ML20236U838: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 20: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter:__________ ___-____ - ______ _ _ _ _ _ - | {{#Wiki_filter:__________ ___-____ - ______ _ _ _ _ _ - | ||
Mr. Micha l J. M;isnfr, Prrsid:nt | Mr. Micha l J. M;isnfr, Prrsid:nt July 24, 1998 l | ||
i | |||
. M-ina Ycnka At:mic P wir Ccmptny P.O. Box 408 Wiscasset, Maine 04578 e | |||
1 | |||
==Dear Mr. Meisner:== | ==Dear Mr. Meisner:== | ||
==SUBJECT:== | ==SUBJECT:== | ||
APPROVAL OF PROPOSED REVISION 14.TO THE MAINE YANKEE ATOMIC POWER STATION'S (OPERATIONAL) QUALITY' ASSURANCE PROGRAM (TAC NO. MA1078) | APPROVAL OF PROPOSED REVISION 14.TO THE MAINE YANKEE ATOMIC POWER STATION'S (OPERATIONAL) QUALITY' ASSURANCE PROGRAM (TAC NO. MA1078) | ||
| Line 33: | Line 32: | ||
If you have any questions regarding this matter, please feel free to contact me at (301) 415-1347. | If you have any questions regarding this matter, please feel free to contact me at (301) 415-1347. | ||
Sincerely, ORIGINAL SIGNED BY: | Sincerely, ORIGINAL SIGNED BY: | ||
Michael K. Webb, Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Docket No. 50-309 | Michael K. Webb, Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Ill Docket No. 50-309 i' | ||
==Enclosure:== | ==Enclosure:== | ||
As stated | As stated | ||
\\Ya | |||
;o*';ao'o:";e: | |||
HARD COPY | E EEF G G DISTRIBUTION: | ||
SBlack | HARD COPY E-MAIL COPY Docket File 50-309 PUBLIC RBurrows RDudley OGC SWeiss MFairtile TFredrichs JRoe Region i PHarris AMarkley MMasnik MWebb JMinns LThonus PDND r/f EHylton LWheeler SBlack 4 | ||
4 | PDND:PM PD. | ||
LA PDND:(A)SC HC.MB D: | |||
PDND:PM | ~ | ||
MWebbw | hj/&/98Masnikp SBlach SWeiss MWebbw E | ||
( | n 7 /F/98 | ||
'[M /98 | |||
( | |||
/g98 | |||
} $98 OFFICIAL RECO COPY DOCUMENT NAME: G:\\SECY\\WEBB\\MYMA1078.LTR 9807310106 980724 PDR ADOCK 05000309 H | |||
PDR | |||
Mr. Micht:;l J. M:isn:r, Prssid:nt | Mr. Micht:;l J. M:isn:r, Prssid:nt July 24, 1998 M:ina Yanken Atomic Powar Company P.O. Box 408 Wiscasset, Maine 04578 | ||
==Dear Mr. Meisner:== | ==Dear Mr. Meisner:== | ||
| Line 55: | Line 57: | ||
==SUBJECT:== | ==SUBJECT:== | ||
APPROVAL OF PROPOSED REVISION 14 TO THE MAINE YANKEE ATOMIC POWER STATION'S.(OPERATIONAL) QUALITY ASSURANCE PROGRAM | APPROVAL OF PROPOSED REVISION 14 TO THE MAINE YANKEE ATOMIC POWER STATION'S.(OPERATIONAL) QUALITY ASSURANCE PROGRAM | ||
{ | |||
(TAC NO. MA1078) | (TAC NO. MA1078) | ||
By {{letter dated|date=January 28, 1998|text=letter dated January 28,1998}}, Maine Yankee Atomic Power Company transmitted Revisions 12.13, and 14 of the Maine Yankee (Operational) Quality Assurance Program (OOAP). Revisions 12 and 13 to the OQAP were submitted as periodic updates pursuant to 10 CFR 50.71(e)(4). Revision 14 was subn. rued in accordance with the requiremerits of | By {{letter dated|date=January 28, 1998|text=letter dated January 28,1998}}, Maine Yankee Atomic Power Company transmitted Revisions 12.13, and 14 of the Maine Yankee (Operational) Quality Assurance Program (OOAP). Revisions 12 and 13 to the OQAP were submitted as periodic updates pursuant to 10 CFR 50.71(e)(4). Revision 14 was subn. rued in accordance with the requiremerits of | ||
~10 CFR 50.54(a)(3) as reflecting changes that reduced commitments in the OOAP description previously approved by the NRC. As a result of requests for additional information by the NRC staff, you amended your original submittal via correspondence dated April 13,1998, and May 26,1998. | |||
The enclosed safety evaluation (SE) documents the bases for our conclusion that the reductions in commitments you identified in Revision 14 to the OOAP are consistent with the requirements of Appendix B to 10 CFR Part 50 for a decommissioning facility and are, therefore, acceptable. | The enclosed safety evaluation (SE) documents the bases for our conclusion that the reductions in commitments you identified in Revision 14 to the OOAP are consistent with the requirements of Appendix B to 10 CFR Part 50 for a decommissioning facility and are, therefore, acceptable. | ||
If you have any questions regarding this matter, please feel free to contact me at (301) 415-1347. | If you have any questions regarding this matter, please feel free to contact me at (301) 415-1347. | ||
| Line 67: | Line 70: | ||
As stated cc w/ enclosure: | As stated cc w/ enclosure: | ||
See next page DISTRIBUTION: | See next page DISTRIBUTION: | ||
HARD COPY | HARD COPY E-MAIL COPY Docket File 50-309 PUBLIC RBurrows RDudley OGC SWeiss MFairtile TFredrichs JRoe Region i PHarris AMarkley MMasnik MWebb JMinns LThonus l | ||
MMasnik | . PDND r/f EHylton LWheeler l | ||
MWe'ab w | SBlack 7 | ||
PDND:(A)SC HOMB D: | |||
PDND:PM PD M LA hgMasnikp SBlach SWeiss MWe'ab w E | |||
on 7 /d/98 | |||
/t /98 | |||
//d/98 | |||
/g98 | |||
} /$98 l | |||
OFFICIAL RECO D COPY DOCUMENT NAME: G:\\SECY\\ WEB 8\\MYMA1078.LTR | |||
p urg 4 | p urg 4 | ||
o p | |||
-d UNITED STATES 3 | |||
WASHINGTON. D.C. 20565 4001 July 24, 1998 | j. | ||
. NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20565 4001 | |||
\\,,, / | |||
July 24, 1998 | |||
' Mr. Michael J. Meisner, President | |||
' Maine Yankee Atomic Power Company P.O. Box 408 Wiscasset, Maine 04578 | |||
==Dear Mr. Meisner:== | ==Dear Mr. Meisner:== | ||
==SUBJECT:== | ==SUBJECT:== | ||
APPROVAL OF PROPOSED REVISION 14 TO THE MAINE YANKEE ATOMIC POWER STATION'S (OPERATIONAL) QUALITY ASSURANCE PROGRAM (TAC NO. MA1078) | APPROVAL OF PROPOSED REVISION 14 TO THE MAINE YANKEE ATOMIC POWER STATION'S (OPERATIONAL) QUALITY ASSURANCE PROGRAM (TAC NO. MA1078) | ||
| Line 86: | Line 99: | ||
If you have any questior.s iegarding this matter, please feel free to contact me at (301) 415-1347. | If you have any questior.s iegarding this matter, please feel free to contact me at (301) 415-1347. | ||
Sincerely, y%.O WZijJ& | Sincerely, y%.O WZijJ& | ||
Michael K. Webb, Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of lleactor Program Management Office of Nuclear cleactor Regulation Docket No. 50-309 l | Michael K. Webb, Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of lleactor Program Management Office of Nuclear cleactor Regulation Docket No. 50-309 l | ||
==Enclosure:== | ==Enclosure:== | ||
| Line 93: | Line 106: | ||
c | c | ||
Maine Yankee Atomic Power Station Docket No. 50-309 cc: | |||
- Mr. Charles B. Brinkman Friends of the Coast Manager - Washington Nuclear P.O. Box 98 Operations Edgecomb, ME. 04556 ABB Combustion Engineering 12300 Twinbrook Parkway, Suite 330 Mr. William O' Dell Rockville, MD 20852 Operations Director Maine Yankee Atomic Power Company Thomas G. Dignan, Jr., Esquire P.O. Box 408 i | |||
ABB Combustion Engineering 12300 Twinbrook Parkway, Suite 330 | Ropes & Gray Wiscasset, ME 04578 j | ||
One International Place Boston, MA 02110-2624 Mr. George Zinke, Director | |||
~ | |||
Nuclear Safety and Regulatory Affairs Mr. Uldis Vanags | Nuclear Safety and Regulatory Affairs Mr. Uldis Vanags Maine Yankee Atomic Power Company State Nuclear Safety Advisor-P.O. Box 408 | ||
-State Planning Office Wiscasset, ME 04578 | |||
- State House Station #38 Augusta, ME 04333 Mr. Jonathan M. Block Attorney at Law Mr. P. L. Anderson, Project Manager P.O. Box 503 Yankee Atomic Electric Company Putney, VT 05346-0566 580 Main Street i | |||
Augusta, ME 04333 | Bolton, MA 01740-1398 WIr. Michael J. Meisner, President Main Yankee Atomic Power Company Regional Administrator, Region i P.O. Box 408 U.S. Nuclear Regulatory Commission Wiscasset, ME 04578 475 Allendale Road King of Prussia, PA 19406 Mr. Robert Fraser, Director Engineering | ||
' First Selectman of Wiscasset Maine Yankee Atomic Power Company Municipal Building P.O. Box 408 U.S. Route 1 Wiscasset, ME 04578 Wiscasset, ME 04578 Mr. Patrick J. Dostie Mr. Richard Rasmussen State of Maine Nuclear Gafety Senior Resident inspector Inspector- | |||
. Maine Yankee Atomic Power Company Maine Yankee Atomic Pour Company U.S. Nuclear Regulatory Commission P.O. Box 408 P.O. Box E Wiscasset, ME 04578 Wiscasset, ME - 04578 Mr. Mark Ferri Mary Ann Lynch, Esquire Decommissioning Director Maine Yankee Atomic Power Company Maine Yankee Atomic Power Company | |||
- P.O. Box 408 P.O. Box 408 i | |||
Wiscasset, ME 04578 Wiscasset, ME 04578 u_}} | |||
Latest revision as of 20:13, 2 December 2024
| ML20236U838 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 07/24/1998 |
| From: | Michael Webb NRC (Affiliation Not Assigned) |
| To: | Meisner M Maine Yankee |
| Shared Package | |
| ML20236U840 | List: |
| References | |
| TAC-MA1078, NUDOCS 9807310106 | |
| Download: ML20236U838 (4) | |
Text
__________ ___-____ - ______ _ _ _ _ _ -
Mr. Micha l J. M;isnfr, Prrsid:nt July 24, 1998 l
i
. M-ina Ycnka At:mic P wir Ccmptny P.O. Box 408 Wiscasset, Maine 04578 e
1
Dear Mr. Meisner:
SUBJECT:
APPROVAL OF PROPOSED REVISION 14.TO THE MAINE YANKEE ATOMIC POWER STATION'S (OPERATIONAL) QUALITY' ASSURANCE PROGRAM (TAC NO. MA1078)
By letter o sted January 28,1998, Maine Yankee Atomic Power Company transmitted Revisions 12,13, and 14 of the Maine Yankee (Operational) Quality Assurance Program (OOAP). Revisions 12 and 13 to the OQAP were submitted as periodic updates pursuant to 10 CFR 50.71(e)(4). Revision 14.was submitted in accordance with the requirements of 10 CFR 50.54(a)(3) as reflecting changes that reduced commitments in the OOAP description previously approved by the NRC. As a result of requests for additional information by the NRC staff, you amended your original submittal via correspondence dated April 13,1998, and May 26,1998.
The enclosed safety evaluation (SE) documents the bases for our conclusion that the reductions in commitments you identified in Revision 14 to the OQAP are consistent with the requirements of Appendix B to 10 CFR Part 50 for a decommissioning facility and are, therefore, acceptable.
If you have any questions regarding this matter, please feel free to contact me at (301) 415-1347.
Sincerely, ORIGINAL SIGNED BY:
Michael K. Webb, Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Ill Docket No. 50-309 i'
Enclosure:
As stated
\\Ya
- o*';ao'o
- ";e:
E EEF G G DISTRIBUTION:
HARD COPY E-MAIL COPY Docket File 50-309 PUBLIC RBurrows RDudley OGC SWeiss MFairtile TFredrichs JRoe Region i PHarris AMarkley MMasnik MWebb JMinns LThonus PDND r/f EHylton LWheeler SBlack 4
PDND:PM PD.
LA PDND:(A)SC HC.MB D:
~
hj/&/98Masnikp SBlach SWeiss MWebbw E
n 7 /F/98
'[M /98
(
/g98
} $98 OFFICIAL RECO COPY DOCUMENT NAME: G:\\SECY\\WEBB\\MYMA1078.LTR 9807310106 980724 PDR ADOCK 05000309 H
Mr. Micht:;l J. M:isn:r, Prssid:nt July 24, 1998 M:ina Yanken Atomic Powar Company P.O. Box 408 Wiscasset, Maine 04578
Dear Mr. Meisner:
I
SUBJECT:
APPROVAL OF PROPOSED REVISION 14 TO THE MAINE YANKEE ATOMIC POWER STATION'S.(OPERATIONAL) QUALITY ASSURANCE PROGRAM
{
By letter dated January 28,1998, Maine Yankee Atomic Power Company transmitted Revisions 12.13, and 14 of the Maine Yankee (Operational) Quality Assurance Program (OOAP). Revisions 12 and 13 to the OQAP were submitted as periodic updates pursuant to 10 CFR 50.71(e)(4). Revision 14 was subn. rued in accordance with the requiremerits of
~10 CFR 50.54(a)(3) as reflecting changes that reduced commitments in the OOAP description previously approved by the NRC. As a result of requests for additional information by the NRC staff, you amended your original submittal via correspondence dated April 13,1998, and May 26,1998.
The enclosed safety evaluation (SE) documents the bases for our conclusion that the reductions in commitments you identified in Revision 14 to the OOAP are consistent with the requirements of Appendix B to 10 CFR Part 50 for a decommissioning facility and are, therefore, acceptable.
If you have any questions regarding this matter, please feel free to contact me at (301) 415-1347.
Sincerely, ORIGINAL SIGNED BY:
Michael K. Webb, Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-309
Enclosure:
As stated cc w/ enclosure:
See next page DISTRIBUTION:
HARD COPY E-MAIL COPY Docket File 50-309 PUBLIC RBurrows RDudley OGC SWeiss MFairtile TFredrichs JRoe Region i PHarris AMarkley MMasnik MWebb JMinns LThonus l
. PDND r/f EHylton LWheeler l
SBlack 7
PDND:(A)SC HOMB D:
PDND:PM PD M LA hgMasnikp SBlach SWeiss MWe'ab w E
on 7 /d/98
/t /98
//d/98
/g98
} /$98 l
OFFICIAL RECO D COPY DOCUMENT NAME: G:\\SECY\\ WEB 8\\MYMA1078.LTR
p urg 4
o p
-d UNITED STATES 3
j.
. NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20565 4001
\\,,, /
July 24, 1998
' Mr. Michael J. Meisner, President
' Maine Yankee Atomic Power Company P.O. Box 408 Wiscasset, Maine 04578
Dear Mr. Meisner:
SUBJECT:
APPROVAL OF PROPOSED REVISION 14 TO THE MAINE YANKEE ATOMIC POWER STATION'S (OPERATIONAL) QUALITY ASSURANCE PROGRAM (TAC NO. MA1078)
By letter dated January 28,1998, Maine Yankee Atomic Power Company transmitted Revisions 12,13, and 14 of the Maine Yankee (Operational) Quality Assurance Program (OQAP). Revisions 12 and 13 to the OQAP were submitted as periodic updates pursuant to 10 CFR 50.71(e)(4). Revision 14 was submitted in accordance with the requirements of 10 CFR 50.54(a)(3) as reflecting changes that reduced commitments in the OQAP description previously approved by the NRC. As a result of requests for additional information by the NRC staff, you amended your original submittal via correspondence dated April 13,1998, and May 26,1998.
The enclosed safety evaluation (SE) documents the bases for our conclusion that the reductions in commitments you identified in Revision 14 to the OQAP are consistent with the requirements of Appendix B to 10 CFR Part 50 for a decommissioning facility and are, therefore, acceptable.
If you have any questior.s iegarding this matter, please feel free to contact me at (301) 415-1347.
Sincerely, y%.O WZijJ&
Michael K. Webb, Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of lleactor Program Management Office of Nuclear cleactor Regulation Docket No. 50-309 l
Enclosure:
As stated cc w/ enclosure:
See next page l
c
Maine Yankee Atomic Power Station Docket No. 50-309 cc:
- Mr. Charles B. Brinkman Friends of the Coast Manager - Washington Nuclear P.O. Box 98 Operations Edgecomb, ME. 04556 ABB Combustion Engineering 12300 Twinbrook Parkway, Suite 330 Mr. William O' Dell Rockville, MD 20852 Operations Director Maine Yankee Atomic Power Company Thomas G. Dignan, Jr., Esquire P.O. Box 408 i
Ropes & Gray Wiscasset, ME 04578 j
One International Place Boston, MA 02110-2624 Mr. George Zinke, Director
~
Nuclear Safety and Regulatory Affairs Mr. Uldis Vanags Maine Yankee Atomic Power Company State Nuclear Safety Advisor-P.O. Box 408
-State Planning Office Wiscasset, ME 04578
- State House Station #38 Augusta, ME 04333 Mr. Jonathan M. Block Attorney at Law Mr. P. L. Anderson, Project Manager P.O. Box 503 Yankee Atomic Electric Company Putney, VT 05346-0566 580 Main Street i
Bolton, MA 01740-1398 WIr. Michael J. Meisner, President Main Yankee Atomic Power Company Regional Administrator, Region i P.O. Box 408 U.S. Nuclear Regulatory Commission Wiscasset, ME 04578 475 Allendale Road King of Prussia, PA 19406 Mr. Robert Fraser, Director Engineering
' First Selectman of Wiscasset Maine Yankee Atomic Power Company Municipal Building P.O. Box 408 U.S. Route 1 Wiscasset, ME 04578 Wiscasset, ME 04578 Mr. Patrick J. Dostie Mr. Richard Rasmussen State of Maine Nuclear Gafety Senior Resident inspector Inspector-
. Maine Yankee Atomic Power Company Maine Yankee Atomic Pour Company U.S. Nuclear Regulatory Commission P.O. Box 408 P.O. Box E Wiscasset, ME 04578 Wiscasset, ME - 04578 Mr. Mark Ferri Mary Ann Lynch, Esquire Decommissioning Director Maine Yankee Atomic Power Company Maine Yankee Atomic Power Company
- P.O. Box 408 P.O. Box 408 i
Wiscasset, ME 04578 Wiscasset, ME 04578 u_