{{#Wiki_filter:September 1, 2021
{{#Wiki_filter:
 
==SUBJECT:==
MONTICELLO NUCLEAR GENERATING PLANT - EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000263/2021501
 
==Dear Mr. Conboy:==
On August 12, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Monticello Nuclear Generating Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
 
No findings or violations of more than minor significance were identified during this inspection.
 
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Sincerely, Signed by Pelke, Patricia on 09/01/21 Patricia J. Pelke, Chief Operations Branch Division of Reactor Safety Docket No. 05000263 License No. DPR-22
 
===Enclosure:===
As stated
 
==Inspection Report==
Docket Number: 05000263 License Number: DPR-22 Report Number: 05000263/2021501 Enterprise Identifier: I-2021-501-0017 Licensee: Northern States Power Company, Minnesota Facility: Monticello Nuclear Generating Plant Location: Monticello, MN Inspection Dates: August 09, 2021 to August 12, 2021 Inspectors: M. Garza, Emergency Preparedness Inspector G. Hansen, Senior Emergency Preparedness Inspector S. Hedger, Emergency Preparedness Inspector P. Zurawski, Senior Resident Inspector Approved By: Patricia J. Pelke, Chief Operations Branch Division of Reactor Safety Enclosure
 
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an emergency preparedness biennial exercise inspection at Monticello Nuclear Generating Plant, in accordance with the Reactor Oversight Process.
 
The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
 
===List of Findings and Violations===
 
No findings or violations of more than minor significance were identified.
 
===Additional Tracking Items===
None.
 
=INSPECTION SCOPES=
 
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
 
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19),inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
 
==REACTOR SAFETY==
 
==71114.01 - Exercise Evaluation==
 
===Inspection Review (IP Section 02.01-02.11) (1 Sample)===
: (1) The inspectors evaluated the Biennial Emergency Plan Exercise on August 10, 2021. The exercise scenario simulated an event at the Monticello Nuclear Generating Plant that initiated with the declaration and notification of a Notice of Unusual Event due to the unplanned loss of Control Room indications for 15 minutes or longer, specifically the loss of all torus level input to control room indicators and plant process computer system (PPCS). The scenario conditions simulated the escalation of the significance of the event, requiring the declaration and notification of an Alert and a Site Area Emergency. The Site Area Emergency was the highest classification level reached, as planned, during the exercise.
 
==71114.08 - Exercise Evaluation Scenario Review==
 
===Inspection Review (IP Section 02.01 - 02.04) (1 Sample)===
: (1) The inspectors reviewed and evaluated the proposed scenario for biennial            emergency plan exercise on July 7,
 
==OTHER ACTIVITIES - BASELINE==
 
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) ===
{{IP sample|IP=IP 71151|count=1}}
: (1) April 01, 2020 through June 30, 2021 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13)
(1 Sample)
: (1) April 01, 2020 through June 30, 2021 EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
: (1) April 01, 2020 through June 30,
 
==INSPECTION RESULTS==
No findings were identified.
 
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
 
On August 12, 2021, the inspectors presented the emergency preparedness biennial exercise inspection results to Thomas Conboy and other members of the licensee staff.
 
=DOCUMENTS REVIEWED=
 
Inspection Type              Designation  Description or Title                                        Revision or
Procedure                                                                                            Date
71114.01  Corrective Action 501000030432 EP Drill - Conflicting Procedural Guidance                  08/06/2019
Documents        501000031629 EP-Drill - CR/TSC Communication Improvement                09/10/2019
501000031654 EP Exercise - Initial Communication with Shift Manager      09/10/2019
501000031678 EP Drill - Unclear Definition of Intact                    09/10/2019
501000031682 EP Drill Team Work with the State EOC                      09/10/2019
501000031692 EP Drill - Offsite Communication Procedures                09/10/2019
501000031700 EP Drill - OSC Briefing Effectiveness                      09/10/2019
501000031710 EP Drill - Rad Protection Surveys                          09/10/2019
501000038380 Emergency Notification Form Auto Population                03/03/2020
501000039354 EP Notification Form Error 3-23-20                          04/02/2020
501000041918 EP Drill- Notification Completion Time                      06/30/2020
501000045279 NUE Follow-up Actions                                      10/08/2020
501000046482 EP Table-Top Drill - Escalation Criteria                    11/17/2020
501000053359 Seals Missing from OSC EP Cabinet                          06/24/2021
501000053609 EP Drill - Procedure May Not Be Adequate                    06/29/2021
Miscellaneous                  Monticello Nuclear Generating Plant Emergency Plan          55
Procedures        A.2-101      Classification of Emergencies                              54
A.2-106      Activation and Operation of the TSC                        43
A.2-107      Activation and Operation of the OSC                        41
A.2-109      Activation and Operations of the Back-up OSC                13
A.2-201      On-Site Protective Action                                  21
A.2-205      Personnel Accountability                                    18
A.2-206      Work Control During Emergencies                            13
A.2-213      Responsibilities of the Emergency Director                  31
A.2-401      Emergency Exposure Control                                  11
A.2-402      On-Site Radiological Monitoring                            10
A.2-501      Communications during an Emergency                          28
A.2-504      Emergency Communicator Duties in the TSC and OSC            25
A.2-801      Responsibilities of the Emergency Manager                  26
A.2-802      Activation and Operation of EOF                            25
71114.08  Miscellaneous                  Monticello Nuclear Generating Plant Emergency Plan Exercise 06/09/2021
Inspection Type          Designation Description or Title                                        Revision or
Procedure                                                                                        Date
Scenario
71151      Miscellaneous            Emergency Response Organization (ERO) Drill Participation    04/01/2020-
Performance Indicator Records                                06/30/2021
Drill and Exercise Participation (DEP) Performance Indicator 04/01/2020-
Records                                                      06/30/2021
Alert Notification System (ANS) Reliability Performance      04/01/2020-
Indicator Records                                            06/30/2021
6
}}
}}

Revision as of 23:04, 16 January 2022

Emergency Preparedness Biennial Exercise Inspection Report 05000263/2021501
ML21242A245
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/01/2021
From: Patricia Pelke
NRC/RGN-III/DRS/OLB
To: Conboy T
Northern States Power Company, Minnesota