ML20206G506: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:* | ||
* | * * /[a na e | ||
UNITED STATES y" | |||
g NUCLEAR REGULATORY COMMISSION | |||
,. I g., | |||
400 North Olive Street L. B. 81 Dallas, Texas 75201 | a wa sMNG TON,0. C. FC 555 | ||
%,**"*/ | |||
November 18, 1988 Docket tios. 50-445/446 Nr. W1111am G. Counsil Executive Vice President Texas Utilities Electric Cunpany 400 North Olive Street L. B. 81 Dallas, Texas 75201 | |||
==Dear Hr. Counsil:== | ==Dear Hr. Counsil:== | ||
==SUBJECT:== | ==SUBJECT:== | ||
Et;GlhEERING FUNCTIONAL EVALVATIUN | Et;GlhEERING FUNCTIONAL EVALVATIUN I | ||
TU Electric letter TXX-88591) dated September 14, 1988, provided the status of | TU Electric letter TXX-88591) dated September 14, 1988, provided the status of the Stone & Webster Engineering Corporation (SWEC) Engineering Functional Evaluation (EFE) and requesteo the staff's approval of the integration of the remaining EFE efforts into Comanche Peak Steam Electric Station (CPSES) Project activities. | ||
As discussed in the Septerher 14, 1988 letter, the primary purpose of the EFE was to prcvide additional levels of confidence that the design validation activities of the TV Electric Corrective Action Program (CAP) were conducteo effective 1). This principal objective was accomplished by Module 1 of the | As discussed in the Septerher 14, 1988 letter, the primary purpose of the EFE was to prcvide additional levels of confidence that the design validation activities of the TV Electric Corrective Action Program (CAP) were conducteo effective 1). | ||
SWEC EFE which provided an independent evaluation of the adequacy of the CPSES | This principal objective was accomplished by Module 1 of the SWEC EFE which provided an independent evaluation of the adequacy of the CPSES design validation and Post Construction Hardware Validation Program. | ||
The 1 | |||
I independent evaluation will be documented in a forthcoming SWEC EFE report. | |||
) | ) | ||
The remaining objectives of the SWEC EFE were to address the utilization uf design dats during testing (Module 2), utilization of design data during maintenance and operatiuns (Mooule 3), and the control of design activities c'uring operations (Module 4). | |||
The remaining objectives of the SWEC EFE were to address the utilization uf design dats during testing (Module 2), utilization of design data during maintenance and operatiuns (Mooule 3), and the control of design activities c'uring operations (Module 4). Because these objectives are also subject to | Because these objectives are also subject to the oversight of the TV Electric Quality Assurance Progran, TU Electri: pro-posed that the activities planned to be completed in hodules 2, 3, and 4 be integrated tato the ongoing CPSES Project activities. | ||
the oversight of the TV Electric Quality Assurance Progran, TU Electri: pro-posed that the activities planned to be completed in hodules 2, 3, and 4 be integrated tato the ongoing CPSES Project activities. The integration is to be accomplished by providing the EFE review plans for Modules 2, 3, and 4 ta | The integration is to be accomplished by providing the EFE review plans for Modules 2, 3, and 4 ta the TV Electric Quality Assurance Departnent for impler.entation. | ||
Additionally, the review criteric for Module 4 has been provided to the TU Electric Engineering Assurance Section to be reviewed and considered during the preparation of pro-cedures for overall site integration of the design control program for operations. | |||
ry letter cated January 22, 1988, the staff provideo its evalu'ation and approval | ry letter cated January 22, 1988, the staff provideo its evalu'ation and approval cf the CPSES licensing and corrective cction pregrams. | ||
In the evaluatinn, the staff fourd that the sccres of the SWEC EFE ano the Technical Audit Prcgram, which is an integral part of the TV Electric QA Program, provided acceptable twns for nenitorino the CAP activities. | |||
staff fourd that the sccres of the SWEC EFE ano the Technical Audit Prcgram, which is an integral part of the TV Electric QA Program, provided acceptable twns for nenitorino the CAP activities. The staff has reviu ed the TV E'cctric | The staff has reviu ed the TV E'cctric l | ||
PDR | l}0 8811220300 03111G | ||
\\ | |||
PDR ADOCK 05000445 A | |||
proposal for tha integration of the remaining EFE. activities into the CPSES Project activities and finds that the changes do not affect the bases for the staff's conclusions in the January 22, 1968 evaluation because the proposed approach still provides an adequate areans for TV Electric to monitor imple- | PDC | ||
mentation of design-related activities. Therefore, the staff concludes that the proposed integration described in the September 14, 1988 submittal is acceptable. | |||
Sincerely, | s. | ||
fir. William G. Counsil tiovember 18, 1988 proposal for tha integration of the remaining EFE. activities into the CPSES Project activities and finds that the changes do not affect the bases for the staff's conclusions in the January 22, 1968 evaluation because the proposed approach still provides an adequate areans for TV Electric to monitor imple-mentation of design-related activities. | |||
Comanche Peak Project Division | Therefore, the staff concludes that the proposed integration described in the September 14, 1988 submittal is acceptable. | ||
See next page | Sincerely, f | ||
Christopher I. Grimes, Director | |||
i | [ | ||
Comanche Peak Project Division t | |||
Office of Special Projects cc: | |||
See next page I | |||
i i | |||
E | E g | ||
W. d. Counsil Comanche Peak Steam Electric Station Texas Utilities Electric Company Units 1 and 2 cc: | |||
Jack R. Newman, Esq. | Jack R. Newman, Esq. | ||
Dallas, Texas 75201 | Asst. Director for Inspec. Programs Newman & Holtzinger, P.C. | ||
Comanche Peak Steam Eler.tric Station | Comanche Peak Project Division Suite 1000 U.S. Nuclear Regulatory Commission 1615 L Street, N.W. | ||
P. O. Box 1029 Washington, D.C. 20036 Granbury, Texas 76048 Robert A. Wooldridge, Esq. | |||
P. O. Box 1002 | Regional Administrator, Region IV Worsham, forsythe, Sampels & | ||
U.S. Nuclear Regulatory Commission ilooldridge 611 Ryan Plaza Drive, Suite 1000 2001 Bryan Tower. Suite 2500 Arlington, Texas 76011 Dallas, Texas 75201 Lanny A. Sinkin Mr. Homer C. Schmidt Christic Institute Director of Nuclear Services 1324 North Capitol Street Texas Utilities Electric Company Washington, D.C. | |||
20002 Skyway Tower 400 North Olive Street, L.B. 81 Hs. Billi, Pirner Garde. Esq. | |||
Pittsburgh, Pennsylvania 15230 | Dallas, Texas 75201 Governmenc Accountability Project Midwest Office Mr. R. W. Ackley 104 East Wisconsin Avenue Stone & Webster App *.eton, Wisconsin 54911 l | ||
1401 New York Avenue, NW i | ~ | ||
Susan M. Theisen | Comanche Peak Steam Eler.tric Station l | ||
P. O. Box 12548. Capitol Station | P. O. Box 1002 Cavid R. Pigott, Esq. | ||
j Glen Rose, Texas 76043 Orrick, Herrington & Sutcliffe 600 Montgomery Street Mr. J. L. Vota San Francisco, California 94111 Westinghouse Electric Corporation P. O. Box 355 Anthony Z. Roisman, Esq. | |||
4 Pittsburgh, Pennsylvania 15230 Suits 600 1401 New York Avenue, NW i | |||
Susan M. Theisen Washington, D.C. 20005 Assistant Attorney General Environmental Protection Division Robert Jablon P. O. Box 12548. Capitol Station Bonnie S. Blair Austin, Texas 78711-1548 Spiegel & McDiarmid | |||
] | |||
1350 New York Avenue, !!W Mrs. Juanita Ellis, President Washington, D.C. 20005-4798 Citizens Association for Sound Energy 1426 South Polk George A. Parker, Chairman Dallas, Texas 75224 Public btility Cortmittee Senior Citizens Alliance Of j | |||
Senior Citizens Alliance Of | Ms. Nancy H. Willians Tarrant County, Inc. | ||
t CYGNA Energy Services 6048 Wonder Drive 2121 N. California Blvo., Suite 390 Fort Worth, Texas 76133 Walnut Crt.ek, CA 94596 f | |||
1 | l 1 | ||
.t W. G. Counsil Comanche reak Electric Station | |||
^ | |||
Comanche reak Electric Station | Tev.as Utilities Electric Company Units 1 and 2 cc: | ||
Joseph F. Fulbright Fulbright & Jaworski 1301 McKinney Street Houston, Texas 77010 Roger D. Walker Manager, Nuclear Licensing Texas Utilities Electric Company Skyway Tower 400 North Olive Street, L.B. 81 Dallas, Texas 75201 Texas Utilities Electric Company c/o Bethesda Licensing 3 Metro Center, Suite 61e Bethesda, Maryland 20814 William A. Burchette, Esq. | Joseph F. Fulbright Fulbright & Jaworski 1301 McKinney Street Houston, Texas 77010 Roger D. Walker Manager, Nuclear Licensing Texas Utilities Electric Company Skyway Tower 400 North Olive Street, L.B. 81 Dallas, Texas 75201 Texas Utilities Electric Company c/o Bethesda Licensing 3 Metro Center, Suite 61e Bethesda, Maryland 20814 William A. Burchette, Esq. | ||
Counsel for Tex-La Electric Cooperative of Texas Heron, 8urchette, Ruckert & Rothwell Suite 700 1025 Thomas Jefferson Street, NW Washington, D.C. 20C07 GOS ASSOCIATES, INC. | Counsel for Tex-La Electric Cooperative of Texas Heron, 8urchette, Ruckert & Rothwell Suite 700 1025 Thomas Jefferson Street, NW Washington, D.C. | ||
20C07 GOS ASSOCIATES, INC. | |||
Suite 720 1850 Parkway Place Marietta, Georgia 30067-8237 | Suite 720 1850 Parkway Place Marietta, Georgia 30067-8237 | ||
Mr. William G. Counsil | Mr. William G. Counsil | ||
-2 proposal for the integration of t]e remaining EFE activities into the CPSES Project activities and finds that the changes do not affect the bases for'the staff's conclusions in the January 22, 1988 evaluation because the proposed approach still provides an adequate means for TV Electric to monitor imple-nentation of design.related act'vities. | |||
Comanche Peak Project Division | Therefore, the staff concludes that the proposed integration described in the September 14, 1988 submittal is acceptable. | ||
Office of Special Projects CC: | l t | ||
Sincerely, | |||
%k181 SigMd byl l | |||
Christopher I. Grimes, Director Comanche Peak Project Division Office of Special Projects CC: | |||
See next page Distribution: | See next page Distribution: | ||
Docket. Files | Docket. Files NRC 4-Local PDRs CPPD Reading OSP Reading J. Partlow C. Grimes P. McKee 1 | ||
NRC 4-Local PDRs | J. H. Wilson J. Lyons R. Warnick Licensing Assistant M. Malloy l | ||
CPPD Reading OSP Reading J. Partlow C. Grimes | OGC-WF r | ||
D. Crutchfield l | |||
E. Jordan B. Grimes ACRS(10) i i | |||
i i | i l | ||
i | \\ | ||
l | *r e r nocutotte en*Ft f D D r ew r _ | ||
\ | l OFC | ||
: AD:CPPDTd5p/: AD:CPPD:05pr :PD:CPP :05P l0GC | |||
l OFC | :0:CPPD:0SP lNAME: | ||
:JHWilso,'hy :P ee | |||
:JMoor | |||
:ClGrime 5..:. | |||
I....-: | |||
A 88 | |||
:11/ b/88 | |||
:H /10/88 | |||
:l\\ /lt/88 | |||
/ | |||
{ | { | ||
0FflCIAL RECORD COPY | DATE : O/is/88 | ||
: // / | |||
0FflCIAL RECORD COPY i | |||
. - - -, - - -.. - - _ _ - - - -.. - -.-- -.-.. -}} | |||
Latest revision as of 01:19, 7 December 2024
| ML20206G506 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/18/1988 |
| From: | Charemagne Grimes NRC OFFICE OF SPECIAL PROJECTS |
| To: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| References | |
| NUDOCS 8811220300 | |
| Download: ML20206G506 (5) | |
Text
- * /[a na e
UNITED STATES y"
g NUCLEAR REGULATORY COMMISSION
,. I g.,
a wa sMNG TON,0. C. FC 555
%,**"*/
November 18, 1988 Docket tios. 50-445/446 Nr. W1111am G. Counsil Executive Vice President Texas Utilities Electric Cunpany 400 North Olive Street L. B. 81 Dallas, Texas 75201
Dear Hr. Counsil:
SUBJECT:
Et;GlhEERING FUNCTIONAL EVALVATIUN I
TU Electric letter TXX-88591) dated September 14, 1988, provided the status of the Stone & Webster Engineering Corporation (SWEC) Engineering Functional Evaluation (EFE) and requesteo the staff's approval of the integration of the remaining EFE efforts into Comanche Peak Steam Electric Station (CPSES) Project activities.
As discussed in the Septerher 14, 1988 letter, the primary purpose of the EFE was to prcvide additional levels of confidence that the design validation activities of the TV Electric Corrective Action Program (CAP) were conducteo effective 1).
This principal objective was accomplished by Module 1 of the SWEC EFE which provided an independent evaluation of the adequacy of the CPSES design validation and Post Construction Hardware Validation Program.
The 1
I independent evaluation will be documented in a forthcoming SWEC EFE report.
)
The remaining objectives of the SWEC EFE were to address the utilization uf design dats during testing (Module 2), utilization of design data during maintenance and operatiuns (Mooule 3), and the control of design activities c'uring operations (Module 4).
Because these objectives are also subject to the oversight of the TV Electric Quality Assurance Progran, TU Electri: pro-posed that the activities planned to be completed in hodules 2, 3, and 4 be integrated tato the ongoing CPSES Project activities.
The integration is to be accomplished by providing the EFE review plans for Modules 2, 3, and 4 ta the TV Electric Quality Assurance Departnent for impler.entation.
Additionally, the review criteric for Module 4 has been provided to the TU Electric Engineering Assurance Section to be reviewed and considered during the preparation of pro-cedures for overall site integration of the design control program for operations.
ry letter cated January 22, 1988, the staff provideo its evalu'ation and approval cf the CPSES licensing and corrective cction pregrams.
In the evaluatinn, the staff fourd that the sccres of the SWEC EFE ano the Technical Audit Prcgram, which is an integral part of the TV Electric QA Program, provided acceptable twns for nenitorino the CAP activities.
The staff has reviu ed the TV E'cctric l
l}0 8811220300 03111G
\\
PDR ADOCK 05000445 A
s.
fir. William G. Counsil tiovember 18, 1988 proposal for tha integration of the remaining EFE. activities into the CPSES Project activities and finds that the changes do not affect the bases for the staff's conclusions in the January 22, 1968 evaluation because the proposed approach still provides an adequate areans for TV Electric to monitor imple-mentation of design-related activities.
Therefore, the staff concludes that the proposed integration described in the September 14, 1988 submittal is acceptable.
Sincerely, f
Christopher I. Grimes, Director
[
Comanche Peak Project Division t
Office of Special Projects cc:
See next page I
i i
E g
W. d. Counsil Comanche Peak Steam Electric Station Texas Utilities Electric Company Units 1 and 2 cc:
Jack R. Newman, Esq.
Asst. Director for Inspec. Programs Newman & Holtzinger, P.C.
Comanche Peak Project Division Suite 1000 U.S. Nuclear Regulatory Commission 1615 L Street, N.W.
P. O. Box 1029 Washington, D.C. 20036 Granbury, Texas 76048 Robert A. Wooldridge, Esq.
Regional Administrator, Region IV Worsham, forsythe, Sampels &
U.S. Nuclear Regulatory Commission ilooldridge 611 Ryan Plaza Drive, Suite 1000 2001 Bryan Tower. Suite 2500 Arlington, Texas 76011 Dallas, Texas 75201 Lanny A. Sinkin Mr. Homer C. Schmidt Christic Institute Director of Nuclear Services 1324 North Capitol Street Texas Utilities Electric Company Washington, D.C.
20002 Skyway Tower 400 North Olive Street, L.B. 81 Hs. Billi, Pirner Garde. Esq.
Dallas, Texas 75201 Governmenc Accountability Project Midwest Office Mr. R. W. Ackley 104 East Wisconsin Avenue Stone & Webster App *.eton, Wisconsin 54911 l
~
Comanche Peak Steam Eler.tric Station l
P. O. Box 1002 Cavid R. Pigott, Esq.
j Glen Rose, Texas 76043 Orrick, Herrington & Sutcliffe 600 Montgomery Street Mr. J. L. Vota San Francisco, California 94111 Westinghouse Electric Corporation P. O. Box 355 Anthony Z. Roisman, Esq.
4 Pittsburgh, Pennsylvania 15230 Suits 600 1401 New York Avenue, NW i
Susan M. Theisen Washington, D.C. 20005 Assistant Attorney General Environmental Protection Division Robert Jablon P. O. Box 12548. Capitol Station Bonnie S. Blair Austin, Texas 78711-1548 Spiegel & McDiarmid
]
1350 New York Avenue, !!W Mrs. Juanita Ellis, President Washington, D.C. 20005-4798 Citizens Association for Sound Energy 1426 South Polk George A. Parker, Chairman Dallas, Texas 75224 Public btility Cortmittee Senior Citizens Alliance Of j
Ms. Nancy H. Willians Tarrant County, Inc.
t CYGNA Energy Services 6048 Wonder Drive 2121 N. California Blvo., Suite 390 Fort Worth, Texas 76133 Walnut Crt.ek, CA 94596 f
l 1
.t W. G. Counsil Comanche reak Electric Station
^
Tev.as Utilities Electric Company Units 1 and 2 cc:
Joseph F. Fulbright Fulbright & Jaworski 1301 McKinney Street Houston, Texas 77010 Roger D. Walker Manager, Nuclear Licensing Texas Utilities Electric Company Skyway Tower 400 North Olive Street, L.B. 81 Dallas, Texas 75201 Texas Utilities Electric Company c/o Bethesda Licensing 3 Metro Center, Suite 61e Bethesda, Maryland 20814 William A. Burchette, Esq.
Counsel for Tex-La Electric Cooperative of Texas Heron, 8urchette, Ruckert & Rothwell Suite 700 1025 Thomas Jefferson Street, NW Washington, D.C.
20C07 GOS ASSOCIATES, INC.
Suite 720 1850 Parkway Place Marietta, Georgia 30067-8237
Mr. William G. Counsil
-2 proposal for the integration of t]e remaining EFE activities into the CPSES Project activities and finds that the changes do not affect the bases for'the staff's conclusions in the January 22, 1988 evaluation because the proposed approach still provides an adequate means for TV Electric to monitor imple-nentation of design.related act'vities.
Therefore, the staff concludes that the proposed integration described in the September 14, 1988 submittal is acceptable.
l t
Sincerely,
%k181 SigMd byl l
Christopher I. Grimes, Director Comanche Peak Project Division Office of Special Projects CC:
See next page Distribution:
Docket. Files NRC 4-Local PDRs CPPD Reading OSP Reading J. Partlow C. Grimes P. McKee 1
J. H. Wilson J. Lyons R. Warnick Licensing Assistant M. Malloy l
OGC-WF r
D. Crutchfield l
E. Jordan B. Grimes ACRS(10) i i
i l
\\
- r e r nocutotte en*Ft f D D r ew r _
l OFC
- AD:CPPDTd5p/: AD:CPPD:05pr :PD:CPP :05P l0GC
- 0:CPPD:0SP lNAME:
- JHWilso,'hy :P ee
- JMoor
- ClGrime 5..:.
I....-:
A 88
- 11/ b/88
- H /10/88
- l\\ /lt/88
/
{
DATE : O/is/88
- // /
0FflCIAL RECORD COPY i