be promptly observed and remedied. Comparison of the alarm signal(s) and the various indicators will accurately pinpoint the source of the trouble.
The system is also operated by a logic network of interlocked controls which maintain proper flow paths at all times. This is particularly important in controlling flow through one or the other dual equipment trains and in operation of the Cyclic Dryer Subsystems.
4.5 4.5.1 Power Generation Evaluation Off-Gas (OG) System The 30 minute holdup time provides for the radioactive decay of the short-lived activation and fission gases and thereby reduces the stack release rate. The short-lived fission gases decay to solid daughter products and are removed on the high efficiency filters which have a manufacturers design capability to remove 99.97% of particulates greater than 0.3 microns in size.
The routine release to the environment of noncondensible coolant activation products and noble gas fission products for gland seal leakage is given in Table IX-4-5. This data was developed based on a diffusion mixture of noble gases which would result in a release rate of O. 1 Curies/ sec after 30 minutes holdup.
The equilibrium activity level for particulate daughter products of decay of the noble gases is given in Table IX-4-6. [9l Data in Tables IX-4-5 and IX-4-6 does not take into consideration the operation of the AOG System (see USAR Section 4.4).
The Air Ejector Off-Gas System is monitored and controlled to ensure that the radiation dose limits at the site boundary as prescribed by 10CFR20 are not exceeded. Duplicate continuous radiation monitors record the radiation level in the off-gases and alarms in the Main Control Room on high radiation. Radiation monitors are also provided in the ERP for detection of ERP activity release. Radiation levels at the Air Ejector in excess of the allowable "instantaneous" release rate alarms in the Main Control Room and after a 15 minute delay isolates the Off-Gas System.
The time delay is provided to permit corrective action to be taken by the operator when possible to avoid station shutdown.
IX-4-14 11/16/00  


USAR TABLE IX-4-5 MAXIMUM EXPECTED ACTIVITY RELEASE TO THE ENVIRONMENT FROM GLAND SEAL LEAKAGE**
USAR TABLE IX-4-5 MAXIMUM EXPECTED ACTIVITY RELEASE TO THE ENVIRONMENT FROM GLAND SEAL LEAKAGE**
Release Rate Isotope                   Half Life                 (µCi/sec)
N-17 N-16 0-19 N-13 Ar 41 Ar 37 H 3 Isotope Total Activation Gases Short Lived Kr 89 Xe 137 Xe 135m Xe 138 Kr 87 Kr 83m Kr 88 Kr 85m Xe 135 Xe 133m Xe 133 Xe 131m Kr 85 Total Nobel Gases Half Life 4.14 sec.
N-17                                4.14 sec.                 1 (-4)
7.35 sec.
* N-16                              7.35 sec.                   4 ( 1) 0-19                                29 sec.                   2 ( 0)
29 sec.
N-13                                10 min.                   2 ( 0)
10 min.
Ar 41                              1.83 hr.                   6 (-3)
1.83 hr.
Ar 37                              34.3 day                   1 (-7)
34.3 day 12.26 yr.
H 3                                12.26 yr.                   8 (-4)
3.2 min.
Total Activation Gases                                  5 ( 1)
: 3. 8 min.
Short Lived                                                    4  1)
15 min.
Kr 89                              3.2 min.                   1  2)
17 min.
Xe 137                              3. 8 min.                 2  2)
1.3 hr.
Xe 135m                              15 min.                   4  1)
1.86 hr.
Xe 138                              17 min.                   1  2)
2.8 hr.
Kr 87                                1.3 hr.                   2  1)
4.4 hr.
Kr 83m                              1.86 hr.                   2  0)
9.2 hr.
Kr 88                                2.8 hr.                   2  1)
2.3 day 5.27 day 12.0 day 10.4 yr.
Kr 85m                              4.4 hr.                   8  0)
Total Activation and Noble Gases Release Rate
Xe 135                              9.2 hr.                   1  1)
(µCi/sec) 1 (-4)
Xe 133m                              2.3 day                   3 (-1)
* 4 ( 1) 2 ( 0) 2 ( 0) 6 (-3) 1 (-7) 8 (-4) 5
Xe 133                              5.27 day                  6 ( 0)
( 1) 4
Xe 131m                            12.0 day                  3 (-2)
: 1) 1
Kr 85                              10.4 yr.                  9 (-3)
: 2) 2
Total Nobel Gases                                        6 ( 2)
: 2) 4
Total Activation and Noble Gases                        6 ( 2)
: 1) 1
* Numbers in parentheses represent powers of 10 (i.e., read 1 (-4) as 1 X 10- 4 )
: 2) 2
** Based on 0.1 Ci/sec at ERP IX-4-15                           11/16/00
: 1) 2
: 0) 2
: 1) 8
: 0) 1
: 1) 3 (-1) 6 ( 0) 3 (-2) 9 (-3) 6
( 2) 6 ( 2)
Numbers in parentheses represent powers of 10 (i.e., read 1 (-4) as 1 X 10-4 )  
** Based on 0.1 Ci/sec at ERP IX-4-15 11/16/00  


USAR TABLE IX-4-6 PARTICULATES BUILDUP IN ENVIRONMENT*
USAR TABLE IX-4-6 PARTICULATES BUILDUP IN ENVIRONMENT*
Equilibrium Activity Isotope                     Half Life               Level (Curies)
Equilibrium Activity Isotope Half Life Level (Curies)
Rb 87                               5 X 101oy                   0.14 Rb 88                                 17.8m                     0.29 Rb 89                                 15. 4m                     0.028 Sr 89                                   52d                     0.028 Cs 135                               3 X 10 6 y                0.53 Cs 137                                   30y                     0.066 Ba 137m                               2.55m                     0.060 Cs 138                                 32.2m                     0.15
Rb 87 5 X 101oy 0.14 Rb 88 17.8m 0.29 Rb 89
* Based on O. 1 Ci/ sec at ERP IX-4-16                           11/16/00
: 15. 4m 0.028 Sr 89 52d 0.028 Cs 135 3
X 10 6y 0.53 Cs 137 30y 0.066 Ba 137m 2.55m 0.060 Cs 138 32.2m 0.15
* Based on O. 1 Ci/ sec at ERP IX-4-16 11/16/00  


USAR The ERP allows atmospheric dispersion of the effluent to reduce direct radiation dose rates. ERP release rate limits are established per the CNS ODAM.
USAR The ERP allows atmospheric dispersion of the effluent to reduce direct radiation dose rates. ERP release rate limits are established per the CNS ODAM.
Shielding for the Off-Gas System equipment is                 provided     as necessary to maintain safe radiation dose levels for personnel.
Shielding for the Off-Gas System equipment is provided as necessary to maintain safe radiation dose levels for personnel.
The Off-Gas Filters are designed with a copper ground strap to prevent static electricity from igniting any hydrogen that passes through them. [lOJ The Z-sump vent is designed to vent gases to the ERP to prevent possible sump pressurization due to loss of the system loop seal.[lll The ERP is provided with an automatic heat tracing system to prevent freezing of water vapor at the release opening, thus preventing ice blockage and a possible hydrogen explosion. ll 2 J To insure that a representative sample is obtained for the ERP monitor, the sampling line between the ERP and the Off-Gas Filter Building is heat traced to minimize sample plate-out. If the dilution flow should cease, valves will isolate the Off-Gas System flow. [l3J A differential pressure (dP) can occur between the Off-Gas hold-up and the Z Sump. This operational condition can result in liquid being held up in the line. In order to mitigate this condition that would interfere with post-accident Z Sump operation, the Off-Gas liquid drain line has a 1-1/4 inch flow restrictor to ensure that the drain rate is less than the capacity of one Z Sump pump.         In addition,     a   dP equalization line and dP pressure monitoring instrumentation are provided for Operations to minimize the potential for the undesirable dP conditions. [23 J
prevent them. [lOJ The Off-Gas Filters are designed with a copper ground strap to static electricity from igniting any hydrogen that passes through The Z-sump vent is designed to vent gases to the ERP to prevent possible sump pressurization due to loss of the system loop seal.[lll The ERP is provided with an automatic heat tracing system to prevent freezing of water vapor at the release opening, thus preventing ice blockage and a possible hydrogen explosion. ll 2 J To insure that a representative sample is obtained for the ERP monitor, the sampling line between the ERP and the Off-Gas Filter Building is heat traced to minimize sample plate-out. If the dilution flow should cease, valves will isolate the Off-Gas System flow. [l3J A differential pressure (dP) can occur between the Off-Gas hold-up and the Z Sump. This operational condition can result in liquid being held up in the line. In order to mitigate this condition that would interfere with post-accident Z Sump operation, the Off-Gas liquid drain line has a 1-1/4 inch flow restrictor to ensure that the drain rate is less than the capacity of one Z Sump pump.
: 4. 5. 2         Augmented Off-Gas (AOG) System The AOG System is designed for a continuous safe and reliable operating life of 40 years. The system is designed to operate reliably within safe limits under all normal and maximum operating conditions.
In
In addition, the system will withstand the effects of various types of failure conditions. Table IX-4-7 is a failure mode and effect analysis which indicates the potential consequences of failures in various parts of the system and notes the precautions incorporated in the system design which will accommodate or compensate for these various failure conditions.
: addition, a
: 4. 6           Inspection and Testing The   Off-Gas   System   is   operated   continuously   during     station operation.
dP equalization line and dP pressure monitoring instrumentation are provided for Operations to minimize the potential for the undesirable dP conditions. [23 J
The   Off-Gas   System is     in   scope   for   License     Renewal   per 10 CFR 54.4(a) (1) and (a) (2) and was subject to aging management review. Aging effects are managed by the following Aging Management Programs: Bolting Integrity (see USAR Section K-2.1.2), Buried Piping and Tanks Inspection (see USAR       Section K-2.1.3),     External       Surfaces     Monitoring       (see     USAR Section K-2. 1. 14) ,     Oil   Analyses   ( see   USAR   Section K-2 .1. 28) ,   One-Time Inspection ( see USAR Section K-2. 1. 2 9) , Periodic Surveillance and Preventive Maintenance ( see USAR Section K-2 .1. 31), and Selective Leaching ( see USAR Section K-2.1.34).       There   are no Time-Limited Aging Analyses               that   are applicable.
: 4. 5. 2 Augmented Off-Gas (AOG) System The AOG System is designed for a continuous safe and reliable operating life of 40 years. The system is designed to operate reliably within safe limits under all normal and maximum operating conditions.
IX-4-17                                   01/17/14
In addition, the system will withstand the effects of various types of failure conditions.
 
Table IX-4-7 is a
USAR TABLE IX-4-7 System Failure Analysis FAILURE EQUIPMENT ITEM    OR MALFUNCTION        EFFECT ON SYSTEM       DESIGN PRECAUTIONS    CORRECTIVE ACTION
failure mode and effect analysis which indicates the potential consequences of failures in various parts of the system and notes the precautions incorporated in the system design which will accommodate or compensate for these various failure conditions.
: 1. Steam Jet Air A. Reduction of steam
: 4. 6 Inspection and Testing The Off-Gas System is operated continuously during station operation.
* Hydrogen
The Off-Gas System is in scope for License Renewal per 10 CFR 54.4(a) (1) and (a) (2) and was subject to aging management review. Aging effects are managed by the following Aging Management Programs: Bolting Integrity (see USAR Section K-2.1.2), Buried Piping and Tanks Inspection (see USAR Section K-2.1.3),
* Line pressure,
External Surfaces Monitoring (see USAR Section K-2. 1. 14),
* Open OG-AOV-254AV, Ejector          Supply pressure or    concentration          temperature and flow   Close AOG-AOV-901AV Flow                  increase              indicators and
Oil Analyses
* Flow balance of
( see USAR Section K-2.1. 28),
* Process stream        alarms                steam input for temperature drop
One-Time Inspection ( see USAR Section K-2. 1. 2 9), Periodic Surveillance and Preventive Maintenance
* Design for hydrogen    temperature and
( see USAR Section K-2.1. 31),
* Motive force          detonation            dilution reduction
and Selective Leaching
( see USAR Section K-2.1.34).
There are no Time-Limited Aging Analyses that are applicable.
IX-4-17 01/17/14
: 1.
EQUIPMENT ITEM Steam Jet Air Ejector
: 2. Preheater A.
FAILURE OR MALFUNCTION Reduction of steam Supply pressure or Flow B. Corrosion A. Corrosion of tubes USAR TABLE IX-4-7 System Failure Analysis EFFECT ON SYSTEM
* Hydrogen concentration increase
* Process stream temperature drop
* Motive force reduction
* Reduction in preheating
* External leakage
* Inleak of steam to off-gas -
additional dilution and load on condenser IX-4-18 DESIGN PRECAUTIONS
* Line pressure, temperature and flow indicators and alarms
* Design for hydrogen detonation
* Standby equipment
* Stainless steel nozzles
* Corrosion allowance for carbon steel
* Standby equipment
* Standby equipment
* Start-up blower
* Safety factor in tube design
* Reduction in                                  and/or existing preheating                                    blowers to maintain flow B. Corrosion
* Stainless steel tubing
* External leakage
* Stainless steel
* Upon indication of nozzles                external leakage
* Corrosion allowance    (plant monitoring for carbon steel      equipment, switch
* Standby equipment      to standby equipment to allow repair
: 2. Preheater    A. Corrosion of tubes
* Inleak of steam to
* Safety factor in
* If alarm conditions off-gas -              tube design           are reached, switch additional dilution
* Stainless steel       to standby and load on            tubing                 equipment condenser
* Standby equipment
* Standby equipment
* Design capacity of condenser and water separator drains allows some compensation
* Design capacity of condenser and water separator drains allows some compensation
* Temperature monitor/alarm of condenser discharge
* Temperature monitor/alarm of condenser discharge
* Liquid level alarm on water separator IX-4-18                                          11/16/00
* Liquid level alarm on water separator CORRECTIVE ACTION
* Open OG-AOV-254AV, Close AOG-AOV-901AV
* Flow balance of steam input for temperature and dilution
* Start-up blower and/or existing blowers to maintain flow
* Upon indication of external leakage (plant monitoring equipment, switch to standby equipment to allow repair
* If alarm conditions are reached, switch to standby equipment 11/16/00  


USAR TABLE IX-4-7 System Failure Analysis (Cont'd.)
USAR TABLE IX-4-7 System Failure Analysis (Cont'd.)
FAILURE EQUIPMENT ITEM     OR MALFUNCTION        EFFECT ON SYSTEM      DESIGN PRECAUTIONS    CORRECTIVE ACTION
EQUIPMENT ITEM
: 2. Preheater       B. Reduction or loss
: 2. Preheater (Continued)
* Low Recombiner
: 3. Recombiner FAILURE OR MALFUNCTION B. Reduction or loss of steam supply A. Catalyst deactivates through long-term use, poisoning or wetting
* Temperature
: 4. Post-Recombiner A. Corrosion of Condenser tubes EFFECT ON SYSTEM
* Flow balance of (Continued)      of steam supply      inlet temperature     monitoring/alarms     steam input for on Recombiner,         partial inlet And output     temperature
* Low Recombiner inlet temperature
* High H2 alarm           compensation Re combiner
* Increased H2 concentration
* Upon alarmed Performance)           condition, switch
* Reduced temperature profile through Re combiner
* Standby equipment      to standby equipment
* Water inleak to off-gas causing condenser flooding IX-4-19 DESIGN PRECAUTIONS
: 3. Recombiner      A. Catalyst
* Temperature monitoring/alarms on Recombiner, inlet And output
* Increased
* High H2 alarm Re combiner Performance)
* Inlet temperature
* Standby equipment
* Upon alarmed deactivates          H2 concentration      control to prevent     condition switch through long-term
* Inlet temperature control to prevent wetting
* Reduced temperature    wetting               to standby use, poisoning or    profile through
* Temperature profile monitoring/alarms
* Temperature profile   equipment; wetting              Re combiner            monitoring/alarms     replace or
* H2 concentration alarms
* H2 concentration       reactivate alarms                 catalyst
* Design allowance by catalyst mfgr. to preclude iodine poisoning
* Design allowance by catalyst mfgr. to preclude iodine poisoning
* Standby equipment
* Standby equipment
: 4. Post-Recombiner A. Corrosion of
* Safety factor in tube design
* Water inleak to
* Stainless steel tubing
* Safety factor in
* Liquid level monitor/alarm on Water Seperator
* Switch to standby Condenser          tubes                off-gas causing        tube design           equipment to condenser flooding
* Standby equipment CORRECTIVE ACTION
* Stainless steel       allow repair, tubing               plugging or
* Flow balance of steam input for partial temperature compensation
* Liquid level           replacement of monitor/alarm on     tubes Water Seperator
* Upon alarmed condition, switch to standby equipment
* Standby equipment IX-4-19                                        11/16/00
* Upon alarmed condition switch to standby equipment; replace or reactivate catalyst
* Switch to standby equipment to allow repair, plugging or replacement of tubes 11/16/00  


USAR TABLE IX-4-7 System Failure Analysis   (Cont'd.)
USAR TABLE IX-4-7 System Failure Analysis (Cont'd.)
FAILURE EQUIPMENT ITEM       OR MALFUNCTION          EFFECT ON SYSTEM      DESIGN PRECAUTIONS    CORRECTIVE ACTION
EQUIPMENT ITEM
: 4. Post-Recombiner B. Reduction or loss
: 4. Post-Recombiner Condenser (Continued)
* Insufficient
FAILURE OR MALFUNCTION B. Reduction or loss of coolant (plant condensate)
* Condensate
C. Overtemperature of coolant
* Open Condenser          of coolant (plant      cooling/               discharge              OG-A0V-254AV, (Continued)        condensate)            condensation            temperature            Close monitoring/alarm        AOG-A0V-901AV
: 5. Water Separator A. Corrosion of wire mesh B. Clogging of drain top EFFECT ON SYSTEM
* Will require correction of plant condensate system C. Overtemperature of
* Insufficient cooling/
* Insufficient
condensation
* Temperature-
* Insufficient cooling/
* Decrease flow coolant                cooling/                controlled flow of      rate of high condensation            coolant supply          temperature
condensation
* Condenser discharge    coolant monitor/alarm
* Increased moisture in process gas
* Build-up of water level IX-4-20 DESIGN PRECAUTIONS
* Condensate discharge temperature monitoring/alarm
* Temperature-controlled flow of coolant supply
* Condenser discharge monitor/alarm
* Stainless steel wire mesh
* Cooler-Condenser capacity (downstream)
* Liquid level monitor/alarm
* Drain trap bypass
* Standby equipment CORRECTIVE ACTION
* Open OG-A0V-254AV, Close AOG-A0V-901AV
* Will require correction of plant condensate system
* Decrease flow rate of high temperature coolant
* Alarm indicates need for correction in plant condensate system
* Alarm indicates need for correction in plant condensate system
: 5. Water Separator A. Corrosion of wire
* Cooler-condenser design will accommodate this amount of excess moisture
* Increased moisture
* Standby equipment allows repair during regular inspection and maintenance
* Stainless steel
* Water will be bypassed to condensate drain
* Cooler-condenser mesh                    in process gas          wire mesh              design will
* Cooler-Condenser      accommodate this capacity              amount of excess (downstream)          moisture
* Standby equipment allows repair during regular inspection and maintenance B. Clogging of drain
* Build-up of water
* Liquid level
* Water will be top                    level                    monitor/alarm          bypassed to
* Drain trap bypass      condensate drain
* Standby equipment
* Upon alarm condition (uncorrected),
* Upon alarm condition (uncorrected),
switch to a standby equipment IX-4-20                                          11/16/00
switch to a standby equipment 11/16/00  


USAR TABLE IX-4-7 System Failure Analysis   (Cont'd.)
EQUIPMENT ITEM
FAILURE EQUIPMENT ITEM    OR MALFUNCTION         EFFECT ON SYSTEM       DESIGN PRECAUTIONS    CORRECTIVE ACTION
: 6. Cooler-Condenser
: 6. Cooler-        A. Corrosion of tubes
: 7. Glycol Cooler, Condenser USAR TABLE IX-4-7 System Failure Analysis (Cont'd.)
* Glycol solution
FAILURE OR MALFUNCTION EFFECT ON SYSTEM A. Corrosion of tubes
* Safety factor in
* Glycol solution leakage into process stream; discharged with condensate B. Ice on tubes (low glycol temperature)
* Switch to standby Condenser                              leakage into            tube design           cooler process stream;
C. High discharge gas temperature (insufficient glycol cooling)
* Stainless steel
A. Loss of one glycol cooling unit B. Loss of both glycol units
* Plug defective discharged with        tubing                 tube(s) condensate
* Increased plugging and pressure drop on shell side
* Liquid level gage
* High humidity discharge gas
* Replace defective on glycol tank         tubes
* Inadequate Dryer operation
* High temperature of Cooler-Condenser Discharge
* High gas dewpoint
* Impaired dryer function IX-4-21 DESIGN PRECAUTIONS
* Safety factor in tube design
* Stainless steel tubing
* Liquid level gage on glycol tank
* Level switch on Moisture Separator
* Level switch on Moisture Separator
* Standby Cooler-Condenser B. Ice on tubes (low
* Standby Cooler-Condenser
* Increased plugging
* Temperature controls and alarms on glycol solution
* Temperature
* Standby systems
* Reset glycol glycol                and pressure drop      controls and alarms     temperature temperature)          on shell side          on glycol solution     controls
* Temperature control and alarm on process stream
* High temperature alarm on process stream
* Temperature controls and alarms for glycol solution
* Standby systems
* Standby systems
* Switch to standby
* High temperature alarm
* Temperature control    glycol unit and alarm on
* Standby glycol cooler
* Switch to standby process stream          cooler condenser C. High discharge gas
* High temperature alarm
* High humidity
* High humidity (Dryer) alarm CORRECTIVE ACTION
* High temperature
* Switch to standby cooler
* Reset glycol temperature           discharge gas          alarm on process      temperature (insufficient
* Plug defective tube(s)
* Inadequate Dryer        stream                controls glycol cooling)        operation
* Replace defective tubes
* Temperature
* Reset glycol temperature controls
* Switch to standby controls and alarms    glycol unit for glycol solution
* Switch to standby glycol unit
* Switch to standby
* Switch to standby cooler condenser
* Standby systems        cooler
* Reset glycol temperature controls
: 7. Glycol Cooler, A. Loss of one glycol
* Switch to standby glycol unit
* High temperature of
* Switch to standby cooler
* High temperature
* Switch to standby glycol cooler
* Switch to standby Condenser        cooling unit          Cooler-Condenser        alarm                  glycol cooler Discharge
* Repair coolers 11/16/00  
* Standby glycol cooler B. Loss of both
* High gas dewpoint
* High temperature
* Repair coolers glycol units
* Impaired dryer          alarm function
* High humidity (Dryer) alarm IX-4-21                                          11/16/00


USAR TABLE IX-4-7 System Failure Analysis   (Cont'd.)
EQUIPMENT ITEM
FAILURE EQUIPMENT ITEM    OR MALFUNCTION         EFFECT ON SYSTEM      DESIGN PRECAUTIONS    CORRECTIVE ACTION
: 8. Cooler-Condenser Moisture-Separator
: 8. Cooler-       A. Corrosion of wire
: 9.
* Increased moisture
Dryer Heater
* Stainless steel
: 10. Cyclic Dryers
* Switch to standby Condenser        mesh                  in process gas           wire mesh              system if drying Moisture-     B. Clogging of water
: 11. Gas Cooler USAR TABLE IX-4-7 System Failure Analysis (Cont'd.)
* Possible impairment
FAILURE OR MALFUNCTION A. Corrosion of wire mesh B. Clogging of water drain A. Electrical failure or control failure-under-temperature B. Control failure-over-temperature A. Bed saturation-moisture break-through B. Cycling control failure A. Corrosion of tube EFFECT ON SYSTEM
* High humidity alarm     process Separator        drain                  of dryer function
* Increased moisture in process gas
* Standby equipment       deteriorates
* Possible impairment of dryer function
* Loss of heating, resulting in insufficient dryer regeneration
* Eventual saturation of beds, loss of drying capacity
* Process gas becomes too hot for Dryer Chiller capacity
* Moisture freezeout in Gas Cooler, increasing LiP
* -20°F dewpoint gas reaching Charcoal Bed
* Saturation of Drying Bed
* Leakage of glycol solution into process stream IX-4-22 DESIGN PRECAUTIONS
* Stainless steel wire mesh
* High humidity alarm
* Standby equipment
* Level switch alarm
* Level switch alarm
: 9. Dryer Heater  A. Electrical failure
* Excess heating capacity available in case of element failure
* Loss of heating,
* Alarm system for high humidity condition
* Excess heating
* Standby equipment CORRECTIVE ACTION
* Switch to standby or control            resulting in            capacity available     equipment failure-under-        insufficient dryer      in case of element temperature            regeneration            failure
* Switch to standby system if drying process deteriorates
* Eventual saturation
* Switch to standby equipment
* Alarm system for of beds, loss of        high humidity drying capacity        condition
* Standby equipment B. Control failure-
* Process gas becomes
* High temperature
* High temperature
* Switch to standby over-temperature      too hot for Dryer      alarm                   equipment Chiller capacity
* Switch to standby alarm equipment
* High humidity alarm
* Standby equipment
* High humidity alarm
* High humidity alarm
* High Gas Cooler discharge alarm
* Standby equipment
* Standby equipment
: 10. Cyclic Dryers A. Bed saturation-
* Gas Cooler bypass
* Moisture freezeout
* High humidity alarm
* High humidity alarm
* Switch to standby moisture              in Gas Cooler,
* Standby system
* High Gas Cooler        Dryer break-through          increasing LiP          discharge alarm
* Stainless steel tubing
* Bypass Gas Cooler
                                        * -20°F dewpoint gas
* Standby equipment      temporarily for reaching Charcoal
* Gas Cooler bypass      thaw Bed B. Cycling control
* Saturation of
* High humidity alarm
* High humidity alarm
* Switch to standby failure                Drying Bed
* Gas Cooler bypass
* Standby system          equipment
* Switch to standby Dryer
: 11. Gas Cooler   A. Corrosion of tube
* Bypass Gas Cooler temporarily for thaw
* Leakage of glycol
* Switch to standby equipment
* Stainless steel
* Bypass Gas Cooler; thaw; return to operation 11/16/00  
* Bypass Gas solution into          tubing                Cooler; thaw; process stream
* High humidity alarm    return to
* Gas Cooler bypass      operation IX-4-22                                          11/16/00


USAR TABLE IX-4-7 System Failure Analysis   (Cont'd.)
EQUIPMENT ITEM
FAILURE EQUIPMENT ITEM    OR MALFUNCTION         EFFECT ON SYSTEM      DESIGN PRECAUTIONS    CORRECTIVE ACTION
: 11. Gas Cooler (Continued)
: 11. Gas Cooler  B. Ice on tube
: 12. Charcoal Adsorbers USAR TABLE IX-4-7 System Failure Analysis (Cont'd.)
* Increased plugging
FAILURE OR MALFUNCTION B. Ice on tube C. High discharge temperature A. Moisture (ice) on charcoal B. High operating temperature EFFECT ON SYSTEM
* Stainless steel
* Increased plugging and LiP
* Bypass Gas Cooler; (Continued)                            and LiP                tubing               thaw; return to
* Increased heat load in Charcoal Beds
* High humidity alarm   operation
* Deterioration of performance as ice buildup increases
* Reduced performance level IX-4-23 DESIGN PRECAUTIONS
* Stainless steel tubing
* High humidity alarm
* Gas Cooler bypass
* Gas Cooler bypass
* Temperature alarm C. High discharge
* Temperature alarm
* Increased heat
* Standby Glycol Cooler
* Standby Glycol
* Switch to standby temperature            load in Charcoal        Cooler              Glycol Cooler Beds
* High temperature alarm
* High temperature alarm
: 12. Charcoal    A. Moisture  (ice) on
* Highly instrumented Gas Dryer System with redundant equipment
* Deterioration of
* Gas Cooler (freeze-out moisture)
* Highly instrumented
* Change flow Adsorbers      charcoal                performance as ice    Gas Dryer System     pattern buildup increases      with redundant       appropriately equipment
* Switch to standby
* Gas Cooler (freeze-   Dryer System out moisture)
* Bypass of two Charcoal Beds without significant deterioration of performance
* Bypass of two Charcoal Beds without significant deterioration of performance
* Charcoal Bed flexible flow arrangement B. High operating
* Charcoal Bed flexible flow arrangement
* Reduced
* Temperature alarm
* Temperature alarm
* Change flow temperature            performance level
* Standby Glycol Cooler
* Standby Glycol       pattern Cooler                appropriately
* Charcoal Bed flexible flow arrangement CORRECTIVE ACTION
* Charcoal Bed
* Bypass Gas Cooler; thaw; return to operation
* Switch to standby flexible flow        Glycol Cooler arrangement IX-4-23                                        11/16/00
* Switch to standby Glycol Cooler
* Change flow pattern appropriately
* Switch to standby Dryer System
* Change flow pattern appropriately
* Switch to standby Glycol Cooler 11/16/00  


USAR TABLE IX-4-7 System Failure Analysis   (Cont'd.)
EQUIPMENT ITEM
FAILURE EQUIPMENT ITEM      OR MALFUNCTION         EFFECT ON SYSTEM      DESIGN PRECAUTIONS  CORRECTIVE ACTION
: 13. Glycol Cooler, Charcoal Tanks
: 13. Glycol Cooler, A. Loss of one glycol
: 14. Afterfilter USAR TABLE IX-4-7 System Failure Analysis (Cont'd.)
* High temperature of
FAILURE OR MALFUNCTION A. Loss of one glycol cooling unit B. Loss of both glycol units EFFECT ON SYSTEM
* High temperature
* High temperature of Dryer Chiller discharge
* Switch to standby Charcoal Tanks    cooling unit           Dryer Chiller            alarm              Glycol Cooler discharge
* Impaired adsorption function A. Clogging of filter
* Standby Glycol Cooler B. Loss of both
* Reduced flow B. Rupture of filter element
* Impaired adsorption
* Backpressure in system
* High temperature
* Release of particulates IX-4-24 DESIGN PRECAUTIONS
* Repair coolers glycol units          function               alarm
* High temperature alarm
: 14. Afterfilter    A. Clogging of filter
* Standby Glycol Cooler
* Reduced flow
* High temperature alarm
* Line pressure
* Line pressure monitors/alarms  
* Switch to standby
* ~P across filter monitored/alarmed
* Backpressure in          monitors/alarms     equipment for system                * ~P across filter    filter monitored/alarmed   cleaning/repair
* Standby equipment  
* Standby equipment B. Rupture of filter
* ~p across filter monitored/alarmed
* Release of            * ~p across filter
* Standby equipment CORRECTIVE ACTION
* Switch to standby element                particulates            monitored/alarmed  equipment for
* Switch to standby Glycol Cooler
* Standby equipment   filter cleaning/repair IX-4-24                                        11/16/00
* Repair coolers
* Switch to standby equipment for filter cleaning/repair
* Switch to standby equipment for filter cleaning/repair 11/16/00  


USAR
USAR  


==5.0 REFERENCES==
==5.0 REFERENCES==
FOR CHAPTER IX
FOR CHAPTER IX
: 1. Q/A 9. 6, Amend. 13.
: 1.
: 2. Not used.
Q/A 9. 6, Amend. 13.
: 3. Not used.
: 2.
: 4. Not used.
Not used.
: 5. Not used.
: 3.
: 6. Not used.
Not used.
: 7. Not used.
: 4.
: 8. Not used.
Not used.
: 9. Q/A 9.5, Amend. 9.
: 5.
: 10. MDC 76-37.
Not used.
: 11. MDC 74-147.
: 6.
: 12. MDC 76-10.
Not used.
: 13. MDC 76-6.
: 7.
: 14. SER, pp. 20-21 of Supplement 1.
Not used.
: 15. MDC 83-034, Amend. 1, AOG Reclassification.
: 8.
: 16. MDC 84-115.
Not used.
: 17. MDC 82-086.
: 9.
: 18. MDC 83-12
Q/A 9.5, Amend. 9.
: 19. DC 87-17
: 10.
: 20. MDC 76-4.
MDC 76-37.
: 21. Deleted.
: 11.
: 22. MDC 84-265
MDC 74-147.
: 23. MP 97-100
: 12.
: 24. Q/A 9. 7, Amend. 13
MDC 76-10.
: 25. MDC 76-8
: 13.
: 26. Deleted.
MDC 76-6.
: 27. T.S. Amendment 89
: 14.
: 28. NEDC 10-052 IX-5-1                 03/21/13}}
SER, pp. 20-21 of Supplement 1.
: 15.
MDC 83-034, Amend. 1, AOG Reclassification.
: 16.
MDC 84-115.
: 17.
MDC 82-086.
: 18.
MDC 83-12
: 19.
DC 87-17
: 20.
MDC 76-4.
: 21.
Deleted.
: 22.
MDC 84-265
: 23.
MP 97-100
: 24.
Q/A 9. 7, Amend. 13
: 25.
MDC 76-8
: 26.
Deleted.
: 27.
T.S. Amendment 89
: 28.
NEDC 10-052 IX-5-1 03/21/13}}

Latest revision as of 09:06, 29 November 2024

0 to Updated Final Safety Analysis Report,Section IX, Radioactive Waste Systems
ML21130A082
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/21/2021
From:
Nebraska Public Power District (NPPD)
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21130A114 List: ... further results
References
NLS2021013
Download: ML21130A082 (43)


Text

1.0 2.0

3. 0 4.0 USAR IX -

RADIOACTIVE WASTE SYSTEMS

SUMMARY

DESCRIPTION LIQUID RADWASTE SYSTEM 2.1 Safety Objective 2.2 Safety Design Basis 2.3 Power Generation Objective 2.4 Power Generation Design Basis 2.5 Liquid Radwaste System (Non-Augmented) 2.5.1 Description 2.5.2 High Purity Wastes (Waste Collector Subsystem) 2.5.3 Low Purity Wastes (Floor Drain Subsystem) 2.5.4 Chemical Wastes 2.6 Augmented Liquid Radwaste (LRW) System 2.7 Safety Evaluation

2. 7.1 LRW (Non-Augmented)
2. 7. 2 Augmented LRW 2.8 Power Generation Evaluation 2.9 Inspection and Testing SOLID RADWASTE SYSTEM 3.1 Power Generation Objective 3.2 Power Generation Design Basis 3.3 Description 3.4 3.5
3. 3. 1 General 3.3.2 Wet Solid Radwaste 3.3.3 3.3.4 3.3.5 3.3.2.1 Sludge Processing 3.3.2.2 Spent Resins 3.3.2.3 Wet Solid Radwaste Processing for Disposal Dry Solid Radwaste Miscellaneous Solid Wastes Independent Spent Fuel Storage Installation (ISFSI)

Power Generation Evaluation Inspection and Testing GASEOUS RADWASTE SYSTEM 4.1 Power Generation Objective 4.2 Power Generation Design Basis 4.3 Off-Gas System (Non-Augmented) 4.3.1 Description 4.3.1.1 General 4.3.1.2 Air Ejector Off-Gas System 4.3.1.3 Gland Seal Off-Gas Subsystem 4.4 Augmented Off-Gas (AOG) System 4.4.1 System Parameters 4.4.1.1 Sizing 4.4.1.2 Decontamination Factor (DF) 4.4.1.3 Operation 4.4.1.4 Safety and Reliability 4.4.1.5 Mechanical Design 4.4.1.6 Configuration 4.4.2 Process Design 4.4.2.1 Hydrogen Dilution 4.4.2.2 Recombination 4.4.2.3 Dehumidification 4.4.2.4 Drying 4.4.2.5 Hydrogen Analyzers 4.4.2.6 Long Term Delay ix-1-1 PAGE IX-1-1 IX-2-1 IX-2-1 IX-2-1 IX-2-1 IX-2-1 IX-2-1 IX-2-1 IX-2-2 IX-2-3 IX-2-3 IX-2-4 IX-2-4 IX-2-4 IX-2-5 IX-2-5 IX-2-5 IX-3-1 IX-3-1 IX-3-1 IX-3-1 IX-3-1 IX-3-1 IX-3-1 IX-3-4 IX-3-4 IX-3-6 IX-3-6 IX-3-6 IX-3-6 IX-3-6 IX-4-1 IX-4-1 IX-4-1 IX-4-1 IX-4-1 IX-4-1 IX-4-4 IX-4-5 IX-4-5 IX-4-5 IX-4-6 IX-4-6 IX-4-6 IX-4-6 IX-4-6 IX-4-6 IX-4-8 IX-4-8 IX-4-10 IX-4-10 IX-4-10 IX-4-11 IX-4-11 12/08/15

5.0 4.5 4.6

4. 4. 3
4. 4. 4
4. 4. 5 USAR IX -

RADIOACTIVE WASTE SYSTEMS (Cont'd.)

Seismic Analysis Fabrication Instrumentation and Control Power Generation Evaluation

4. 5. 1 Off-Gas ( OG) System 4.5.2 Augmented Off-Gas (AOG) System Inspection and Testing REFERENCES FOR CHAPTER IX ix-1-2 PAGE IX-4-13 IX-4-13 IX-4-14 IX-4-14 IX-4-14 IX-4-17 IX-4-17 IX-5-1 11/16/00

Figure No.

None USAR LIST OF FIGURES (At end of Section IX) ix-2-1 10/21/98

Table No.

IX-4-1 IX-4-2 IX-4-3 IX-4-4 IX-4-5 IX-4-6 IX-4-7 USAR LIST OF TABLES Title Gaseous Radwaste System Data Noncondensible Gas Flow Rates (Lb/Hr) Entering Augmented Off-Gas Treatment System Stream Composition After Dilution Activity Profile Maximum Expected Activity Release to the Environment From Gland Seal Leakage Particulates Buildup in Environment System Failure Analysis ix-3-1 IX-4-3 IX-4-7 IX-4-9 IX-4-12 IX-4-15 IX-4-16 IX-4-18 03/20/01

USAR IX -

RADIOACTIVE WASTE SYSTEMS 1.0

SUMMARY

DESCRIPTION The radioactive waste systems collect, treat, and dispose of radioactive and potentially radioactive wastes in a controlled and safe manner such that the operation and availability of the station is not limited. The radioactive waste system includes equipment, instrumentation, and operating procedures which ensure that radioactive wastes may be safely processed and disposed of within the limits set forth in 10CFR20, 10CFR50, Appendix I, and 40CFR190.

The radioactive input to the Radwaste systems is due primarily to

1) activation products resulting from irradiation of the reactor water and impurities therein (principally metallic corrosion products) and 2) fission products resulting from defective fuel cladding or tramp uranium contamination within the reactor system.

Radioactive wastes resulting from station operation are classified as liquid, gaseous, and solid. The following definitions apply to radioactive wastes:

1.

Liquid Radioactive Wastes - Liquids directly from the reactor process and auxiliary systems or liquids which can become contaminated due to contact with these liquids from reactor process systems.

2.

Gaseous Radioactive Wastes - Offgases from the Main Condenser evacuation and Turbine Gland Sealing Systems and ventilation system exhausts from buildings having the potential for containing radioactive materials.

Gaseous radioactive wastes include noble

gases, radioiodine, particulates, Carbon-14 and tritium.
3.

Solid Radioactive Wastes - Solids from the reactor or auxiliary systems, solids in contact with reactor or auxiliary systems operations or those materials processed through the radwaste system.

IX-1-1 03/21/13

2.0 LIQUID RADWASTE SYSTEM The Liquid Radwaste (LRW)

System includes an augmented treatment subsystem which is no longer in use.

The LRW System (non-augmented) is described below.

2.1 Safety Objective The safety objective of the LRW System is to provide those means necessary to maintain control over plant liquid radioactive effluents.

2.2 Safety Design Basis The LRW System is designed to prevent the inadvertent release of liquid radioactive material from the exclusion area of the plant so that resulting radiation exposures are within the limits of 10CFR20,

10CFR50, Appendix I, and 10CFRl00.

2.3 Power Generation Objective The power generation objective of the LRW System is that the operation or availability of the plant is not limited.

2.4 Power Generation Design Basis The LRW System is designed so that liquid radwastes are discharged from the plant within the limits specified in 10CFR20, 10CFR50, Appendix I, and 40CFR190, and the operation or availability of the plant is not limited.

The LRW System collects, treats, and returns processed radioactive liquid waste to the plant for reuse. Treated radioactive wastes not suitable for reuse are discharged from the plant as releases or packaged for off site processing or disposal.

2.5 2.5.1 Liquid Radwaste System (Non-Augmented)

Description The LRW System for CNS was designed to accept process wastes from two nuclear units. Since CNS is only a single unit, it is larger than would normally be necessary.

The LRW System collects, processes,

stores, and disposes of all radioactive liquid wastes.

Included in the LRW System are the following components/systems:

a.

Piping and equipment drains carrying potentially radioactive wastes;

b.

Floor drain systems in areas which may contain potentially radioactive wastes;

c.

Tanks, piping, pumps, process equipment, instrumentation and auxiliaries necessary to collect, process, store, and dispose of potentially radioactive wastes; and

d.

Tanks and sumps used to collect potentially radioactive wastes.

Equipment was

selected, arranged, and shielded to permit operation, inspection, and maintenance with acceptable personnel doses. For
example, tanks and processing equipment which are expected to contain significant radiation sources, are located behind shielding, and similarly sumps, pumps, valves, and instruments are located in radiologically controlled access rooms or shielded spaces.

In addition, the radwaste equipment was selected to minimize the need for maintenance. The radwaste system equipment IX-2-1 03/20/01

configurations are given in Burns and Roe Drawings 2032 Sheets 1-5, 2033 Sheets 1-4, 2079 Sheets 1 and 2, and 2080. Operation of the waste system is essentially manual start-automatic stop.

The LRW System is divided into several subsystems so that the liquid wastes from various sources can be kept segregated and processed separately.

Cross connections between the subsystems provide additional flexibility for processing of the wastes by alternate methods.

The liquid radwastes are classified, collected, and treated as either high purity, low

purity, or chemical.

The terms "high" purity and "low" purity refer to chemistry purity conductivity and not radioactivity.

2.5.2 High Purity Wastes (Waste Collector Subsystem)

High purity (low conductivity) liquid wastes are collected in the Waste Collector Tank from the following sources:

Waste Collector Tank

1.

Drywell Equipment Drain Sump

2.

Reactor Building Equipment Drain Sump

3.

Radwaste Building Equipment Drain Sump

4.

Turbine Building Equipment Drain Sump

5.

Startup Discharge from Reactor Water Cleanup (RWCU)

Pumps

6.

Draining of RHR System

7.

Decantate from RWCU Phase Separators

8.

Decantate from Condensate Phase Separators

9.

Fuel pool system

10.

Decantate from Waste Sludge Tank[lSJ

11.

Chemical Waste Sample Tank [22 J

12.

Distillate Tank[ 22 J

13.

Radwaste Building Sample Rack IE

14.

Waste Sample Tanks

15.

Elevated Release Point Sump(Z sumps)

These wastes have low conductivity with variable radioactive concentrations dependent on their area of collection. The average high purity waste collected is 16,000 gallons/day with an average activity level of 1 x 10-4 µCi/ml.

During treatment, the high purity wastes are filtered in the Waste Collector Filter and then demineralized in the deep bed Waste Demineralizer.

The expected decontamination factor ( DF) for combined filtration and demineralization is at least 1,000. After processing, the waste is pumped to the Waste Sample Tanks where it is sampled.

If the analysis of the sample reveals water of high conductivity or high turbidity, the waste is recycled to the Waste Collector Tank for reprocessing. If the analysis of the sample reveals purity of the waste is acceptable, the waste is sent to the Condensate Storage Tank (CST). However, if the CST inventory does not permit additional water, the waste may be sent to the Waste Surge Tank or the waste can be discharged to the river, provided a minimum of one Circulating Water Pump is in operation. The flow capacity is 270 GPM.

The backwash resins from the demineralizer are sent to the Spent Resin Tank. The resins are then pumped to a high integrity container where they are dewatered using the NuPac dewatering system.

The backwash filter material from the Waste Collector Filter is sent to the Waste Sludge Tank. Solids treatment of the contents of this tank is similar to that for the resins. However, the tank contains a mixture of IX-2-2 03/19/01

backwashes from the Waste Collector and Floor Drain Filters and fuel pool demineralizer sludges.

2.5.3 Low Purity Wastes (Floor Drain Subsystem)

Low purity (high conductivity) liquid wastes are collected in the Floor Drain Collector Tank from the following sources:

Floor

1.
2.
3.
4.
5.
6.
7.
8.
9.

Drain Collector Tank Drywell Floor Drain Sump Reactor Building Floor Drain Sumps Radwaste Building Floor Drain Sumps Turbine Building Floor Drain Sump Chemical Waste Tank Laboratory Drain Tanks Elevated Release Point Sump (alternate flow path only)

Augmented Radwaste Building Floor Drain Sump Decantate from Waste Sludge Tank (only when Waste Collector Tank is full) [lSJ These wastes generally have low radioactivity concentrations, therefore, processing consists of filtration and subsequent transfer to the Floor Drain Sample Tank for sampling and analysis.

If the analysis of the sample reveals that the purity of the waste is sufficient to transfer to the High Purity Waste System then the waste is transferred to the Waste Collector Tank, if the inventory of the High Purity Waste System is such as to permit the additional volume. If the purity of the waste precludes processing to the Waste Collector Subsystem, but has low enough radioactivity concentration and acceptable purity for discharge, the waste is discharged to the river, provided a minimum of one Circulating Water Pump is in operation. If the waste cannot be processed to the Waste Collector Subsystem or the river, it is recycled back to the Floor Drain Collector Tank for further processing.

Because no radium-226 or radium-228 of plant origin will be present, and because the potential concentration of iodine-129 is very low, the discharge concentration limit for otherwise unidentified mixture of radioisotopes will not exceed the limit of 10-7 µCi/ml above background. If other radioisotopes are shown not to be present in significant concentrations, or if analyses are made, discharge limits may meet maximum permissible concentrations.

The average Drain Sumps) volume 7,000 gallons/day.

"dirty waste" collected (i.e.,

from Low Purity Wastes from the Floor the Floor Drain System is In the treatment process the wastes are filtered in the Floor Drain Collection Filter with a flow capacity of 65 gpm and an expected DF of 10 for f il tra tion. [ll 2.5.4 Chemical Wastes Chemical wastes are collected in the Chemical Waste Tank and Laboratory Drain Tanks from the following sources.

1.

Shop decontamination solutions

2.

Laboratory drains

3.

Reactor Building and Radwaste Building decontamination drains IX-2-3 03/21/13

4.

RWCU, Waste, and Condensate Precoat Tank drains The chemical wastes are normally comprised of laboratory drains.

Infrequently ( every several years) decontamination solutions may be present due to equipment decontamination for maintenance. The MPF floor drains provide some of this solution due to decontamination of equipment in the machine shop.

The maximum activity and volumes are due to the decontamination solutions. ll 6J Chemical wastes are of such high conductivity (ionic content) as to preclude treatment by ion exchange.

The wastes are neutralized, if necessary, using caustic or sulfuric acid as the neutralizing medium. These wastes are sent to the Floor Drain Collector Tank and processed by the Low Purity Waste System for disposal to the river.

The flow rate for the Laboratory Drain Tanks to the Floor Drain Collector Tank is 38 gpm.

The Chemical Waste Tank wastes are transferred to the Floor Drain Collector Tank at a rate of 50 gpm. A DF of 10 is expected in passing through the Floor Drain Collector Filter. After being shown suitable for disposal, the waste is diluted into the Circulating Water Discharge Canal at a rate to be within the unidentified mixture concentration limit of 10CFR20. lll If the radioactivity content of the waste precludes disposal to the

river, the chemical wastes are processed through the floor drain demineralizer system or processed using an approved vendor method.

See USAR IX-2.5.

Corrosion of laboratory drains through the normal use of acids is minimized by recirculating unused portions of samples to waste at the sample station.

In effect this retains the sample in the system until it is satisfactorily neutralized. Reactor water, Condensate and Feedwater samples which do not need to be neutralized are routed to the High Purity Waste Subsystem where the water is recovered for reuse.

2.6 Augmented Liquid Radwaste (LRW) System125 l The function of the Augmented Liquid Radwaste System to supplement the Liquid Radwaste System in processing wastes from the Floor Drain Collector Filter, the Floor Drain Collector Tank, the Chemical Waste Tank, and the Lab Drain Tanks.

However, CNS no longer uses this system to process liquid radwaste. l 27 l Nevertheless, the equipment remains in place as shown in Burns and Roe Drawing 2079, Sheets 1 and 2.

2.7

2. 7.1 Safety Evaluation LRW (Non-Augmented)

The Radwaste Building is located on the north side of the Reactor Building, about 600 feet from the Missouri River. All of the liquid radwaste storage and collection tanks contained in this structure are located below ground level. The liquid radwaste storage and collection tanks with capacities greater than 500 gallons are of Class I design. The attached liquid process piping is of Class I design up to the first isolation valve. The Reactor Water Clean-up (RWCU) phase separator tanks, which are considered a part of the Radwaste System, are located in the Reactor Building. The RWCU phase separator tanks and the attached liquid process piping, up to the first isolation valve, are also of Class I design. Since the Radwaste Building substructure and the IX-2-4 03/21/13

liquid radwaste storage and collection tanks are designed to withstand a Class I seismic occurrence, the possibility that radioactive water may escape the tanks, and then the building, and then run out into the ground through cracks is not credible. Additionally, there is a 40 mil plastic waterproofing membrane that completely envelopes the Radwaste Building substructure walls and foundation mat. These structural design features ensure that the safety objective is met.

2.7.2 Augmented LRW CNS no longer uses this system to process liquid radwaste. [27 l The Augmented Liquid Radwaste System is located in a seismic Class II Radwaste Building extension.

2.8 Power Generation Evaluation Since the CNS LRW system was designed to accept process wastes from two nuclear units, and CNS only has one nuclear unit, the operation and availability of the plant is not limited.

2. 9 Inspection and Testing The LRW System is normally operating during operation of the nuclear plant thereby without any special inspections or testing.

on an "as required" bas is demonstrating operability The LRW System is in scope for License Renewal per 10 CFR 54.4(a) (1) and (a) (2) and was subject to aging management review. Aging effects are managed by the following Aging Management Programs: Bolting Integrity (see USAR Section K-2.1.2), Buried Piping and Tanks Inspection (see USAR Section K-2.1.3),

External Surfaces Monitoring (see USAR Section K-2. 1.14),

Oil Analyses

( see USAR Section K-2. 1. 28),

One-Time Inspection ( see USAR Section K-2. 1. 2 9), Periodic Surveillance and Preventive Maintenance

( see USAR Section K-2. 1. 31),

and Selective Leaching

( see USAR Section K-2.1.34).

There are no Time-Limited Aging Analyses that are applicable.

IX-2-5 01/17/14

3.0 3.1 SOLID RADWASTE SYSTEM Power Generation Objective USAR The power generation objective of the Solid Radwaste System is to collect, process, package, and provide temporary storage facilities for solid wastes prior to shipment for off-site processing and/or disposal.

3.2 Power Generation Design Basis

1.

The system provides collection, processing, packaging, and storage of solid wastes resulting from normal station operations.

2.

The system provides a safe and reliable means for handling solid wastes and to minimize radiation exposure to station personnel.

3.

The Solid Radwaste System includes instrumentation, and operating procedures such that the solid collected and prepared for off-site shipment in shielded casks, if will not result in radiation exposures in excess of the limits set DOT regulations.

equipment, radwastes

required, in NRC or
4.

Shielded casks are provided as necessary to conform with 10CFR71.

3.3 3.3.1 Description General (See Burns and Roe Drawing 2298)

The solid waste processing areas are located in the Radwaste and Augmented Radwaste Buildings and process both wet and dry solid wastes. Wet solid wastes include backwash sludge wastes from the Reactor Water Cleanup ( RWCU)

System, the Condensate Filter Deminerali zer System, the Fuel Pool Filter Demineralizers, the Floor Drain Filter, the Waste Collector

Filter, and spent resins from the Waste Demineralizer and Floor Drain Deminerali zer. Dry solid wastes include rags, paper, equipment parts, solid laboratory
wastes, etc.,

which may be potentially contaminated with radioactive material.

The function of the Solid Radwaste System is to reclaim the liquid phase of the wet solid wastes for reuse within the station and to prepare the solid waste for off-site shipment with minimum exposure of the operators to radiation. Prior to off-site shipment to a licensed burial ground, solid wastes can be temporarily stored on site in shielded areas.

3.3.2 3.3.2.1 Wet Solid Radwaste Sludge Processing Expended filter-demineralizer ion exchange resins are removed when necessary by backwashing.

RWCU System sludges and Condensate System sludges are collected in Phase Separators where excess backwash water is removed by decantation.

The sludge is accumulated for processing, with subsequent radioactivity level decay.

The Fuel Pool Filter Demineralizer 1 Floor Drain Collector Filter and Waste Collector Filter are backwashed to the Waste Sludge Tank.

RWCU sludges, Condensate System sludges, and waste filter and Fuel Pool sludges are kept separate because of the variation in radioactive material content.

This approach minimizes shielding requirements during shipping of the solid wastes.

IX-3-1 11/16/00

3.3.2.1.1 Reactor Water Cleanup (RWCU) Sludge The purpose of the Radwaste System for cleanup sludge is to process the highly radioactive backwash waste which is discharged from the RWCU System.

The backwash

waste, as Demineralizers, is a relatively dilute solids) which is highly radioactive.

discharged from slurry (0.5%

by the RWCU Filter weight suspended The backwash discharge from the RWCU Filter Demineralizers is collected and concentrated in two 4,500 gallon cleanup RWCU Phase Separators which are located below the RWCU Demineralizers in the Reactor Building. Upon sufficient backwash accumulation, the concentrated waste is transferred to the Dewatering System for dewatering.

The RWCU Phase Separators are designed to concentrate the sludge from 0.5 weight

% solids to 5%

by weight solids by sedimentation and decantation of the supernatant. While the working separator is filling, the other previously filled tank is held isolated to allow additional decay of sludge activity.

After each backwash batch is received by the working separator, it is allowed to settle for a

period of time and the decantate is then transferred by pumping to the Waste Collector Tank. When sufficient sludge has accumulated, the working separator is isolated and the sludge is fluidized to a

5%

(by weight) slurry and transferred by pumping to the Dewatering System for dewatering. The cleanup phase separators are Class I Seismic. All other equipment is Class II Seismic.

3.3.2.1.1.1 Equipment Description Cleanup Phase Separators These tanks are of stainless steel construction and designed and fabricated in accordance with API-650 for atmospheric design pressure at 250°F. Each tank has a capacity of 4,500 gallons.

3.3.2.1.2 Sludge Pumps This pump has a capacity of 200 gpm at 300 feet TDH.

Decant Pump This pump has a capacity of 50 gpm at 30 feet TDH.

Condensate Filter Demineralizer Sludge The purpose of this system is to process the radioactive backwash waste which is discharged from the Condensate Filter Demineralizer System.

The backwash waste as discharged Demineralizers is a relatively dilute slurry which is radioactive.

from each of seven Condensate

( 0. 5% weight suspended solids)

The backwash discharge from the Condensate Filter Demineralizers is collected in the Condensate Backwash and Transfer Tank which is located below the Condensate Filter Demineralizers in the Radwaste Building. After collection, the waste is transferred by pumping to one of the two Condensate Phase Separators for processing.

IX-3-2 03/21/13

The Condensate Phase Separators are designed to concentrate the sludge from 0.5 weight % solids to 5% by weight solids by sedimentation and decantation of the supernatant. While the working separator is filling, the other previously filled tank is held isolated to allow additional decay of sludge activity.

After each backwash batch is received by the working separator, it is allowed to settle for a

period of time and the decantate is then transferred by pumping to the Waste Collector Tank. When sufficient sludge has accumulated, the working separator is isolated and the sludge is fluidized to a

5%

(by weight) slurry and transferred by pumping to the Dewatering System for dewatering. The Condensate Phase Separators are Class I Seismic. All other equipment is Class II Seismic.

3.3.2.1.2.1 Equipment Description Condensate Phase Separators These tanks are of epoxy-coated carbon steel with stainless steel internals and designed and fabricated in accordance with API-650 for atmospheric design pressure at 250°F.

Each tank has a

capacity of 12,500 gallons.

Sludge Pump This pump has a capacity of 400 gpm at 125 feet TOH.

Decant Pump This pump has a capacity of 475 gpm at 50 feet TOH.

Condensate Backwash and Transfer Tank This tank is made of epoxy-coated carbon fabricated in accordance with API-650 for atmospheric 150°F. This tank has a capacity of 12,600 gallons.

Condensate Backwash Transfer Pump steel, designed design pressure This pump has a capacity of 450 gpm at 30 feet TOH.

and at 3.3.2.1.3 Fuel Pool Filter Demineralizer, Floor Drain Collector Filter, and Waste Collector Filter Sludge Backwash sludge wastes from the Fuel Pool Filter Demineralizer, Floor Drain Collector Filter, and Waste Collector Filter Demineralizers are drained by gravity to the Waste Sludge Tank which is located in the Radwaste Building.

Provisions are incorporated in the Waste Sludge Tanks for the addition of flocculent, if required. These waste sludges are transferred on a batch basis by pumping to the Dewatering System for dewatering. The sludges are a relatively dilute slurry of 0.5 weight% of suspended solids. Piping is also provided to pump the wastes to the Condensate Phase Separators for additional concentration of the sludge for flexibility. All basement tanks are Class I Seismic; all other equipment is Class II Seismic.

IX-3-3 03/21/13

3.3.2.1.3.1 Equipment Description Waste Sludge Tank This tank is of epoxy-lined carbon steel and designed and fabricated in accordance with API-650 for atmospheric pressure and 140°F. The tank has a capacity of 15,000 gallons.

Waste Sludge Pump This pump has a capacity of 500 gpm at 125 feet TDH.

3.3.2.2 Spent Resins Spent resin from the Waste Demineralizer and Floor Drain Demineralizer is sluiced into a 2,000 gallon Spent Resin Tank.

The Waste Demineralizer contains 80 cubic feet which will not be regenerated. Expected spent resin volume 240 cubic feet per year.

of mixed resins is approximately After each spent resin batch is discharged to the Spent Resin Tank, the spent resins will be pumped from the tank to the Centrifuges or the Dewatering System for dewatering. The Spent Resin Tank is Class I Seismic.

3.3.2.3 Wet Solid Radwaste Processing for Disposal The Resin Dewatering System is available for processing wet solid wastes for disposal.

The purpose of this system is to process the waste sludges (see IX-3.3.2.1) and the spent resins (see IX-3.3.2.2). This system concentrates the bulk volume of the wet solid

wastes, prepares this concentrated waste for off-site shipment, and reclaims the liquid phase of the wet solid wastes for reuse within the station.

3.3.2.3.1 Resin Dewatering System Description ll 9 J Wet solid wastes are processed using a Resin Drying (Dewatering)

System. This system processes powdered and bead type ion exchange resins and other filter media by removing the excess water from the resins. This is accomplished in a

three step process, performed remotely in ventilated, shielded areas to minimize radiation exposure to workers.

First, the liner is filled from the plant's waste tanks using excess water to keep the resin in a slurry and recirculating the waste tank so that a homogeneous mixture is achieved in the liner. During this transfer, the liner will be dewatered so that the available space in the liner is filled with resin to the maximum extent practicable.

Second, the excess water is pumped out of the liner using a positive displacement diaphragm pump.

Third, when all of the pumpable water is removed, the blower is started to recirculate air through the resin. The blower heats the air and as the warm air passes through the resin it entrains and vaporizes moisture in the resin bed. This moist air is pumped through the entrainment separator tank where refrigeration coils condense the water vapor in the air stream and any entrained water is removed.

The water is pumped out of the tank using a diaphragm pump. The air is recirculated through the resin until the percent relative humidity of the air stream indicates the resin bed is dry. The system is then shut

down, the fillhead removed and the container capped.

The IX-3-4 03/21/13

USAR container is given a

surface-wipe test for determination of surface contamination and then loaded for off-site shipment or transport to storage.

Containers which will be stored temporarily on-site are loaded into Temporary Storage Modules (TSMs) and transferred via truck/crane to the LLRW Storage Facility Pad.

The TSMs are concrete cylinders which provide radiation shielding, physical protection, and protection from the elements during the storage period at the Pad. Storage duration at the LLRW Storage Facility Pad is limited to five years in accordance with the guidance provided by Generic Letter 81-38.

The TSMs placed on the Pad for interim storage will eventually be returned to the Augmented Radwaste Building and the waste containers removed.

The waste containers will then be placed into shipping casks for off-site shipment. The empty TSMs will be returned to the Pad for storage and reuse, as necessary.

3.3.2.3.1.1 Equipment Description Fill Head Assembly This Assembly sits over the liner and serves to direct water/resin slurry in, water out, dry air in, and moist air out of the cask liner. The fillhead is stored in the shipping cask pit.

Piping Assembly This Assembly contains the water separator which condenses water out of the moist air returning from the fillhead assembly during the drying cycle. The water pump is also located in this assembly and is used to pump free standing water out of the water/resin slurry in the liner.

The piping skid is located on the floor, east of the shipping cask pit, and north of the Drum Handling Control Room north wall. The discharge piping is routed to an existing sump pit located in the Drum Storage Fill Station of the 903' Radwaste Building.

Blower Assembly This Assembly is used to pump drying air through the resin being dried in the liner after the free standing water has been pumped out. The air is filtered to remove oils and particulates prior to being directed back to the liner. The skid also contains the HEPA filter for exhaust air during the water/resin slurry fill portion of the cycle.

The blower skid is located on the northeast corner of the Drum Handling Control Room roof.

Chiller Assembly This assembly consists of a condensing unit with the appropriate refrigeration specialties (i.e.,

filter/dryer, sight

glass, liquid line solenoid valve, thermostatic expansion valve, etc.).

The condensing unit provides the cooling refrigerant to the water separator portion of the piping skid assembly.

The chiller is located on the northeast corner of the Drum Handling Control Room roof.

IX-3-5 11/16/00

Control Panel The Control Panel contains process monitoring equipment for remote controlling and monitoring of fill levels, liner temperatures, blower exhaust temperatures, blower inlet temperatures, fillhead position, resin slurry flow control valve, dewatering pump, alarms, water separator inlet air wet bulb temperature, etc. One remote television screen is also included, although it is not attached to the Control Panel.

The Control Panel and television screen are located along the east wall of the Drum Handling Control Room.

3.3.3 Dry Solid Radwaste Two methods are presently available for processing dry, solid, radioactively contaminated waste.

The preferred method is incineration, compaction, and smelting through services procured from an off-site vendor(s) due to the cost of waste disposal.

However, hydraulic compaction is an alternative.

The preferred method of processing dry,

solid, radioactively contaminated waste begins with its collection in large Sea Land containers at the site. The waste is not compacted or processed in any way prior to shipment to an off-site vendor. The vendor will sort all waste into three streams for processing: incineration, compaction and smelting. The majority of the waste will be incinerated and packaged. Any non-incinerable waste may be compacted using a super-compactor. Any metallic waste may be smelted into blocks for use as shielding at Department of Energy facilities. The slag from the smelting process is incorporated into the packaging for the incinerated waste.

The last method of processing dry radioactive waste (DAW) is with the hydraulic compactor. The hydraulic compactor includes the hydraulic pump with

motor, hydraulic oil
storage, high efficiency
filter, fan and accessories. The hydraulic compactor is designed to compress the wastes in a 55 gallon drum at 50 psi over the open area of the drum. During compression, ventilation air is pulled across the top of the drum through high efficiency filters by a fan. The filled 55 gallon drums are transferred to a temporary storage area.

3.3.4 Miscellaneous Solid Wastes Some solid materials that are not processed by the radwaste system are stored in the spent fuel pool until offsite storage or disposal. Examples are control

blades, neutron detectors, and vacuum filters.

(See Section X-3.5.1 for further discussion).

3.3.5 Independent Spent Fuel Storage Installation (ISFSI)

The ISFSI augments the Spent Fuel Pool as a means for storage of spent fuel, pursuant to 10 CFR 72.210.

3.4 Power Generation Evaluation Operation of the Solid Radwaste System is by semi-remote means, and the shielding design in the system working areas minimizes radiation dose to personnel and allows the processing of waste to be within 10CFR20 limits.

3.5 Inspection and Testing Those Solid Radwaste System used on a routine basis do not require specific testing to assure proper operation. Those Solid Radwaste Systems not used on a routine basis are tested prior to use to assure proper operation.

IX-3-6 12/08/15

USAR Secondary Transfer Car The Secondary Transfer Car moves on fixed rails and has a capacity of 800 lbs. The car is capable of rotating the drum for spray-cleaning and surface-wipe test at 1-2 rpm. Speed is approximately 20 feet per minute.

Concrete Mixing Station The Concrete Mixing Station consists of an agitator, drum splash guard, agitator cleanup system, and an auxiliary cement filling system.

Wiping Station This station consists of remote handling and viewing equipment to permit smear wiping of the external surface of the drum.

Capping Station This station consists of a drum capper and viewing equipment to permit capping of drum prior to storage.

Drum Loading Conveyor The Drum Loading Conveyor is approximately 34 feet long and is suitable to hold 15 drums, half of which may be filled with cement at any one time. The conveyor operates at approximately 20 feet per minute and is capable of loading one (1) drum at a time onto the Primary Transfer Car.

Storage Conveyors Each of the six (6) Storage Conveyors has a capacity of 25 drums.

Each conveyor is capable of accepting one (1) drum every five minutes with no impact damage to the drum, and is capable of discharging one ( 1) drum at a time without leaving gaps in the storage line.

Discharge Conveyor The Discharge Conveyor consists of a mechanism for removing drums from each of the Storage Conveyors.

3.3.3 Dry Solid Radwaste Two methods are presently available for processing dry, solid, radioactively contaminated waste.

The preferred method is incineration, compaction, and smelting through services procured from an off-site vendor(s) due to the cost of waste disposal.

However, hydraulic compaction is an alternative.

The preferred method of processing dry,

solid, radioactively contaminated waste begins with its collection in large Sea Land containers at the site. The waste is not compacted or processed in any way prior to shipment to an off-site vendor. The vendor will sort all waste into three streams for processing: incineration, compaction and smelting. The majority of the waste will be incinerated and packaged. Any non-incinerable waste may be compacted using a super-compactor. Any metallic waste may be smelted into blocks for use as shielding at Department of Energy facilities. The slag from the smelting process is incorporated into the packaging for the incinerated waste.

The last method of processing dry radioactive waste (DAW) is with the hydraulic compactor. The hydraulic compactor includes the hydraulic pump IX-3-7 05/26/09

USAR with

motor, hydraulic oil
storage, high efficiency
filter, fan and accessories. The hydraulic compactor is designed to compress the wastes in a 55 gallon drum at 50 psi over the open area of the drum. During compression, ventilation air is pulled across the top of the drum through high efficiency filters by a fan. The filled 55 gallon drums are transferred to a temporary storage area.

3.3.4 Independent Spent Fuel Storage Installation (ISFSI)

The ISFSI augments the Spent Fuel Pool as a means for storage of spent fuel, pursuant to 10 CFR 72.210.

3.4 Power Generation Evaluation Operation of the Solid Radwaste System is by semi-remote means, and the shielding design in the system working areas minimizes radiation dose to personnel and allows the processing of waste to be within 10CFR20 limits.

3.5 Inspection and Testing Those Solid Radwaste System used on a routine basis do not require specific testing to assure proper operation. Those Solid Radwaste Systems not used on a routine basis are tested prior to use to assure proper operation.

IX-3-8 11/22/10

USAR 4.0 GASEOUS RADWASTE SYSTEM This section describes the Gaseous Radwaste System which includes the Off-Gas (OG) System and Augmented Off-Gas (AOG) System.

4.1 Power Generation Objective The Off-Gas System collects and processes gaseous radioactive wastes from the Main Condenser Steam Jet Air Ejectors ( SJAEs), the startup Mechanical Vacuum Pumps, the Gland Steam Condensers, and other minor sources, and controls their release to the atmosphere through the Elevated Release Point (ERP) in such a way that the operation and availability of the station is not limited.

4.2 Power Generation Design Basis

1.

The Gaseous Radwaste System is designed so that gaseous and particulate radwastes are processed and discharged such that operation and availability of the station are not limited.

2.

The Gaseous Radwaste System is designed to minimize the possible explosion hazard of the hydrogen and oxygen present.

3.

The Gaseous Radwaste System is designed equipment, instrumentation, and operating procedures such that radwastes discharged from the ERP to the environment will not limits set forth in the ALARA requirements of 10CFR50, Appendix I.

to include the gaseous exceed the

4.

The Gaseous Radwaste System is designed to provide isolation on high off-gas radioactivity level.

integrity design.

5.

for The Gaseous all expected Radwaste operating System is conditions designed to maintain its by conservative process

6.

The off-gas liquid drain line must function to drain excess liquid from the system and drain at a rate not in excess of the capacity of one Z Sump pump.

4.3 4.3.1 4.3.1.1 Off-Gas System (Non-Augmented)

Description General The Off-Gas System (Burns and Roe Drawing 2009) includes the subsystems that process and dispose of the gases from the Main Condenser Air Ejectors, the startup Mechanical Vacuum Pumps, and the Gland Steam Condensers.

The processed gases are routed to the ERP for dilution and elevated release to the atmosphere.

The Air Ejector discharge and the ERP are continuously monitored by radiation monitors. See USAR VII-12.

Expected activity levels of activation gases leaving the reactor steam nozzles during normal operation with no fuel leaks are identified in Table IX-4-1.

The corresponding activity arriving at the turbine and air ejector are less due to decay in transit and the fact that part of the N-13, N-16, and most of the 0-19 isotopes remain with the condensate and do not follow the noncondensibles. Other radioactive gases which may also be present are H-3, N-17, Ar-37, and Ar-41. These are present in amounts low enough to be deemed insignificant by comparison with the N-13. Of the activity arriving in IX-4-1 11/16/00

USAR the primary steam at the turbine, a fraction will go to the Gland Seal Off-Gas subsystem.

Gases routed to the ERP include air ejector and gland seal off-gases, and gases from the Standby Gas Treatment System (see USAR V-3.3.4 for additional information concerning SGT System). Dilution air input to the ERP is provided to reduce the hydrogen in the Air Ejector of £-gases to a concentration of less than four percent (4%)

by volume.

Dilution air is supplied by one of two full capacity fans in the Off-Gas Filter Building located near the ERP. The ERP is designed such that prompt mixing of all gas inlet streams occurs in the base to provide additional dilution of hydrogen and to allow location of the sample point as near to the base as possible. The ERP drainage is routed to the Liquid Radwaste System via loop seals.

The Gaseous Radwaste System is adequately shielded to minimize the dose received by station personnel.

IX-4-2 11/16/00

USAR TABLE IX-4-1 GASEOUS RADWASTE SYSTEM DATA Basis for System Design A.

Rate of evolution in steam from reactor steam nozzle.

B.

Isotope Half-Life Evolution Rate (µCi/sec)

N-13 10 min.

2.0 X 10 3 N-16 7.4 sec.

1.0 X 10 7 0-19 29 sec.

7.0 X 10 3 Flow rates of dry gases at air ejector at 130°F and 1 Hydrogen (From Reactor Water Decomposition)

Oxygen (From Reactor Water Decomposition)

Air (In-leakage to Turbine Condenser)

Water Vapor (To Saturate)

Activated and Noble Gases TOTAL GASES (1)

At 130°F and 15.7 psia.

atm.

108 ft 3/min.

54 ft 3/min.

45 ft 3/min.(l) 34 ft 3/min.

Negligible 241 ft 3/min.

C.

ERP release rate of N-13 = 300 µCi/sec with 30 minute holdup.

IX-4-3 03/30/01

USAR 4.3.1.2 Air Ejector Off-Gas Subsystem The Air Ejector Off-Gas Subsystem consists of a 30 minute hold-up line, high efficiency filters, isolation valves, dilution fans, and the ERP.

During normal operation, the Air Ejector off-gas is the major contributor to the activity in the station off-gas release.

The Air Ejector off-gases entering this system are noncondensibles from the Main Condenser.

These noncondensibles consist essentially of hydrogen and oxygen formed in the reactor by radiolytic decomposition of water, air in-leakage to the Main Condenser, water vapor, and fission gases which are negligible in terms of volume.

Fission gases may arise from minor amounts of tramp uranium on the surface of the fuel element or from imperfections or perforations which might develop in the fuel cladding.

The release rate of activation gases is proportional to the thermal output of the reactor and to the hold-up time provided in the system prior to release at the ERP.

For normal station operation, the Air Ejector Off-Gas Subsystem provides a total hold-up time of 30 minutes, based on normal air in-leakage.

This time period provides for decay of short lived Xe or Kr to solid daughters to permit retention of these particulates by filters prior to off-gas vent pipe release.

In addition, this holdup provides sufficient time for an operator to take appropriate action in the event that the noble gas release rate (due to fuel leaks) exceeds the instantaneous permissible release rate.

The 30 minute hold-up requirement and the flow rates given in Table IX-4-1 are the basis for sizing the Air Ejector Off-Gas Subsystem.

Valves are placed in each of the Air Ejector Off-Gas Subsystems, which are automatically closed on an isolation signal from both air ejector process radiation monitors. A signal from both channels is required to close these valves by means of a time delay of 15 minutes when the short term release rate limit is reached.

The

system, from the Air Ejector outlet to the Dilution Fan outlet, is designed for a pressure of 350 psi to contain a possible explosion resulting from the hydrogen and oxygen present. The Off-Gas Filter System which is located in the Off-Gas Filter Building, consists of two parallel
trains, with each train containing a

moisture separator, two full-flow, high-efficiency, particulate air (HEPA) filters, and a filter retainer plate.

Each train is sized for 100% Air Ejector Off-Gas Capacity (one operating, one spare unit).

Upon possible explosion upstream of filters, the failed filter retainer plate is capable of stopping all filter pieces larger than 0.15 x O.15 mm in cross-section and shall sustain explosion pressure from either direction. Both filter units are located below grade in a shielded pit; appropriate valving is provided to permit isolating either filter unit. The internal construction of each unit is designed to permit remote removal of the unit within its container.

The Off-Gas Dilution Fans supply dilution air to reduce the hydrogen concentration in the ERP and maintain suitable exit velocities at the top of the ERP. Either one of the two fans provides the required dilution air flow

( one normally operating and one spare).

The two fans are electrically interlocked. Loss of either fan is annunciated in the Main Control Room. Both IX-4-4 01/28/05

USAR fans are on an emergency power source. Check valves are located to prevent bypass of air. The Off-Gas Dilution Fans are located in the Off-Gas Filter Building, in a room radiation shielded from all adjoining areas. Dilution flow is added to the flow of Off-Gas before the Off-Gas pipe enters the floor of the Off-Gas Filter Building to travel underground to the ERP. Dilution flow piping has been designed to contain an explosion (Off-Gas flow is within extra heavy or schedule 40 pipe) and to completely seal off an inoperative dilution run. Standard weight pipe, incorporating a check valve and a butterfly valve, is maintained up to the dilution fan outlet plenum. r2 oJ A positive pressure of approximately 1 in. w. g. exists. System operation is normal with the slight backpressure on the air ejectors because they will function with a backpressure in excess of 1 psi. A flow orifice has been located downstream of where the dilution flow enters to provide a low pressure for the Off-Gas inlet and to provide monitoring of the dilution flow. r25 J To provide an indirect indication of hydrogen leakage into the Off-Gas Building, a red light that is connected to the CAM unit has been installed inside the northwest window of the building.

This light will illuminate if high activity is present in the Off-Gas Building. An increase in activity would also indicate the presence of hydrogen because they both are a result of off-gas leakage.

The Air Ejector Off-Gas pipe meets the requirements of ANSI B31. 1. 0 Section I and Case N-12.

The Air Ejector Off-Gas pipe wall is designed for pressures per NACA-TN-3935.

4.3.1.3 Gland Seal Off-Gas Subsystem The Gland Seal Off-Gas Subsystem collects gases from the Gland Steam Condenser and the Mechanical Vacuum Pumps and passes them through holdup piping prior to release to the stack. Gland Seal off-gases and gases from the Mechanical Vacuum Pumps (used during each startup) are routed to the stack via the Gland Seal Holdup Line which is separate from the Air Ejector Holdup Line.

The Gland Seal Off-Gas Subsystem provides a one minute holdup time to allow decay of N-16. The holdup time is provided by a long 48 inch diameter pipe between the Gland Seal Exhausters and the ERP.

Operating pressure is atmospheric; however, design pressure for explosion possibilities is 900 psig.

Hydrogen and oxygen are well below explosive limits.

No filters, shut-off valves, or radiation monitors are required. The Mechanical Vacuum Pumps are manually stopped by remote manual switch. Upon a Main Steam Line (MSL) Radiation Monitor isolation signal, the Mechanical Vacuum Pumps trip and the inlet and outlet valves to the Mechanical Vacuum Pumps close.

The Gland Seal Off-Gas pipe ANSI B31.l.0,Section I, and Code Case N-12.

4.4 4.4.1 Augmented Off-Gas (AOG) System r;~sJ System Parameters meets the requirements of It is the function of the AOG System to further delay the radioactive gases in the off-gas stream, reducing the activity level, prior to venting to the atmosphere. This system satisfies the as low as practicable requirements of 10CFR50, Appendix I. The off-gas stream enters the AOG System after passage through the 4 8 inch delay pipe at the flow rates shown in Table IX-4-2.

IX-4-5 11/16/00

USAR The AOG System is designed to handle off-gas flow from the plant during operation with maximum air in-leakage at 130°F.

The system design parameters are as follows:

4.4.1.1 4.4.1.2 4.4.1.3 4.4.1.4 4.4.1.5 4.4.1.6 Sizing:

The equipment is installed in two parallel

trains, each with 100% capacity, except for the charcoal beds which can be operated in the following arrangements:

6 beds in parallel or 6 beds in series up to 50 scfm, or 5 beds in series up to 30 scfm.

Decontamination Factor (DF):

1,000 minimum, based on 6 charcoal

beds, 30 scfm
flow, and the 30-minute activity level of 100,000 µCi/sec.

Decontamination factors for alternate charcoal bed configurations and flow rates are calculated in NEDC 10-052. [2BJ Operation:

Continuous Remote control capability Reduced flow operation capability Safety and Reliability:

Redundancy Mechanical Design:

Configuration:

IX-4-6 Failsafe control systems Safety monitoring and alarm systems Elimination of potential leakage of radioactive elements Elimination of potential hydrogen explosion 350 psig Design Pressure 40 year useful life expectancy.

1.

Initially designed as follows:

2.
a.

Process side radioactive

b.
c.

components per ASME

Code,Section III, Class 3.

Nonradioactive components per

Code, Section Division 1.

Seismic Class IIS.

ASME

VIII, After implementation of Minor Design Change 8 3-034 [lSJ design is as follows:
a.

Piping and equipment pressure parts as per USAR Appendix A.

b.

Other components per USNRC Regulatory Guide 1.143, Rev. 1, October 1979.

Skid-mounted equipment modules and individual components 06/19/14

Component Air Hydrogen Oxygen Water Total USAR TABLE IX-4-2 NONCONDENSIBLE GAS FLOW RATES (LB/HR)

ENTERING AUGMENTED OFF-GAS TREATMENT SYSTEM Normal In-leakage Startup at 130°F 1,150.0 138.0

1. 6
31. 8 12.8 254.0 132.0
91. 8 1,296.4 515.6 IX-4-7 Maximum In-Leakage at 130°F 181.8
31. 8 254.0
91. 8 559.4 11/16/00

4.4.2 Process Design The processes required basically 30 minute delay, dilution, term delay, as shown below:

Off-gas l

USAR to satisfy the system parameters are recombination, dehumidification, and long Decontaminated Stream 30 minute delay Dilution Recombina-Dehumidi-i Long term delay tion fication After the off-gas stream passes through the 30 minute delay pipe and existing filters, the SJAE dilutes the off-gas stream raising pressure to the required system inlet pressure. In the recombination process, the hydrogen and oxygen are recombined stoichiometrically.

Dehumidification consists of moisture removal prior to long term delay to reduce the dewpoint of the gas to a very low level. Long term delay for the decay of the noble gas isotopes is achieved in a series of charcoal beds. These processes are shown in detail on the flow diagram, Cosmodyne Drawing 6000302, Sheets 1 and 2, and are described in detail in the following paragraphs.

4. 4. 2. 1 Hydrogen Dilution The Off-Gas stream, after a 30 minute delay in an existing delay pipe, enters the AOG System. The normal hydrogen concentration is much greater than the lower hydrogen flammability limit of 4.1% and requires dilution of the Off-Gas stream to reduce hydrogen concentration to a safe level.

The dilution requirements are based on minimum bleed air flow, which results in the highest concentration of hydrogen as the worst-case condition (Table IX-4-3)

The Off-Gas stream is diluted with steam prior to entering the Recombiner. The Recombiner trains utilize nuclear plant steam to eliminate the recycle loop as a potential source of catalyst migration to undiluted portions of the Off-Gas process. This process of dilution is described below.

Up to 7000 lbm/hr of steam is utilized for Off-Gas dilution.

2400 lbm/hr of this steam is provided by motive steam to the third stage ejector. The remaining steam is provided at the suction of the third stage ejector via a pressure reducing nozzle. Both of these sources of dilution steam are supplied from plant nuclear steam. The action of throttling the high pressure nuclear plant steam into the low pressure AOG stream superheats the stream, therein, assuring that the gas temperature entering the Recombiner is well above saturation temperature to prevent condensation of moisture on the Recombiner catalyst bed.

IX-4-8 11/16/00

USAR TABLE IX-4-3 STREAM COMPOSITION AFTER DILUTION VOLUME MASS Rate Rate COMPONENT by Vol.

Lb-mol/hr by Wt.

lb/hr.

Hydrogen (Hx)

3. 96 15.77 0.45 31.80 Oxygen (Ox)
1. 98 7.88 3.61 254.00 Air 0.23 0.93 0.38 26.97 Steam (H2O) 93.82 373.30 95.55 6,719.40 Total 100.00 397.90 100.00 7,032.20 IX-4-9 11/16/00

USAR

4. 4. 2. 2 Recombination The recombination process is carried out in a

single stage Catalytic Recombiner. Prior to entering the Recombiner, the AOG stream must have hydrogen concentration lower than 4% for safety and must be preheated above the saturation temperature. As explained previously, the stream entering the Recombiner is sufficiently diluted and is also preheated to about 250°F-320°F during normal operation.

This dilution is also sufficient for minimum bleed air flow of 6.0 scfm; in this worst case condition, the hydrogen concentration is still only 3.96%.

It is important that the Recombiner catalyst remain dry at all times to preserve its reactivity; therefore, to prevent condensation of moisture on the catalyst bed during startup, a steam-heated preheater is used to raise the temperature of the AOG stream from 250°F to 320°F. Since the SJAE is not operating prior to startup, service air provides the motive force. The Recombiner is also preheated prior to startup by an external electric heater.

The SJAE will be running, and service air may be used for additional off-gas flow.

In the Recombiner, most of the hydrogen and oxygen present in the inlet stream are catalytically combined, reducing the hydrogen concentration from 4% on a wet basis to 1% maximum, dry basis. The heat of reaction, with the formation of water vapor, raises the temperature of the gas stream as it passes through the Recombiner catalyst bed. With inlet temperature maintained at 320°F, the temperature of the effluent gas stream will equal [preheater outlet temperature]+[%H2 Into Recombiner x 125°F].

Example: preheater temperature of 320°F plus Recombiner H2 concentration of 2%, Recombiner outlet temperature equals [320°F] + [2%xl25°F] = 570°F. r17 J The hot effluent consists principally of steam, with air and very small quantities of radioactive gases

( krypton and xenon).

On leaving the Recombiner, the AOG stream flows to a Post-Recombiner Condenser.

4.4.2.3 Dehumidification The steam in the Post-Recombiner Condenser is desuperheated, condensed, and cooled to approximately 150°F. Condensate at 120°F (maximum) is used as the cooling medium. The AOG stream is further cooled, then flows to a water separator where the condensed liquid is separated from the gas stream and cycled back to the Hotwell.

The effluent AOG gas from the water separator is cooled further to approximately 40°F in a cooler-condenser. A Glycol Cooler System provides the necessary refrigeration. Condensate is removed in a Moisture Separator and is sent to the Chemical Drain Sump.

4.4.2.4 Drying The AOG stream is then dried to approximately -60°F dewpoint by passing it through an adsorbent bed of a Cyclic Dryer System. The Cyclic Dryer System contains two dryer beds, each of which has the capacity of adsorbing water contained in the AOG stream at maximum flow rate for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

The two dryer beds are alternately placed in service every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, at which time the exhausted dryer bed is regenerated. For regeneration, a portion of the AOG stream is withdrawn upstream of the Dryer System, is heated by an electric heater, and fed to the exhausted dryer bed. This gas stream is returned to the inlet of the AOG System by the Third Stage SJAE. The regeneration accomplished in this manner is a closed loop operation, eliminating the possibility of accidental release of residual gases to the atmosphere.

IX-4-10 12/21/04

USAR 4.4.2.5 Hydrogen Analyzers Hydrogen analyzers are installed at the downstream end of the AOG System. Also, the Recombiners are equipped with temperature sensors and alarms.

This instrumentation system will indicate any anomalies in the hydrogen concentration and permit corrective action as required.

4. 4. 2. 6 Long Term Delay For decay of radioactive isotopes, the AOG stream is passed through a series of charcoal adsorber beds. A lower than ambient operating temperature of 0°F is selected since the adsorption coefficients, K,

of krypton and xenon increase with decrease in temperature. Experiments were conducted by Oak Ridge using tracer gases to determine K values at various temperatures. Also, the contractor conducted its own experiments utilizing argon as a

sweep gas and

krypton, xenon, and carbon dioxide as the constituents. Based on this and other published data, adsorption coefficients of 75 and 1,500 cc/gm are selected for krypton and xenon, respectively.

A quantity of 33.3 tons of charcoal at 0°F temperature will delay krypton isotopes for 44.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and xenon isotopes for 37 days. This is based on 30 scfm flow rate at 0°F temperature and about O. 5 psig pressure. These specified delays will reduce the effluent activity to less than 100 µCi/sec.

Table IX-4-4 shows the activity profile for the system based upon 0.1 Ci/sec input to the AOG System.

A maximum flow of 50 scfm was assessed per calculation NEDC 04-056.

IX-4-11 06/19/14

ACTIVITY AFTER 30-MINUTE DELAY ISOTOPE

(µCi/sec)

Kr-89 180 Kr-87 15,000 Kr-83m 2,900 Kr-88 18,000 Kr-85m 5,600 Kr-85 20 Xe-137 670 Xe-135m 6,900 Xe-138 21,000 Xe-135 22,000 Xe-133m 280 Xe-133 8,200 Xe-131m 15 N-13 1,500 TOTAL 102,265 Notes USAR TABLE IX-4-4 ACTIVITY PROFILE 30 SCFM ACTIVITY 40 SCFM ACTIVITY OF CHARCOAL BED OF CHARCOAL BED EFFLUENT EFFLUENT (NOTE 1 & 3)

(NOTE 2 & 3) 6 BEDS (5 BEDS) 6 BEDS

(µCi/sec)

(µCi/sec) 0,

( 0) 0 0,

(0) 0 0,

( 0) 0.01

. 3, (2.1) 4.74 5.1, ( 18.1) 29.54 20, (20. 0) 20 0,

(0) 0 0,

( 0) 0 0,

(0) 0 0,

( 0) 0

.003, (0.016) 0.07 64.3, (138. 3) 214.73

1. 8, (2. 5) 3.03 0,

(0) 0 91.5, (181) 272.1 50 SCFM ACTIVITY OF CHARCOAL BED EFFLUENT (NOTE 2 & 3) 6 BEDS

(µCi/sec) 0 0

0.149 25.5 86.2 20 0

0 0

0 0.362 450 4.19 0

586.6

1.

The 6 bed values are based on the original Cosmodyne Contract. The 5 bed values are based on NEDC 10-052. r2si

2.

The 6 bed values are based on NEDC 04-056.

3.

Charcoal bed arrangements which correspond to the listed release rates are validated in NEDC 10-052. l281 IX-4-12 06/19/14

USAR In the safety evaluation of the AOG System, the NRC estimated that approximately 900 Ci/yr of the noble gases and negligible iodines would be released from the Condenser Off-Gas System. The estimates of Table IX-4-4, corresponding to an annual release of approximately 2300 Ci, are based upon a higher condenser inleakage rate and conditions yielding 100,000 µCi/sec Off-Gas activity after a

30-minute holdup for a

3400 MWt reactor.

The NRC estimate was normalized for a 2486 MWt reactor.

The NRC calculated the DDE at the site boundary to be 0.35 mrem/year and the potential dose to a child's thyroid from drinking milk from the nearest farm with cows to be 5. 8 mrem/year. [l 4 l The activity of F-18 is not considered in calculating the effluent activity, since it is expected that fluoride will be removed from the Off-Gas stream along with condensed steam prior to entering the AOG System.

The six Charcoal Beds, each containing approximately 11,000 pounds of charcoal, are arranged to operate in series, in parallel, and with a bypass of first vessel. To meet the values specified in Table IX-4-4 the charcoal beds must be operated in one of the following configurations: 6 beds in parallel (up to 40 scfm),

6 beds in series (up to 50 scfm), or 5 beds in series up to 30 scfm. [2 BJ Following the Charcoal Beds, the air stream is filtered to remove charcoal dust and/or solid daughter particles.

4.4.3 Seismic Analysis Original design for seismic loading the Off-Gas System is based on Class IIS and:

Horizontal Coefficient Vertical 0.10 g 0

g Seismic design analysis, based on analytical models for each skid, provided qualification for the structural design in lieu of testing.

The analytical approach utilized the multidegree-of-freedom model.

In this procedure, each structural system (skid) was mathematically modeled using a sufficient number of mass points to ensure adequate representation of motion throughout all parts of the skid. This technique utilized modal participation factors to determine the multidegree-of-freedom modal response. (See Section XII 2.3.5.2).

Following implementation of MDC 83-034 [lSJ seismic analyses are to be performed in accordance with the criteria specified in Regulatory Guide 1.143, Rev. 1, October, 1979.

4. 4. 4 Fabrication The AOG System original design and fabrication was conducted in accordance with the following standards:

Pressure Vessels:

ASME Section III, Class 3 Heat Exchangers:

ASME Section III, Class 3, TEMA R Process Piping:

ASME Section III, Class 3 & ANSI Pumps and Valves:

ASME Section III, Class 3 (NPVC)

Materials:

ASTM Electrical & Instruments:

NEC, NEMA, IEEE, IES Metal Treatment:

SSPC IX-4-13 06/19/14

USAR Those components which are not in direct contact with the radioactive stream were designed and fabricated in accordance with ASME Code Section VIII, Division 1.

Welding materials are in accordance with the requirements of the American Welding Society (AWS) specifications.

Quality group classification and quality assurance provisions are in accordance with criteria specified in USAR Appendix A for piping and equipment pressure

parts, and per USNRC Regulatory Guide 1.143, Rev. 1, October, 197 9, for other components. [lSJ
4. 4. 5 Instrumentation and Control A

continuous indication of system operating conditions is displayed in the AOG Control Room.

The system operates automatically and by remote control; temperatures, pressures, humidity, hydrogen concentration, and flow rates are continuously monitored to ensure correct operation and proper control function.

Radioactivity is monitored at the ERP.

Instrumentation related to critical parameters is connected to an alarm system allowing abnormal conditions to be promptly observed and remedied. Comparison of the alarm signal(s) and the various indicators will accurately pinpoint the source of the trouble.

The system is also operated by a logic network of interlocked controls which maintain proper flow paths at all times. This is particularly important in controlling flow through one or the other dual equipment trains and in operation of the Cyclic Dryer Subsystems.

4.5 4.5.1 Power Generation Evaluation Off-Gas (OG) System The 30 minute holdup time provides for the radioactive decay of the short-lived activation and fission gases and thereby reduces the stack release rate. The short-lived fission gases decay to solid daughter products and are removed on the high efficiency filters which have a manufacturers design capability to remove 99.97% of particulates greater than 0.3 microns in size.

The routine release to the environment of noncondensible coolant activation products and noble gas fission products for gland seal leakage is given in Table IX-4-5. This data was developed based on a diffusion mixture of noble gases which would result in a release rate of O. 1 Curies/ sec after 30 minutes holdup.

The equilibrium activity level for particulate daughter products of decay of the noble gases is given in Table IX-4-6. [9l Data in Tables IX-4-5 and IX-4-6 does not take into consideration the operation of the AOG System (see USAR Section 4.4).

The Air Ejector Off-Gas System is monitored and controlled to ensure that the radiation dose limits at the site boundary as prescribed by 10CFR20 are not exceeded. Duplicate continuous radiation monitors record the radiation level in the off-gases and alarms in the Main Control Room on high radiation. Radiation monitors are also provided in the ERP for detection of ERP activity release. Radiation levels at the Air Ejector in excess of the allowable "instantaneous" release rate alarms in the Main Control Room and after a 15 minute delay isolates the Off-Gas System.

The time delay is provided to permit corrective action to be taken by the operator when possible to avoid station shutdown.

IX-4-14 11/16/00

USAR TABLE IX-4-5 MAXIMUM EXPECTED ACTIVITY RELEASE TO THE ENVIRONMENT FROM GLAND SEAL LEAKAGE**

N-17 N-16 0-19 N-13 Ar 41 Ar 37 H 3 Isotope Total Activation Gases Short Lived Kr 89 Xe 137 Xe 135m Xe 138 Kr 87 Kr 83m Kr 88 Kr 85m Xe 135 Xe 133m Xe 133 Xe 131m Kr 85 Total Nobel Gases Half Life 4.14 sec.

7.35 sec.

29 sec.

10 min.

1.83 hr.

34.3 day 12.26 yr.

3.2 min.

3. 8 min.

15 min.

17 min.

1.3 hr.

1.86 hr.

2.8 hr.

4.4 hr.

9.2 hr.

2.3 day 5.27 day 12.0 day 10.4 yr.

Total Activation and Noble Gases Release Rate

(µCi/sec) 1 (-4)

  • 4 ( 1) 2 ( 0) 2 ( 0) 6 (-3) 1 (-7) 8 (-4) 5

( 1) 4

1) 1
2) 2
2) 4
1) 1
2) 2
1) 2
0) 2
1) 8
0) 1
1) 3 (-1) 6 ( 0) 3 (-2) 9 (-3) 6

( 2) 6 ( 2)

Numbers in parentheses represent powers of 10 (i.e., read 1 (-4) as 1 X 10-4 )

    • Based on 0.1 Ci/sec at ERP IX-4-15 11/16/00

USAR TABLE IX-4-6 PARTICULATES BUILDUP IN ENVIRONMENT*

Equilibrium Activity Isotope Half Life Level (Curies)

Rb 87 5 X 101oy 0.14 Rb 88 17.8m 0.29 Rb 89

15. 4m 0.028 Sr 89 52d 0.028 Cs 135 3

X 10 6y 0.53 Cs 137 30y 0.066 Ba 137m 2.55m 0.060 Cs 138 32.2m 0.15

  • Based on O. 1 Ci/ sec at ERP IX-4-16 11/16/00

USAR The ERP allows atmospheric dispersion of the effluent to reduce direct radiation dose rates. ERP release rate limits are established per the CNS ODAM.

Shielding for the Off-Gas System equipment is provided as necessary to maintain safe radiation dose levels for personnel.

prevent them. [lOJ The Off-Gas Filters are designed with a copper ground strap to static electricity from igniting any hydrogen that passes through The Z-sump vent is designed to vent gases to the ERP to prevent possible sump pressurization due to loss of the system loop seal.[lll The ERP is provided with an automatic heat tracing system to prevent freezing of water vapor at the release opening, thus preventing ice blockage and a possible hydrogen explosion. ll 2 J To insure that a representative sample is obtained for the ERP monitor, the sampling line between the ERP and the Off-Gas Filter Building is heat traced to minimize sample plate-out. If the dilution flow should cease, valves will isolate the Off-Gas System flow. [l3J A differential pressure (dP) can occur between the Off-Gas hold-up and the Z Sump. This operational condition can result in liquid being held up in the line. In order to mitigate this condition that would interfere with post-accident Z Sump operation, the Off-Gas liquid drain line has a 1-1/4 inch flow restrictor to ensure that the drain rate is less than the capacity of one Z Sump pump.

In

addition, a

dP equalization line and dP pressure monitoring instrumentation are provided for Operations to minimize the potential for the undesirable dP conditions. [23 J

4. 5. 2 Augmented Off-Gas (AOG) System The AOG System is designed for a continuous safe and reliable operating life of 40 years. The system is designed to operate reliably within safe limits under all normal and maximum operating conditions.

In addition, the system will withstand the effects of various types of failure conditions.

Table IX-4-7 is a

failure mode and effect analysis which indicates the potential consequences of failures in various parts of the system and notes the precautions incorporated in the system design which will accommodate or compensate for these various failure conditions.

4. 6 Inspection and Testing The Off-Gas System is operated continuously during station operation.

The Off-Gas System is in scope for License Renewal per 10 CFR 54.4(a) (1) and (a) (2) and was subject to aging management review. Aging effects are managed by the following Aging Management Programs: Bolting Integrity (see USAR Section K-2.1.2), Buried Piping and Tanks Inspection (see USAR Section K-2.1.3),

External Surfaces Monitoring (see USAR Section K-2. 1. 14),

Oil Analyses

( see USAR Section K-2.1. 28),

One-Time Inspection ( see USAR Section K-2. 1. 2 9), Periodic Surveillance and Preventive Maintenance

( see USAR Section K-2.1. 31),

and Selective Leaching

( see USAR Section K-2.1.34).

There are no Time-Limited Aging Analyses that are applicable.

IX-4-17 01/17/14

1.

EQUIPMENT ITEM Steam Jet Air Ejector

2. Preheater A.

FAILURE OR MALFUNCTION Reduction of steam Supply pressure or Flow B. Corrosion A. Corrosion of tubes USAR TABLE IX-4-7 System Failure Analysis EFFECT ON SYSTEM

  • Process stream temperature drop
  • Motive force reduction
  • Reduction in preheating
  • External leakage
  • Inleak of steam to off-gas -

additional dilution and load on condenser IX-4-18 DESIGN PRECAUTIONS

  • Line pressure, temperature and flow indicators and alarms
  • Standby equipment
  • Stainless steel nozzles
  • Corrosion allowance for carbon steel
  • Standby equipment
  • Safety factor in tube design
  • Stainless steel tubing
  • Standby equipment
  • Design capacity of condenser and water separator drains allows some compensation
  • Temperature monitor/alarm of condenser discharge
  • Liquid level alarm on water separator CORRECTIVE ACTION
  • Open OG-AOV-254AV, Close AOG-AOV-901AV
  • Flow balance of steam input for temperature and dilution
  • Start-up blower and/or existing blowers to maintain flow
  • Upon indication of external leakage (plant monitoring equipment, switch to standby equipment to allow repair
  • If alarm conditions are reached, switch to standby equipment 11/16/00

USAR TABLE IX-4-7 System Failure Analysis (Cont'd.)

EQUIPMENT ITEM

2. Preheater (Continued)
3. Recombiner FAILURE OR MALFUNCTION B. Reduction or loss of steam supply A. Catalyst deactivates through long-term use, poisoning or wetting
4. Post-Recombiner A. Corrosion of Condenser tubes EFFECT ON SYSTEM
  • Low Recombiner inlet temperature
  • Increased H2 concentration
  • Reduced temperature profile through Re combiner
  • Water inleak to off-gas causing condenser flooding IX-4-19 DESIGN PRECAUTIONS
  • Temperature monitoring/alarms on Recombiner, inlet And output
  • High H2 alarm Re combiner Performance)
  • Standby equipment
  • Inlet temperature control to prevent wetting
  • Temperature profile monitoring/alarms
  • H2 concentration alarms
  • Design allowance by catalyst mfgr. to preclude iodine poisoning
  • Standby equipment
  • Safety factor in tube design
  • Stainless steel tubing
  • Liquid level monitor/alarm on Water Seperator
  • Standby equipment CORRECTIVE ACTION
  • Flow balance of steam input for partial temperature compensation
  • Upon alarmed condition, switch to standby equipment
  • Upon alarmed condition switch to standby equipment; replace or reactivate catalyst
  • Switch to standby equipment to allow repair, plugging or replacement of tubes 11/16/00

USAR TABLE IX-4-7 System Failure Analysis (Cont'd.)

EQUIPMENT ITEM

4. Post-Recombiner Condenser (Continued)

FAILURE OR MALFUNCTION B. Reduction or loss of coolant (plant condensate)

C. Overtemperature of coolant

5. Water Separator A. Corrosion of wire mesh B. Clogging of drain top EFFECT ON SYSTEM
  • Insufficient cooling/

condensation

  • Insufficient cooling/

condensation

  • Increased moisture in process gas
  • Build-up of water level IX-4-20 DESIGN PRECAUTIONS
  • Condensate discharge temperature monitoring/alarm
  • Temperature-controlled flow of coolant supply
  • Condenser discharge monitor/alarm
  • Stainless steel wire mesh
  • Cooler-Condenser capacity (downstream)
  • Liquid level monitor/alarm
  • Drain trap bypass
  • Standby equipment CORRECTIVE ACTION
  • Open OG-A0V-254AV, Close AOG-A0V-901AV
  • Will require correction of plant condensate system
  • Decrease flow rate of high temperature coolant
  • Alarm indicates need for correction in plant condensate system
  • Cooler-condenser design will accommodate this amount of excess moisture
  • Standby equipment allows repair during regular inspection and maintenance
  • Water will be bypassed to condensate drain
  • Upon alarm condition (uncorrected),

switch to a standby equipment 11/16/00

EQUIPMENT ITEM

6. Cooler-Condenser
7. Glycol Cooler, Condenser USAR TABLE IX-4-7 System Failure Analysis (Cont'd.)

FAILURE OR MALFUNCTION EFFECT ON SYSTEM A. Corrosion of tubes

  • Glycol solution leakage into process stream; discharged with condensate B. Ice on tubes (low glycol temperature)

C. High discharge gas temperature (insufficient glycol cooling)

A. Loss of one glycol cooling unit B. Loss of both glycol units

  • Increased plugging and pressure drop on shell side
  • High humidity discharge gas
  • Inadequate Dryer operation
  • High temperature of Cooler-Condenser Discharge
  • High gas dewpoint
  • Impaired dryer function IX-4-21 DESIGN PRECAUTIONS
  • Safety factor in tube design
  • Stainless steel tubing
  • Liquid level gage on glycol tank
  • Level switch on Moisture Separator
  • Standby Cooler-Condenser
  • Temperature controls and alarms on glycol solution
  • Standby systems
  • Temperature control and alarm on process stream
  • High temperature alarm on process stream
  • Temperature controls and alarms for glycol solution
  • Standby systems
  • High temperature alarm
  • Standby glycol cooler
  • High temperature alarm
  • High humidity (Dryer) alarm CORRECTIVE ACTION
  • Switch to standby cooler
  • Plug defective tube(s)
  • Replace defective tubes
  • Reset glycol temperature controls
  • Switch to standby glycol unit
  • Switch to standby cooler condenser
  • Reset glycol temperature controls
  • Switch to standby glycol unit
  • Switch to standby cooler
  • Switch to standby glycol cooler
  • Repair coolers 11/16/00

EQUIPMENT ITEM

8. Cooler-Condenser Moisture-Separator
9.

Dryer Heater

10. Cyclic Dryers
11. Gas Cooler USAR TABLE IX-4-7 System Failure Analysis (Cont'd.)

FAILURE OR MALFUNCTION A. Corrosion of wire mesh B. Clogging of water drain A. Electrical failure or control failure-under-temperature B. Control failure-over-temperature A. Bed saturation-moisture break-through B. Cycling control failure A. Corrosion of tube EFFECT ON SYSTEM

  • Increased moisture in process gas
  • Possible impairment of dryer function
  • Loss of heating, resulting in insufficient dryer regeneration
  • Eventual saturation of beds, loss of drying capacity
  • Process gas becomes too hot for Dryer Chiller capacity
  • Moisture freezeout in Gas Cooler, increasing LiP
  • -20°F dewpoint gas reaching Charcoal Bed
  • Saturation of Drying Bed
  • Leakage of glycol solution into process stream IX-4-22 DESIGN PRECAUTIONS
  • Stainless steel wire mesh
  • High humidity alarm
  • Standby equipment
  • Level switch alarm
  • Excess heating capacity available in case of element failure
  • Alarm system for high humidity condition
  • Standby equipment CORRECTIVE ACTION
  • Switch to standby system if drying process deteriorates
  • Switch to standby equipment
  • High temperature
  • Switch to standby alarm equipment
  • High humidity alarm
  • Standby equipment
  • High humidity alarm
  • High Gas Cooler discharge alarm
  • Standby equipment
  • Gas Cooler bypass
  • High humidity alarm
  • Standby system
  • Stainless steel tubing
  • High humidity alarm
  • Gas Cooler bypass
  • Switch to standby Dryer
  • Bypass Gas Cooler temporarily for thaw
  • Switch to standby equipment
  • Bypass Gas Cooler; thaw; return to operation 11/16/00

EQUIPMENT ITEM

11. Gas Cooler (Continued)
12. Charcoal Adsorbers USAR TABLE IX-4-7 System Failure Analysis (Cont'd.)

FAILURE OR MALFUNCTION B. Ice on tube C. High discharge temperature A. Moisture (ice) on charcoal B. High operating temperature EFFECT ON SYSTEM

  • Increased plugging and LiP
  • Increased heat load in Charcoal Beds
  • Deterioration of performance as ice buildup increases
  • Reduced performance level IX-4-23 DESIGN PRECAUTIONS
  • Stainless steel tubing
  • High humidity alarm
  • Gas Cooler bypass
  • Temperature alarm
  • Standby Glycol Cooler
  • High temperature alarm
  • Highly instrumented Gas Dryer System with redundant equipment
  • Gas Cooler (freeze-out moisture)
  • Bypass of two Charcoal Beds without significant deterioration of performance
  • Charcoal Bed flexible flow arrangement
  • Temperature alarm
  • Standby Glycol Cooler
  • Charcoal Bed flexible flow arrangement CORRECTIVE ACTION
  • Bypass Gas Cooler; thaw; return to operation
  • Switch to standby Glycol Cooler
  • Change flow pattern appropriately
  • Switch to standby Dryer System
  • Change flow pattern appropriately
  • Switch to standby Glycol Cooler 11/16/00

EQUIPMENT ITEM

13. Glycol Cooler, Charcoal Tanks
14. Afterfilter USAR TABLE IX-4-7 System Failure Analysis (Cont'd.)

FAILURE OR MALFUNCTION A. Loss of one glycol cooling unit B. Loss of both glycol units EFFECT ON SYSTEM

  • High temperature of Dryer Chiller discharge
  • Impaired adsorption function A. Clogging of filter
  • Reduced flow B. Rupture of filter element
  • Backpressure in system
  • Release of particulates IX-4-24 DESIGN PRECAUTIONS
  • High temperature alarm
  • Standby Glycol Cooler
  • High temperature alarm
  • Line pressure monitors/alarms
  • ~P across filter monitored/alarmed
  • Standby equipment
  • ~p across filter monitored/alarmed
  • Standby equipment CORRECTIVE ACTION
  • Switch to standby Glycol Cooler
  • Repair coolers
  • Switch to standby equipment for filter cleaning/repair
  • Switch to standby equipment for filter cleaning/repair 11/16/00

USAR

5.0 REFERENCES

FOR CHAPTER IX

1.

Q/A 9. 6, Amend. 13.

2.

Not used.

3.

Not used.

4.

Not used.

5.

Not used.

6.

Not used.

7.

Not used.

8.

Not used.

9.

Q/A 9.5, Amend. 9.

10.

MDC 76-37.

11.

MDC 74-147.

12.

MDC 76-10.

13.

MDC 76-6.

14.

SER, pp. 20-21 of Supplement 1.

15.

MDC 83-034, Amend. 1, AOG Reclassification.

16.

MDC 84-115.

17.

MDC 82-086.

18.

MDC 83-12

19.

DC 87-17

20.

MDC 76-4.

21.

Deleted.

22.

MDC 84-265

23.

MP 97-100

24.

Q/A 9. 7, Amend. 13

25.

MDC 76-8

26.

Deleted.

27.

T.S. Amendment 89

28.

NEDC 10-052 IX-5-1 03/21/13