ML20206G506: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:*
* e
* * /[a na e
            * * /[a na                                 UNITED STATES y"           g               NUCLEAR REGULATORY COMMISSION
UNITED STATES y"
  ,. I       g .,           a                       wa sMNG TON,0. C. FC 555
g NUCLEAR REGULATORY COMMISSION
              %,**"*/                                     November 18, 1988 Docket tios. 50-445/446 Nr. W1111am G. Counsil Executive Vice President Texas Utilities Electric Cunpany                                                 :
,. I g.,
400 North Olive Street L. B. 81 Dallas, Texas 75201                                                               ,
a wa sMNG TON,0. C. FC 555
%,**"*/
November 18, 1988 Docket tios. 50-445/446 Nr. W1111am G. Counsil Executive Vice President Texas Utilities Electric Cunpany 400 North Olive Street L. B. 81 Dallas, Texas 75201


==Dear Hr. Counsil:==
==Dear Hr. Counsil:==
==SUBJECT:==
==SUBJECT:==
Et;GlhEERING FUNCTIONAL EVALVATIUN                                     ,
Et;GlhEERING FUNCTIONAL EVALVATIUN I
TU Electric letter TXX-88591) dated September 14, 1988, provided the status of     I the Stone & Webster Engineering Corporation (SWEC) Engineering Functional Evaluation (EFE) and requesteo the staff's approval of the integration of the remaining EFE efforts into Comanche Peak Steam Electric Station (CPSES) Project activities.
TU Electric letter TXX-88591) dated September 14, 1988, provided the status of the Stone & Webster Engineering Corporation (SWEC) Engineering Functional Evaluation (EFE) and requesteo the staff's approval of the integration of the remaining EFE efforts into Comanche Peak Steam Electric Station (CPSES) Project activities.
As discussed in the Septerher 14, 1988 letter, the primary purpose of the EFE was to prcvide additional levels of confidence that the design validation activities of the TV Electric Corrective Action Program (CAP) were conducteo effective 1). This principal objective was accomplished by Module 1 of the         ,
As discussed in the Septerher 14, 1988 letter, the primary purpose of the EFE was to prcvide additional levels of confidence that the design validation activities of the TV Electric Corrective Action Program (CAP) were conducteo effective 1).
SWEC EFE which provided an independent evaluation of the adequacy of the CPSES     :
This principal objective was accomplished by Module 1 of the SWEC EFE which provided an independent evaluation of the adequacy of the CPSES design validation and Post Construction Hardware Validation Program.
1                  design validation and Post Construction Hardware Validation Program. The           I
The 1
I independent evaluation will be documented in a forthcoming SWEC EFE report.
)
)
independent evaluation will be documented in a forthcoming SWEC EFE report.
The remaining objectives of the SWEC EFE were to address the utilization uf design dats during testing (Module 2), utilization of design data during maintenance and operatiuns (Mooule 3), and the control of design activities c'uring operations (Module 4).
The remaining objectives of the SWEC EFE were to address the utilization uf design dats during testing (Module 2), utilization of design data during maintenance and operatiuns (Mooule 3), and the control of design activities c'uring operations (Module 4). Because these objectives are also subject to     ,
Because these objectives are also subject to the oversight of the TV Electric Quality Assurance Progran, TU Electri: pro-posed that the activities planned to be completed in hodules 2, 3, and 4 be integrated tato the ongoing CPSES Project activities.
the oversight of the TV Electric Quality Assurance Progran, TU Electri: pro-posed that the activities planned to be completed in hodules 2, 3, and 4 be integrated tato the ongoing CPSES Project activities. The integration is to be accomplished by providing the EFE review plans for Modules 2, 3, and 4 ta
The integration is to be accomplished by providing the EFE review plans for Modules 2, 3, and 4 ta the TV Electric Quality Assurance Departnent for impler.entation.
!                  the TV Electric Quality Assurance Departnent for impler.entation. Additionally, the review criteric for Module 4 has been provided to the TU Electric Engineering Assurance Section to be reviewed and considered during the preparation of pro-cedures for overall site integration of the design control program for operations. ;
Additionally, the review criteric for Module 4 has been provided to the TU Electric Engineering Assurance Section to be reviewed and considered during the preparation of pro-cedures for overall site integration of the design control program for operations.
ry letter cated January 22, 1988, the staff provideo its evalu'ation and approval
ry letter cated January 22, 1988, the staff provideo its evalu'ation and approval cf the CPSES licensing and corrective cction pregrams.
* cf the CPSES licensing and corrective cction pregrams. In the evaluatinn, the     :
In the evaluatinn, the staff fourd that the sccres of the SWEC EFE ano the Technical Audit Prcgram, which is an integral part of the TV Electric QA Program, provided acceptable twns for nenitorino the CAP activities.
staff fourd that the sccres of the SWEC EFE ano the Technical Audit Prcgram, which is an integral part of the TV Electric QA Program, provided acceptable twns for nenitorino the CAP activities. The staff has reviu ed the TV E'cctric     l l}0 8811220300 03111G                                                     \       ,
The staff has reviu ed the TV E'cctric l
PDR   ADOCK 05000445 A                   PDC
l}0 8811220300 03111G
: s.                                                                                     ,
\\
  .        fir. William G. Counsil                             tiovember 18, 1988     !
PDR ADOCK 05000445 A
proposal for tha integration of the remaining EFE. activities into the CPSES Project activities and finds that the changes do not affect the bases for the staff's conclusions in the January 22, 1968 evaluation because the proposed approach still provides an adequate areans for TV Electric to monitor imple-   !
PDC
mentation of design-related activities. Therefore, the staff concludes that the proposed integration described in the September 14, 1988 submittal is acceptable.
 
Sincerely,                           ;
s.
f Christopher I. Grimes, Director       [
fir. William G. Counsil tiovember 18, 1988 proposal for tha integration of the remaining EFE. activities into the CPSES Project activities and finds that the changes do not affect the bases for the staff's conclusions in the January 22, 1968 evaluation because the proposed approach still provides an adequate areans for TV Electric to monitor imple-mentation of design-related activities.
Comanche Peak Project Division       t Office of Special Projects cc:                                                                           ,
Therefore, the staff concludes that the proposed integration described in the September 14, 1988 submittal is acceptable.
See next page                                                                   ,
Sincerely, f
I i
Christopher I. Grimes, Director
i
[
Comanche Peak Project Division t
Office of Special Projects cc:
See next page I
i i


E             .
E g
g W. d. Counsil                         Comanche Peak Steam Electric Station Texas Utilities Electric Company     Units 1 and 2 cc:
W. d. Counsil Comanche Peak Steam Electric Station Texas Utilities Electric Company Units 1 and 2 cc:
Jack R. Newman, Esq.                 Asst. Director for Inspec. Programs Newman & Holtzinger, P.C.             Comanche Peak Project Division Suite 1000                           U.S. Nuclear Regulatory Commission 1615 L Street, N.W.                   P. O. Box 1029 Washington, D.C. 20036               Granbury, Texas 76048 Robert A. Wooldridge, Esq.           Regional Administrator, Region IV Worsham, forsythe, Sampels &         U.S. Nuclear Regulatory Commission ilooldridge                     611 Ryan Plaza Drive, Suite 1000 2001 Bryan Tower. Suite 2500         Arlington, Texas 76011 Dallas, Texas 75201 Lanny A. Sinkin Mr. Homer C. Schmidt                 Christic Institute Director of Nuclear Services         1324 North Capitol Street Texas Utilities Electric Company     Washington, D.C. 20002 Skyway Tower 400 North Olive Street, L.B. 81       Hs. Billi, Pirner Garde. Esq.
Jack R. Newman, Esq.
Dallas, Texas 75201                   Governmenc Accountability Project Midwest Office Mr. R. W. Ackley                     104 East Wisconsin Avenue Stone & Webster                       App *.eton, Wisconsin 54911 l
Asst. Director for Inspec. Programs Newman & Holtzinger, P.C.
Comanche Peak Steam Eler.tric Station
Comanche Peak Project Division Suite 1000 U.S. Nuclear Regulatory Commission 1615 L Street, N.W.
~                                                                                          .
P. O. Box 1029 Washington, D.C. 20036 Granbury, Texas 76048 Robert A. Wooldridge, Esq.
P. O. Box 1002                       Cavid R. Pigott, Esq.
Regional Administrator, Region IV Worsham, forsythe, Sampels &
l j               Glen Rose, Texas     76043           Orrick, Herrington & Sutcliffe 600 Montgomery Street Mr. J. L. Vota                       San Francisco, California 94111 Westinghouse Electric Corporation 4
U.S. Nuclear Regulatory Commission ilooldridge 611 Ryan Plaza Drive, Suite 1000 2001 Bryan Tower. Suite 2500 Arlington, Texas 76011 Dallas, Texas 75201 Lanny A. Sinkin Mr. Homer C. Schmidt Christic Institute Director of Nuclear Services 1324 North Capitol Street Texas Utilities Electric Company Washington, D.C.
;              P. O. Box 355                         Anthony Z. Roisman, Esq.
20002 Skyway Tower 400 North Olive Street, L.B. 81 Hs. Billi, Pirner Garde. Esq.
Pittsburgh, Pennsylvania 15230         Suits 600                           ,
Dallas, Texas 75201 Governmenc Accountability Project Midwest Office Mr. R. W. Ackley 104 East Wisconsin Avenue Stone & Webster App *.eton, Wisconsin 54911 l
1401 New York Avenue, NW i
~
Susan M. Theisen                       Washington, D.C. 20005 Assistant Attorney General Environmental Protection Division     Robert Jablon                       .
Comanche Peak Steam Eler.tric Station l
P. O. Box 12548. Capitol Station       Bonnie S. Blair                     '
P. O. Box 1002 Cavid R. Pigott, Esq.
  .              Austin, Texas 78711-1548               Spiegel & McDiarmid 1350 New York Avenue, !!W
j Glen Rose, Texas 76043 Orrick, Herrington & Sutcliffe 600 Montgomery Street Mr. J. L. Vota San Francisco, California 94111 Westinghouse Electric Corporation P. O. Box 355 Anthony Z. Roisman, Esq.
]                                                      Washington, D.C. 20005-4798
4 Pittsburgh, Pennsylvania 15230 Suits 600 1401 New York Avenue, NW i
:              Mrs. Juanita Ellis, President
Susan M. Theisen Washington, D.C. 20005 Assistant Attorney General Environmental Protection Division Robert Jablon P. O. Box 12548. Capitol Station Bonnie S. Blair Austin, Texas 78711-1548 Spiegel & McDiarmid
;                Citizens Association for Sound Energy 1426 South Polk                       George A. Parker, Chairman
]
:              Dallas, Texas 75224                   Public btility Cortmittee           ,
1350 New York Avenue, !!W Mrs. Juanita Ellis, President Washington, D.C. 20005-4798 Citizens Association for Sound Energy 1426 South Polk George A. Parker, Chairman Dallas, Texas 75224 Public btility Cortmittee Senior Citizens Alliance Of j
Senior Citizens Alliance Of         j Ms. Nancy H. Willians                   Tarrant County, Inc.             t CYGNA Energy Services                 6048 Wonder Drive 2121 N. California Blvo., Suite 390   Fort Worth, Texas     76133 Walnut Crt.ek, CA 94596                                                   ,
Ms. Nancy H. Willians Tarrant County, Inc.
f l
t CYGNA Energy Services 6048 Wonder Drive 2121 N. California Blvo., Suite 390 Fort Worth, Texas 76133 Walnut Crt.ek, CA 94596 f
1
l 1


  .t         ..
.t W. G. Counsil Comanche reak Electric Station
      ^
^
Comanche reak Electric Station W. G. Counsil                            Units 1 and 2 Tev.as Utilities Electric Company cc:
Tev.as Utilities Electric Company Units 1 and 2 cc:
Joseph F. Fulbright Fulbright & Jaworski 1301 McKinney Street Houston, Texas 77010 Roger D. Walker Manager, Nuclear Licensing Texas Utilities Electric Company Skyway Tower 400 North Olive Street, L.B. 81 Dallas, Texas 75201 Texas Utilities Electric Company c/o Bethesda Licensing 3 Metro Center, Suite 61e Bethesda, Maryland 20814 William A. Burchette, Esq.
Joseph F. Fulbright Fulbright & Jaworski 1301 McKinney Street Houston, Texas 77010 Roger D. Walker Manager, Nuclear Licensing Texas Utilities Electric Company Skyway Tower 400 North Olive Street, L.B. 81 Dallas, Texas 75201 Texas Utilities Electric Company c/o Bethesda Licensing 3 Metro Center, Suite 61e Bethesda, Maryland 20814 William A. Burchette, Esq.
Counsel for Tex-La Electric Cooperative of Texas Heron, 8urchette, Ruckert & Rothwell Suite 700 1025 Thomas Jefferson Street, NW Washington, D.C. 20C07 GOS ASSOCIATES, INC.
Counsel for Tex-La Electric Cooperative of Texas Heron, 8urchette, Ruckert & Rothwell Suite 700 1025 Thomas Jefferson Street, NW Washington, D.C.
20C07 GOS ASSOCIATES, INC.
Suite 720 1850 Parkway Place Marietta, Georgia 30067-8237
Suite 720 1850 Parkway Place Marietta, Georgia 30067-8237


Mr. William G. Counsil                                                   -2 proposal for the integration of t]e remaining EFE activities into the CPSES Project activities and finds that the changes do not affect the bases for'the staff's conclusions in the January 22, 1988 evaluation because the proposed approach still provides an adequate means for TV Electric to monitor imple-nentation of design.related act'vities. Therefore, the staff concludes that the proposed integration described in the September 14, 1988 submittal is acceptable.                                                                                                                                         l Sincerely,                                                       t
Mr. William G. Counsil
                                                                                                                %k181 SigMd byl                                           l Christopher I. Grimes, Director                                   ;
-2 proposal for the integration of t]e remaining EFE activities into the CPSES Project activities and finds that the changes do not affect the bases for'the staff's conclusions in the January 22, 1988 evaluation because the proposed approach still provides an adequate means for TV Electric to monitor imple-nentation of design.related act'vities.
Comanche Peak Project Division                                   !
Therefore, the staff concludes that the proposed integration described in the September 14, 1988 submittal is acceptable.
Office of Special Projects CC:
l t
Sincerely,
%k181 SigMd byl l
Christopher I. Grimes, Director Comanche Peak Project Division Office of Special Projects CC:
See next page Distribution:
See next page Distribution:
Docket. Files                       -
Docket. Files NRC 4-Local PDRs CPPD Reading OSP Reading J. Partlow C. Grimes P. McKee 1
NRC 4-Local PDRs                                                                                                                                   '
J. H. Wilson J. Lyons R. Warnick Licensing Assistant M. Malloy l
CPPD Reading OSP Reading J. Partlow C. Grimes 1                      P. McKee J. H. Wilson J. Lyons R. Warnick Licensing Assistant M. Malloy r
OGC-WF r
l                      OGC-WF D. Crutchfield                                                                                                                                     :
D. Crutchfield l
l                      E. Jordan B. Grimes ACRS(10)                                                                                                                                           ,
E. Jordan B. Grimes ACRS(10) i i
i i
i l
i                                                                                                                                                                         !
\\
l
*r e r nocutotte en*Ft f D D r ew r _
\
l OFC
                                        *r e r nocutotte en*Ft f D D r ew r _
: AD:CPPDTd5p/: AD:CPPD:05pr :PD:CPP :05P l0GC
l OFC       : AD:CPPDTd5p/: AD:CPPD:05pr :PD:CPP :05P l0GC                                                                           :0:CPPD:0SP :            :
:0:CPPD:0SP lNAME:
lNAME:                                          :JHWilso ,'hy :P         ee                 :JMoor                                   :ClGrime     :          :
:JHWilso,'hy :P ee
I ....-:          .-..-              ...;-..-.-... 5..:. -.........:.....-. ....:-----...--. :.....,-----:--...----..                                                    ,
:JMoor
DATE : O/is/88                            : // / A /88   :11/ b/88                   :H /10/88                               :l\ /lt/88   :          :
:ClGrime 5..:.
I....-:
A 88
:11/ b/88
:H /10/88
:l\\ /lt/88
/
{
{
0FflCIAL RECORD COPY                                                                                                                               i
DATE : O/is/88
                . _ , . . - _ - - - . _ . - , - _ _ _ - _ ,                  . - - - , - - - . . - - _ _ - - - - . . - -.-- - .-.. -}}
: // /
0FflCIAL RECORD COPY i
. - - -, - - -.. - - _ _ - - - -.. - -.-- -.-.. -}}

Latest revision as of 01:19, 7 December 2024

Discusses Util Re Status of S&W Engineering Functional Evaluation & Request for NRC Approval of Integration of Remaining Efforts Into Plant Activities. Proposed Integration Acceptable
ML20206G506
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/18/1988
From: Charemagne Grimes
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
NUDOCS 8811220300
Download: ML20206G506 (5)


Text

  • * /[a na e

UNITED STATES y"

g NUCLEAR REGULATORY COMMISSION

,. I g.,

a wa sMNG TON,0. C. FC 555

%,**"*/

November 18, 1988 Docket tios. 50-445/446 Nr. W1111am G. Counsil Executive Vice President Texas Utilities Electric Cunpany 400 North Olive Street L. B. 81 Dallas, Texas 75201

Dear Hr. Counsil:

SUBJECT:

Et;GlhEERING FUNCTIONAL EVALVATIUN I

TU Electric letter TXX-88591) dated September 14, 1988, provided the status of the Stone & Webster Engineering Corporation (SWEC) Engineering Functional Evaluation (EFE) and requesteo the staff's approval of the integration of the remaining EFE efforts into Comanche Peak Steam Electric Station (CPSES) Project activities.

As discussed in the Septerher 14, 1988 letter, the primary purpose of the EFE was to prcvide additional levels of confidence that the design validation activities of the TV Electric Corrective Action Program (CAP) were conducteo effective 1).

This principal objective was accomplished by Module 1 of the SWEC EFE which provided an independent evaluation of the adequacy of the CPSES design validation and Post Construction Hardware Validation Program.

The 1

I independent evaluation will be documented in a forthcoming SWEC EFE report.

)

The remaining objectives of the SWEC EFE were to address the utilization uf design dats during testing (Module 2), utilization of design data during maintenance and operatiuns (Mooule 3), and the control of design activities c'uring operations (Module 4).

Because these objectives are also subject to the oversight of the TV Electric Quality Assurance Progran, TU Electri: pro-posed that the activities planned to be completed in hodules 2, 3, and 4 be integrated tato the ongoing CPSES Project activities.

The integration is to be accomplished by providing the EFE review plans for Modules 2, 3, and 4 ta the TV Electric Quality Assurance Departnent for impler.entation.

Additionally, the review criteric for Module 4 has been provided to the TU Electric Engineering Assurance Section to be reviewed and considered during the preparation of pro-cedures for overall site integration of the design control program for operations.

ry letter cated January 22, 1988, the staff provideo its evalu'ation and approval cf the CPSES licensing and corrective cction pregrams.

In the evaluatinn, the staff fourd that the sccres of the SWEC EFE ano the Technical Audit Prcgram, which is an integral part of the TV Electric QA Program, provided acceptable twns for nenitorino the CAP activities.

The staff has reviu ed the TV E'cctric l

l}0 8811220300 03111G

\\

PDR ADOCK 05000445 A

PDC

s.

fir. William G. Counsil tiovember 18, 1988 proposal for tha integration of the remaining EFE. activities into the CPSES Project activities and finds that the changes do not affect the bases for the staff's conclusions in the January 22, 1968 evaluation because the proposed approach still provides an adequate areans for TV Electric to monitor imple-mentation of design-related activities.

Therefore, the staff concludes that the proposed integration described in the September 14, 1988 submittal is acceptable.

Sincerely, f

Christopher I. Grimes, Director

[

Comanche Peak Project Division t

Office of Special Projects cc:

See next page I

i i

E g

W. d. Counsil Comanche Peak Steam Electric Station Texas Utilities Electric Company Units 1 and 2 cc:

Jack R. Newman, Esq.

Asst. Director for Inspec. Programs Newman & Holtzinger, P.C.

Comanche Peak Project Division Suite 1000 U.S. Nuclear Regulatory Commission 1615 L Street, N.W.

P. O. Box 1029 Washington, D.C. 20036 Granbury, Texas 76048 Robert A. Wooldridge, Esq.

Regional Administrator, Region IV Worsham, forsythe, Sampels &

U.S. Nuclear Regulatory Commission ilooldridge 611 Ryan Plaza Drive, Suite 1000 2001 Bryan Tower. Suite 2500 Arlington, Texas 76011 Dallas, Texas 75201 Lanny A. Sinkin Mr. Homer C. Schmidt Christic Institute Director of Nuclear Services 1324 North Capitol Street Texas Utilities Electric Company Washington, D.C.

20002 Skyway Tower 400 North Olive Street, L.B. 81 Hs. Billi, Pirner Garde. Esq.

Dallas, Texas 75201 Governmenc Accountability Project Midwest Office Mr. R. W. Ackley 104 East Wisconsin Avenue Stone & Webster App *.eton, Wisconsin 54911 l

~

Comanche Peak Steam Eler.tric Station l

P. O. Box 1002 Cavid R. Pigott, Esq.

j Glen Rose, Texas 76043 Orrick, Herrington & Sutcliffe 600 Montgomery Street Mr. J. L. Vota San Francisco, California 94111 Westinghouse Electric Corporation P. O. Box 355 Anthony Z. Roisman, Esq.

4 Pittsburgh, Pennsylvania 15230 Suits 600 1401 New York Avenue, NW i

Susan M. Theisen Washington, D.C. 20005 Assistant Attorney General Environmental Protection Division Robert Jablon P. O. Box 12548. Capitol Station Bonnie S. Blair Austin, Texas 78711-1548 Spiegel & McDiarmid

]

1350 New York Avenue, !!W Mrs. Juanita Ellis, President Washington, D.C. 20005-4798 Citizens Association for Sound Energy 1426 South Polk George A. Parker, Chairman Dallas, Texas 75224 Public btility Cortmittee Senior Citizens Alliance Of j

Ms. Nancy H. Willians Tarrant County, Inc.

t CYGNA Energy Services 6048 Wonder Drive 2121 N. California Blvo., Suite 390 Fort Worth, Texas 76133 Walnut Crt.ek, CA 94596 f

l 1

.t W. G. Counsil Comanche reak Electric Station

^

Tev.as Utilities Electric Company Units 1 and 2 cc:

Joseph F. Fulbright Fulbright & Jaworski 1301 McKinney Street Houston, Texas 77010 Roger D. Walker Manager, Nuclear Licensing Texas Utilities Electric Company Skyway Tower 400 North Olive Street, L.B. 81 Dallas, Texas 75201 Texas Utilities Electric Company c/o Bethesda Licensing 3 Metro Center, Suite 61e Bethesda, Maryland 20814 William A. Burchette, Esq.

Counsel for Tex-La Electric Cooperative of Texas Heron, 8urchette, Ruckert & Rothwell Suite 700 1025 Thomas Jefferson Street, NW Washington, D.C.

20C07 GOS ASSOCIATES, INC.

Suite 720 1850 Parkway Place Marietta, Georgia 30067-8237

Mr. William G. Counsil

-2 proposal for the integration of t]e remaining EFE activities into the CPSES Project activities and finds that the changes do not affect the bases for'the staff's conclusions in the January 22, 1988 evaluation because the proposed approach still provides an adequate means for TV Electric to monitor imple-nentation of design.related act'vities.

Therefore, the staff concludes that the proposed integration described in the September 14, 1988 submittal is acceptable.

l t

Sincerely,

%k181 SigMd byl l

Christopher I. Grimes, Director Comanche Peak Project Division Office of Special Projects CC:

See next page Distribution:

Docket. Files NRC 4-Local PDRs CPPD Reading OSP Reading J. Partlow C. Grimes P. McKee 1

J. H. Wilson J. Lyons R. Warnick Licensing Assistant M. Malloy l

OGC-WF r

D. Crutchfield l

E. Jordan B. Grimes ACRS(10) i i

i l

\\

  • r e r nocutotte en*Ft f D D r ew r _

l OFC

AD:CPPDTd5p/: AD:CPPD:05pr :PD:CPP :05P l0GC
0:CPPD:0SP lNAME:
JHWilso,'hy :P ee
JMoor
ClGrime 5..:.

I....-:

A 88

11/ b/88
H /10/88
l\\ /lt/88

/

{

DATE : O/is/88

// /

0FflCIAL RECORD COPY i

. - - -, - - -.. - - _ _ - - - -.. - -.-- -.-.. -