Once: (315)34H907 sereweepaa,ntand                                                                                Fac (315)M1321 ChiefNudsaroscer                                                                                easi: muelerjennomm April 24,1998 3                                                                                                      NMP2L 1773 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:                        Nine Mile Point Unit 2 Docket No. 50-410 NPF-69 Gentlemen:
Once: (315)34H907 sereweepaa,ntand                                                                                Fac (315)M1321 ChiefNudsaroscer                                                                                easi: muelerjennomm April 24,1998 3                                                                                                      NMP2L 1773 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:                        Nine Mile Point Unit 2 Docket No. 50-410 NPF-69 Gentlemen:
Niagara Mohawk Power Corporation's (NMPC) letter dated December 15,1997 (NMP2L 1740), submitted a proposed change to' the Technical Specifications (TS) set forth in Appendix A to the above mentioned license. The proposed change revises the Safety Limit Minimum Critical Power Ratio (MCPR) to reflect the cycle specific operating limits.
Niagara Mohawk Power Corporation's (NMPC) {{letter dated|date=December 15, 1997|text=letter dated December 15,1997}} (NMP2L 1740), submitted a proposed change to' the Technical Specifications (TS) set forth in Appendix A to the above mentioned license. The proposed change revises the Safety Limit Minimum Critical Power Ratio (MCPR) to reflect the cycle specific operating limits.
A telephone conference was held between NMPC and the NRC Staff on March 24,1998, which resulted in the addition of a footnote to the respective TS pages. Attachment A to this-letter submits revised pages 2-1, 3/4 4-1, and B2-1 to replace the previously submitted pages 2-1,3/4 4-1, ana B2-1 that were contained within Attachment A of the December 15, 1997 submittal. Attachment B to this letter provides a marked up copy of the revised pages 2-1, 3/4 4-1, and B2-1 to replace the marked-up copy of pages 2-1, 3/4 4-1, and B2-1 included in Attachment C of the December 15,1997 submittal. The revised pages add a footnote to the TS and TS Bases stating that the Safety Limit MCPR values are applicable to Cycle 7 operat'on only.
A telephone conference was held between NMPC and the NRC Staff on March 24,1998, which resulted in the addition of a footnote to the respective TS pages. Attachment A to this-letter submits revised pages 2-1, 3/4 4-1, and B2-1 to replace the previously submitted pages 2-1,3/4 4-1, ana B2-1 that were contained within Attachment A of the December 15, 1997 submittal. Attachment B to this letter provides a marked up copy of the revised pages 2-1, 3/4 4-1, and B2-1 to replace the marked-up copy of pages 2-1, 3/4 4-1, and B2-1 included in Attachment C of the December 15,1997 submittal. The revised pages add a footnote to the TS and TS Bases stating that the Safety Limit MCPR values are applicable to Cycle 7 operat'on only.
The added footnote is an administrative change to the TS and TS Jases and does not impact the conclusions of the no significant hazards consideration included in the December 15, 1997 submittal. Therefore, a revised no significant hazards consideration is not required and is not included with this submittal.
The added footnote is an administrative change to the TS and TS Jases and does not impact the conclusions of the no significant hazards consideration included in the December 15, 1997 submittal. Therefore, a revised no significant hazards consideration is not required and is not included with this submittal.

Revision as of 22:19, 20 March 2021

Forwards Revised Pages 2-1,3/4 4-1 & B2-1 to Replace Previously Submitted Pages Contained in Attachment a to 971215 Proposed Change to TS for License NPF-49
ML20217N783
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/24/1998
From: Mueller J
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217N786 List:
References
NMP2L-1773, NUDOCS 9805050431
Download: ML20217N783 (2)


Text

. _ - _ _ _ _ _ _ _ _ _ _ - _ .

N.i.noaraMohawk a

JohnH.Mueller , .

Once: (315)34H907 sereweepaa,ntand Fac (315)M1321 ChiefNudsaroscer easi: muelerjennomm April 24,1998 3 NMP2L 1773 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: Nine Mile Point Unit 2 Docket No. 50-410 NPF-69 Gentlemen:

Niagara Mohawk Power Corporation's (NMPC) letter dated December 15,1997 (NMP2L 1740), submitted a proposed change to' the Technical Specifications (TS) set forth in Appendix A to the above mentioned license. The proposed change revises the Safety Limit Minimum Critical Power Ratio (MCPR) to reflect the cycle specific operating limits.

A telephone conference was held between NMPC and the NRC Staff on March 24,1998, which resulted in the addition of a footnote to the respective TS pages. Attachment A to this-letter submits revised pages 2-1, 3/4 4-1, and B2-1 to replace the previously submitted pages 2-1,3/4 4-1, ana B2-1 that were contained within Attachment A of the December 15, 1997 submittal. Attachment B to this letter provides a marked up copy of the revised pages 2-1, 3/4 4-1, and B2-1 to replace the marked-up copy of pages 2-1, 3/4 4-1, and B2-1 included in Attachment C of the December 15,1997 submittal. The revised pages add a footnote to the TS and TS Bases stating that the Safety Limit MCPR values are applicable to Cycle 7 operat'on only.

The added footnote is an administrative change to the TS and TS Jases and does not impact the conclusions of the no significant hazards consideration included in the December 15, 1997 submittal. Therefore, a revised no significant hazards consideration is not required and is not included with this submittal.

Sincerely, 9805050431 980424 John H. Mueller f " 080NU l

L Chief Nuclear Officer l

JHM/TWP/Imc q Attachments y Nine Mile Point Nudear Station. P.O. Box 63. Lycoming, New York 13093 www.rdmo.com I

Page 2 xc: - Mr. H. J. Miller, Regional Administrator, Region I-Mr. S. S. Bajwa,-Director, Project Directorate I-1, NRR. 9 Mr. B. S. Norris, Senior Resident Inspector Mr. D. S. Hood,, Senior Project Manager, NRR Mr. J.- P. Spath' v NYSERDA 286 Washington Avenue Ext.