ML21292A302: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:VIRGINIA ELECTRIC A.t'\l"D POWER COMPANY RICHMOND, VIRGINIA 23261 October 19, 2021 U. S. Nuclear Regulatory Commission Serial No.: 21-362 Attention: Document Control Desk NRA/GDM: RO Washington, DC 20555-0001 Docket Nos.: 50-280 50-281 License Nos.: DPR-32 DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 RESPONSE TO QUESTION ON LICENSE AMENDMENT REQUEST TO REVISE REACTOR CORE SAFETY LIMIT By emails dated September 28, 2021 (ML21272A062) and October 13, 2021 (ML21286A727) a member of the Dominion Energy Services Nuclear Regulatory Affairs organization provided information related to the planned implementation of Surry Power Station Units 1 and 2 License Amendment Request to revise the TS 2.1.A.1.b safety limit for fuel melt. Subsequently, the NRG Project Manager for Surry Power Station requested that this information be submitted under 10 CFR 50.30(b ), "Oath or affirmation." | ||
The purpose of this letter is to formally provide the pertinent information provided in the emails dated September 28, 2021 and October 13, 2021 in accordance with the requirements of 10 CFR 50.4 and 50.30(b) (i.e. under oath or affirmation). Specifically, the pertinent information is as follows: | |||
An additional implementation plan item will be added associated with the Surry Power Station Units 1 and 2 License Amendment Request to revise the TS 2.1.A.1.b safety limit for fuel melt. Specifically, UFSAR section 3.4.1.1 will be revised as part of the implementation plan for the license amendments following their issuance to include the revised fuel melt safety limit and its technical basis. Furthermore, the UFSAR will be reviewed and additional UFSAR changes will be implemented, if required, to reflect the revised fuel melt safety limit. | |||
Serial No. 21-362 Docket Nos. 50-280/281 Page 2 of 3 Should you have any questions or require additional information, please contact Mr. Gary D. Miller at (804) 273-2771. | |||
Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Commitments contained in this letter: None COMMONWEALTH OF VIRGINIA ) | |||
) | |||
COUNTY OF HENRICO ) | |||
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mr. Mark D. Sartain, who is Vice President - Nuclear Engineering and Fleet Support, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief. | |||
Acknowledged before me this / 1--tftday of Vc.-fober ,2021. | |||
My Commission Expires: tzfar i | |||
(:J.,tf I | |||
RAIG Notary P Commonwealth Reg.# 75 Co . . | |||
* Serial No. 21-362 Docket Nos. 50-280/281 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 State Health Commissioner Virginia Department of Health James Madison Building- 7th floor 109 Governor Street Suite 730 Richmond, VA 23219 Mr. L. John Klos NRG Project Manager- Surry U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, MD 20852-2738 Mr. G. Edward Miller NRG Senior Project Manager- North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, MD 20852-2738 NRG Senior Resident Inspector Surry Power Station}} | |||
Revision as of 13:17, 18 January 2022
| ML21292A302 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 10/19/2021 |
| From: | Mark D. Sartain Virginia Electric & Power Co (VEPCO) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 21-362 | |
| Download: ML21292A302 (3) | |
Text
VIRGINIA ELECTRIC A.t'\l"D POWER COMPANY RICHMOND, VIRGINIA 23261 October 19, 2021 U. S. Nuclear Regulatory Commission Serial No.: 21-362 Attention: Document Control Desk NRA/GDM: RO Washington, DC 20555-0001 Docket Nos.: 50-280 50-281 License Nos.: DPR-32 DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 RESPONSE TO QUESTION ON LICENSE AMENDMENT REQUEST TO REVISE REACTOR CORE SAFETY LIMIT By emails dated September 28, 2021 (ML21272A062) and October 13, 2021 (ML21286A727) a member of the Dominion Energy Services Nuclear Regulatory Affairs organization provided information related to the planned implementation of Surry Power Station Units 1 and 2 License Amendment Request to revise the TS 2.1.A.1.b safety limit for fuel melt. Subsequently, the NRG Project Manager for Surry Power Station requested that this information be submitted under 10 CFR 50.30(b ), "Oath or affirmation."
The purpose of this letter is to formally provide the pertinent information provided in the emails dated September 28, 2021 and October 13, 2021 in accordance with the requirements of 10 CFR 50.4 and 50.30(b) (i.e. under oath or affirmation). Specifically, the pertinent information is as follows:
An additional implementation plan item will be added associated with the Surry Power Station Units 1 and 2 License Amendment Request to revise the TS 2.1.A.1.b safety limit for fuel melt. Specifically, UFSAR section 3.4.1.1 will be revised as part of the implementation plan for the license amendments following their issuance to include the revised fuel melt safety limit and its technical basis. Furthermore, the UFSAR will be reviewed and additional UFSAR changes will be implemented, if required, to reflect the revised fuel melt safety limit.
Serial No.21-362 Docket Nos. 50-280/281 Page 2 of 3 Should you have any questions or require additional information, please contact Mr. Gary D. Miller at (804) 273-2771.
Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Commitments contained in this letter: None COMMONWEALTH OF VIRGINIA )
)
COUNTY OF HENRICO )
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mr. Mark D. Sartain, who is Vice President - Nuclear Engineering and Fleet Support, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this / 1--tftday of Vc.-fober ,2021.
My Commission Expires: tzfar i
(:J.,tf I
RAIG Notary P Commonwealth Reg.# 75 Co . .
- Serial No.21-362 Docket Nos. 50-280/281 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 State Health Commissioner Virginia Department of Health James Madison Building- 7th floor 109 Governor Street Suite 730 Richmond, VA 23219 Mr. L. John Klos NRG Project Manager- Surry U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, MD 20852-2738 Mr. G. Edward Miller NRG Senior Project Manager- North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, MD 20852-2738 NRG Senior Resident Inspector Surry Power Station