PECO NUCLEAR.                                                     ecco emerov ce<1 amv 965 Chesterbrook Boulevard A Unit of PECO Energy                                             Wayne, PA 19087 5091 September 1,1999 l
PECO NUCLEAR.
I Docket Nos. 50-277             !
ecco emerov ce<1 amv 965 Chesterbrook Boulevard A Unit of PECO Energy Wayne, PA 19087 5091 September 1,1999 Docket Nos. 50-277 50-278 I
I 50-278 License Nos. DPR-44 DPR-56 U.S. Nuclear Regulatory Commission                                                                 i Attention: Document Control Desk                                                                   l Washington, D.C. 20555                                                                             i Re:     Peach Bottom Atomic Power Station, Units 2 and 3 License Change Application ECR 99-01497 Ref.: Letter G. D. Edwards to U. S. Nuclear Regulatory Commission, Dated July 1,1999, License Change Application ECR 99-01497 Docket Nos. 50-277 & 50-278
License Nos. DPR-44 DPR-56 U.S. Nuclear Regulatory Commission i
Attention: Document Control Desk l
Washington, D.C. 20555 i
Re:
Peach Bottom Atomic Power Station, Units 2 and 3 License Change Application ECR 99-01497 Ref.: Letter G. D. Edwards to U. S. Nuclear Regulatory Commission, Dated July 1,1999, License Change Application ECR 99-01497 Docket Nos. 50-277 & 50-278


==Dear Sir / Madam:==
==Dear Sir / Madam:==
I
I
                                                                                                                  )
)
PECO Energy Company (PECO Energy) hereby resubmits Attachment 2, in its entirety, to the above captioned letter, which transmitted License Change Application ECR 99-01497, requesting a change to the Peach Bottom Atomic Power Station                         ,
PECO Energy Company (PECO Energy) hereby resubmits Attachment 2, in its entirety, to the above captioned letter, which transmitted License Change Application ECR 99-01497, requesting a change to the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Facility Operating Licenses. The proposed change will revise j
(PBAPS), Units 2 and 3 Facility Operating Licenses. The proposed change will revise                 j the Facility Operating Licenses to reflect a change in the corporate structure at Public           !
the Facility Operating Licenses to reflect a change in the corporate structure at Public
            . Service Electric & Gas (PSE&G). During the review process a few minor                               ;
. Service Electric & Gas (PSE&G). During the review process a few minor discrepancies were discovered in the pages of Attachment 2. These discrepancies have now been corrected.
discrepancies were discovered in the pages of Attachment 2. These discrepancies have now been corrected.                                                                           ]
]
l If you have any questions, please feel free to contact me at 610-640-6722                         ;
If you have any questions, please feel free to contact me at 610-640-6722 Very truly yours,
Very truly yours,
%4[
                  %4[ N
N Director-Licensing i)80U41 1p\\'
              ' James A. H on 1p\'
' James A. H on Attachments; Affidavit cc H. J. Miller, Administrator, Region I, USNRC A. C. McMurtray, USNRC Senior Resident inspector, PBAPS R. A. Janati, Commonwealth of Pennsylvania 9909090183 990901 PDR ADOCK 05000277 P
Director- Licensing                i)80U41 Attachments; Affidavit cc   H. J. Miller, Administrator, Region I, USNRC A. C. McMurtray, USNRC Senior Resident inspector, PBAPS R. A. Janati, Commonwealth of Pennsylvania 9909090183 990901 PDR P
PDR
ADOCK 05000277 PDR


    -4 c
-4 c
COMMONWEALTH OF PENNSYLVANIA                                 :
COMMONWEALTH OF PENNSYLVANIA
: SS.
: SS.
COUNTY OF CHESTER                                             :
COUNTY OF CHESTER
                            'J. J. Hagan, Being first duly sworn, deposes and says:
'J. J. Hagan, Being first duly sworn, deposes and says:
That he is Senior Vice President of PECO Energy Company; the Applicant herein; that he has read the updated Attachment 2 to License Change Application ECR 99-01497, for Peach Bottom Atomic Power Station Facility Operating Licenses DPR-44 and DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, Information and belief.
That he is Senior Vice President of PECO Energy Company; the Applicant herein; that he has read the updated Attachment 2 to License Change Application ECR 99-01497, for Peach Bottom Atomic Power Station Facility Operating Licenses DPR-44 and DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, Information and belief.
w-ior Vi President Subscribed and Sw n to before me this /d dayof                   k1999 iV
w-ior Vi President Subscribed and Sw n to before me this /d dayof k1999 iV
: 0. 5
: 0. 5
[     Notary 1/ublic Notarial sea!
[
!'                                                            Carol A.Walton, Notary Public l
Notary 1/ublic Notarial sea!
Tredyffrin Typ., Chester County                       !
Carol A.Walton, Notary Public l
My Commission Expires May 28,2002                         l Member, Pennsylvene Associaton of Notaries                 !
Tredyffrin Typ., Chester County My Commission Expires May 28,2002 l
[.g4                   '
Member, Pennsylvene Associaton of Notaries
l l             <  '
[.g4 l


k i f ATTACHMENT 2 FACILITY OPERATING LICENSE CHANGES License Nos. DPR-44 DPR-56 Docket Nos. 50-277 50-278 Description of Changes                 page 2 Unit 2 Licenso Markups                 pages 3 -4 Unit 2 " Camera Ready"                 pages 5-6 Unite 3 License Markup                 pages 7-8 Unit 3 " Camera Ready"                 pages 9-10
k i
f ATTACHMENT 2 FACILITY OPERATING LICENSE CHANGES License Nos. DPR-44 DPR-56 Docket Nos. 50-277 50-278 Description of Changes page 2 Unit 2 Licenso Markups pages 3 -4 Unit 2 " Camera Ready" pages 5-6 Unite 3 License Markup pages 7-8 Unit 3 " Camera Ready" pages 9-10


      ' . ' License Nos. DPR-44                                                     Docket N:s. 50-277   l DPR-56                                                                 50-278   I I
'. ' License Nos. DPR-44 Docket N:s. 50-277 DPR-56 50-278 ATTACHMENT 2 Facility Operating License Changes Peach Bottom Unit 2 Changes References to Public Service Electric and Gas Company or PSE&G are being changed as follows:
ATTACHMENT 2 l
License section, page number Action Description Heading, page 1 Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 1.A, page 1 Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 2, page 2 Change Public Service Electric and Gas Company to PSEG Nuclear LLC (PSEG Nuclear)
Facility Operating License Changes                                 l Peach Bottom Unit 2 Changes References to Public Service Electric and Gas Company or PSE&G are being changed as           ,
{
follows:                                                                                       I License section, page number                     Action Description Heading, page 1                             Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 1.A, page 1                       Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 2, page 2                         Change Public Service Electric and Gas Company to PSEG Nuclear LLC (PSEG               l Nuclear)                                       {
Paragraphs 2B(1) page 2 Change PSE&G to PSEG Nuclear Peach Bottom Unit 3 Changes References to Public Service Electric and Gas Company or PSE&G are being changed as follows:
Paragraphs 2B(1) page 2                     Change PSE&G to PSEG Nuclear                   '
Peach Bottom Unit 3 Changes References to Public Service Electric and Gas Company or PSE&G are being changed as follows:
1 i
1 i
License section, page number                       Action Description                   )
License section, page number Action Description
Heading, page 1                           Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 1.A, page 1                     Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 2, page 2                       Change Public Service Electric and Gas Company to PSEG Nuclear LLC (PSEG Nuclear)
)
Paragraphs 2B(1) page 2                   Change PSE&G to PSEG Nuclear i
Heading, page 1 Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 1.A, page 1 Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 2, page 2 Change Public Service Electric and Gas Company to PSEG Nuclear LLC (PSEG Nuclear)
Paragraphs 2B(1) page 2 Change PSE&G to PSEG Nuclear i
1 of 3
1 of 3


r                                                                                                             1 4
r 1
UNITED STATES NUCLEAR REGULATORY COMMISSION Washington' DC 20555-0001 l
4 UNITED STATES NUCLEAR REGULATORY COMMISSION Washington' DC 20555-0001 l
PECO ENERGY COMPANY                                           j
PECO ENERGY COMPANY
[PSEG NUCLEAR LLC)         > bueLC SERV!CE ELECT 9!C .* ND G.^S COi"^ NY l                               1 DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277                                       ,
[PSEG NUCLEAR LLC)
PEACH BOTTOM ATOMIC POWER STATION. UNIT 2
> bueLC SERV!CE ELECT 9!C.* ND G.^S COi"^ NY l j
,                                              FACILITY OPERATING LICENSE                                       i l
1 DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION. UNIT 2 FACILITY OPERATING LICENSE i
License No. DPR-44 Amendment No.1
l License No. DPR-44 Amendment No.1 1.
: 1. The Atomic Energy Commission (the Commission) having found that:
The Atomic Energy Commission (the Commission) having found that:
!                      A. The application for license filed by PECO Energy Company, formerly l   [ PSEC Nuclear LLCJ       Philadelphia Electric Company,"
A.
l Delmarva Power and Light Company, and Atlantic City Electnc Company (the licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and         !
The application for license filed by PECO Energy Company, formerly l
l                              regulations set forth in 10 CFR Chapter I and all required notifications to     I other agencies or bodies have been duly made; B. Construction of the Peach Bottom Atomic Power Station, Unit 2 (the facility) has been substantially completed in conformity with Construction Permit No.
[ PSEC Nuclear LLCJ Philadelphia Electric Company,"
CPPR-37 and the application, as amended, the provisions of the Act and the l                             rules and regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D. There is reasonable assurance: (1) that the activities authorized by this amended operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted   l in compliance with the rules and regulations of the Commission;                   j E. PECO Energy Company is technically qualified and the licensees are               1 financially qualified to engage in the activities authorized by this amended operating license in accordance with the rules and regulations of the Commission; F. The licensees have satisfied the applicable provisions of 10 CFR Part 140,
l Delmarva Power and Light Company, and Atlantic City Electnc Company (the licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and l
                              " Financial Protection Requirements and Indemnity Agreements," of the           j Commission's regulations;                                                         l G. The issuance of this amended operating license will not be inimical to the common defense and security or to the health and safety of the public; Page1
regulations set forth in 10 CFR Chapter I and all required notifications to I
other agencies or bodies have been duly made; B.
Construction of the Peach Bottom Atomic Power Station, Unit 2 (the facility) has been substantially completed in conformity with Construction Permit No.
CPPR-37 and the application, as amended, the provisions of the Act and the l
rules and regulations of the Commission; C.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D.
There is reasonable assurance: (1) that the activities authorized by this amended operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; j
E.
PECO Energy Company is technically qualified and the licensees are 1
financially qualified to engage in the activities authorized by this amended operating license in accordance with the rules and regulations of the Commission; F.
The licensees have satisfied the applicable provisions of 10 CFR Part 140,
" Financial Protection Requirements and Indemnity Agreements," of the j
Commission's regulations; G.
The issuance of this amended operating license will not be inimical to the common defense and security or to the health and safety of the public; Page1


H.     After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs and considering available altamatives, the issuance of Amendment No.1 to Facility Operating License No. DPR-44 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfied; and I.     The receipt, possession, and 'use of source, by-product and special nuclear material as authonzed by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.
H.
PSEG Nuclear Lt.C (PSEG Nuclear) l
After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs and considering available altamatives, the issuance of Amendment No.1 to Facility Operating License No. DPR-44 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfied; and I.
: 2. Amendment No.1 to Facility Operating License No. DPR-44 issued to the PECO Energy Company (PECO), formerly Philadelphia Electric Company,lPd:: S:C j
The receipt, possession, and 'use of source, by-product and special nuclear material as authonzed by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.
l E!rdMc :nd Gr- C=peny (PSE* G), Delmarva Power and Light Company (DP&LC),
PSEG Nuclear Lt.C (PSEG Nuclear) l 2.
Amendment No.1 to Facility Operating License No. DPR-44 issued to the PECO j
Energy Company (PECO), formerly Philadelphia Electric Company,lPd:: S:C l E!rdMc :nd Gr-C=peny (PSE* G), Delmarva Power and Light Company (DP&LC),
and Atlantic City Electnc Company (ACEC), is hereby amended in its entirety to read as follows:
and Atlantic City Electnc Company (ACEC), is hereby amended in its entirety to read as follows:
A.       This amended license applies to the Peach Bottom Atomic Power Station, Unit 2, a single cycle, forced circulation, boiling water nuclear reactor and associated equipment (the facility), owned by the licensees and operated by PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented and amended.
A.
B.     Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
This amended license applies to the Peach Bottom Atomic Power Station, Unit 2, a single cycle, forced circulation, boiling water nuclear reactor and associated equipment (the facility), owned by the licensees and operated by PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented and amended.
1 (1)     PECO Energy Company, pursuant to Section 104b of the Act and 10                 )
B.
CFR Part 50, " Licensing of Production and Utilization Facilities," to         l l PSEG Nuclearl         possess, use, and operate the facility and TPSE&Gj, DP&LC, and ACEC to possess the facility at the designated location in Peach Bottom, York County, Pennsylvania in accordance with the procedures and limitations set forth in this license; (2)     PECO Energy Company, pursuant to the Act and 10 CFR Part 70, to                 l receive, possess and use at any time special nuclear material as               ;
Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
reactor fuel, in accordance with the limitations for storage and               I amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)     PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)     PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use in amounts as required any byproduct, source, or specia! nuclear material without Page 2
1 (1)
PECO Energy Company, pursuant to Section 104b of the Act and 10
)
CFR Part 50, " Licensing of Production and Utilization Facilities," to l PSEG Nuclearl possess, use, and operate the facility and TPSE&Gj, DP&LC, and ACEC to possess the facility at the designated location in Peach Bottom, York County, Pennsylvania in accordance with the procedures and limitations set forth in this license; (2)
PECO Energy Company, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)
PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use in amounts as required any byproduct, source, or specia! nuclear material without Page 2


UNITED STATES NUCLEAR REGULATORY COMMISSION
UNITED STATES NUCLEAR REGULATORY COMMISSION
                                              . Washington, DC 20555-0001 PECO ENERGY COMPANY -
. Washington, DC 20555-0001 PECO ENERGY COMPANY -
: l.                                       PSEG NUCLEAR LLC DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION. UNIT 2 FACILITY OPERATING LICENSE License No. DPR-44 Amendment No.1
l.
: 1. The Atomic Energy Commission (the Commission) having found that:
PSEG NUCLEAR LLC DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION. UNIT 2 FACILITY OPERATING LICENSE License No. DPR-44 Amendment No.1 1.
A. The application for license filed by PECO Energy Company, formerly l             Philadelphia Electric Company, PSEG Nuclear LLC, Delmarva Power and Light Company, and Atlantic City Electric Company (the licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I and all required notifications to other agencies or bodies have been duly made; B. Construction of the Peach Bottom Atomic Power Station, Unit 2 (the facility) has been substantially completed in conformity with Construction Permit No.
The Atomic Energy Commission (the Commission) having found that:
CPPR-37 and the application, as amended, the provisions of the Act and the rules and regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D. There is reasonable assurance: (1) that the activities authorized by this amended operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; E. PECO Energy Company is technically qualified and the licensees are financially quali3ed to engage in the activities authorized by this amended operating license in accordance with the rules and regulations of the Commission; F. The licensees have satisfied the applicable provisions of 10 CFR Part 140,
A.
                        " Financial Protection Requirements and indemnity Agreements," of the Commission's regulations; G. The issuance of this amended operating license will not be inimical to the common defense and security or to the health and safety of the public; Page1
The application for license filed by PECO Energy Company, formerly l
Philadelphia Electric Company, PSEG Nuclear LLC, Delmarva Power and Light Company, and Atlantic City Electric Company (the licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I and all required notifications to other agencies or bodies have been duly made; B.
Construction of the Peach Bottom Atomic Power Station, Unit 2 (the facility) has been substantially completed in conformity with Construction Permit No.
CPPR-37 and the application, as amended, the provisions of the Act and the rules and regulations of the Commission; C.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D.
There is reasonable assurance: (1) that the activities authorized by this amended operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; E.
PECO Energy Company is technically qualified and the licensees are financially quali3ed to engage in the activities authorized by this amended operating license in accordance with the rules and regulations of the Commission; F.
The licensees have satisfied the applicable provisions of 10 CFR Part 140,
" Financial Protection Requirements and indemnity Agreements," of the Commission's regulations; G.
The issuance of this amended operating license will not be inimical to the common defense and security or to the health and safety of the public; Page1


H.     After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs and considering available
H.
                        - alternatives, the issuance of Amendment No.1 to Facility Operating License No. DPR-44 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfied; and I.     The receipt, possession, and use of socree, by-product and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.
After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs and considering available
: 2. Amendment No.1 to Facility Operating License No. DPR-44 issued to the PECO Energy Company (PECO), formerly Philadelphia Electric Company, PSEG Nuclear LLC (PSEG Nuclear), Delmarva Power and Light Company (DP&LC), and Atlantic               i City Electric Company (ACEC), is hereby amended in its antirety to read as follows:
- alternatives, the issuance of Amendment No.1 to Facility Operating License No. DPR-44 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfied; and I.
A.     This amended license applies to the Peach Bottom Atomic Power Station,
The receipt, possession, and use of socree, by-product and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.
                        . Unit 2, a single cycle, forced circulation, boiling water nuclear reactor and   ,
2.
associated equipment (the facility), owned by the licensees and operated by     l PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented and amended.
Amendment No.1 to Facility Operating License No. DPR-44 issued to the PECO Energy Company (PECO), formerly Philadelphia Electric Company, PSEG Nuclear LLC (PSEG Nuclear), Delmarva Power and Light Company (DP&LC), and Atlantic City Electric Company (ACEC), is hereby amended in its antirety to read as follows:
B.     Subject to the conditions and requirements incorporated herein, the             1 Commission hereby licenses:
A.
(1)     PECO Energy Company, pursuant to Section 104b of the Act and 10 CFR Part 50, " Licensing of Production and Utilization Facilities," to ,
This amended license applies to the Peach Bottom Atomic Power Station,
l                      possess, use, and operate the facility and PSEG Nuclear, DP&LC, and ACEC to possess the facility at the designated location in Peach Bottom, York County, Pennsylvania in accordance with the procedures and limitations set forth in this license; (2)     PECO Energy Company, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)_     PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)     PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use in amounts as required any byproduct, source, or special nuclear material without Page 2
. Unit 2, a single cycle, forced circulation, boiling water nuclear reactor and associated equipment (the facility), owned by the licensees and operated by PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented and amended.
B.
Subject to the conditions and requirements incorporated herein, the 1
Commission hereby licenses:
(1)
PECO Energy Company, pursuant to Section 104b of the Act and 10 CFR Part 50, " Licensing of Production and Utilization Facilities," to l
possess, use, and operate the facility and PSEG Nuclear, DP&LC, and ACEC to possess the facility at the designated location in Peach Bottom, York County, Pennsylvania in accordance with the procedures and limitations set forth in this license; (2)
PECO Energy Company, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)_
PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use in amounts as required any byproduct, source, or special nuclear material without Page 2


UNITED STATES NUCLEAR REGULATORY COMMISSION Washington, DC 20555-0001 PECO ENERGY COMPANY
UNITED STATES NUCLEAR REGULATORY COMMISSION Washington, DC 20555-0001 PECO ENERGY COMPANY
( PSEG NUCLEAR LLC )       > IJD1"eICln'D24M4MPEDI:'3XML'M'4 DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT 3 FACILITY OPERATING LICENSE License No. DPR-56
( PSEG NUCLEAR LLC ) > IJD1"eICln'D24M4MPEDI:'3XML'M'4 DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT 3 FACILITY OPERATING LICENSE License No. DPR-56 1.
: 1. The Atomic Energy Commission (the Commission) having found that:
The Atomic Energy Commission (the Commission) having found that:
A. The application for license filed by PECO Energy Company, formerly (P5EG Nuclear LLC] Philadelphia Electric Company,
A.
* Delmarva Power and Light Company, and Atlantic City Electric Company (the licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I and all required notifications to other egencies or bodies have been duly made; B. Construction of the Peach Bottom Atomic Power Station, Unit 3 (the facility) has been substantially completed in conformity with Construction Permit No.
The application for license filed by PECO Energy Company, formerly (P5EG Nuclear LLC] Philadelphia Electric Company,
CPPR-38 and the application, as amended, the provisions of the Act and the rules and regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D.-   There is reasonable assurance: (1) that the activities authorized by this
* Delmarva Power and Light Company, and Atlantic City Electric Company (the licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I and all required notifications to other egencies or bodies have been duly made; B.
Construction of the Peach Bottom Atomic Power Station, Unit 3 (the facility) has been substantially completed in conformity with Construction Permit No.
CPPR-38 and the application, as amended, the provisions of the Act and the rules and regulations of the Commission; C.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D.-
There is reasonable assurance: (1) that the activities authorized by this
?.
?.
operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; E. PECO Energy Company is technically qualified and the licensees are               ,
operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; E.
financially qualified to engage in the activities authorized by this amended     !
PECO Energy Company is technically qualified and the licensees are financially qualified to engage in the activities authorized by this amended operating license in accordance with the rules and regulations of the I
operating license in accordance with the rules and regulations of the             I Commission; I
Commission; F.
F. The licensees have satisfied the applicable provisions of 10 CFR Part 140,
The licensees have satisfied the applicable provisions of 10 CFR Part 140,
                              " Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations;                                                         l l
" Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations; G.
G. The issuance of this operating license will not be inimical to the common         i defense and security or to the health and safety of the public;                   I Page1
The issuance of this operating license will not be inimical to the common defense and security or to the health and safety of the public; Page1


9 H.             After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs and considering available altematives,
9 H.
        .,      ,                the issuance of Facility Operating License No. DPR-56 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfied; and I.             The receipt, possession, and use of source, by-product and special nuclear material as authonzed by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.
After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs and considering available altematives, the issuance of Facility Operating License No. DPR-56 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfied; and I.
The receipt, possession, and use of source, by-product and special nuclear material as authonzed by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.
[PSEG Nuclear LLC (PSEG Nuclear)]
[PSEG Nuclear LLC (PSEG Nuclear)]
: 2. Facility Operating License No. DPR-56 is hereby issued to the PECO Enerry Company (PECO), formerly Philadelphia Electric Company,"'= O.-C                               2:3t V
2.
                                                                                                                            )
Facility Operating License No. DPR-56 is hereby issued to the PECO Enerry
                      ... _ _ _ . ... . ... _._ . . ..            Delmarva Power and Light Company (DP&LC), and Atlantic City Electnc Company (ACEC), is hereby amended in its entirety to read as follows:
)
A.             This license applies to the Peach Bottom Atomic Power Station, Unit 3, a single cycle, forced circulation, boiling water nuclear reactor and associated equipment (the facility), owned by the licensees and operated by PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented                           )
Company (PECO), formerly Philadelphia Electric Company,"'= O.-C 2:3t V Delmarva Power and Light Company (DP&LC), and Atlantic City Electnc Company (ACEC), is hereby amended in its entirety to read as follows:
A.
This license applies to the Peach Bottom Atomic Power Station, Unit 3, a single cycle, forced circulation, boiling water nuclear reactor and associated equipment (the facility), owned by the licensees and operated by PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented
)
and amended.
and amended.
B.             Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
B.
(1)           PECO Energy Company, pursuant to Section 104b of the Act and 10                   i CFR Part 50, " Licensing of Production and Utilization Facilities," to
Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
( PSEG Nuclearj                     possess, use, and operate the facility and NASE &G)l DP&LC, and ACEC to possess the facility at the designated location in Peach                   !
(1)
                                              ' Bottom, York County, Pennsylvania in accordance with the procedures and limitations set forth in this license; i
PECO Energy Company, pursuant to Section 104b of the Act and 10 i
(2)           PECO Energy Company, pursuant to the Act and 10 CFR Part 70, to                   l receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts         j required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)           PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)           PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40 and 70 to receive, possess and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; Page 2
CFR Part 50, " Licensing of Production and Utilization Facilities," to
( PSEG Nuclearj possess, use, and operate the facility and NASE &G)l DP&LC, and ACEC to possess the facility at the designated location in Peach
' Bottom, York County, Pennsylvania in accordance with the procedures and limitations set forth in this license; i
(2)
PECO Energy Company, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts j
required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)
PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40 and 70 to receive, possess and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; Page 2


p-
p-
        ~
~
  <-                                            UNITED STATES
UNITED STATES NUCLEAR REGULATORY COMMISSION Washington, DC 20555-0001 i
;.                                NUCLEAR REGULATORY COMMISSION Washington, DC 20555-0001 i                                         PECO ENERGY COMPANY l         l                                   PSEG NUCLEAR LLC DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT 3 -
PECO ENERGY COMPANY l
FACILITY OPERATING LICENSE I                                                                                   License No. DPR-56
l PSEG NUCLEAR LLC DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT 3 -
: 1. The Atomic Energy Commission (the Commission) having found that:
FACILITY OPERATING LICENSE I
A. The application for license filed by PECO Energy Company, formerly l           Philadelphia Electric Company, PSEG Nuclear LLC, Delmarva Power and Light Company, and Atlantic City Electric Company (the licensees) complies l
License No. DPR-56 1.
with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10     <
The Atomic Energy Commission (the Commission) having found that:
CFR Chapter I and all required notifications to other agencies or bodies have been duly made; B. Construction of the Peach Bottom Atomic Power Station, Unit 3 (the facility) has been substantially completed in conformity with Construction Permit No.
A.
CPPR-38 and the application, as amended, the provisions of the Act and the l                     rules and regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D. There is reasonable assurance: (1) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; E. PECO Energy Company is technically qualified and the licensees are financially qualified to engage in the activities authorized by this amended       ,
The application for license filed by PECO Energy Company, formerly l
operating license in accordance with the rules and regulations of the             i Commission; F. The licensees have satisfied the applicable provisions of 10 CFR Part 140,
Philadelphia Electric Company, PSEG Nuclear LLC, Delmarva Power and Light Company, and Atlantic City Electric Company (the licensees) complies l
                      " Financial Protection Requirements and indemnity Agreements," of the Commission't regulations; G. The issuance of this operating license will not be inimical to the common defense and security or to the health and safety of the public; Page1
with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I and all required notifications to other agencies or bodies have been duly made; B.
Construction of the Peach Bottom Atomic Power Station, Unit 3 (the facility) has been substantially completed in conformity with Construction Permit No.
CPPR-38 and the application, as amended, the provisions of the Act and the l
rules and regulations of the Commission; C.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D.
There is reasonable assurance: (1) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; E.
PECO Energy Company is technically qualified and the licensees are financially qualified to engage in the activities authorized by this amended operating license in accordance with the rules and regulations of the Commission; F.
The licensees have satisfied the applicable provisions of 10 CFR Part 140,
" Financial Protection Requirements and indemnity Agreements," of the Commission't regulations; G.
The issuance of this operating license will not be inimical to the common defense and security or to the health and safety of the public; Page1


H.       After weighing the environmental, economic, technical, and other benefits of
H.
                          .the facility against environmental costs and considering available altamatives,
After weighing the environmental, economic, technical, and other benefits of
          ,      ,          the issuance of Facility Operating License No. DPR-56 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfed; and I.       The receipt, possession, and use of source, by-product and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.
.the facility against environmental costs and considering available altamatives, the issuance of Facility Operating License No. DPR-56 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfed; and I.
: 2. Facility Operating License No. DPR-56 is hereby issued to the PECO Energy Company (PECO), former1y Philadelphia Electnc Company, PSEG Nuclear LLC (PSEG Nuclear), Delmarva Power and Light Company (DP&LC), and Atlantic City Electric Company (ACEC), is hereby amended in its entirety to read as follows:
The receipt, possession, and use of source, by-product and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.
A.       This license applies to the Peach Bottom Atomic Power Station, Unit 3, a single cycle, forced circulation, boiling water nuclear reactor and associated equipment (the facility), owned by the licensees and operated by PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented and amended.
2.
B.       Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
Facility Operating License No. DPR-56 is hereby issued to the PECO Energy Company (PECO), former1y Philadelphia Electnc Company, PSEG Nuclear LLC (PSEG Nuclear), Delmarva Power and Light Company (DP&LC), and Atlantic City Electric Company (ACEC), is hereby amended in its entirety to read as follows:
(1)     PECO Energy Company, pursuant to Section 104b of the Act and 10 CFR Part 50," Licensing of Production and Utilization Facilities," to l                       possess, use, and operate the facility and PSEG Nuclear, DP&LC, and ACEC to possess the facility at the designated location in Peach Bottom York County, Pennsylania in accordance with the procedures and limitations set forth in this license; (2)     PECO Energy Company, pursuant to the /.ct and 10 CFR Part 70, to receive, possess and use at any time specia! nuclear material as reactor fuel, in accordance with the limitations for storage and amounts l required for reactor operation, as described in the Final Safety Analysis )
A.
Report, as supplemented and amended; (3)     PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)     PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40 and 70 to receive, possess and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; Page 2 I}}
This license applies to the Peach Bottom Atomic Power Station, Unit 3, a single cycle, forced circulation, boiling water nuclear reactor and associated equipment (the facility), owned by the licensees and operated by PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented and amended.
B.
Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
(1)
PECO Energy Company, pursuant to Section 104b of the Act and 10 CFR Part 50," Licensing of Production and Utilization Facilities," to l
possess, use, and operate the facility and PSEG Nuclear, DP&LC, and ACEC to possess the facility at the designated location in Peach Bottom York County, Pennsylania in accordance with the procedures and limitations set forth in this license; (2)
PECO Energy Company, pursuant to the /.ct and 10 CFR Part 70, to receive, possess and use at any time specia! nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)
PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40 and 70 to receive, possess and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; Page 2}}

Latest revision as of 21:45, 5 December 2024

Suppl License Change Application ECR 99-01497 for Licenses DPR-44 & DPR-56,correcting Minor Discrepancies Discovered in Pages of Attachment 2
ML20211M708
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/01/1999
From: Hutton J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9909090183
Download: ML20211M708 (12)


Text

..

A v

PECO NUCLEAR.

ecco emerov ce<1 amv 965 Chesterbrook Boulevard A Unit of PECO Energy Wayne, PA 19087 5091 September 1,1999 Docket Nos. 50-277 50-278 I

License Nos. DPR-44 DPR-56 U.S. Nuclear Regulatory Commission i

Attention: Document Control Desk l

Washington, D.C. 20555 i

Re:

Peach Bottom Atomic Power Station, Units 2 and 3 License Change Application ECR 99-01497 Ref.: Letter G. D. Edwards to U. S. Nuclear Regulatory Commission, Dated July 1,1999, License Change Application ECR 99-01497 Docket Nos. 50-277 & 50-278

Dear Sir / Madam:

I

)

PECO Energy Company (PECO Energy) hereby resubmits Attachment 2, in its entirety, to the above captioned letter, which transmitted License Change Application ECR 99-01497, requesting a change to the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Facility Operating Licenses. The proposed change will revise j

the Facility Operating Licenses to reflect a change in the corporate structure at Public

. Service Electric & Gas (PSE&G). During the review process a few minor discrepancies were discovered in the pages of Attachment 2. These discrepancies have now been corrected.

]

If you have any questions, please feel free to contact me at 610-640-6722 Very truly yours,

%4[

N Director-Licensing i)80U41 1p\\'

' James A. H on Attachments; Affidavit cc H. J. Miller, Administrator, Region I, USNRC A. C. McMurtray, USNRC Senior Resident inspector, PBAPS R. A. Janati, Commonwealth of Pennsylvania 9909090183 990901 PDR ADOCK 05000277 P

PDR

-4 c

COMMONWEALTH OF PENNSYLVANIA

SS.

COUNTY OF CHESTER

'J. J. Hagan, Being first duly sworn, deposes and says:

That he is Senior Vice President of PECO Energy Company; the Applicant herein; that he has read the updated Attachment 2 to License Change Application ECR 99-01497, for Peach Bottom Atomic Power Station Facility Operating Licenses DPR-44 and DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, Information and belief.

w-ior Vi President Subscribed and Sw n to before me this /d dayof k1999 iV

0. 5

[

Notary 1/ublic Notarial sea!

Carol A.Walton, Notary Public l

Tredyffrin Typ., Chester County My Commission Expires May 28,2002 l

Member, Pennsylvene Associaton of Notaries

[.g4 l

k i

f ATTACHMENT 2 FACILITY OPERATING LICENSE CHANGES License Nos. DPR-44 DPR-56 Docket Nos. 50-277 50-278 Description of Changes page 2 Unit 2 Licenso Markups pages 3 -4 Unit 2 " Camera Ready" pages 5-6 Unite 3 License Markup pages 7-8 Unit 3 " Camera Ready" pages 9-10

'. ' License Nos. DPR-44 Docket N:s. 50-277 DPR-56 50-278 ATTACHMENT 2 Facility Operating License Changes Peach Bottom Unit 2 Changes References to Public Service Electric and Gas Company or PSE&G are being changed as follows:

License section, page number Action Description Heading, page 1 Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 1.A, page 1 Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 2, page 2 Change Public Service Electric and Gas Company to PSEG Nuclear LLC (PSEG Nuclear)

{

Paragraphs 2B(1) page 2 Change PSE&G to PSEG Nuclear Peach Bottom Unit 3 Changes References to Public Service Electric and Gas Company or PSE&G are being changed as follows:

1 i

License section, page number Action Description

)

Heading, page 1 Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 1.A, page 1 Change Public Service Electric and Gas Company to PSEG Nuclear LLC Paragraph 2, page 2 Change Public Service Electric and Gas Company to PSEG Nuclear LLC (PSEG Nuclear)

Paragraphs 2B(1) page 2 Change PSE&G to PSEG Nuclear i

1 of 3

r 1

4 UNITED STATES NUCLEAR REGULATORY COMMISSION Washington' DC 20555-0001 l

PECO ENERGY COMPANY

[PSEG NUCLEAR LLC)

> bueLC SERV!CE ELECT 9!C.* ND G.^S COi"^ NY l j

1 DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION. UNIT 2 FACILITY OPERATING LICENSE i

l License No. DPR-44 Amendment No.1 1.

The Atomic Energy Commission (the Commission) having found that:

A.

The application for license filed by PECO Energy Company, formerly l

[ PSEC Nuclear LLCJ Philadelphia Electric Company,"

l Delmarva Power and Light Company, and Atlantic City Electnc Company (the licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and l

regulations set forth in 10 CFR Chapter I and all required notifications to I

other agencies or bodies have been duly made; B.

Construction of the Peach Bottom Atomic Power Station, Unit 2 (the facility) has been substantially completed in conformity with Construction Permit No.

CPPR-37 and the application, as amended, the provisions of the Act and the l

rules and regulations of the Commission; C.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D.

There is reasonable assurance: (1) that the activities authorized by this amended operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; j

E.

PECO Energy Company is technically qualified and the licensees are 1

financially qualified to engage in the activities authorized by this amended operating license in accordance with the rules and regulations of the Commission; F.

The licensees have satisfied the applicable provisions of 10 CFR Part 140,

" Financial Protection Requirements and Indemnity Agreements," of the j

Commission's regulations; G.

The issuance of this amended operating license will not be inimical to the common defense and security or to the health and safety of the public; Page1

H.

After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs and considering available altamatives, the issuance of Amendment No.1 to Facility Operating License No. DPR-44 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfied; and I.

The receipt, possession, and 'use of source, by-product and special nuclear material as authonzed by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.

PSEG Nuclear Lt.C (PSEG Nuclear) l 2.

Amendment No.1 to Facility Operating License No. DPR-44 issued to the PECO j

Energy Company (PECO), formerly Philadelphia Electric Company,lPd:: S:C l E!rdMc :nd Gr-C=peny (PSE* G), Delmarva Power and Light Company (DP&LC),

and Atlantic City Electnc Company (ACEC), is hereby amended in its entirety to read as follows:

A.

This amended license applies to the Peach Bottom Atomic Power Station, Unit 2, a single cycle, forced circulation, boiling water nuclear reactor and associated equipment (the facility), owned by the licensees and operated by PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented and amended.

B.

Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:

1 (1)

PECO Energy Company, pursuant to Section 104b of the Act and 10

)

CFR Part 50, " Licensing of Production and Utilization Facilities," to l PSEG Nuclearl possess, use, and operate the facility and TPSE&Gj, DP&LC, and ACEC to possess the facility at the designated location in Peach Bottom, York County, Pennsylvania in accordance with the procedures and limitations set forth in this license; (2)

PECO Energy Company, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)

PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use in amounts as required any byproduct, source, or specia! nuclear material without Page 2

UNITED STATES NUCLEAR REGULATORY COMMISSION

. Washington, DC 20555-0001 PECO ENERGY COMPANY -

l.

PSEG NUCLEAR LLC DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION. UNIT 2 FACILITY OPERATING LICENSE License No. DPR-44 Amendment No.1 1.

The Atomic Energy Commission (the Commission) having found that:

A.

The application for license filed by PECO Energy Company, formerly l

Philadelphia Electric Company, PSEG Nuclear LLC, Delmarva Power and Light Company, and Atlantic City Electric Company (the licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I and all required notifications to other agencies or bodies have been duly made; B.

Construction of the Peach Bottom Atomic Power Station, Unit 2 (the facility) has been substantially completed in conformity with Construction Permit No.

CPPR-37 and the application, as amended, the provisions of the Act and the rules and regulations of the Commission; C.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D.

There is reasonable assurance: (1) that the activities authorized by this amended operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; E.

PECO Energy Company is technically qualified and the licensees are financially quali3ed to engage in the activities authorized by this amended operating license in accordance with the rules and regulations of the Commission; F.

The licensees have satisfied the applicable provisions of 10 CFR Part 140,

" Financial Protection Requirements and indemnity Agreements," of the Commission's regulations; G.

The issuance of this amended operating license will not be inimical to the common defense and security or to the health and safety of the public; Page1

H.

After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs and considering available

- alternatives, the issuance of Amendment No.1 to Facility Operating License No. DPR-44 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfied; and I.

The receipt, possession, and use of socree, by-product and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.

2.

Amendment No.1 to Facility Operating License No. DPR-44 issued to the PECO Energy Company (PECO), formerly Philadelphia Electric Company, PSEG Nuclear LLC (PSEG Nuclear), Delmarva Power and Light Company (DP&LC), and Atlantic City Electric Company (ACEC), is hereby amended in its antirety to read as follows:

A.

This amended license applies to the Peach Bottom Atomic Power Station,

. Unit 2, a single cycle, forced circulation, boiling water nuclear reactor and associated equipment (the facility), owned by the licensees and operated by PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented and amended.

B.

Subject to the conditions and requirements incorporated herein, the 1

Commission hereby licenses:

(1)

PECO Energy Company, pursuant to Section 104b of the Act and 10 CFR Part 50, " Licensing of Production and Utilization Facilities," to l

possess, use, and operate the facility and PSEG Nuclear, DP&LC, and ACEC to possess the facility at the designated location in Peach Bottom, York County, Pennsylvania in accordance with the procedures and limitations set forth in this license; (2)

PECO Energy Company, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)_

PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

PECO Energy Company, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use in amounts as required any byproduct, source, or special nuclear material without Page 2

UNITED STATES NUCLEAR REGULATORY COMMISSION Washington, DC 20555-0001 PECO ENERGY COMPANY

( PSEG NUCLEAR LLC ) > IJD1"eICln'D24M4MPEDI:'3XML'M'4 DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT 3 FACILITY OPERATING LICENSE License No. DPR-56 1.

The Atomic Energy Commission (the Commission) having found that:

A.

The application for license filed by PECO Energy Company, formerly (P5EG Nuclear LLC] Philadelphia Electric Company,

  • Delmarva Power and Light Company, and Atlantic City Electric Company (the licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I and all required notifications to other egencies or bodies have been duly made; B.

Construction of the Peach Bottom Atomic Power Station, Unit 3 (the facility) has been substantially completed in conformity with Construction Permit No.

CPPR-38 and the application, as amended, the provisions of the Act and the rules and regulations of the Commission; C.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D.-

There is reasonable assurance: (1) that the activities authorized by this

?.

operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; E.

PECO Energy Company is technically qualified and the licensees are financially qualified to engage in the activities authorized by this amended operating license in accordance with the rules and regulations of the I

Commission; F.

The licensees have satisfied the applicable provisions of 10 CFR Part 140,

" Financial Protection Requirements and Indemnity Agreements," of the Commission's regulations; G.

The issuance of this operating license will not be inimical to the common defense and security or to the health and safety of the public; Page1

9 H.

After weighing the environmental, economic, technical, and other benefits of the facility against environmental costs and considering available altematives, the issuance of Facility Operating License No. DPR-56 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfied; and I.

The receipt, possession, and use of source, by-product and special nuclear material as authonzed by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.

[PSEG Nuclear LLC (PSEG Nuclear)]

2.

Facility Operating License No. DPR-56 is hereby issued to the PECO Enerry

)

Company (PECO), formerly Philadelphia Electric Company,"'= O.-C 2:3t V Delmarva Power and Light Company (DP&LC), and Atlantic City Electnc Company (ACEC), is hereby amended in its entirety to read as follows:

A.

This license applies to the Peach Bottom Atomic Power Station, Unit 3, a single cycle, forced circulation, boiling water nuclear reactor and associated equipment (the facility), owned by the licensees and operated by PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented

)

and amended.

B.

Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:

(1)

PECO Energy Company, pursuant to Section 104b of the Act and 10 i

CFR Part 50, " Licensing of Production and Utilization Facilities," to

( PSEG Nuclearj possess, use, and operate the facility and NASE &G)l DP&LC, and ACEC to possess the facility at the designated location in Peach

' Bottom, York County, Pennsylvania in accordance with the procedures and limitations set forth in this license; i

(2)

PECO Energy Company, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts j

required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)

PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40 and 70 to receive, possess and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; Page 2

p-

~

UNITED STATES NUCLEAR REGULATORY COMMISSION Washington, DC 20555-0001 i

PECO ENERGY COMPANY l

l PSEG NUCLEAR LLC DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT 3 -

FACILITY OPERATING LICENSE I

License No. DPR-56 1.

The Atomic Energy Commission (the Commission) having found that:

A.

The application for license filed by PECO Energy Company, formerly l

Philadelphia Electric Company, PSEG Nuclear LLC, Delmarva Power and Light Company, and Atlantic City Electric Company (the licensees) complies l

with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I and all required notifications to other agencies or bodies have been duly made; B.

Construction of the Peach Bottom Atomic Power Station, Unit 3 (the facility) has been substantially completed in conformity with Construction Permit No.

CPPR-38 and the application, as amended, the provisions of the Act and the l

rules and regulations of the Commission; C.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; D.

There is reasonable assurance: (1) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public, and (2) that such activities will be conducted in compliance with the rules and regulations of the Commission; E.

PECO Energy Company is technically qualified and the licensees are financially qualified to engage in the activities authorized by this amended operating license in accordance with the rules and regulations of the Commission; F.

The licensees have satisfied the applicable provisions of 10 CFR Part 140,

" Financial Protection Requirements and indemnity Agreements," of the Commission't regulations; G.

The issuance of this operating license will not be inimical to the common defense and security or to the health and safety of the public; Page1

H.

After weighing the environmental, economic, technical, and other benefits of

.the facility against environmental costs and considering available altamatives, the issuance of Facility Operating License No. DPR-56 is in accordance with 10 CFR Part 50, Appendix D, of the Commission's regulations and all applicable requirements of said Appendix D have been satisfed; and I.

The receipt, possession, and use of source, by-product and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30,40, and 70, including 10 CFR Section 30.33,40.32, and 70.23 and 70.31.

2.

Facility Operating License No. DPR-56 is hereby issued to the PECO Energy Company (PECO), former1y Philadelphia Electnc Company, PSEG Nuclear LLC (PSEG Nuclear), Delmarva Power and Light Company (DP&LC), and Atlantic City Electric Company (ACEC), is hereby amended in its entirety to read as follows:

A.

This license applies to the Peach Bottom Atomic Power Station, Unit 3, a single cycle, forced circulation, boiling water nuclear reactor and associated equipment (the facility), owned by the licensees and operated by PECO Energy Company. The facility is located in Peach Bottom, York County, Pennsylvania and is described in the " Final Safety Analysis Report" as supplemented and amended and the Environmental Report as supplemented and amended.

B.

Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:

(1)

PECO Energy Company, pursuant to Section 104b of the Act and 10 CFR Part 50," Licensing of Production and Utilization Facilities," to l

possess, use, and operate the facility and PSEG Nuclear, DP&LC, and ACEC to possess the facility at the designated location in Peach Bottom York County, Pennsylania in accordance with the procedures and limitations set forth in this license; (2)

PECO Energy Company, pursuant to the /.ct and 10 CFR Part 70, to receive, possess and use at any time specia! nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)

PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)

PECO Energy Company, pursuant to the Act and 10 CFR Parts 30,40 and 70 to receive, possess and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or when associated with radioactive apparatus or components; Page 2