#REDIRECT [[IR 05000498/1986035]]
{{Adams
| number = ML20209H792
| issue date = 04/29/1987
| title = Ack Receipt of Informing NRC of Schedule for Resolving Deficiencies Noted in Emergency Preparedness Insp Repts 50-498/86-35 & 50-499/86-35.Schedule Responsive to Concerns Identified in Repts
| author name = Gagliardo J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| addressee name = Goldberg J
| addressee affiliation = HOUSTON LIGHTING & POWER CO.
| docket = 05000498, 05000499
| license number =
| contact person =
| document report number = NUDOCS 8705040122
| title reference date = 03-27-1987
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000498/1986035]]
 
=Text=
{{#Wiki_filter:,
  ** -"
                                            APR 291987
        In Reply Refer To:
        -Dockets:    50-498/86-35
                    50-499/86-35
        Houston Lighting & Power. Company
        ATTN:  J. H. Goldberg, Group Vice
                    President, Nuclear
        P. O. Box 1700
        Houston, Texas    77001
        Gentlemen:
              Thank you for your letter of March 27, 1987, in response to our letter
        dated February 26, 1987. We have reviewed your reply and find the schedule
        for resolving deficiencies responsive to the concerns raised in our emergency
        preparedness inspection report. We will review the implementation of your
        corrective actions during future inspections to determine that an adequate
        state of onsite emergency preparedness has been achieved and will be
        maintained.
                                                    Sincerely,
                                                  -ORIGINAL SIGNED BY:
                                                                                            -
                                                    J. E. Gagliardo, Chief
                                                    Reactor Projects Branch
        cc:
        Houston Lighting & Power Company
        ATTN: M. Wisenberg, Manager,
                    Nuclear Licensing
        P. O. Box 1700
        Houston, Texas    77001
        Houston Lighting & Power Company
        ATTN: Gerald E. Vaughn, Vice President
                Nuclear Operations
        P. O. Box 1700
        Houston, Texas    77001
        Texas Radiation Control Program Director
        RIV:EP&SP        C:EP&SP        C:R&SPBb        C:            C:RPB
        JBBaird/jt      LAYandell      WLFisher                  ble  J Ga ia  o
        4 /Gb/87        I{/%/87        4/%/87          G}L/1%/87        /g 8j1
                                                                                          /
            8705040122 870429
            PDR  ADOCK O        4y8                                                      ,
            a
                                                                                      /y/ji
 
  r
    . .
        Houston Lighting and Power Company -2-
        bec to DMB (IE35)
        bec distrib. by RIV:
        RPB
        DRSP
        Resident Inspector-OPS
        R. D. Martin, RA
        Resident Inspector-CONST.
        Section Chief (RPB/C)
        R&SPB
        MIS SYSTEM
        2 4V File
        D. Weiss, RM/ALF
        RSTS Operator
        R. Pirfo, ELD
        R. G. Taylor, RPB/C
        RSB
        Inspector
        Section Chief
        W. L. Fisher
        R. L. Bangart
        R. E. Hall
        Project Inspector, RPB
        D. B. Matthews, NRR
,
 
  .      .
              .
  .. .  .
            .
    s.
  c.          The Light
              m m P u y "eseetia ix&Pe-e,    n          e.o. 8ex >700 nees ee. rex ,27ooi <2is> 22s.92ii
                                                                      March 27, 1987
                                                                        ST-HL-AE-1994
                                                                        File No.: G9.08
                                                                        10CFR 50.47
                                                                                                  .-
                                                                                      @h
                U. S. Nuclear Regulatory Commission
                Attention: Document Control Desk                            <
                                                                                  ','.,r ~ " '---- ~]t
                Washington, DC    20555                                        ): ' AM - 2 E
                                                                                _                      h
                                                  South Texas Project
                                                    Units 1 and 2
                                          Docket Nos. STN 50-498, STN 50-499
                                          Emergency Preparedness Appraisal
                      In response to Mr. J. E. Gagliardo's letter dated February 27, 1987,
                which tratsmitted the Emergency Preparedness Appraisal Inspection Report, we
                are submitting the attached schedule for resolving all identified
                deficiencies. Houston Lighting & Power (HMP) personnel met with the NRC
                staff on Janary 8, 1987 to discuss these items. The attachment also cross
                references each of the Inspection Report item numbers to the numbers assigned
                by HMP prior to receipt of the inspection report and used during the January
                meeting. Also noted on the attachment are any necessary qualifying comments
                relative to the schedule dates.
                      Since the time of the appraisal, HMP has devoted an extensive amount of                >
                resources to the Emergency Preparedness Program. We believe that with
;                completion of the procedures, training, systems, etc. listed on the
      '
                attachment, HMP will be able to demonstrate adequate emergency preparedness
                at the South Texas Project Electric Generating Station.
i
l
                      If you should have any questions on this matter, please contact Mr.
                M. A. McBurnett at (512) 972-8530.
                                                                  J. H. Goldberg
                                                                  Group Vice President, Nuclear
l                MAM/ljm
l
l                Attachment: NRC Emergency Preparedness Appraisal Response
l
l                                                                                                            -
1
                L3/NRC/cp                                                                                k
  %ySM
 
    .        .
                  *
        . .- .
  ,,
                Houston 1.ighting & Power Company
                                                                                ST-HL-AE-1994
                                                                                File No.: C9.08
                                                                                Page 2
                cc:
                Regional Administrator, Region IV        M.B. Lee /J.E. Malaski'
                Nuclear Regulatory Commission            City of Austin
                611 Ryan Plaza Drive, Suite 1000        P.O. Box 1088
;              Arlington, TX 76011                      Austin, TX 78767-8814
                N. Prasad Kadambi, Project Manager        M.T. Hardt/A. von Rosenberg
                U.S. Nuclear Regulatory Commission        City Public Service Board
                7920 Norfolk Avenue                      P.O. Box 1771
                Bethesda, MD 20814                        San Antonio, 13t 78296
                Robert L. Perch, Project Manager          Advisory Committee on Reactor Safeguards
                U.S. Nuclear Regulatory Commission        U.S. Nuclear Regulatory Commission
                7920 Norfolk Avenue                      1717 H Street
                Bethesda, MD 20814                        Washington, DC 20555
                Dan R. Carpenter
                Senior Resident Inspector / Operations
                c/o U.S. Nuclear Regulatory
                  Commission
                P.O. Box 910
                Bay City, TX 77414
,              Claude E. Johnson
!              Senior Resident Inspector /STP
                c/o U.S. Nuclear Regulatory
                  Commission
                P.O. Box 910
                Bay City, TX 77414
j              M.D. Schwarz, Jr. , Esquire
'
                Baker & Botts
                One Shell Plaza
      .        Houston, TX 77002
                J.R. Newman, Esquire
                Newman & Holtzinger, P.C.
                1615 L Street, N.W.
                Washington, DC 20036
                T.V. Shockley/R.L. Range
                Central Power & Light Company
                P. O. Box 2121
                Corpus Christi, TX 78403
l-
                                                                                        Revised 2/3/87
                    L3/NRC/cp
                                                      -.      . - _ . - _ - _ - -                - - .
 
              _                                          _                                      - -
  ,          .
                              '
  .''            '
          .
                                                                                                                          Attachment
                                                                                                                          ST-HL-AE-1994
        *                                                                                                                Page 1 of 5
    .
      .
                                                          NRC Emergency Preparedness Appraisal Response
                                                                                Scheduled
                                  NRC No.          HL&P* No.                  Completion Date          Notes / Comments
                                  8635-001          4a                                    3/09/87        Completed
                                  8635-002          4a                                    3/11/87        Completed
                                  8635-003          5b                                    4/01/87
                                                                                                                                                            ,
                                  8635-004          3a                                    4/07/87
                                  8635-005          7a,b,c                              Fuel Load        Installed Systems will be
                                                                                                        functional for drill purposes by
                                                                                                        4/1/87; however, these systems
                                                                                                        will not be . fully operational
                                                                                                        until fuel load.
                                8635-006          lb,6a                                  4/01/87
                                8635-007          7a,b,c                                Fuel Load      Installed Systems will be
                                                                                                        functional for drill purposes by
                                                                                                        4/1/87; however, these systems
                                                                                                        will not be fully operational
                                                                                                        until fuel load.
                                8635-008          6b                                    3/24/87      Completed
                                8635-009          10b,9c,15                              3/02/87      Completed
                                8635-010        10c                                    3/09/87        Completed
                                8635-011        6c                                    3/24/87        Completed
i                                8635-012        7a,b,c                              Fuel Load        Installed Systems will be
l      .
                                                                                                        functional for drill purposes by
                                                                                                      4/1/87; however, these systems
                                                                                                      will not be fully operational
                                                                                                      until fuel load.
                                8635-013          9a                                    5/01/87      The E0C HVAC system does not use
                                                                                                      charcoal filters; therefore, no
                                                                                                      charcoal testing will be
                                                                                                      established for this system. The
                                                                                                      Emergency Plan was revised to
                                                                                                      delete reference to charcoal
                                                                                                      filters.
                                8635-014        6d                                    3/24/87        Completed
                                8635-015        Ic,10a                                3/02/87        Completed
l
l
'
            - . - . - - _ . .            ._ .. -            .-- . - - . - . . - - . _ -  -
                                                                                                                    _ .. - . . ..- .- -. .. - . , . . . - --
 
      .              .
                              -
        ,
            . . .
    '
                                                                                                                                              Attachment
                                                                                                                                              ST-HL-AE-1994
        ,
                                                                                                                                              Page 2 of 5
          .
                                                                                          Scheduled
                                  NRC No.  HL&P* No.                                    Completion Date                      Notes / Comments
                                  8635-016  7f                                              Full Power                        The PASS System is essentially
                                                                                              License                          complete and partially tested.
                                                                                                                                Full operability will be
                                                                                                                                demonstrated prior to full power
                                                                                                                                operation.
                                  8635-017  7f                                              Full Power                        The PASS System is essentially
                                                                                              License                          complete and partially tested.
                                                                                                                                Full operability will be
                                                                                                                                demonstrated prior to full power
                                                                                                                                operation.
                                  8635-018 7f                                                Full Power                        The PASS System is essentially
                                                                                              License                          complete and partially tested.
                                                                                                                                Full operability will be
                                                                                                                                demonstrated prior to full power
                                                                                                                                operation.
                                  8635-019 --
                                                                                              6/01/67                          There is no dedicated system for
                                                                                                                                post accident sampling of plant
                                                                                                                                liquid effluents. Appropriate
                                                                                                                                ALARA reviews and procedural
                                                                                                                                precautions are being added to
                                                                                                                                address such activities at the
                                                                                                                                normal sample locations.
  ,                              8635-020 10f                                              Fuel Load                          Offsite reassembly controls will
                                                                                                                                be established by 4/1/87 and
                                                                                                                                tested prior to Fuel Load.
                                  8635-021 13a,10e                                          4/01/87
                                  8635-022 la                                                12/19/86                          Completed
          .
                                  8635-023 4c                                                2/24/87                          Completed
l
l                                  8635-024 --
                                                                                              4/01/87                          The additional electrical outlets
'
                                                                                                                                in the PIO Support room at the
l                                                                                                                              MIC are being added.
                                  8635-025 7e                                              Fuel Load                          Non-radiological process systems,
.                                                                                                                              including their indication and
l                                                                                                                              alarm functions are scheduled to
'
                                                                                                                                be completed and operational
j                                                                                                                              prior to issuance of the low
j                                                                                                                              power license.
!
                                  8635-026 2e                                                3/24/87                          Completed
l
l
l
!
                                                                                                                                                                                  .
  <
                . - - - . . .  -          . _ . , - _ _ , , _ _ _ . . _ . _ , , . _ , .                . , , , . _ _ . . . _          ,,_m  _ _ . , , , . , , _ ---_-.,_..,,._m- _
                                                                                                                                                                                        .--
 
.        .
    .
      .    .
          .
    .                                                                Attachment
                                                                    ST-HL-AE-1994
                                                                    Page 3 of 5            j
                                      Scheduled
              NRC No.  HL&P* No.      Completion Date Notes / Comments
              8635-027  --
                                            4/03/87    Inconsistency between the Plan,
                                                      the FSAR and implementing
                                                      procedures will be resolved
                                                      through transmittal of marked-up
                                                      FSAR pages on 4/3/87 and followed
                                                      up with a formal FSAR amendment.
              8635-028 6a,c.e              3/24/87    Completed
              8635-029 6a-e                3/24/87    Completed
              8635-030  2e                2/10/87    Completed
              8635-031 8a                  2/24/87    Completed. There is no back up
                                                      communications system to the
                                                      State EOC.
              8635-032  --
                                          Fuel Load  The PNS system sirens have been
                                                      completed and tested. The Tone
                                                      Alert Radios will be distributed
                                                        to EPZ population prior to fuel
                                                        load.    Programs for operation and
                                                      control of the PNS will be in
                                                      place prior to 4/1/87
              8635-033  Ig                3/31/87
              8635-034  13e                4/01/87
              8635-035  10                3/09/87    Completed
              8635-036 10d                3/09/87    Completed
  -
              8635-037 10f                3/31/87
              8635-038 13d                3/20/87    Completed
              8635-039 2e                  2/10/87    Completed
              8635-040 2d                  4/15/87
              8635-041 12                  3/11/87    Completed
              8635-042 4a                  3/27/87
              0635-043 le                  1/09/87    Completed
              8635-044 --
                                            4/07/87
              8635-045 Sa                  4/15/87    Completion delayed to allow for
                                                      licensing of one remaining pager
                                                      transmitter station.
                                                              .-.
                                                                        _ _ _ . ._. ._
                                                                                        -.
                              - _ - .    .
 
.        .'
    . s .  -
'
',                                                                Attachment
                                                                  ST-HL-AE-1994
,
                                                                  Page 4 of 5
..
                                    Scheduled
              NRC No.  HL&P* No. . Completion Date  Notes / Comments
              8635-046  8b            6/01/87
              8635-047  4a,5a          3/11/87        Completed
              8635-048  7c,7q        Fuel Load      RM21A is functional and
                                                      demonstrable for exercise play on
                                                      4/8/87, full operational
                                                      capability is dependent upon
                                                    ' plant completion for fuel load.
              8635-049  --
                                        4/01/87        The IRDAM program has been
                                                      subsequently upgraded and
                                                      renamed, STAMPEDE.    Final
                                                      procedural revisions for STAMPEDE
                                                      will be complete 4/1/87.
              8635-050  Id            1/09/87        Completed
              8635-051  If            3/09/87        Completed
              8635-052  13b            4/01/87
              8635-053  13c            4/01/87
              8635-054  Sc              4/15/87        Completion delayed due to system
                                                      expansion.
              8635-055  8c              6/01/87
              8635-056  14              6/01/87        Procedures for site access and
                                                      accountability are complete; the
                                                      security system will be completed
                                                      and controls demonstrated by
  .
                                                      6/1/87.
              8635-057  13a,10e        4/01/87
              8635-058  10f,13a        3/31/87
              8635-059  --
                                      4/01/87
              8635-060  15            3/02/87        Completed
              8635-061  16,lh          4/01/87
              8635-062  10g            12/14/86      Completed
              8635-063  10h            12/14/86      Completed
              8635-064  4f            12/19/86      Completed
                                          ~
 
.        .
      . . .
        .
            -
''
    *
                                                                          Attachment
                                                                          ST-HL-AE-1994
                                                                            Page 5 of 5
.x
                                      Scheduled
              NRC No.    HL&P* No.    Completion Date          Notes / Comments
              8635-065    2e              2/10/87              Inventory controls complete,
                                                                calibration is controlled and is
                                                                being conducted as equipment is
                                                                received.
              8635-066    2e              3/01/87              Inventory controls are complete,
                                                                calibration is controlled and is
                                                                being conducted as equipment is
                                                          ,
                                                                received.
              8635-067    2b              4/01/87
              8635-068    2c              4/01/87              The Nuclear Safety Review Board
                                                                has accepted responsibility for
                                                                12 month EP Program reviews and
                                                                will document plans for conduct.
              8635-069    2c              3/09/87              The Emergency Plan has been
                                                                revised to identify NSRB as the
                                                                responsible organization for
                                                                10CFR50.54(t). Since NSRB is
                                                                independent from the Emergency
                                                                Preparedness Department and PORL,
                                                                this item is resolved.
              8635-070    3b              5/01/87              Respiratory training is scheduled
                                                                for April,1987 and will complete
                                                                this item.
              8635-071    3b              4/07/87
              8635-072    17              5/01/87              Transient information has been
  -                                                            posted with the exception of 3
                                                                weatherproof signs to be placed
                                                                at public boat ramps.
              8635-073    2a              4/01/87
              8635-074    --
                                          4/08/87              Procedures, training and drill
                                                                experience have significantly
                                                                improved these performance items
                                                                since December, 1986, as will be
                                                                evidenced by exercise performance
                                                                on April 8, 1987.
              8635-075    4d              3/03/87              Completed
              *The HL&P number is the number used by HL&P to identify the deficiency in the
              meeting on January 8, 1987.
                      -
                          .            -        .. -- - - - -              -  . - .  .  .- .-  - . -
}}

Revision as of 10:26, 19 December 2021

Ack Receipt of Informing NRC of Schedule for Resolving Deficiencies Noted in Emergency Preparedness Insp Repts 50-498/86-35 & 50-499/86-35.Schedule Responsive to Concerns Identified in Repts
ML20209H792
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/29/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 8705040122
Download: ML20209H792 (2)


See also: IR 05000498/1986035

Text

,

    • -"

APR 291987

In Reply Refer To:

-Dockets: 50-498/86-35

50-499/86-35

Houston Lighting & Power. Company

ATTN: J. H. Goldberg, Group Vice

President, Nuclear

P. O. Box 1700

Houston, Texas 77001

Gentlemen:

Thank you for your letter of March 27, 1987, in response to our letter

dated February 26, 1987. We have reviewed your reply and find the schedule

for resolving deficiencies responsive to the concerns raised in our emergency

preparedness inspection report. We will review the implementation of your

corrective actions during future inspections to determine that an adequate

state of onsite emergency preparedness has been achieved and will be

maintained.

Sincerely,

-ORIGINAL SIGNED BY:

-

J. E. Gagliardo, Chief

Reactor Projects Branch

cc:

Houston Lighting & Power Company

ATTN: M. Wisenberg, Manager,

Nuclear Licensing

P. O. Box 1700

Houston, Texas 77001

Houston Lighting & Power Company

ATTN: Gerald E. Vaughn, Vice President

Nuclear Operations

P. O. Box 1700

Houston, Texas 77001

Texas Radiation Control Program Director

RIV:EP&SP C:EP&SP C:R&SPBb C: C:RPB

JBBaird/jt LAYandell WLFisher ble J Ga ia o

4 /Gb/87 I{/%/87 4/%/87 G}L/1%/87 /g 8j1

/

8705040122 870429

PDR ADOCK O 4y8 ,

a

/y/ji

r

. .

Houston Lighting and Power Company -2-

bec to DMB (IE35)

bec distrib. by RIV:

RPB

DRSP

Resident Inspector-OPS

R. D. Martin, RA

Resident Inspector-CONST.

Section Chief (RPB/C)

R&SPB

MIS SYSTEM

2 4V File

D. Weiss, RM/ALF

RSTS Operator

R. Pirfo, ELD

R. G. Taylor, RPB/C

RSB

Inspector

Section Chief

W. L. Fisher

R. L. Bangart

R. E. Hall

Project Inspector, RPB

D. B. Matthews, NRR

,

. .

.

.. . .

.

s.

c. The Light

m m P u y "eseetia ix&Pe-e, n e.o. 8ex >700 nees ee. rex ,27ooi <2is> 22s.92ii

March 27, 1987

ST-HL-AE-1994

File No.: G9.08

10CFR 50.47

.-

@h

U. S. Nuclear Regulatory Commission

Attention: Document Control Desk <

','.,r ~ " '---- ~]t

Washington, DC 20555 ): ' AM - 2 E

_ h

South Texas Project

Units 1 and 2

Docket Nos. STN 50-498, STN 50-499

Emergency Preparedness Appraisal

In response to Mr. J. E. Gagliardo's letter dated February 27, 1987,

which tratsmitted the Emergency Preparedness Appraisal Inspection Report, we

are submitting the attached schedule for resolving all identified

deficiencies. Houston Lighting & Power (HMP) personnel met with the NRC

staff on Janary 8, 1987 to discuss these items. The attachment also cross

references each of the Inspection Report item numbers to the numbers assigned

by HMP prior to receipt of the inspection report and used during the January

meeting. Also noted on the attachment are any necessary qualifying comments

relative to the schedule dates.

Since the time of the appraisal, HMP has devoted an extensive amount of >

resources to the Emergency Preparedness Program. We believe that with

completion of the procedures, training, systems, etc. listed on the

'

attachment, HMP will be able to demonstrate adequate emergency preparedness

at the South Texas Project Electric Generating Station.

i

l

If you should have any questions on this matter, please contact Mr.

M. A. McBurnett at (512) 972-8530.

J. H. Goldberg

Group Vice President, Nuclear

l MAM/ljm

l

l Attachment: NRC Emergency Preparedness Appraisal Response

l

l -

1

L3/NRC/cp k

%ySM

. .

. .- .

,,

Houston 1.ighting & Power Company

ST-HL-AE-1994

File No.: C9.08

Page 2

cc:

Regional Administrator, Region IV M.B. Lee /J.E. Malaski'

Nuclear Regulatory Commission City of Austin

611 Ryan Plaza Drive, Suite 1000 P.O. Box 1088

Arlington, TX 76011 Austin, TX 78767-8814

N. Prasad Kadambi, Project Manager M.T. Hardt/A. von Rosenberg

U.S. Nuclear Regulatory Commission City Public Service Board

7920 Norfolk Avenue P.O. Box 1771

Bethesda, MD 20814 San Antonio, 13t 78296

Robert L. Perch, Project Manager Advisory Committee on Reactor Safeguards

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission

7920 Norfolk Avenue 1717 H Street

Bethesda, MD 20814 Washington, DC 20555

Dan R. Carpenter

Senior Resident Inspector / Operations

c/o U.S. Nuclear Regulatory

Commission

P.O. Box 910

Bay City, TX 77414

, Claude E. Johnson

! Senior Resident Inspector /STP

c/o U.S. Nuclear Regulatory

Commission

P.O. Box 910

Bay City, TX 77414

j M.D. Schwarz, Jr. , Esquire

'

Baker & Botts

One Shell Plaza

. Houston, TX 77002

J.R. Newman, Esquire

Newman & Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036

T.V. Shockley/R.L. Range

Central Power & Light Company

P. O. Box 2121

Corpus Christi, TX 78403

l-

Revised 2/3/87

L3/NRC/cp

-. . - _ . - _ - _ - - - - .

_ _ - -

, .

'

. '

.

Attachment

ST-HL-AE-1994

  • Page 1 of 5

.

.

NRC Emergency Preparedness Appraisal Response

Scheduled

NRC No. HL&P* No. Completion Date Notes / Comments

8635-001 4a 3/09/87 Completed

8635-002 4a 3/11/87 Completed

8635-003 5b 4/01/87

,

8635-004 3a 4/07/87

8635-005 7a,b,c Fuel Load Installed Systems will be

functional for drill purposes by

4/1/87; however, these systems

will not be . fully operational

until fuel load.

8635-006 lb,6a 4/01/87

8635-007 7a,b,c Fuel Load Installed Systems will be

functional for drill purposes by

4/1/87; however, these systems

will not be fully operational

until fuel load.

8635-008 6b 3/24/87 Completed

8635-009 10b,9c,15 3/02/87 Completed

8635-010 10c 3/09/87 Completed

8635-011 6c 3/24/87 Completed

i 8635-012 7a,b,c Fuel Load Installed Systems will be

l .

functional for drill purposes by

4/1/87; however, these systems

will not be fully operational

until fuel load.

8635-013 9a 5/01/87 The E0C HVAC system does not use

charcoal filters; therefore, no

charcoal testing will be

established for this system. The

Emergency Plan was revised to

delete reference to charcoal

filters.

8635-014 6d 3/24/87 Completed

8635-015 Ic,10a 3/02/87 Completed

l

l

'

- . - . - - _ . . ._ .. - .-- . - - . - . . - - . _ - -

_ .. - . . ..- .- -. .. - . , . . . - --

. .

-

,

. . .

'

Attachment

ST-HL-AE-1994

,

Page 2 of 5

.

Scheduled

NRC No. HL&P* No. Completion Date Notes / Comments

8635-016 7f Full Power The PASS System is essentially

License complete and partially tested.

Full operability will be

demonstrated prior to full power

operation.

8635-017 7f Full Power The PASS System is essentially

License complete and partially tested.

Full operability will be

demonstrated prior to full power

operation.

8635-018 7f Full Power The PASS System is essentially

License complete and partially tested.

Full operability will be

demonstrated prior to full power

operation.

8635-019 --

6/01/67 There is no dedicated system for

post accident sampling of plant

liquid effluents. Appropriate

ALARA reviews and procedural

precautions are being added to

address such activities at the

normal sample locations.

, 8635-020 10f Fuel Load Offsite reassembly controls will

be established by 4/1/87 and

tested prior to Fuel Load.

8635-021 13a,10e 4/01/87

8635-022 la 12/19/86 Completed

.

8635-023 4c 2/24/87 Completed

l

l 8635-024 --

4/01/87 The additional electrical outlets

'

in the PIO Support room at the

l MIC are being added.

8635-025 7e Fuel Load Non-radiological process systems,

. including their indication and

l alarm functions are scheduled to

'

be completed and operational

j prior to issuance of the low

j power license.

!

8635-026 2e 3/24/87 Completed

l

l

l

!

.

<

. - - - . . . - . _ . , - _ _ , , _ _ _ . . _ . _ , , . _ , . . , , , . _ _ . . . _ ,,_m _ _ . , , , . , , _ ---_-.,_..,,._m- _

.--

. .

.

. .

.

. Attachment

ST-HL-AE-1994

Page 3 of 5 j

Scheduled

NRC No. HL&P* No. Completion Date Notes / Comments

8635-027 --

4/03/87 Inconsistency between the Plan,

the FSAR and implementing

procedures will be resolved

through transmittal of marked-up

FSAR pages on 4/3/87 and followed

up with a formal FSAR amendment.

8635-028 6a,c.e 3/24/87 Completed

8635-029 6a-e 3/24/87 Completed

8635-030 2e 2/10/87 Completed

8635-031 8a 2/24/87 Completed. There is no back up

communications system to the

State EOC.

8635-032 --

Fuel Load The PNS system sirens have been

completed and tested. The Tone

Alert Radios will be distributed

to EPZ population prior to fuel

load. Programs for operation and

control of the PNS will be in

place prior to 4/1/87

8635-033 Ig 3/31/87

8635-034 13e 4/01/87

8635-035 10 3/09/87 Completed

8635-036 10d 3/09/87 Completed

-

8635-037 10f 3/31/87

8635-038 13d 3/20/87 Completed

8635-039 2e 2/10/87 Completed

8635-040 2d 4/15/87

8635-041 12 3/11/87 Completed

8635-042 4a 3/27/87

0635-043 le 1/09/87 Completed

8635-044 --

4/07/87

8635-045 Sa 4/15/87 Completion delayed to allow for

licensing of one remaining pager

transmitter station.

.-.

_ _ _ . ._. ._

-.

- _ - . .

. .'

. s . -

'

', Attachment

ST-HL-AE-1994

,

Page 4 of 5

..

Scheduled

NRC No. HL&P* No. . Completion Date Notes / Comments

8635-046 8b 6/01/87

8635-047 4a,5a 3/11/87 Completed

8635-048 7c,7q Fuel Load RM21A is functional and

demonstrable for exercise play on

4/8/87, full operational

capability is dependent upon

' plant completion for fuel load.

8635-049 --

4/01/87 The IRDAM program has been

subsequently upgraded and

renamed, STAMPEDE. Final

procedural revisions for STAMPEDE

will be complete 4/1/87.

8635-050 Id 1/09/87 Completed

8635-051 If 3/09/87 Completed

8635-052 13b 4/01/87

8635-053 13c 4/01/87

8635-054 Sc 4/15/87 Completion delayed due to system

expansion.

8635-055 8c 6/01/87

8635-056 14 6/01/87 Procedures for site access and

accountability are complete; the

security system will be completed

and controls demonstrated by

.

6/1/87.

8635-057 13a,10e 4/01/87

8635-058 10f,13a 3/31/87

8635-059 --

4/01/87

8635-060 15 3/02/87 Completed

8635-061 16,lh 4/01/87

8635-062 10g 12/14/86 Completed

8635-063 10h 12/14/86 Completed

8635-064 4f 12/19/86 Completed

~

. .

. . .

.

-

Attachment

ST-HL-AE-1994

Page 5 of 5

.x

Scheduled

NRC No. HL&P* No. Completion Date Notes / Comments

8635-065 2e 2/10/87 Inventory controls complete,

calibration is controlled and is

being conducted as equipment is

received.

8635-066 2e 3/01/87 Inventory controls are complete,

calibration is controlled and is

being conducted as equipment is

,

received.

8635-067 2b 4/01/87

8635-068 2c 4/01/87 The Nuclear Safety Review Board

has accepted responsibility for

12 month EP Program reviews and

will document plans for conduct.

8635-069 2c 3/09/87 The Emergency Plan has been

revised to identify NSRB as the

responsible organization for

10CFR50.54(t). Since NSRB is

independent from the Emergency

Preparedness Department and PORL,

this item is resolved.

8635-070 3b 5/01/87 Respiratory training is scheduled

for April,1987 and will complete

this item.

8635-071 3b 4/07/87

8635-072 17 5/01/87 Transient information has been

- posted with the exception of 3

weatherproof signs to be placed

at public boat ramps.

8635-073 2a 4/01/87

8635-074 --

4/08/87 Procedures, training and drill

experience have significantly

improved these performance items

since December, 1986, as will be

evidenced by exercise performance

on April 8, 1987.

8635-075 4d 3/03/87 Completed

  • The HL&P number is the number used by HL&P to identify the deficiency in the