{{#Wiki_filter:April 2, 2021 Mr. Bob Franssen, Vice President Entergy Operations, Inc.
{{#Wiki_filter:}}
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
 
==SUBJECT:==
 
==SUMMARY==
OF PUBLIC MEETING WITH ENTERGY OPERATIONS, INC.
 
==Dear Mr. Franssen:==
 
This refers to the virtual public meeting conducted on March 31, 2021, between the Nuclear Regulatory Commission (NRC) and your staff. Approximately 60 people attended the public meeting, including members of the general public, with representatives from the several state and local government organizations.
During the meeting, the NRC presented the results of the annual assessment of safety performance at Grand Gulf Nuclear Station for the period of January 1 through December 31, 2020, as documented in NRC Inspection Report 05000416/2020006, issued March 3, 2021, (ADAMS Accession No. ML21055A008). Your staff presented the stations perspective regarding the issues that contributed to the stations performance in the Degraded Performance Column (Column 3) of the NRCs Reactor Oversight Process (ROP) Action Matrix. During the public question-and-answer portion of the meeting, there were questions from the public regarding actions necessary for the station to be re-assessed into Column 1 of the ROP Action Matrix, the stations previous power uprate license amendment, and the testing of plant equipment.
A copy of the NRCs presentation, Entergys presentation, and an attendance list from the meeting are provided as Enclosures to this letter.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter and its enclosures will be made available electronically for public inspection in the NRCs Public Document Room or the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
                                              /RA/
Jason W. Kozal, Chief Project Branch C Division of Reactor Projects Docket No. 50-416 License No. NPF-29
 
==Enclosures:==
: 1. NRC Presentation
: 2. Entergy Presentation
: 3. Attendance List cc: Electronic Distribution for Grand Gulf
 
ML21092A154 SUNSI Review              ADAMS        Publicly Available      Non-Sensitive Keyword:
By: CHY                      Yes  No    Non-Publicly Available  Sensitive    NRC-002 OFFICE        SPE:DRP/C    BC:DRP/C NAME          CYoung        JKozal SIGNATURE      CHY          JWK DATE          4/1/21        4/2/21 Welcome!
The meeting will begin shortly.                          2020 Annual Performance To hear the audio portion of this                                              Assessment presentation, dial 888-790-3252 and enter participant code 5338120#                  Grand Gulf Nuclear Station (GGNS)
Video display - use the Webex "Layout"                      U.S Nuclear Regulatory Commission - Region IV button to select the "side by side" view to                                                March 31, 2021 most easily view the presenter 1  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 1 1                                                  2 Agenda
* Introductions
* COVID-19 Impacts on NRC Oversight
* Regulatory Process Overview
* Grand Gulf Performance Assessment
* Entergy Response
* NRC Closing Comments                                                              FACILITATOR Frances Ramirez
* Q&A                                                              Senior Reactor Inspector, Region IV 3  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 4 3                                                  4 1
 
NRC Representatives Scott Morris                          Michael Hay                      Jason Kozal Regional                        Deputy Director,                        Chief, PRESENTER                                                                      Administrator,                          Division of                        Projects Matt Thomas                                                                    Region IV                      Reactor Projects                        Branch C Resident Inspector, Grand Gulf Nuclear Station To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  5    To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  6 5                                                                                                          6 NRC Opening Remarks Grand Gulf Nuclear Station
 
===Introductions===
Bob Franssen GGNS Site Vice President, Scott Morris Entergy Operations Inc.                                                                                          Regional Administrator, Region IV To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 7    To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 8 7                                                                                                          8 2
 
NRC Mission Statement Grand Gulf Nuclear Station
* The NRC licenses and regulates the 2020 Annual Assessment Meeting                                                                          nation's civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety and to promote the common defense and security and to protect the environment To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  9  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  10 9                                                                                                          10 NRC Response to COVID-19                                                                              NRC Reactor Oversight Process (ROP)
* NRC continues to monitor licensee operations and maintains the ability to                          The ROP is implemented in each of the four rapidly respond to safety or security-                              NRC regions related events                                                  Involves both inspection and assessment
* Resident Inspectors make less                                      Implemented by regional inspectors and frequent but regular visits to sites                                onsite resident NRC inspectors Includes performance indicators (PIs)
* Residents use remote monitoring submitted by licensees each quarter which when not on site measure the reliability and availability of
* Currently deferring very few                                          plant equipment and processes inspections and plan to complete the baseline by year end To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  11  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  12 11                                                                                                          12 3
 
NRC Reactor Oversight Process (ROP)                                                                        Resident Inspector Program Column I          Column II        Column III  Column IV          Column V
* NRC Resident Inspectors Licensee          Regulatory        Degraded      Multiple /      Unacceptable Response          Response      Performance      Repetitive      Performance                    live in the local communities Degraded Cornerstone                                      and perform inspection activities at all Region IV Nuclear Plants
* NRC Action Matrix
* Licensee Response column is baseline inspection (issues of very low safety significance)
* Increase in number of findings of significance moves licensee to the right in the matrix
* Moving to the right leads to increased NRC Oversight (Supplemental Inspections, higher level engagement with plant management)
To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 13  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 14 13                                                                                                        14 Resident Inspector Program                                                                                Resident Inspector Program
* Provide daily oversight of
* Daily visits to Control Room plant activities
* Periodic meetings with plant senior managers
* Prioritize inspections based on important plant activities To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 15  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 16 15                                                                                                        16 4
 
Region-Based Inspections                                                                    Grand Gulf 2020 Assessment Results
* Personnel in the NRC Region IV office also conduct
* January 1, 2020 - December 31, 2020 inspections.
* Grand Gulf performance preserved public
* Personnel in the Division of Reactor Safety and                                                                    health and safety Division of Nuclear Materials Safety conduct onsite
* The plant is safe to continue operating inspections. Including:
* Grand Gulf is in the NRCs Column 3
                -  Engineering
* The plant is under enhanced NRC oversight
                -  Operator Qualification Examinations due to some performance issues
                -  Radiation Protection
                -  Emergency Planning
                -  Security
                -  Independent Spent Fuel Storage Installations To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  17  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  18 17                                                                                                          18 Industry-wide Performance                                                                                  Grand Gulf 2020 PIs and Findings 100 92
* PIs 90 80 70
                                                                                                                      - 16 Green Performance Indicators 60                                                                                                        - 1 Yellow Performance Indicator 50 40 30
* Violations 20                                                                                                        - 12 Green inspection findings 3          1          0      0              0 10 0                                                                                                        - 2 Severity Level IV violations
                                                                                                                      - 3 Licensee-Identified violations 19                                                                                                          20 19                                                                                                          20 5
 
2020 Yellow Performance Indicator                                        Key 2020 Completed Inspections
* May 25, 2020 scram - inadvertent turbine overspeed trip
* August 8, 2020 manual scram - turbine valve malfunction
* Problem Identification &
* August 24, 2020 scram - reactor feed pump trip
* November 6, 2020 scram - unexpected low generator cooling flow signal Resolution (PI&R)
* December 11, 2020: scram - improper control of generator cooling water
* Traditional Enforcement Trend Inspection
* Entergy Confirmatory Order Inspections 21                                                              22 21                                                                        22 Problem Identification & Resolution                                      Traditional Enforcement Inspection
* In January 2020, the NRC completed the 71152
* IP 92723 - Follow Up Inspection for Three or Biennial PI&R Inspection at Grand Gulf                                    More Severity Level IV Traditional Enforcement
* Overall, the licensees corrective action program                        Violations in the Same Area in a 12-Month met regulatory requirements for nuclear safety                            Period
      - One Green Finding                                                      - April 2019 inspection unable to be completed due to licensee performance gaps
      - Several program deficiencies associated with effectiveness, evaluation, and correction of issues.                    - April 2020 inspection successfully completed
* The NRC plans continued inspection and focus
* NRC continues to monitor the licensees on the licensees corrective action program                              corrective action progress in this area 23                                                              24 23                                                                        24 6
 
Entergy Confirmatory Order                                          Planned Upcoming Inspections
* In November 2017, the NRC issued three
* IP 95002, Yellow Unplanned apparent violations involving willfulness at GGNS                      Scrams PI Supplemental
* NRC Confirmatory Order issued in March 2018                            Inspection
      - Contained fleet-wide corrective actions for Entergy to address willful issues at all their sites
* IP 92702, Confirmatory Order
* The NRC conducted follow-up inspections under                          Inspection IP 92702 to review Confirmatory Order actions
* IP 71003, Post- Approval Site
      - January 2019 and January 2020 inspections                          Inspection for License Renewal
      - A third inspection is planned for a later date
* IP 71152, Problem Identification and Resolution Inspection 25                                                                                                        26 25                                                                26 NRC Annual Assessment Summary Grand Gulf Nuclear Station                                          The End-of-Cycle letter for 2020 for Grand Gulf Nuclear Station is located at this link:
Response                                            Open ADAMS Package (2020 Grand Gulf Annual Assessment Letter)
Bob Franssen GGNS Site Vice President, Entergy Operations Inc.
27  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  28 27                                                                28 7
 
NRC Social Media                                                                                    Contacting the NRC
* Report an emergency
                                                                                                                      - (301) 816-5100 (call collect)
* Twitter: https://twitter.com/nrcgov
* Report a safety concern
* Facebook: https://www.facebook.com/nrcgov
* YouTube: https://www.youtube.com/user/NRCgov
                                                                                                                      - (800) 695-7403
* Flickr: https://www.flickr.com/photos/nrcgov/sets                                                            - Allegation@nrc.gov
* LinkedIn: https://www.linkedin.com/company/usnuclearregulatorycommission
* GovDelivery: https://service.govdelivery.com/accounts/USNRC/subscriber/new
* General information or questions
                                                                                                                      - www.nrc.gov
                                                                                                                      - Select What We Do for Public Affairs To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  29  To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#  30 29                                                                                                          30 Q&A Members of the public are invited to participate in this NRC Closing Remarks                                                                      meeting after the formal presentation. Signal the phone bridge moderator by pressing *1 if you want to ask a question.
If we were not able to answer your question, submit an E-mail to the NRC to Patricia.Vossmar@nrc.gov or Jason.Kozal@nrc.gov .
Scott Morris Regional Administrator, Region IV To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120#
To hear the audio portion of this presentation, dial 888-790-3252 and enter participant code 5338120# 31 31                                                                                                          32 8
 
01/04/2021 1                                        2 Gr and Gulf Nuclear Station NRC Annual Assessment Meeting Building the Premier Utility We exist to grow a world-class energy business that creates sustainable value for our four stakeholders - customers, employees, communities and owners.
1                                        2 3                                          4 Unplanned Shutdowns Opening                                    Grand Gulf experienced five unplanned shutdowns in 2020. These shutdowns occurred following our Comments                                  Spring, 2020 refueling outage.
The 2020 refueling outage was highlighted by a major modification to the stations Turbine Control System -
intended to bring long-term and improved performance to the site.
3                                        4
 
01/04/2021 5                                                                      6 Response                                                                Sustainable Improvements Improvement milestones have been developed featuring Benchmarks Dedicated Entergy leadership                                            Ongoing commitments External resources with relevant experience                              Commitment to safe operation Rigorous oversight structure                                            Commitment to the community Commitment to the environment 5                                                                      6 7
Thank you Building the Premier Utility 7
 
GG 2020 EOC Meeting Attendance:
Bill Maier        NRC Bob Franssen      Entergy Cale Young        NRC David Crockett    NRC Frances Ramirez    NRC Jaime Rodriguez    NRC Jason Kozal        NRC Matt Thomas        NRC Mike Hay          NRC Patricia Vossmar  NRC Scott Morris      NRC Victor Dricks      NRC Allison Graves    Entergy Amy Elam          NRC Andrea Jennetta    S&P Global Platts Andrew Sabisch    Entergy Angel Moreno      NRC Bobby Smith        Director of Radiological Health Cliff Acosta      LDEQ Curtis Beckler    Neil David Ortman      FEMA Region Four Dean Tennant      Entergy Doug Dodson        NRC Ed Everett        ANI Eric Carr          PSEG Nuclear Everett Perkins    Certrec Corporation Geoff Miller      NRC Gustin Bryan      NRC J.Brad Edwards    Cooperative Energy James Snyder      Nuclear Energy Institute Jeff Hardy Jessica Walker    LDQ John Giddens      Entergy John Monninger    NRC Kenneth Chermansky Entergy Lloyd Generette    US EPA Mark Lingenfelter  Public Mark Sullivan      Entergy Mary Lissel        NRC Michael Bowling    Entergy Nathan Brown      NRC Neil Sheeham      NRC Neil Tay          NRC
 
Paul Williams    Public Paul Zaffuts    Zaffuts Group Law Firm Phil Sharpe      Studsdik Ron Rispoli      Entergy Services Russell Thames  Entergy Shakur Walker    NRC MS Emergency Management Shawn Maley      Agency Solange DeSantis Entergy Steve Hillman    Entergy Tim Bebey        NRC Tim Donovan      Utilities Safety Alliance Timothy Stedham  NRC Tom Gardsdale    No Info Tony Nakanishu  NRC Victoria Midland NRC Wesley          Entergy Whitney Hale    Public}}

Revision as of 21:09, 17 January 2022

GG 2020 EOC Public Meeting Summary of Public Meeting with Entergy Operations, Inc
ML21092A154
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/02/2021
From: Jason Kozal
NRC/RGN-IV/DRP
To: Franssen B
Entergy Operations
References
Download: ML21092A154 (15)


Text