e | e ENCLOSURE 2 NOTICE OF DEVIATION Florida Power Corporation Docket No. 50-302 Crystal River License No. DPR-72 1 | ||
ENCLOSURE 2 NOTICE OF DEVIATION Florida Power Corporation | |||
The following deviation was identified during a Nuclear Regulatory Commission (NRC) inspection conducted on November 17-21 and December 1-5, 1986. | The following deviation was identified during a Nuclear Regulatory Commission (NRC) inspection conducted on November 17-21 and December 1-5, 1986. | ||
The Crystal River Unit 3 FSAR Section 11.4.1 radiation monitoring design basis, states that the radiation monitoring system measures radioactivity at selected plant locations in order to verify compliance with 10 CFR 20. The spent fuel cooling water monitor RM-L4 is provided to detect any radio-activity released in the spent fuel storage area. | The Crystal River Unit 3 FSAR Section 11.4.1 radiation monitoring design basis, states that the radiation monitoring system measures radioactivity at selected plant locations in order to verify compliance with 10 CFR 20. The spent fuel cooling water monitor RM-L4 is provided to detect any radio-activity released in the spent fuel storage area. | ||
Contrary to the above FSAR commitment, temporary modification, T-MAR 79-08-78, removed RM-L4 from service on September 5, 1979, and is still out of service. | Contrary to the above FSAR commitment, temporary modification, T-MAR 79-08-78, removed RM-L4 from service on September 5, 1979, and is still out of service. | ||
The T-MAR also states that until RM-L4 is relocated, it is inoperative. | |||
Please provide in writing within 30 days of the date of this Notice a description of corrective actions regarding this deviation, actions taken to avoid further deviations, and the dates when these actions were or will be completed. | Please provide in writing within 30 days of the date of this Notice a description of corrective actions regarding this deviation, actions taken to avoid further deviations, and the dates when these actions were or will be completed. | ||
FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by Luis A. Reyes Luis A. Reyes, Acting Director Division of Reactor Projects Dated at Atlanta, Georgia this lith day of | FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by Luis A. Reyes Luis A. Reyes, Acting Director Division of Reactor Projects Dated at Atlanta, Georgia this lith day of February 1987 8702200236 870211 PDR ADOCK 05000302 O | ||
PDR | |||
.-}} | |||
Latest revision as of 00:10, 6 December 2024
| ML20211C852 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/11/1987 |
| From: | Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20211C810 | List: |
| References | |
| 50-302-86-39, NUDOCS 8702200236 | |
| Download: ML20211C852 (1) | |
Text
,
e ENCLOSURE 2 NOTICE OF DEVIATION Florida Power Corporation Docket No. 50-302 Crystal River License No. DPR-72 1
The following deviation was identified during a Nuclear Regulatory Commission (NRC) inspection conducted on November 17-21 and December 1-5, 1986.
The Crystal River Unit 3 FSAR Section 11.4.1 radiation monitoring design basis, states that the radiation monitoring system measures radioactivity at selected plant locations in order to verify compliance with 10 CFR 20. The spent fuel cooling water monitor RM-L4 is provided to detect any radio-activity released in the spent fuel storage area.
Contrary to the above FSAR commitment, temporary modification, T-MAR 79-08-78, removed RM-L4 from service on September 5, 1979, and is still out of service.
The T-MAR also states that until RM-L4 is relocated, it is inoperative.
Please provide in writing within 30 days of the date of this Notice a description of corrective actions regarding this deviation, actions taken to avoid further deviations, and the dates when these actions were or will be completed.
FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by Luis A. Reyes Luis A. Reyes, Acting Director Division of Reactor Projects Dated at Atlanta, Georgia this lith day of February 1987 8702200236 870211 PDR ADOCK 05000302 O
.-