{{#Wiki_filter:._     ._..m_           -.      . . _ _ . _ . _ . - _ _ _ _            _ . _ . . -                              - . _ _ .
{{#Wiki_filter:._
;                g" %cy                                                  UNITED STATES
._..m_
:            f_                                                NUCLEAR REGULATORY COMMISSION i
g" %c y
          -y
UNITED STATES f_
          - g . ',. )   .(
.( '4 NUCLEAR REGULATORY COMMISSION
                          'g
- g. ',.
                              '4S                                              REGION 111 v / .a,j                                         801 WARRENVILLE ROAD uSLE, ILLINOIS 60532-4351 y                   .....
i
,                                                                        May 2,1997
-y
;                      Mr. Richard R. Grigg, President and i                       Chief Operating Officer
)
: j.                     Wisconsin Electric Power Company 231 W. Michigan Milwaukee, WI 53201
S REGION 111
'g v /.a,j 801 WARRENVILLE ROAD uSLE, ILLINOIS 60532-4351 y
May 2,1997 Mr. Richard R. Grigg, President and i
Chief Operating Officer j.
Wisconsin Electric Power Company 231 W. Michigan Milwaukee, WI 53201


==Dear Mr. Grigg:==
==Dear Mr. Grigg:==
On March 6,1997, the NRC staff completed the semiannual Plant Performance Review' (PPR) of the Point Beach Nuclear Plant. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety perforrnance. The results are used by NRC management for planning and allocation of inspection resources.
On March 6,1997, the NRC staff completed the semiannual Plant Performance Review' (PPR) of the Point Beach Nuclear Plant. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety perforrnance. The results are used by NRC management for planning and allocation of inspection resources.
The PPR for Point Beach involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period October 1996 through March 1997. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting reviews.
The PPR for Point Beach involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period October 1996 through March 1997. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting reviews.
                                                                                                                                )
)
In our {{letter dated|date=February 12, 1997|text=letter dated February 12,1997}}, issued after the previous PPR, we described the formation of a Point Beach oversight panel and the development of an Oversight Plan.                     i These actions were taken to assure close NRC oversight of your actions to address l
In our {{letter dated|date=February 12, 1997|text=letter dated February 12,1997}}, issued after the previous PPR, we described the formation of a Point Beach oversight panel and the development of an Oversight Plan.
performance issues. In addition, following the last Senior Management Meeting held                       1 January 14-15,1997, a letter was sent to Mr. Abdoo on January 27,1997, informing him of the NRC's concerns with the decline in performance at Point Beach during the last assessment period. Since the previous PPR, we have observed an increase in your staff's efforts to identify and address problems at Point Beach. NRC inspections will be required                 j upon completion of your improvement initiatives and prior to restart of Unit 2. The oversight panel will continue its review of your staff's preparations for the Unit 2 restart and your continued performance improvement initiatives for Units 1 and 2.                                 j Our specialist inspections scheduled for the next six months are shown on the attached inspection plan. Resident and Region-based project engineer inspections, are not listed on l
i These actions were taken to assure close NRC oversight of your actions to address performance issues. In addition, following the last Senior Management Meeting held 1
the schedule due to their ongoing and continuous nature. An in-depth assessment of                         '
January 14-15,1997, a letter was sent to Mr. Abdoo on January 27,1997, informing him of the NRC's concerns with the decline in performance at Point Beach during the last assessment period. Since the previous PPR, we have observed an increase in your staff's efforts to identify and address problems at Point Beach. NRC inspections will be required j
Unit 2 fuel load and restart activities is also not on the attached schedule. In addition, we plan to evaluate your actions pursuant to the commitments in CAL 3-96-005 and -OO5A, and the resumption of spent fuel dry cask storage activities. We understand you have not scheduled further dry cask storage activities, but estimate that they may begin in the late summer of 1997.
upon completion of your improvement initiatives and prior to restart of Unit 2. The oversight panel will continue its review of your staff's preparations for the Unit 2 restart and your continued performance improvement initiatives for Units 1 and 2.
9705120149 970502                                                                                               i PDR       ADOCK 05000266 G                               PDR
j Our specialist inspections scheduled for the next six months are shown on the attached inspection plan. Resident and Region-based project engineer inspections, are not listed on the schedule due to their ongoing and continuous nature. An in-depth assessment of Unit 2 fuel load and restart activities is also not on the attached schedule. In addition, we plan to evaluate your actions pursuant to the commitments in CAL 3-96-005 and -OO5A, and the resumption of spent fuel dry cask storage activities. We understand you have not scheduled further dry cask storage activities, but estimate that they may begin in the late summer of 1997.
i 9705120149 970502 PDR ADOCK 05000266 G
PDR


R. R. Grigg                                                                                     We plan to continue to meet with Point Beach management approximately every two weeks prior to the Unit 2 restart and monthly thereafter to discuss our inspection results and progress on your performance improvement initiatives. We willinform you of any major changes to the inspection plan. If you have any questions, please contact Jim McCormick-Barger at (630) R29-9872.
R. R. Grigg We plan to continue to meet with Point Beach management approximately every two weeks prior to the Unit 2 restart and monthly thereafter to discuss our inspection results and progress on your performance improvement initiatives. We willinform you of any major changes to the inspection plan. If you have any questions, please contact Jim McCormick-Barger at (630) R29-9872.
Sincerely,
Sincerely,
                                                                      /s/ John A. Grobe John A. Grobe, Deputy Director Division of Reactor Projects Docket Nos. 50-266; 50-301; 72-005 License Nos. DPR-24; DPR-27
/s/ John A. Grobe John A. Grobe, Deputy Director Division of Reactor Projects Docket Nos. 50-266; 50-301; 72-005 License Nos. DPR-24; DPR-27


==Enclosure:==
==Enclosure:==
Inspection Plan cc w/ encl:                     S. A. Patuiski, Site Vice President A. J. Cayia, Plant Manager Virgil Kanable, Chief, Boiler Section Cheryl L. Parrino, Chairman, Wisconsin Public Service Commission                                                                       !
Inspection Plan cc w/ encl:
State Liaison Officer (See attached continued distribution)
S. A. Patuiski, Site Vice President A. J. Cayia, Plant Manager Virgil Kanable, Chief, Boiler Section Cheryl L. Parrino, Chairman, Wisconsin Public Service Commission State Liaison Officer (See attached continued distribution)
SEE PREVIOUS CONCURRENCES i
SEE PREVIOUS CONCURRENCES i
To receive a copy of thae document.indicato in the box "C" a Copy without attachment / enclosure *E' = Copy with attachment / enclosure y . m c.,y OFFICE                 Rill m 4           ce Rill             8, Rill                                       Rill         Rlll       ,j     j NAME                   Kunowski:dp           JMcB h Jorgensen                                             Lennartz/Rin& GavulaW U
To receive a copy of thae document.indicato in the box "C" a Copy without attachment / enclosure *E' = Copy with attachment / enclosure y. m c.,y OFFICE Rill m 4 ce Rill 8, Rill Rill Rlll
DATE                   04/J//97               04/://97           04/ /97                                   04/f g/97 /F'' 04    /
,j j
mammmmmmmmmmi                                                         eme - --- .
NAME Kunowski:dp JMcB h Jorgensen Lennartz/Rin&
                                                                                                                        -mems            bl(.17
GavulaW
                                                                                                                                              .    = ,
-mems bl(.17 U
OFFICE                     Rlli       m j            Rlli                                   M Rlll                     Rlli of,/[
04/ g/97 /F''
NAME                      Garb /hk                   Kozak h                                         Grant             Grobh DATE                       04h97                     04E7/97                                         04/ /97           Of/2Jd7 OFFICIAL RECORD COPY
04
/
DATE 04/J//97 04/://97 04/ /97 f
mammmmmmmmmmi eme
=
OFFICE Rlli Rlli M
Rlll Rlli of,/[
m j Grobh Garb /hk Kozak h Grant NAME Of/2Jd7 DATE 04h97 04E7/97 04/ /97 OFFICIAL RECORD COPY
{
{


R. R. Grigg                                                   the Office of Nuclear Reactor Regulation will be reviewing Unit 2 fuelload and restart activities, focussing on the main control room. This is also not on the schedu!e. In addition, we plan to inspect your commitments associated with CAL 3-96-005 and -OO5A, and the resumption of spent fuel dry cask storage activities. We understand you have not schedulec d v nask storage activities, but estimate that they may begin in late summer of 1997.
R. R. Grigg the Office of Nuclear Reactor Regulation will be reviewing Unit 2 fuelload and restart activities, focussing on the main control room. This is also not on the schedu!e. In addition, we plan to inspect your commitments associated with CAL 3-96-005 and -OO5A, and the resumption of spent fuel dry cask storage activities. We understand you have not schedulec d v nask storage activities, but estimate that they may begin in late summer of 1997.
We will inform you of any major changes to the inspection plan. If you have any questions, please contact Jim McCormick-Barger at (630) 829-9872.
We will inform you of any major changes to the inspection plan. If you have any questions, please contact Jim McCormick-Barger at (630) 829-9872.
Sincerely, John A. Grobe, Deputy Director Division of Reactor Projects Docket Nos. 50-266; 50-301; 72-005 License Nos. DPR-24; DPR-27
Sincerely, John A. Grobe, Deputy Director Division of Reactor Projects Docket Nos. 50-266; 50-301; 72-005 License Nos. DPR-24; DPR-27


==Enclosure:==
==Enclosure:==
Inspection Plan cc w/enci:       S. A. Patuiski, Site Vice President A. J. Cayia, Plant Manager Virgil Kanable, Chief, Boiler Section Cheryl L. Parrino, Chairman, Wisconsin Public Service Commission State Liaison Officer (See attached continued distribution)
Inspection Plan cc w/enci:
T. i. . .m . es. e     i.e   in e. m.. c - em em.m me h   u i     r - em nem m.~       i u - se. .m OFFICE       Rlli n4L     c Rlli m lg Rlli ,lc JJUm                           lA/ Alli       g NAME         Kunowski:dp     JMcB '           Jor @ n         "'e'rErtz/ Ring Gavul@fLi DATE        04//7/97        04/7/97
S. A. Patuiski, Site Vice President A. J. Cayia, Plant Manager Virgil Kanable, Chief, Boiler Section Cheryl L. Parrino, Chairman, Wisconsin Public Service Commission State Liaison Officer (See attached continued distribution)
                                              /            04/17/ 7         04/1(/97           04// /V ~ u-mum um-ummm               mummmme mummmme mmme umi OFFICE       Rlli M[f             Rill                 Rill                   Rlll NAME         Gardner/ Creed       Kozakh               Grant                   Grobe DATE         04/ /97             04/ /97             04/ /97                 04/ /97 OFFICIAL RECOR D COPY j
T.
: i...m. es. e i.e in e. m.. c - em em.m me h u i r - em nem m.~
i u - se..m OFFICE Rlli n4L c Rlli m lg Rlli,lc JJUm lA/ Alli g
NAME Kunowski:dp JMcB '
Jor @ n
"'e'rErtz/ Ring Gavul@fLi 04/7/97 04/17/ 7 04/1(/97 04// /V ~
DATE 04//7/97
/
mum um-ummm mummmme mummmme mmme umi u-OFFICE Rlli M[f Rill Rill Rlll NAME Gardner/ Creed Kozakh Grant Grobe DATE 04/ /97 04/ /97 04/ /97 04/ /97 OFFICIAL RECOR D COPY j


R. R. Grigg                                                                 (Distribution continued)
R. R. Grigg (Distribution continued)
Docket File w/enci                                         DRS w/ encl PUBLIC lE-01 w/ encl                                       Rlli PRR w/ encl Enf. Coordinator, Rlli w/enci                               OC/LFDCB w/enci SRI, Pt. Beach w/ encl                                     DRP w/ encl LPM, NRR w/ encl                                           C. D. Pederson, Rlli w/enci A. B. Beach, w/enci l
Docket File w/enci DRS w/ encl PUBLIC lE-01 w/ encl Rlli PRR w/ encl Enf. Coordinator, Rlli w/enci OC/LFDCB w/enci SRI, Pt. Beach w/ encl DRP w/ encl LPM, NRR w/ encl C. D. Pederson, Rlli w/enci A. B. Beach, w/enci l
l l
l l
i l
i l
I l
I l
120020                                                                           \ \
120020
ll llm sIll Illllll         . . . I.ll
\\
                                                                        . . ~ . . - - - . . .
\\
ll ll Ill Illllll I.ll m s
.. ~.. - - -...
_m.___._..
_m.___._..


ENCLO2URE POINT BEACH
ENCLO2URE POINT BEACH
                                                                                                                                                                ~
{
INSPECTION PLAN                                                                   !
~
INSPECTION       TITLE /                             NUMBER OF           PLANNED                   TYPE OF INSPECTION - COMMENTS               !
INSPECTION PLAN INSPECTION TITLE /
PROGRAM AREA                       INSPECTORS           INSPECTION DATES IP 40500         Restart-Corrective                         4-5         5/19-23/97 & 6/2-6/97     U2 Restart inspection (RI)
NUMBER OF PLANNED TYPE OF INSPECTION - COMMENTS f
Actions / Engineering IP 83750         Radiation Protection /                       2           5/5-9/97                 Routine Radiation Protection (Cl)
PROGRAM AREA INSPECTORS INSPECTION DATES IP 40500 Restart-Corrective 4-5 5/19-23/97 & 6/2-6/97 U2 Restart inspection (RI)
{
Actions / Engineering IP 83750 Radiation Protection /
2 5/5-9/97 Routine Radiation Protection (Cl)
Plant Support i
Plant Support i
IP 81700         Security / Plant Support                     1           6/2-6/97                 Security inspection (Cl)                   i IP 82701         Emergency Preparedness / Plant             2-3         6/23-27/97               EP inspection (Cl)                         {'
IP 81700 Security / Plant Support 1
Support                                                                                               .                      ,
6/2-6/97 Security inspection (Cl) i IP 82701 Emergency Preparedness / Plant 2-3 6/23-27/97 EP inspection (Cl)
IP 62706         Maintenance Rule / Maintenance             4-5         7/7-11/97               Maintenance Rule Inspection (RI)
{
IP 84750         Radiation Protection /                       1           7/7-11/97               Effluents, REMP, Chemistry Plant Support                                                                     Inspection (Cl)
Support IP 62706 Maintenance Rule / Maintenance 4-5 7/7-11/97 Maintenance Rule Inspection (RI) f IP 84750 Radiation Protection /
,                  IP 86750         Radiation Protection / Plant Support         1           8/25-29/97               Solid Radwaste and Shipping                 !
1 7/7-11/97 Effluents, REMP, Chemistry l
inspection (Cl) '
Plant Support Inspection (Cl)
IP 64704         Fire Protection / Plant Support               1         Unannounced               Fir's Protection Inspection (Cl)             i IP 92703         Spent Fuel Dry Cask Storage CAL               1         2 Days, Actual Dates     Followup to CAL and Bulletin 96-04 Followup                                                 are Dependent on         commitments (RI)
[
Licensee's Compietion                                                 ;
IP 86750 Radiation Protection / Plant Support 1
of Actions IPs               Spent Fuel Dry Cask Storage                 1-2         To 8e Determined         Routine inspection of all aspects of 60851                                                                     When Cask Loading       an independent spent fuel storage 60853                                                                     Resumes                 installation (Cl)                             !
8/25-29/97 Solid Radwaste and Shipping inspection (Cl) '
60854                                                                                                                                             i 60855 IP - Inspection Procedure                                   '-                              '
IP 64704 Fire Protection / Plant Support 1
i Ti - Temporary Instruction Cl - Core inspection - Minimum NRC Program (mandatory all plants)                                                                                   ,
Unannounced Fir's Protection Inspection (Cl) i IP 92703 Spent Fuel Dry Cask Storage CAL 1
RI - Regional Initiative                                                                                                                           *
2 Days, Actual Dates Followup to CAL and Bulletin 96-04 Followup are Dependent on commitments (RI)
* i
Licensee's Compietion of Actions IPs Spent Fuel Dry Cask Storage 1-2 To 8e Determined Routine inspection of all aspects of I
                                                                                                                                                . _ _ _    ..___'}}
60851 When Cask Loading an independent spent fuel storage 60853 Resumes installation (Cl) 60854 i'
60855 i
IP - Inspection Procedure Ti - Temporary Instruction Cl - Core inspection - Minimum NRC Program (mandatory all plants)
RI - Regional Initiative i
I
.}}

Latest revision as of 18:59, 11 December 2024

Informs That on 970306 NRC Staff Completed Semiannual Plant Performance Review of Point Beach Nuclear Plant.Nrc Inspections Will Be Required Upon Completion of Improvement Initiatives & Prior to Restart of Unit 2
ML20138K092
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/02/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Grigg R
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 9705120149
Download: ML20138K092 (5)


Text

._

._..m_

g" %c y

UNITED STATES f_

.( '4 NUCLEAR REGULATORY COMMISSION

- g. ',.

i

-y

)

S REGION 111

'g v /.a,j 801 WARRENVILLE ROAD uSLE, ILLINOIS 60532-4351 y

May 2,1997 Mr. Richard R. Grigg, President and i

Chief Operating Officer j.

Wisconsin Electric Power Company 231 W. Michigan Milwaukee, WI 53201

Dear Mr. Grigg:

On March 6,1997, the NRC staff completed the semiannual Plant Performance Review' (PPR) of the Point Beach Nuclear Plant. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety perforrnance. The results are used by NRC management for planning and allocation of inspection resources.

The PPR for Point Beach involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period October 1996 through March 1997. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting reviews.

)

In our letter dated February 12,1997, issued after the previous PPR, we described the formation of a Point Beach oversight panel and the development of an Oversight Plan.

i These actions were taken to assure close NRC oversight of your actions to address performance issues. In addition, following the last Senior Management Meeting held 1

January 14-15,1997, a letter was sent to Mr. Abdoo on January 27,1997, informing him of the NRC's concerns with the decline in performance at Point Beach during the last assessment period. Since the previous PPR, we have observed an increase in your staff's efforts to identify and address problems at Point Beach. NRC inspections will be required j

upon completion of your improvement initiatives and prior to restart of Unit 2. The oversight panel will continue its review of your staff's preparations for the Unit 2 restart and your continued performance improvement initiatives for Units 1 and 2.

j Our specialist inspections scheduled for the next six months are shown on the attached inspection plan. Resident and Region-based project engineer inspections, are not listed on the schedule due to their ongoing and continuous nature. An in-depth assessment of Unit 2 fuel load and restart activities is also not on the attached schedule. In addition, we plan to evaluate your actions pursuant to the commitments in CAL 3-96-005 and -OO5A, and the resumption of spent fuel dry cask storage activities. We understand you have not scheduled further dry cask storage activities, but estimate that they may begin in the late summer of 1997.

i 9705120149 970502 PDR ADOCK 05000266 G

PDR

R. R. Grigg We plan to continue to meet with Point Beach management approximately every two weeks prior to the Unit 2 restart and monthly thereafter to discuss our inspection results and progress on your performance improvement initiatives. We willinform you of any major changes to the inspection plan. If you have any questions, please contact Jim McCormick-Barger at (630) R29-9872.

Sincerely,

/s/ John A. Grobe John A. Grobe, Deputy Director Division of Reactor Projects Docket Nos. 50-266; 50-301;72-005 License Nos. DPR-24; DPR-27

Enclosure:

Inspection Plan cc w/ encl:

S. A. Patuiski, Site Vice President A. J. Cayia, Plant Manager Virgil Kanable, Chief, Boiler Section Cheryl L. Parrino, Chairman, Wisconsin Public Service Commission State Liaison Officer (See attached continued distribution)

SEE PREVIOUS CONCURRENCES i

To receive a copy of thae document.indicato in the box "C" a Copy without attachment / enclosure *E' = Copy with attachment / enclosure y. m c.,y OFFICE Rill m 4 ce Rill 8, Rill Rill Rlll

,j j

NAME Kunowski:dp JMcB h Jorgensen Lennartz/Rin&

GavulaW

-mems bl(.17 U

04/ g/97 /F

04

/

DATE 04/J//97 04/://97 04/ /97 f

mammmmmmmmmmi eme

=

OFFICE Rlli Rlli M

Rlll Rlli of,/[

m j Grobh Garb /hk Kozak h Grant NAME Of/2Jd7 DATE 04h97 04E7/97 04/ /97 OFFICIAL RECORD COPY

{

R. R. Grigg the Office of Nuclear Reactor Regulation will be reviewing Unit 2 fuelload and restart activities, focussing on the main control room. This is also not on the schedu!e. In addition, we plan to inspect your commitments associated with CAL 3-96-005 and -OO5A, and the resumption of spent fuel dry cask storage activities. We understand you have not schedulec d v nask storage activities, but estimate that they may begin in late summer of 1997.

We will inform you of any major changes to the inspection plan. If you have any questions, please contact Jim McCormick-Barger at (630) 829-9872.

Sincerely, John A. Grobe, Deputy Director Division of Reactor Projects Docket Nos. 50-266; 50-301;72-005 License Nos. DPR-24; DPR-27

Enclosure:

Inspection Plan cc w/enci:

S. A. Patuiski, Site Vice President A. J. Cayia, Plant Manager Virgil Kanable, Chief, Boiler Section Cheryl L. Parrino, Chairman, Wisconsin Public Service Commission State Liaison Officer (See attached continued distribution)

T.

i...m. es. e i.e in e. m.. c - em em.m me h u i r - em nem m.~

i u - se..m OFFICE Rlli n4L c Rlli m lg Rlli,lc JJUm lA/ Alli g

NAME Kunowski:dp JMcB '

Jor @ n

"'e'rErtz/ Ring Gavul@fLi 04/7/97 04/17/ 7 04/1(/97 04// /V ~

DATE 04//7/97

/

mum um-ummm mummmme mummmme mmme umi u-OFFICE Rlli M[f Rill Rill Rlll NAME Gardner/ Creed Kozakh Grant Grobe DATE 04/ /97 04/ /97 04/ /97 04/ /97 OFFICIAL RECOR D COPY j

R. R. Grigg (Distribution continued)

Docket File w/enci DRS w/ encl PUBLIC lE-01 w/ encl Rlli PRR w/ encl Enf. Coordinator, Rlli w/enci OC/LFDCB w/enci SRI, Pt. Beach w/ encl DRP w/ encl LPM, NRR w/ encl C. D. Pederson, Rlli w/enci A. B. Beach, w/enci l

l l

i l

I l

120020

\\

\\

ll ll Ill Illllll I.ll m s

.. ~.. - - -...

_m.___._..

ENCLO2URE POINT BEACH

{

~

INSPECTION PLAN INSPECTION TITLE /

NUMBER OF PLANNED TYPE OF INSPECTION - COMMENTS f

PROGRAM AREA INSPECTORS INSPECTION DATES IP 40500 Restart-Corrective 4-5 5/19-23/97 & 6/2-6/97 U2 Restart inspection (RI)

{

Actions / Engineering IP 83750 Radiation Protection /

2 5/5-9/97 Routine Radiation Protection (Cl)

Plant Support i

IP 81700 Security / Plant Support 1

6/2-6/97 Security inspection (Cl) i IP 82701 Emergency Preparedness / Plant 2-3 6/23-27/97 EP inspection (Cl)

{

Support IP 62706 Maintenance Rule / Maintenance 4-5 7/7-11/97 Maintenance Rule Inspection (RI) f IP 84750 Radiation Protection /

1 7/7-11/97 Effluents, REMP, Chemistry l

Plant Support Inspection (Cl)

[

IP 86750 Radiation Protection / Plant Support 1

8/25-29/97 Solid Radwaste and Shipping inspection (Cl) '

IP 64704 Fire Protection / Plant Support 1

Unannounced Fir's Protection Inspection (Cl) i IP 92703 Spent Fuel Dry Cask Storage CAL 1

2 Days, Actual Dates Followup to CAL and Bulletin 96-04 Followup are Dependent on commitments (RI)

Licensee's Compietion of Actions IPs Spent Fuel Dry Cask Storage 1-2 To 8e Determined Routine inspection of all aspects of I

60851 When Cask Loading an independent spent fuel storage 60853 Resumes installation (Cl) 60854 i'

60855 i

IP - Inspection Procedure Ti - Temporary Instruction Cl - Core inspection - Minimum NRC Program (mandatory all plants)

RI - Regional Initiative i

I

.