ML20211C802: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ | {{#Wiki_filter:_ | ||
_ _ _ _ _. - _. _ _ ~ - _ | |||
i i. | i i. | ||
o Duke Power Company g | o Duke Power Company g | ||
ute, Ewy cc=pn Oconee Ncclear Site i | ute, Ewy cc=pn Oconee Ncclear Site | ||
= | |||
[ | i d M 8*"8N. | ||
i September 18, 1997 U. S. Nuclear Regulatory Commisnon | P.O. Box 1439 Senecs, SC 29679 | ||
% R. McCollusa,)r. | |||
(864) 885-3107 omcr | |||
[ | |||
% nr,ue,,o. | |||
(864) 885-3564 m 1 | |||
i September 18, 1997 U. S. Nuclear Regulatory Commisnon ATTENTION: | |||
Document Control Desk Washington, DC 20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Duke Power Company Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, ~287 Proposed Amendment to the Reactor Building Structural Integrity Technical Specifications i | Duke Power Company Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, ~287 Proposed Amendment to the Reactor Building Structural Integrity Technical Specifications i | ||
Editorial Correction In letters dated October 30, 1996, April 22, 1997, and | Editorial Correction In letters dated October 30, | ||
: 1996, April 22, | |||
: 1997, and September 3, 1997, Duke Energy Corporation (Duke) submitted 4 | |||
P | a proposed amendment to the Oconee Technical Specifications which ado esses the structural integrity of the re. actor buildings. In a letter to Duke dat.ed September 15, 1997,- tile NRC approved the requested amendments (Nos 225, 225, and 222 for - FOL DPR 38, 47, nnd 55, respectively). | ||
It is Duke's process to review amendments for accuracy prior to officially updating the Technical Specifications. During the 1 | |||
review of the approved amendment, an oversight of an editorial nature was discovered in the Duke September 3, | |||
1997 supplement that carried over iv.to the approved amendments. | |||
Purt of a sentence, that had previously been included in the April 22, 1997 submittal, was inadvertently | |||
-deleted in the September 3, | |||
1997 supplement. | |||
This typographical error occurs at th. bottom of revised Oconee Technical Specification page 4.4-15 where the first part of what should be item number 5 was omitted. Because of page spacing, re-insertion of the omitted words beginning at the top of page 4.4-16 is-desired. This change will affect the format and spacing of pages 4.4-16 tnrough 4.4-19, but wilA not affect the technical content. Please review and reissue 9709260312 9709t9I MlO/ | |||
PDR ADOCK 05000269 7 | |||
) | |||
P V DR, | |||
U. S. Nuclear Regulatory Commission | U. | ||
S. Nuclear Regulatory Commission September 18, 1907 Page 2 the attached pages as part of the Technical Specification amendment. This amendment is required to support the tendon surveillance on Oconee Unit 1 which begins on September 22, 1997. | |||
If there are any further questions regarding this matter, pleaee call Ed Price at (864) 885-4388 | If there are any further questions regarding this matter, pleaee call Ed Price at (864) 885-4388 or Mike Bailey at (864) 885-4390. | ||
Very truly yours, W. R. McCollum, Jr. | Very truly yours, g | ||
W. R. McCollum, Jr. | |||
Site Vice President j | |||
Oconee Nuclear Station | |||
.4 f | |||
i}} | i}} | ||
Latest revision as of 00:10, 6 December 2024
| ML20211C802 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 09/18/1997 |
| From: | Mccollum W DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML16141B236 | List: |
| References | |
| NUDOCS 9709260312 | |
| Download: ML20211C802 (2) | |
Text
_
_ _ _ _ _. - _. _ _ ~ - _
i i.
o Duke Power Company g
ute, Ewy cc=pn Oconee Ncclear Site
=
i d M 8*"8N.
P.O. Box 1439 Senecs, SC 29679
% R. McCollusa,)r.
(864) 885-3107 omcr
[
% nr,ue,,o.
(864) 885-3564 m 1
i September 18, 1997 U. S. Nuclear Regulatory Commisnon ATTENTION:
Document Control Desk Washington, DC 20555
SUBJECT:
Duke Power Company Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, ~287 Proposed Amendment to the Reactor Building Structural Integrity Technical Specifications i
Editorial Correction In letters dated October 30,
- 1996, April 22,
- 1997, and September 3, 1997, Duke Energy Corporation (Duke) submitted 4
a proposed amendment to the Oconee Technical Specifications which ado esses the structural integrity of the re. actor buildings. In a letter to Duke dat.ed September 15, 1997,- tile NRC approved the requested amendments (Nos 225, 225, and 222 for - FOL DPR 38, 47, nnd 55, respectively).
It is Duke's process to review amendments for accuracy prior to officially updating the Technical Specifications. During the 1
review of the approved amendment, an oversight of an editorial nature was discovered in the Duke September 3,
1997 supplement that carried over iv.to the approved amendments.
Purt of a sentence, that had previously been included in the April 22, 1997 submittal, was inadvertently
-deleted in the September 3,
1997 supplement.
This typographical error occurs at th. bottom of revised Oconee Technical Specification page 4.4-15 where the first part of what should be item number 5 was omitted. Because of page spacing, re-insertion of the omitted words beginning at the top of page 4.4-16 is-desired. This change will affect the format and spacing of pages 4.4-16 tnrough 4.4-19, but wilA not affect the technical content. Please review and reissue 9709260312 9709t9I MlO/
PDR ADOCK 05000269 7
)
P V DR,
U.
S. Nuclear Regulatory Commission September 18, 1907 Page 2 the attached pages as part of the Technical Specification amendment. This amendment is required to support the tendon surveillance on Oconee Unit 1 which begins on September 22, 1997.
If there are any further questions regarding this matter, pleaee call Ed Price at (864) 885-4388 or Mike Bailey at (864) 885-4390.
Very truly yours, g
W. R. McCollum, Jr.
Site Vice President j
Oconee Nuclear Station
.4 f
i