IR 05000445/2020410: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 31: Line 31:


Sincerely,
Sincerely,
/RA James R. Larsen Acting for/
/RA James R. Larsen Acting for/  
Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 05000445 and 05000446 License Nos. NPF-87 and NPF-89
 
Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety  
 
Docket Nos. 05000445 and 05000446 License Nos. NPF-87 and NPF-89  


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000445 and 05000446 License Numbers: NPF-87 and NPF-89 Report Numbers: 05000445/2020410 and 05000446/2020410 Enterprise Identifier: I-2020-410-0004 Licensee: Vistra Operations Company LLC Facility: Comanche Peak Nuclear Power Plant Location: Glen Rose, TX Inspection Dates: August 24, 2020 to August 27, 2020 Inspectors: D. Holman, Sr Physical Security Inspector Approved By: Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Enclosure
Docket Numbers:
05000445 and 05000446  
 
License Numbers:
NPF-87 and NPF-89  
 
Report Numbers:
05000445/2020410 and 05000446/2020410  
 
Enterprise Identifier: I-2020-410-0004  
 
Licensee:
Vistra Operations Company LLC  
 
Facility:
Comanche Peak Nuclear Power Plant  
 
Location:
Glen Rose, TX  
 
Inspection Dates:
August 24, 2020 to August 27, 2020  
 
Inspectors:
D. Holman, Sr Physical Security Inspector  
 
Approved By:
Ray L. Kellar, P.E., Chief
Plant Support Branch 1
Division of Reactor Safety  


=SUMMARY=
=SUMMARY=
Line 44: Line 76:


===List of Findings and Violations===
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
No findings or violations of more than minor significance were identified.


Line 56: Line 87:


==SAFEGUARDS==
==SAFEGUARDS==
==71130.02 - Access Control==
==71130.02 - Access Control==
===Access Control (1 Sample)===
===Access Control (1 Sample)===
    (1)
(1)
* Tier I: All Requirements
* Tier I: All Requirements
* Tier II: 6 Requirements (02.08 a-e and g)
* Tier II: 6 Requirements (02.08 a-e and g)
* Tier III: 1 Requirement (02.09)
* Tier III: 1 Requirement (02.09)
==71130.09 - Security Plan Changes==
==71130.09 - Security Plan Changes==
The inspectors evaluated the security plan changes through completion of the following procedure elements:


The inspectors evaluated the security plan changes through completion of the following
===Review Security Plan Changes (IP Section 02.01) (1 Sample)===
 
===procedure elements: Review Security Plan Changes (IP Section 02.01)===
{{IP sample|IP=IP 71130.09|count=1}}
: (1) The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2)since the implementation of this IP.
: (1) The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2)since the implementation of this IP.


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)


===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
===
===
{{IP sample|IP=IP 71151|count=1}}
{{IP sample|IP=IP 71151|count=1}}
The inspector verified performance indicator data listed below:
The inspector verified performance indicator data listed below:
: (1) October 2019 through June
: (1) October 2019 through June
Line 90: Line 122:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation       Description or Title                                         Revision or
Inspection
Procedure                                                                                                  Date
Procedure
71130.02   Corrective Action 2019-007675       Keys in emergency vehicles                                   10/2/19
Type
Documents        2019-008490       Discovered contraband in x-Ray                               11/4/19
Designation
Corrective Action 2020-006290       NRC observation about FAC entry sign                         8/27/20
Description or Title
Documents        2020-006322       NRC observation, exit side PCMs have gaps that can be       8/27/20
Revision or
Resulting from                      circumvented
Date
Inspection        2020-006324       Minor violation of 10 CFR 73.22 protection of safeguards. 8/27/20
71130.02
20-006325       Minor violation for rusted security padlocks not included in 8/27/20
Corrective Action
Documents
2019-007675
Keys in emergency vehicles
10/2/19
2019-008490
Discovered contraband in x-Ray
11/4/19
Corrective Action
Documents
Resulting from
Inspection
20-006290
NRC observation about FAC entry sign
8/27/20
20-006322
NRC observation, exit side PCMs have gaps that can be
circumvented
8/27/20
20-006324
Minor violation of 10 CFR 73.22 protection of safeguards.
8/27/20
20-006325
Minor violation for rusted security padlocks not included in
the maintenance program.
the maintenance program.
20-006327       NRC observation, SFRs lack necessary details                 8/27/20
8/27/20
20-006337       Form SEC-506-12 verbiage does not match verbiage used in     8/27/20
20-006327
NRC observation, SFRs lack necessary details
8/27/20
20-006337
Form SEC-506-12 verbiage does not match verbiage used in
body of procedure.
body of procedure.
20-006360       Minor violation of 10 CFR 73.55(c)(7)(i) security procedures 8/28/20
8/27/20
20-006360
Minor violation of 10 CFR 73.55(c)(7)(i) security procedures
with "should" instead of "shall"
with "should" instead of "shall"
Miscellaneous     Email to Security From:
8/28/20
: [[contact::J. Jurado]], Subject: SFR and IRs                        8/20/20
Miscellaneous
Email to Security
Supervisors
Supervisors
Email to Security From:  
From:  
: [[contact::R. Brock]], Subject: Post 13 Presentation                3/29/18
: [[contact::J. Jurado]], Subject: SFR and IRs
8/20/20
Email to Security
Supervisors
Supervisors
SAS Key Cabinet   10/22/18 to 10/25/18                                         See
From:
Issue/Turn-in Log and                                                         Description
: [[contact::R. Brock]], Subject: Post 13 Presentation
SGI Key          11/17/18 to 11/29/18
3/29/18
SFR 0011-20       Unsatisfactory Job performance                               1/8/20
SAS Key Cabinet
SFR 0020-20       On Duty without all Equipment                               1/13/20
Issue/Turn-in Log
SFR 0145-20       Unsatisfactory Job Performance                               4/26/20
SGI Key
SFR 0146-20       Unsatisfactory Job Performance                               4/26/20
10/22/18 to 10/25/18
SFR 0147-20       Assumed post without duty equipment                         4/26/20
and
SFR 0171-20       For Cause Hold                                               5/7/20
11/17/18 to 11/29/18
SFR 0465-18       SGI Safe                                                     10/25/18
See
Procedures       CPNPP SI 1.0     Common Instructions                                         Revision 41
Description
CPNPP SI 3.11     Key Control                                                 Revision 24
SFR 0011-20
CPNPP SI 3.13     Key Card Control                                             Revision 52
Unsatisfactory Job performance
CPNPP SOP         Unescorted Access Authorization                              Revision 11
1/8/20
SFR 0020-20
On Duty without all Equipment
1/13/20
SFR 0145-20
Unsatisfactory Job Performance
4/26/20
SFR 0146-20
Unsatisfactory Job Performance
4/26/20
SFR 0147-20
Assumed post without duty equipment
4/26/20
SFR 0171-20
For Cause Hold
5/7/20
SFR 0465-18
SGI Safe
10/25/18
Procedures
CPNPP SI 1.0
Common Instructions
Revision 41
CPNPP SI 3.11
Key Control
Revision 24
CPNPP SI 3.13
Key Card Control
Revision 52
CPNPP SOP
SEC-120
SEC-120
Inspection Type       Designation   Description or Title                                   Revision or
Unescorted Access Authorization
Procedure                                                                                  Date
Revision 11
CPNPP SOP     Personnel Identification, Key Card Badge Issuance, and Revision 19
 
SEC-302      Access Control
Inspection
CPNPP SOP     Lock, Key, Password, Combinations and Key Card Badge   Revision 27
Procedure
SEC306        Control System
Type
CPNPP STA-902 Access To CPNPP Site Areas                             Revision 26
Designation
Work Orders 5847504       Monthly Inspection, CPX-SCEQPD-03                     2/4/20
Description or Title
5908056       Monthly Inspection, CPX-SCEQPD-03                     6/22/20
Revision or
5918090       Monthly Inspection, CPX-SCEQPD-03                     7/20/20
Date
6
CPNPP SOP
SEC-302
Personnel Identification, Key Card Badge Issuance, and
Access Control
Revision 19
CPNPP SOP
SEC306
Lock, Key, Password, Combinations and Key Card Badge
Control System
Revision 27
CPNPP STA-902
Access To CPNPP Site Areas
Revision 26
Work Orders
5847504
Monthly Inspection, CPX-SCEQPD-03
2/4/20
5908056
Monthly Inspection, CPX-SCEQPD-03
6/22/20
5918090
Monthly Inspection, CPX-SCEQPD-03
7/20/20
}}
}}

Latest revision as of 13:44, 30 November 2024

Security Baseline Inspection Report 05000445/2020410 and 05000446/2020410
ML20254A349
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/10/2020
From: Ray Kellar
Plant Support Branch-1
To: Peters K
Vistra Operations Company
References
IR 2020410
Download: ML20254A349 (8)


Text

September 10, 2020

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000445/2020410 AND 05000446/2020410

Dear Mr. Peters:

On August 27, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Comanche Peak Nuclear Power Plant. The NRC inspectors discussed the results of this inspection with Mr. T. McCool, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA James R. Larsen Acting for/

Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos. 05000445 and 05000446 License Nos. NPF-87 and NPF-89

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000445 and 05000446

License Numbers:

NPF-87 and NPF-89

Report Numbers:

05000445/2020410 and 05000446/2020410

Enterprise Identifier: I-2020-410-0004

Licensee:

Vistra Operations Company LLC

Facility:

Comanche Peak Nuclear Power Plant

Location:

Glen Rose, TX

Inspection Dates:

August 24, 2020 to August 27, 2020

Inspectors:

D. Holman, Sr Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Comanche Peak Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.02 - Access Control

Access Control (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: 6 Requirements (02.08 a-e and g)
  • Tier III: 1 Requirement (02.09)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2)since the implementation of this IP.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

The inspector verified performance indicator data listed below:

(1) October 2019 through June

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 27, 2020, the inspectors presented the security baseline inspection results to Mr. T. McCool, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

2019-007675

Keys in emergency vehicles

10/2/19

2019-008490

Discovered contraband in x-Ray

11/4/19

Corrective Action

Documents

Resulting from

Inspection

20-006290

NRC observation about FAC entry sign

8/27/20

20-006322

NRC observation, exit side PCMs have gaps that can be

circumvented

8/27/20

20-006324

Minor violation of 10 CFR 73.22 protection of safeguards.

8/27/20

20-006325

Minor violation for rusted security padlocks not included in

the maintenance program.

8/27/20

20-006327

NRC observation, SFRs lack necessary details

8/27/20

20-006337

Form SEC-506-12 verbiage does not match verbiage used in

body of procedure.

8/27/20

20-006360

Minor violation of 10 CFR 73.55(c)(7)(i) security procedures

with "should" instead of "shall"

8/28/20

Miscellaneous

Email to Security

Supervisors

From:

J. Jurado, Subject: SFR and IRs

8/20/20

Email to Security

Supervisors

From:

R. Brock, Subject: Post 13 Presentation

3/29/18

SAS Key Cabinet

Issue/Turn-in Log

SGI Key

10/22/18 to 10/25/18

and

11/17/18 to 11/29/18

See

Description

SFR 0011-20

Unsatisfactory Job performance

1/8/20

SFR 0020-20

On Duty without all Equipment

1/13/20

SFR 0145-20

Unsatisfactory Job Performance

4/26/20

SFR 0146-20

Unsatisfactory Job Performance

4/26/20

SFR 0147-20

Assumed post without duty equipment

4/26/20

SFR 0171-20

For Cause Hold

5/7/20

SFR 0465-18

SGI Safe

10/25/18

Procedures

CPNPP SI 1.0

Common Instructions

Revision 41

CPNPP SI 3.11

Key Control

Revision 24

CPNPP SI 3.13

Key Card Control

Revision 52

CPNPP SOP

SEC-120

Unescorted Access Authorization

Revision 11

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CPNPP SOP

SEC-302

Personnel Identification, Key Card Badge Issuance, and

Access Control

Revision 19

CPNPP SOP

SEC306

Lock, Key, Password, Combinations and Key Card Badge

Control System

Revision 27

CPNPP STA-902

Access To CPNPP Site Areas

Revision 26

Work Orders

5847504

Monthly Inspection, CPX-SCEQPD-03

2/4/20

5908056

Monthly Inspection, CPX-SCEQPD-03

6/22/20

5918090

Monthly Inspection, CPX-SCEQPD-03

7/20/20